NORTH CENTRAL RAILWAY

Shri Narendra Modi Hon'ble Prime Minister

MAHARAJGANJ PARLIAMENTARY CONSTITUENCY , the most populous state of Nation is served by North Central Railway along with Northern, North Eastern Rajiv Chaudhry and East Central Railways. Indian Railways (IR) plays a very General Manager important role in development of the state and provides North Central Railway connectivity for freight and passengers, including international tourists. IR has a history of more than 160 years in the state and has the highest route kilometers - 9100 route kilometers - within it, which is 14% of entire railway network. IR has made Uttar Pradesh proud by giving it Nation's first semi high speed train Gatimaan Express, which initially ran between Agra and . It has now been extended upto Jhansi - a move that will boost tourism in Bundelkhand region of Uttar Pradesh. After Gatiman the nation's first engineless semi high speed train set "Vande Bharat Express" is now serving Uttar Pradesh running from New Delhi to Varanasi. Efforts for further development of railway infrastructure in Uttar Pradesh have been intensified in last five years with 911% more investment in coparison to previous years. Results of such a massive investmentare becoming visible with enhanced infrastructure and modern passenger amenities. Soon the era of congestion and inconvenience will be matter of past and a new Railway equipped with state-of-the art facilities will be able to serve the citizens in a better manner and provide them enhanced value for their money. The longest stretch of the under construction Eastern Dedicated Freight Corridor i.e. almost 57% of the entire length lies in Uttar Pradesh from Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad.

In this brochure, we have compiled the important contributions and achievements of Indian Railways in the development of the MAHARAJGANJ constituency of Uttar Pradesh in the last five years. I hope that it will serve as a ready reckoner for those eager to know about the role of Railways in the development of this constituency. It may be noted that the budgets allocated to various projects are not apportioned constituency wise but reflect the cost of the project. INPUTS BY RAILWAY IN MAHARAJGANJ UP PARLIAMENTARY CONSTITUENCY

MAHARAJGANJ PARLIAMENTARY CONSTITUENCY A. ASSEMBLY SEGMENTS (Maharajganj, Baniapur, Ekma, Manjhi, Taraiya, Goriyakothi) B. WORKS COMPLETED IN LAST FIVE YEARS: IMPROVEMENT IN PASSENGER AMENITIES GSolar Panel installed at Railway Station at a cost of Rs.19 Lakh. GSolar Panel installed at Anandnagar Railway Station at a cost of Rs.29 Lakh. G Nautanva: Development as Adarsh Station at a cost of Rs.10 Lakh. G Nautanva: 02 Ticket Windows at a cost of Rs.4 Lakh. G Low cost Passenger Platform shelter at Siswa Bazar, Gurliram Garhwa station at a cost of Rs. 4 Lakh. G Train Display Board provided at Anandnagar & Nautanwa at a cost of Rs. 4.50 Lakh. G Nautanwa & Anandnagar-Signages related to passenger amenities provided. GNautanwa Elimination of deficiencies as per minimum essential amenities by raising Platform Nos (1,2) to high level at a cost of Rs. 200.00 Lakh. GProvision of boundary wall at goods shed along with development of green patch at a cost of Rs. 12.00 Lakh. GAnandnagar & Nautanwa: Stainless Steel Railling, parking sinages, SS benches, dustbin etc. at a cost of Rs. 10.00 Lakh. GAnandnagar:Provision of 1 no. 20 M high mast at a cost of Rs. 11.00 Lakh. GNautanwa - Provision of FOB at a cost of Rs. 120.00 Lakh. C. OTHER DEVELOPMENTS: New Trains introduced with stoppage over Maharajganj Constituency. GTrain No. 11079/11080 Lokmanya Tilak T.- weekly express. GTrain No. 12571/12572 Gorakhpur-Anandvihar (T) four days a week Humsafar express. GTrain No. 15009/15010 Gorakhpur-Badshahnagar Express. GTrain No. 75007/75008 Gorakhpur-Gonda DEMU. GTrain No. 15067/15068 Gorakhpur-Bandra (T) weekly express. GTrain No. 15063/15064 Gorakhpur-Lokmanya Tilak (T) weekly express. GTrain No. 15065/15066 Gorakhpur-Panvel Express (Four days a week). D. ONGOING WORKS: GNautanwa-Yard remodelling for conversion of goods line-5 into running line, engine escape lines, shunting neck & goods shed facilities etc at a cost of Rs. 732.00 Lakh. Road Over Bridge/Limited Height Subways (LHS) in lieu of GLevel Crossing No. 5A on Gorakhpur-Anand Nagar section at a cost of Rs.4,688.98 Lakh. GLevel Crossing No. 270C, 274C, 307C, 308C & 290C on Gonda-Lucknow and LC No. 33 on Anand Nagar Barhni and LC No. 81, 91 at Aishbagh-Mailani section at a cost of Rs.2,032.54 Lakh. GLevel Crossing No. 38C at Km 35/3-4 on Anand Nagar-Nautanwa section at a cost of Rs. 225.44 Lakh. GLevel Crossing No. 39C at Km 36/4-5 on Anand Nagar Jn. - Nautanwa section at a cost of Rs. 225.44 Lakh. GLevel Crossing No. 37C at Km 52/8-9 on Anand Nagar -Gonda section at a cost of Rs. 225.44 Lakh. GLevel Crossing No. 40C at Km 56/7-8 on Anand Nagar -Gonda section at a cost of Rs. 225.44 Lakh. GLevel Crossing No. 41C at Km 38/4-5 on Anand Nagar - Nautanwa section at a cost of Rs. 225.44 Lakh. GLevel Crossing No. 28C at Km 24/1-2 on Anand Nagar - Nautanwa section at a cost of Rs. 225.44 Lakh. GLevel Crossing No. 44B-2 at Km 61/9-62/0 on Anand Nagar - Gonda section at a cost of Rs. 225.44 Lakh. Other Works: GAnand Nagar-Nautanwa section- Construction of LHS in lieu of level crossing no.13C at Km 11/5-6 bet. Purandarpur-Jhamat stations at a cost of Rs. 211.00 Lakh. GAnand Nagar-Nautanwa section- Construction of LHS in lieu of level crossing no.15C at Km 13/8-9 bet. Purandarpur- Jhamat stations at a cost of Rs. 211.00 Lakh. GAnand Nagar-Nautanwa section- Construction of LHS in lieu of level crossing no. 37C at Km 33/9-34/0 bet .Naikot-Barwa Kalan stations at a cost of Rs. 253.00 Lakh. GAnand Nagar-Nautanwa section- Construction of LHS in lieu of level crossing no. 36C at Km 32/7-8 bet. Naikot-Barwa Kalan stations at a cost of Rs. 253.00 Lakh. GAnand Nagar-Nautanwa section- Construction of LHS in lieu of level crossing no. 16C at Km 15/0-1 bet. Anand Nagar- Lachmipur stations at a cost of Rs. 251.00 Lakh. GProvision of LHS at LC no-31 ‘A1’ at Km 321/4-5 in Siswa Bazar-Khada section at a cost of Rs. 240.00 Lakh. GProvision of shallow tubewell , storage tank and pipe line connection on 6 nos. D class stations & 14 No. E class station at a cost of Rs. 145.00 Lakh. GProvision of toilet, Railing and other facilities for Divyang Passengers on 30 stations at a cost of Rs. 229.00 Lakh. GProvision of SS dustbins at D and E category stations (400 nos.) at a cost of Rs. 20.00 Lakh. GProvision of addl. 200 nos. stainless steel benches with RCC Grouting at a cost of Rs. 50.00 Lakh. GGorakhpur-Anandnagar-Gonda & Anandnagar- Nautanwa Electrification. (261.61 RKM) at a cost of Rs. 23213.00 Lakh. GPassenger amenities works (6 nominated Aarsh stations) ( Shohratgarh, Munderwa, Nautanwa, Babhnan, Maghar & Burhwal) at a cost of Rs. 554.00 Lakh. LED Station Name Board Solar Panel at Anand Nagar Station

Humsafar Express

Gorakhpur-Gomtinagar Express Gorakhpur-Nautanwa Passenger Train