Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, - 700053 Form – I Developer – Merlin Projects Limited

FORM-I (I) Basic Information

Sl. Item Details No. 1. Name of the projects/s Proposed Residential Complex by Merlin Projects Limited. 2. S. No. in the schedule 8(a) 3. Proposed capacity / area / length / tonnage to be The proposed project is development of a handled / command area / lease area / number of residential complex comprising of three residential wells to be drilled towers and a podium to be developed by Merlin Projects Limited. Area of the land is 9061.74 sq.m. Few sheds and trees exist within the site. Landuse of the project site is bastu. The 3 residential towers will be Basement + Ground + 12 storied and podium will be Basement + Ground storied, total numbers of residential flats will be 180. Total construction area of the proposed development is 28,687.54 sq.m. The development will be residential. 4. New / Expansion / Modernization New 5. Existing Capacity Nil 6. Category of Project i.e. ‘A’ or ‘B’ B 7. Does it attract the general condition? If yes, please No specify 8. Does it attract the specific condition? If yes, please No specify 9. Location Plot / Survey / Kharsa No. Holding No. - 24 (old – 112), Basantalal Saha Road, under Kolkata Municipal Corporation, Ward no. – 117, Borough – XIII, Kolkata - 700053. Village - Tehsil - District Kolkata State 10. Nearest railway station / airport alongwith distance in Railway Station – (901 m),New kms (1 km), (7.9 km), Airport – Netaji Subhas International Airport (18.5 km approx.) 11. Nearest Town, City, District Headquarters alongwith Kolkata Municipal Corporation () distance in kms 12. Village Panchayats, Zilla Parishad, Municipal Kolkata Municipal Corporation (Behala) Corporation, Local Body (complete postal addresses with telephone nos. to be given) 13. Name of the Applicant Merlin Projects Limited 14. Registered Address Merlin Oxford, 2nd Floor, 22, Prince Anwar Shah Road, Kolkata – 700033, West Bengal. P.S. – Charu Market, P.O. - Tollygunge. 15. Address for Correspondence Merlin Oxford, 2nd Floor, 22, Prince Anwar Shah Road, Kolkata – 700033, West Bengal. P.S. – Charu Market, P.O. - Tollygunge. Name Dilip Kumar Choudhary Designation (Owner / Partner / CEO) Director Address Merlin Oxford, 2nd Floor, 22, Prince Anwar Shah Road, Kolkata, West Bengal. P.S. – Charu Market, P.O. - Tollygunge. Pin Code 700033. E – mail [email protected] Telephone No. 033-40154545

1 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

Fax. No. 033-40154500 16. Details of Alternative Sites examined, if any. Location Not Applicable of these sites should be shown on a topo - sheet

17. Interlinked projects No 18. Whether separate application of interlinked project Not Applicable has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval / clearance No under: if yes, details of the same and their status to be give. a) The Forest Conservation Act, 1980? b) The Wildlife Protection Act, 1972? c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Order / Policy The land is owned by Merlin Projects Limited and 7 relevant / relating to the site? others. No government order or policy is related to the project site to the best of knowledge. 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the No project and / or land in which the project is propose to be set up? a) Name of the Court b) Case No. c) Orders / directions of the Court, if any and its relevance with the proposed project.

ƒ Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,)

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, landuse, changes in water bodies, etc.)

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Physically, the project site has few existing structures. landuse, land cover or topography Landuse of the project site is bastu. Thus, landuse of including increase in intensity of proposed project will be compatible with the surroundings. landuse (with respect to local Copies of land documents of the project site are enclosed in landuse plan) Annexure-1.1. 1.2 Clearance of existing land, Yes Project site has few existing structures and trees. Thus, the vegetation and buildings? structures will be demolished. Out of the existing trees, 6 will be retained and 9 will be cut with prior permission from the concerned authority. 1.3 Creation of new landuses? No As stated, the project site landuse is bastu. 1.4 Pre-construction investigations e.g. Yes Necessary soil testing of the project site for assessment of bore houses, soil testing? bearing capacity of the soil has already been conducted in March to April 2016. The derived result of the said testing will act as the guiding factor for the structural design of the project. The sub soil investigation report is given in Annexure 1.4. 1.5 Construction works? Yes The total built up area for the proposed project will be 28,687.54 sq.m. The complex will have 180 residential flats. Total ground coverage after the construction of the project

2 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data will be 3646.66 sq.m. 1.6 Demolition works? Yes As already stated, the project site has few existing structures that will be demolished. 1.7 Temporary sites used for No The project site itself will be used as partial accommodation construction works or housing of for the construction workers. However, majority of the construction workers? construction workers will come from local area. 1.8 Above ground buildings, structures Yes Excavation of foundation and earthwork will be required for or earthworks including linear the backfilling of the proposed construction. structures, cut and fill or excavations? 1.9 Underground works including mining No No underground works are required except construction of a or tunneling? basement, underground reservoirs and other services. 1.10 Reclamation works? No No reclamation work required. 1.11 Dredging? No No Dredging required. 1.12 Offshore structures? No No offshore structures required. 1.13 Production and manufacturing No No production/manufacturing process is involved, as it is a processes? construction project. 1.14 Facilities for storage or goods or Yes Existing sheds will be used for storage of building materials. materials? Around 250 sq.m of area will be identified within the project site. Cement will be separately stored under cover in bales. Sand will be stacked with adequate care. Bricks and steel will be laid in open. No construction materials or waste will be stacked outside the site boundary. 1.15 Facilities for treatment or disposal or Yes Solid Wastes: solid waste or liquid effluents? Solid wastes generated will be 0.519 tonne/day of domestic nature. The wastes will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins. The non-biodegradable wastes will be taken care by K.M.C. and the biodegradable organic part of the wastes will be composted in a mechanical compost plant within site. Liquid Effluent: Liquid Effluent: During the construction phase, construction wastewater will be treated, reused and discharged into the municipal drain. Domestic wastewater will be treated and discharged into K.M.C. drain. During the operation phase also, generated wastewater having volume of 110 kLD which will be treated in STP and reused for toilet flushing and other secondary purposes. Remaining part will be discharged into municipal drain. The domestic wastewater will be collected through vertical stack in building and conveyed to respective disposal points by underground pipes. The underground sewer system will be designed 3 times of the average flow to carry domestic wastewater. 1.16 Facilities for long term housing or No The project is predominantly residential in nature. However, operational workers? during the operational stage, the complex will be accommodating the residents of the apartments with other secondary activities. No long term housing facilities for the operational workers or the commercial area employees will be available. 1.17 New road, rail or sea traffic during No Not Applicable construction or operation? 1.18 New road, rail, air, waterborne or No Not Applicable

3 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No There will not be any requirement for closure or diversion of transport routes or infrastructure existing transport routes along the abutting road due to leading to changes in traffic following reasons: movements? i) No construction material will be stacked outside the project site. ii) The unloading of construction materials will be done according to the instruction of the regulatory authority. 1.20 New or diverted transmission lines or No Not Applicable pipelines? 1.21 Impoundment, damming, culverting, No No Impoundment, damming, culverting, realignment or other realignment or other changes to the changes to the hydrology of surface watercourse is hydrology or watercourses or proposed. aquifers? 1.22 Stream crossings? No No stream of natural watercourse passes through the project site. 1.23 Abstraction or transfers of water from No Required fresh water will be made available by Kolkata ground or surface waters? Municipal Corporation. During the construction phase also, required water is expected to be available from the said source. 1.24 Changes in water bodies or the land No There is no waterbody existing at site. surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes Transport of personnel / material during the construction and for construction, operation or operation phase is envisaged. In the construction phase, decommissioning? movement of few trucks is expected daily. During operational phase, parking space for around 229 cars will be provided. Break up for car parking facilities are as follows: Car Parking Provided: 229 Nos. [Basement = 60, Ground covered = 122, Ground Open = 47] Adequate parking area for service vehicles will also be provided. 1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning or restoration works? 1.28 Influx of people to an area in either Yes Construction workers will be temporarily staying at the temporarily or permanently? project site during the construction period. During operational stage, about 900 persons will be residing in the apartments within the complex. 1.29 Induction of alien species? Yes The landscaping and plantation programme will detail out the exotic as well as native species to be planted within the project site. 1.30 Loss of native species or genetic Yes Project site has 15 existing trees, out of which 9 will be cut, diversity? and the rest will be retained. However, about 127 trees will be planted as a part of the landscape programme. 1.31 Any other actions? No -

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

4 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped or No An area of 9061.74 sqm of land has been chosen for the agricultural land (ha) development of the project. The land is developed.

2.2 Water (expected source & competing Yes Water Reqd. during construction phase = 12 kLD. users) unit: KLD Water Reqd. during operational phase: No. of daily user: Occupancy Type No. of Occupants Residents 900 persons Residential Floating 90 persons Service Staff 30 persons Total Occupants 1020 persons

Break up of Water Consumption: Activity Water Consumption Domestic 138 kLD Car Cleaning 5.0 kLD Internal Road & Pavement 2.0 kLD Cleaning Landscaping 17 kLD Total 162 kLD

Source of Water: Domestic fresh water requirement will be catered by municipality and water requirement for toilet flushing and secondary activities like landscaping, internal road cleaning and car cleaning will be catered from treated wastewater from S.T.P. and collected rooftop rainwater respectively. 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – stone, Yes Cement = 5,740 tonne aggregates, and / soil (expected Sand = 15,780 cu.m source – MT) Stonechip = 14,630 cu.m Brick = 4,64,740 pieces Steel = 1,490 tonne Steel and cement will be sourced from authorized vendors. Sand & aggregate will be sourced from local material supplier. 2.5 Forests and timber (source – MT) No Required timber will be supplied by local vendors. 2.6 Energy including electricity and fuels Yes Daily power requirement for the proposed residential (source, competing users) Unit: fuel complex is assessed as around 1022 kW. CESC will be the (MT), energy (MW) supply agency. 2.7 Any other natural resources (use No Not Applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 3.1 Use of substances or materials, No There will be no storage of hazardous materials or which are hazardous (as per MSIHC chemicals within the complex. rules) to human health or the environment (flora, fauna and water supplies) 3.2 Changes in occurrence of disease or No Suitable drainage and waste management measures will be affect disease vectors (e.g. insect or adopted in both construction and operational phase, which

5 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

water borne diseases) will prevent stagnation of water or accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. 3.3 Affect the welfare of people e.g. by Yes This project will provide employment to approximately 100 changing living conditions? local labours in the construction phase. About 900 persons will be residing in 180 apartments within this complex in the operational phase. Also, the complex will accommodate about 30 service & security people. Also, all the apartments within the complex may need household workers; it is expected that almost all the household workers will be coming from the surrounding areas. Thus, the living conditions as well as economic profile of the people living in surrounding areas will be upgraded. 3.4 Vulnerable groups of people who No Proper mitigative measures for the minimization of could be affected by the project e.g. degradation of various environmental parameters like noise hospital patients, children, the elderly abatement, traffic management etc., will be adopted during etc., the post-construction stage of the proposed complex. 3.5 Any other causes No -- 4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No Not Applicable 4.2 Municipal waste (domestic and or Yes During the operational period, solid waste will be generated commercial wastes) from different residential apartments as well as from the daily users and visitors. Solid waste will also be generated from site cleaning and maintenance activities. The daily generated quantity of such waste has been primarily assessed as 519 kg or 0.519 tonne. Break up of the quantity is as follows: Type of User Per capita solid No. of Solid waste waste Users generation generation Residents 0.5 kg/cap/day 900 450.0 kg/day Residential 0.1kg/cap/day 90 9.0 kg/day Floating Service Staff 0.3 kg/cap/day 30 9.0 kg/day Site 0.05 kg/cap/day 1020 51.0 kg/day Maintenance Total 519.0 say 519 kg/day or 0.519 tonne/day Generated solid waste will be collected as House to House (HTH) basis from designated locations & segregated into organic waste and in-organic waste by agency dealing in collection and disposal of garbage. The segregated non- recyclable solid waste will be disposed into municipal waste disposal area. Organic waste will be composted in a mechanical compost plant within site. Adequate number of collection bins, separates for biodegradable and non-biodegradable waste will be provided as per Municipal Solid Waste (Management and Handling) Rule, 2000. Waste from such bins will be collected separately on daily basis. All the collection bins will be properly maintained on regular basis. Arrangement will be made with collection agencies for providing garbage station or transfer point, from where all wastes collected

6 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

from bins will be disposed off for further disposal by the municipal authorities. 4.3 Hazardous wastes ( as per No There will be no storage of hazardous waste within the Hazardous Waste Management complex except little amount of spent oil from D.G. Sets, Rules) which will be either reused or disposed off to an authorized collection agencies. 4.4 Other industrial process wastes No Not Applicable 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other sludge from Yes The sludge generated from the Inspection Pits of the Sewer effluent treatment Line and sludge from STP will be periodically disposed to the municipal collection agency. 4.7 Construction or demolition wastes Yes Construction & demolition waste will be reused for site development activities. 4.8 Redundant machinery or equipment No Not Applicable 4.9 Contaminated soils or other materials No Not Applicable 4.10 Agricultural wastes No Not Applicable 4.11 Other solid wastes No --

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 5.1 Emissions from combustion of fossil No The operation of proposed project does not envisage any fuels from stationary or mobile major air pollutant generating sources except DG sets (1X sources. 800 kVA) and vehicular movement. 5.2 Emissions from production No Not Applicable as no production process is involved with this processes. project. 5.3 Emissions from materials handling Yes This will be restricted to the construction phase and to the including storage or transport. construction site only. 5.4 Emissions form construction No This will be restricted to the construction phase and to the activities including plant and construction site only. equipment. 5.5 Dust or odours from handling or Yes Certain amount of dust particulate might be generated materials including construction during the handling of construction materials, excavation & materials, sewage and waste earthworks, construction & demolition activities etc. But, proper control measures will be taken to minimize the generated volume of dust and dirt. 5.6 Emissions from incineration of waste No No incineration of waste will take place within the premises both during the construction as well as operational period. 5.7 Emissions from burning of waste in No Open burning of biomass/ other material will be avoided. open air (e.g. slash materials, construction debris). 5.8 Emissions from any other sources. No -

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data

6.1 From operation of equipment e.g. Yes During construction, the machinery used for construction will engines, ventilation plant, crushers be of required standard and of reputed make and will adhere to national standards, which will take care of noise pollution control/ vibration control and air emission control. Hence, insignificant impacts due to construction machinery are envisaged. Apart from this, construction activities will be restricted to daytime only. Noise in the operational phase might be from DG sets only.

7 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

DG sets will operate during power failure and will generate noise level below 75 dB (A) each as they will be silent in nature. 6.2 From industrial or similar processes No Not Applicable 6.3 From construction or demolition Yes Due to various construction activities, there will be short- term noise impacts in the immediate vicinity of the project site. The construction activities will include the following noise generating activities: ƒ Excavation activities ƒ Operation of DG sets, concreting and mixing ƒ Demolition activities. Construction of structures and running of construction equipments like Mixer Machine, Vibrators, Earth Cutting Machines, Pay Loader etc. It has been assessed that the average noise level will be around 80-85 dB(A) during peak construction hours. But this will be confined within the project site and within construction period only. 6.4 From blasting or piling Yes No scope of blasting is involved in the proposed development, but piling work will be done. While conducting the piling works, D.M.C. piles will be used. Hence, the magnitude of generated noise and vibration will be minimized. 6.5 From construction or operational Yes During the construction and operational stage of the project, traffic traffic movement will be inside the project site resulting in low generation of noise in the surroundings. But, due to adoption of good traffic management practices, generated impacts, if any, will be minimized. 6.6 From lighting or cooling systems No - 6.7 From any other sources No -

7. Risks or contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 7.1 From handling, storage, use or No There will be no storage of hazardous materials or spillage of hazardous materials chemicals within the complex. 7.2 From discharge of sewage or other No During the construction period of the project, generated effluents to water or the land domestic sewage from the labourers’ daily use will be (expected mode and place or treated in the temporarily built septic tanks within the discharge) complex and the treated wastewater will be finally discharged into the K.M.C. drain. The construction wastewater will be collected into a couple of Sediment Trap within the project site and after the sedimentation process it will be discharged into the K.M.C. drain. Sediment traps will have half an hour retention periods and their approximate size will be 2.5m(L) X 2.5m(W) X 0.75m (D). During the operational period, the excess treated wastewater will be discharged into roadside drain. 7.3 By deposition of pollutants emitted to No No pollutants in terms of emission, effluent or solid waste air into the land or into water will be emitted or discharged into the air, land or the surface water. 7.4 From any other sources No Not Applicable 7.5 Is there a risk of long term build up No Not Applicable

8 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

or pollutants in the environment form these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health of the environment

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 8.1 From explosions, spillages, fires etc No This is basically a construction project and does not involve from storage, handling, use or major hazardous construction activity. Hence, chances of production or hazardous substances explosions, spillages, fires are minimal. During construction, all the labourers will be provided with suitable personal protective equipment (PPE) as required under the health & safety norms. Training and awareness about the safety norms will be provided to all supervisors and labours involved in construction activity. No major hazardous waste is being stored within the project site. No industrial or process activity is involved in this project hence chances of chemical hazards and accidents are minimal. However, suitable fire-fighting measures recommended by the fire department of Govt. of West Bengal will be adopted. 8.2 From any other causes No Not Applicable 8.3 Could the project be affected by No The area under study falls in Zone-III according to the Indian natural disasters causing Standard Seismic Zoning Map. Suitable seismic coefficients environmental damage (e.g. floods, in horizontal and vertical directions respectively, have to be earthquakes, landslides, cloudburst adopted while designing the structures. There are no etc)? chances of floods and landslide.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Sl. Information / Checklist Yes / Details thereof (with approximate quantities / rates, No. confirmation No wherever possible) with source of information data 9.1 Lead to development of supporting Yes The local landuse of the area is predominantly residential. facilities, ancillary development Landuse along the B.L. Saha Road is mixed in nature. The stimulated by the project which could all sides around the project site are occupied by structures. have impact on the environment e.g.: The drainage & sewerage network of the area is laid along the abutting road. CESC supplies electricity in the entire Supporting infrastructure (roads, area. Thus, while developing the project, the surrounding power supply, waste or waste water areas have been adequately considered so that the treatment etc.) cumulative impact on the surrounding environment can be minimized. Housing development No The project itself accommodates housing. Extractive industries No Not Applicable Supply industries No Not Applicable Other No Not Applicable 9.2 Lead to after-use of the site, which No Not Applicable could have an impact on the environment 9.3 Set a precedent for later No Not Applicable developments 9.4 Have cumulative effects due to Yes Similar kind of residential complexes with different volume

9 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

proximity to other existing or planned are coming up in the region. projects with similar effects

(II) Environmental Sensitivity

Sl. Areas Name / Aerial distance (within 15 km) Proposed No. Identity project location boundary 1. Areas protected under international conventions, None - national or local legislation for their ecological, landscape, cultural or other related value 2. Areas which are important or sensitive for None - ecological reasons – Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3. Areas used by protected, important or sensitive None - species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or underground waters None No coastal or marine areas within 15 km radius of the site. 5. State, National boundaries None - 6. Routes or facilities used by the public for access No Not applicable. to recreation or other tourist, pilgrim areas 7. Defense installation No Not applicable. 8. Densely populated or built-up area Yes The project site is located within Kolkata Municipal Corporation area. The site is surrounded by low to medium rise houses which are being developed gradually. The area is moderately populated. 9. Areas occupied by sensitive man-made land Yes Ranging from 1.0 km to 15 km from the uses (hospitals, schools, places of worships, project site. community facilities) 10. Areas containing important, high quality or None Not applicable scarce resources (groundwater resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11. Areas already subjected to pollution or No The ambient air quality of the region shows environmental damage, (those where existing that the pollutants, like SPM, RPM, SO2 and legal environmental standards are exceeded) NOX, are well within the permissible limits of the NAAQS standards prescribed by CPCB. 12. Areas susceptible to natural hazard which could None cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(III) Proposed Terms of Reference for EIA studies: Not applicable

“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date:………………..

Place: KOLKATA………. (Signature of the Applicant) Name : Dilip Kumar Choudhary Designation: Director Merlin Projects Limited

10 Proposed Residential Complex at Premises No. - 24, B.L. Saha Road, Kolkata - 700053 Form – I Developer – Merlin Projects Limited

Address: Merlin Oxford, 2nd Floor, 22, Prince Anwar Shah Road, Kolkata – 700033, West Bengal. P.S. – Charu Market, P.O. - Tollygunge.

Note: a. The projects involving clearance under Coastal Regulation Zone Notification 1991 shall submit with the application a C.R.Z. map duly demarcated by one of the authorized agencies, showing the project activities w.r.t. C.R.Z. and the recommendations of the State Coastal Zone Management Authority. Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z. Notification, 1991 for the activities to be located in the C.R.Z.

b. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migrating Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis- à-vis the project location and the recommendations or comments of the Chief Wildlife Warden thereon (at the stage of E.C.).

c. All correspondence with the Ministry of Environment & Forest including submission of application for TOR/Environmental Clearance, subsequently clarifications, as may be required from time to time participation in the EAC Meeting on behalf of the project proponent shall be made by the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.

11