Annual Flood Report 2019

Total Page:16

File Type:pdf, Size:1020Kb

Annual Flood Report 2019 ANNUAL FLOOD REPORT 2019 FLOOD FORECASTING & WARNING CENTRE PROCESSING & FLOOD FORECASTING CIRCLE BANGLADESH WATER DEVELOPMENT BOARD Annual Flood Report 2019 Flood Forecasting and Warning Centre (FFWC) Bangladesh Water Development Board (BWDB) WAPDA Building (8th Floor), Motijheel C/A, Dhaka-1000 Phone : 9550755; 9553118 Fax : 9557386 Email ; [email protected] ; [email protected] Web : www.ffwc.gov.bd Editing & Compilation: Md. Arifuzzaman Bhuyan, Executive Engineer, FFWC, BWDB Sarder Udoy Raihan, Sub-Divisional Engineer, FFWC, BWDB Contribution: Md. Alraji Leon, Assistant Engineer, FFWC, BWDB Partho Protim Barua, Assistant Engineer, FFWC, BWDB Preetom Kumar Sarker, Assistant Engineer, FFWC, BWDB Mehadi Hasan, Assistant Engineer, FFWC, BWDB Review: Md. Saiful Hossain, Superintending Engineer, PFFC, BWDB Published by the FFWC, BWDB, Ministry of Water Resources, Dhaka TABLE OF CONTENTS LIST OF TABLES .......................................................................................................................... 5 LIST OF FIGURES ........................................................................................................................ 7 PREFACE ..................................................................................................................................... 10 EXECUTIVE SUMMARY .......................................................................................................... 12 LIST OF ABBREVIATIONS ..................................................................................................... 13 CHAPTER 1 : INTRODUCTION ............................................................................................. 15 1.1. THE PHYSICAL SETTING .................................................................................................................. 15 1.2. THE RIVER SYSTEM ......................................................................................................................... 15 1.3. ACTIVITIES OF FFWC ...................................................................................................................... 17 1.4. OPERATIONAL STAGES BEFORE FORECAST MODEL RUN ................................................................ 19 1.5. NATURE AND CAUSES OF FLOODING ............................................................................................. 20 1.5.1. Causative Factors ............................................................................................................................ 20 1.5.2. Statistics of Flooding ...................................................................................................................... 21 CHAPTER 2 : RAINFALL SITUATION ................................................................................. 22 2.1 MARCH .......................................................................................................................................... 23 2.2 APRIL ............................................................................................................................................. 23 2.3 MAY ............................................................................................................................................... 24 2.4 JUNE .............................................................................................................................................. 25 2.5 JULY ............................................................................................................................................... 26 2.6 AUGUST ......................................................................................................................................... 28 2.7 SEPTEMBER .................................................................................................................................... 29 2.8 OCTOBER ....................................................................................................................................... 30 CHAPTER 3 : RIVER SITUATION ......................................................................................... 38 3.1 THE BRAHMAPUTRA BASIN ............................................................................................................. 38 3.2 THE GANGES BASIN ......................................................................................................................... 41 3.3 THE MEGHNA BASIN ........................................................................................................................ 45 3.4 THE SOUTH EASTERN HILL BASIN ..................................................................................................... 50 3.5 PEAK AND RECORDED HIGHEST WATER LEVELS ............................................................................... 52 CHAPTER 4 : FORECAST EVALUATION, 2019 ................................................................ 77 4.1 EVALUATION CRITERIA OF FORECAST PERFORMANCE ..................................................................... 78 4.1.1 Mean Absolute Error (MAE) ......................................................................................................... 78 4.1.2 Co-efficient of Determination, r2 ................................................................................................... 78 4.2 PRE-DEFINED SCALES TO EVALUATE FORECAST PERFORMANCE ...................................................... 79 4.3 DETERMINISTIC FORECAST STATISTICS AND PERFORMANCE, 2019 .................................................. 79 4.3.1 Deterministic Forecast Performance ................................................................................................ 79 4.3.2 Medium Range (upto 10-days) Probabilistic Forecast Performance ............................................... 90 CHAPTER 5 : INUNDATION STATUS .................................................................................. 90 5.1 BASINWISE INUNDATION STATUS ..................................................................................................... 95 5.2 COUNTRYWIDE INUNDATION 2019 ................................................................................................... 98 CHAPTER 6 : CHARACTERISTICS AND SPECIAL EVENTS OF 2019 FLOOD ........ 106 6.1 Characteristics of 2019 Flood .......................................................................................................... 106 6.2 Special Events of 2019 Flood Season ............................................................................................... 107 6.2.1 The Severe Flood of Brahmaputra-Jamuna River .......................................................................... 107 6.2.2 The Late Monsoon Normal Flood of Ganges River ...................................................................... 111 Annual Flood Report 2019 Page- 3 CHAPTER 7 : RESEARCH AND DEVELOPMENT ........................................................... 114 7.1 Operational Flash Flood Forecasting System for the North-Eastern Region ..................................... 114 7.2 Initiative with Google for Improved Flood Inundation Mapping ...................................................... 114 CHAPTER 8 : CONCLUSION ................................................................................................ 116 ANNEX-1 .................................................................................................................................. 119 ANNEX-2 .................................................................................................................................. 120 ANNEX-3 .................................................................................................................................. 121 ANNEX-4 .................................................................................................................................. 122 ANNEX-5 .................................................................................................................................. 123 ANNEX-6 .................................................................................................................................. 124 ANNEX-7 .................................................................................................................................. 125 ANNEX-8 .................................................................................................................................. 126 Annual Flood Report 2019 Page- 4 LIST OF TABLES TABLE 1.1 :YEAR-WISE FLOOD AFFECTED AREA IN BANGLADESH ................ 21 TABLE 2.1: RAINFALL STATISTICS FOR THE MONSOON-2019 OVER THE FOUR BASINS ..................................................................................................................... 22 TABLE 2.2: SUMMARY OF THE RAINFALL SITUATION DURING THE MONTH OF MARCH-2019 ..................................................................................................... 23 TABLE 2.3: SUMMARY OF THE RAINFALL SITUATION DURING THE MONTH OF APRIL-2019......................................................................................................... 24 TABLE 2.4: SUMMARY OF THE RAINFALL SITUATION DURING THE MONTH OF MAY-2019 ........................................................................................................... 24 TABLE 2.5: SUMMARY OF THE RAINFALL SITUATION DURING THE MONTH OF JUNE -2019 ......................................................................................................... 26 TABLE 2.6: SUMMARY OF THE RAINFALL SITUATION DURING THE
Recommended publications
  • Initial Environmental Examination
    Initial Environmental Examination Project Number: 53382-001 May 2021 Bangladesh: South Asia Sub regional Economic Cooperation Dhaka-Sylhet Corridor Road Investment Project Main report vol. 1 Prepared by the Roads and Highways Division, Bangladesh, Dhaka for the Asian Development Bank. Page i Terms as Definition AASHTO American Association of State Highway and Transportation Officials ADB Asian Development Bank AMAN Rice (grown in wet season) APHA American Public Health Association ARIPA Acquisition and Requisition of Immoveable Property Act As Arsenic BD Bangladesh BIWTA Bangladesh Inland Water Transport Authority BNBC Bangladesh National Building Code BOQ Bill of Quantities Boro Rice (grown in dry season) BRTA Bangladesh Road Transport Authority BWDB Bangladesh Water Development Board CITES Convention on Trade in Endangered Species CO Carbon Monoxide CoI Corridor of Impact CPRs Community Property Resources DMMP Dredged Material Management Plan DC Deputy Commissioner DO Dissolved Oxygen DoE Department of Environment DoF Department of Forest EA Executive Agency ECA Environmental Conservation Act ECR Environmental Conservation Rules EIA Environmental Impact Assessment EMP Environmental Management Plan EMoP Environmental Monitoring Plan Engineer The construction supervision consultant/engineer EPAS Environmental Parameter Air Sampler EPC Engineering Procurement and Construction EQS Environmental Quality Standards ESCAP Economic and Social Commission for Asia and the Pacific ESSU Environmental and Social Safeguards Unit FC Faecal Coliform
    [Show full text]
  • (PSI) Project Name Mymensingh Kewatkhali Bridge Project Country
    Project Number: 000163 Project Summary Information (PSI) Project Name Mymensingh Kewatkhali Bridge Project Country People’s Republic of Bangladesh Sector Transport Project No. 0000163 Borrower People’s Republic of Bangladesh Implementation Agency Ministry of Road Transport and Bridges Environmental and Social Category A Date of PSI prepared or updated Sep. 5, 2018 Date of Concept Decision Approved on Sep. 4, 2018 Estimated Date of Board Consideration Aug., 2019 I. Introduction Mymensingh Kewatkhali Bridge is part of the Dhaka-Mymensingh-India border corridor, which is strategically important for both regional and local connectivity. Three land ports have been developed along the Indian border in Mymensingh Division, namely Nakugaon Land port in Sherpur district, Gobrakura Land Port and Haluaghat Land Port in Mymensingh District. Traffic from the three land ports must cross Old Brahmaputra River at Mymensingh City in order to reach Dhaka and other parts of Bangladesh. As with other land ports on the northern border with India, the main import items are coal, lime stone, boulder, stone, glass sand, fruits and raw hides. Export items are food and beverage items, plastic goods and bricks. Given the proximity to the Indian border (around 60-80 km from Mymensingh to the three land ports), the road passing through Mymensingh serves international trade by carrying the major import/export items from/to India. The improved crossing at Mymensingh will help facilitate cross-border trade with northeast India. On the other hand, the Mymensingh Kewatkhali bridge will provide crossing over the Old Brahmaputra River to connect the landlocked north central and northeast Bangladesh with Dhaka.
    [Show full text]
  • West Tripura District, Tripura
    कᴂद्रीय भूमि जल बो셍ड जल संसाधन, नदी विकास और गंगा संरक्षण विभाग, जल शक्ति मंत्रालय भारत सरकार Central Ground Water Board Department of Water Resources, River Development and Ganga Rejuvenation, Ministry of Jal Shakti Government of India AQUIFER MAPPING AND MANAGEMENT OF GROUND WATER RESOURCES WEST TRIPURA DISTRICT, TRIPURA उत्तर पूिी क्षेत्र, गुिाहाटी North Eastern Region, Guwahati GOVERNMENT OF INDIA MINISTRY OF JAL SHAKTI DEPARTMENT OF WATER RESOURCES, RIVER DEVELOPMENT & GANGA REJUVENATION CENTRAL GROUND WATER BOARD REPORT ON “AQUIFER MAPPING AND MANAGEMENT PLAN OF WEST TRIPURA DISTRICT, TRIPURA” (AAP 2017-18) By Shri Himangshu Kachari Assistant Hydrogeologist Under the supervision of Shri T Chakraborty Officer In Charge, SUO, Shillong & Nodal Officer of NAQUIM, NER CONTENTS Page no. 1. Introduction 1-20 1.1 Objectives 1 1.2 Scope of the study 1 1.2.1 Data compilation & data gap analysis 1 1.2.2 Data Generation 2 1.2.3 Aquifer map preparation 2 1.2.4 Aquifer management plan formulation 2 1.3 Approach and methodology 2 1.4 Area details 2-4 1.5Data availability and data adequacy before conducting aquifer mapping 4-6 1.6 Data gap analysis and data generation 6 1.6.1 Data gap analysis 6 1.6.2 Recommendation on data generation 6 1.7 Rainfall distribution 7 1.8 Physiography 7-8 1.9 Geomorphology 8 1.10 Land use 9-10 1.11Soil 11 1.12 Drainage 11-12 1.13 Agriculture 13-14 1.14 Irrigation 14 1.15 Irrigation projects: Major, Medium and Minor 15-16 1.16 Ponds, tanks and other water conservation structures 16 1.17 Cropping pattern 16-17 1.18 Prevailing water conservation/recharge practices 17 1.19 General geology 18-19 1.20 Sub surface geology 19-20 2.
    [Show full text]
  • IPP: Bangladesh: Second Chittagong Hill Tracts Rural Development Project
    Second Chittagong Hill Tracts Rural Development Project (RRP BAN 42248) Indigenous Peoples Plan March 2011 BAN: Second Chittagong Hill Tracts Rural Development Project Prepared by ANZDEC Ltd for the Ministry of Chittagong Hill Tracts Affairs and Asian Development Bank. CURRENCY EQUIVALENTS (as of 16 March 2011) Currency unit – taka (Tk) Tk1.00 = $0.0140 $1.00 = Tk71.56 ABBREVIATIONS ADB – Asian Development Bank ADR – alternative dispute resolution AP – affected person CHT – Chittagong Hill Tracts CHTDF – Chittagong Hill Tracts Development Facility CHTRC – Chittagong Hill Tracts Regional Council CHTRDP – Chittagong Hill Tracts Rural Development Project CI – community infrastructure DC – deputy commissioner DPMO – district project management office GOB – Government of Bangladesh GPS – global positioning system GRC – grievance redress committee HDC – hill district council INGO – implementing NGO IP – indigenous people IPP – indigenous peoples plan LARF – land acquisition and resettlement framework LCS – labor contracting society LGED – Local Government Engineering Department MAD – micro agribusiness development MIS – management information system MOCHTA – Ministry of Chittagong Hill Tracts Affairs NOTE (i) In this report, "$" refers to US dollars. This indigenous peoples plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. 1 CONTENTS Page A. Executive Summary 3 B.
    [Show full text]
  • Upstream Satellite Remote Sensing for River Discharge Forecasting: Application to Major Rivers in South Asia
    Remote Sensing of Environment 131 (2013) 140–151 Contents lists available at SciVerse ScienceDirect Remote Sensing of Environment journal homepage: www.elsevier.com/locate/rse Upstream satellite remote sensing for river discharge forecasting: Application to major rivers in South Asia Feyera A. Hirpa a, Thomas M. Hopson b,⁎, Tom De Groeve c, G. Robert Brakenridge d, Mekonnen Gebremichael a, Pedro J. Restrepo e a Department of Civil & Environmental Engineering, University of Connecticut, Storrs, CT 06269, USA b Research Applications Laboratory, National Center for Atmospheric Research, Boulder, CO 80307-3000, USA c Joint Research Centre of the European Commission, Ispra, Via Fermi 2147, 21020 Ispra, Italy d CSDMS, INSTAAR, University of Colorado, Boulder, CO 80309-0450, USA e North Central River Forecast Center, NOAA, Chanhassen, MN, 55317, USA article info abstract Article history: In this work we demonstrate the utility of satellite remote sensing for river discharge nowcasting and forecasting Received 19 August 2011 for two major rivers, the Ganges and Brahmaputra, in southern Asia. Passive microwave sensing of the river and Received in revised form 16 November 2012 floodplain at more than twenty locations upstream of Hardinge Bridge (Ganges) and Bahadurabad (Brahmaputra) Accepted 17 November 2012 gauging stations are used to: 1) examine the capability of remotely sensed flow information to track the down- Available online xxxx stream propagation of river flow waves and 2) evaluate their use in producing river flow nowcasts, and forecasts at 1–15 days lead time. The pattern of correlation between upstream satellite data and in situ observations of Keywords: Floods downstream discharge is used to estimate wave propagation time.
    [Show full text]
  • The Conservation Action Plan the Ganges River Dolphin
    THE CONSERVATION ACTION PLAN FOR THE GANGES RIVER DOLPHIN 2010-2020 National Ganga River Basin Authority Ministry of Environment & Forests Government of India Prepared by R. K. Sinha, S. Behera and B. C. Choudhary 2 MINISTER’S FOREWORD I am pleased to introduce the Conservation Action Plan for the Ganges river dolphin (Platanista gangetica gangetica) in the Ganga river basin. The Gangetic Dolphin is one of the last three surviving river dolphin species and we have declared it India's National Aquatic Animal. Its conservation is crucial to the welfare of the Ganga river ecosystem. Just as the Tiger represents the health of the forest and the Snow Leopard represents the health of the mountainous regions, the presence of the Dolphin in a river system signals its good health and biodiversity. This Plan has several important features that will ensure the existence of healthy populations of the Gangetic dolphin in the Ganga river system. First, this action plan proposes a set of detailed surveys to assess the population of the dolphin and the threats it faces. Second, immediate actions for dolphin conservation, such as the creation of protected areas and the restoration of degraded ecosystems, are detailed. Third, community involvement and the mitigation of human-dolphin conflict are proposed as methods that will ensure the long-term survival of the dolphin in the rivers of India. This Action Plan will aid in their conservation and reduce the threats that the Ganges river dolphin faces today. Finally, I would like to thank Dr. R. K. Sinha , Dr. S. K. Behera and Dr.
    [Show full text]
  • From Dorota Borowa's Ice Painting Workshop. TABLE of CONTENTS
    15.12.19 - 30.01.20 SUB MERGE From Dorota Borowa's Ice Painting workshop. TABLE OF CONTENTS ABOUT SUBMERGE 4 OVERVIEW 6 THEMES AT SUBMERGE 12 CURATED PROGRAMMES AT SUBMERGE - CONFLUENCE 136 - SOAK 168 MEDIATORS 192 TAKE IT FURTHER 196 COLLABORATORS 202 *Please note that the images used throughout the report are the copyright of the photographer or Science Gallery Bengaluru and are not available under Creative Commons People and Water by T. S. Satyan and Jyoti Bhatt. Courtesy of Museum of Art and Photography (MAP). ABOUT SUBMERGE On 15 December 2019, we opened our first exhibition season on water, SUBMERGE, to the public. Through this exhibition, we supported the Year of Water initiative as observed by the Government of Karnataka. It also featured H2O Today, a popular traveling exhibition by the Smithsonian Institution. We encouraged visitors to explore the collective experiences of water and refIect on future challenges through a range of dynamic exhibits and workshops. We presented 15 exhibits spread across three floors of Bangalore International Centre, which examined the role of water in our lives, beyond the value that we derive from it. These exhibits were brought to life through 45 connected programmes such as workshops, lectures, master classes, film screenings and musical performances. Participants engaged with the latest research and thinking on water, and examined its cultural significance, by interacting with scholars and artists from around the world. We also provoked them to begin a dialogue on water as an urgent concern for the city of Bengaluru, and global challenge of the Anthropocene. Ice Painting by Dorota Borowa.
    [Show full text]
  • Trade and Transport Connectivity in the Bay of Bengal Region Bridging the East Trade and Transport Connectivity in the Bay of Bengal Region
    Bridging the East Trade and Transport Connectivity in the Bay of Bengal Region Bridging the East Trade and Transport Connectivity in the Bay of Bengal Region Published By D-217, Bhaskar Marg, Bani Park, Jaipur 302016, India Tel: +91.141.2282821, Fax: +91.141.2282485 Email: [email protected], Web site: www.cuts-international.org With the support of In partnership with Unnayan Shamannay © CUTS International, 2019 Citation: CUTS (2019), Bridging the East Trade and Transport Connectivity in the Bay of Bengal Region Printed in India by M S Printer, Jaipur ISBN 978-81-8257-275-1 This document is an output of a project entitled ‘Creating an Enabling and Inclusive Policy and Political Economy Discourse for Trade, Transport and Transit Facilitation in and among Bangladesh, Bhutan, India, Nepal and Myanmar: Facilitating implementation and stakeholder buy-in in the BBIN group of countries and Myanmar sub-region’. This publication is made possible with the support of the Department for International Development, UK. The views and opinions expressed in this publication is that of CUTS International and partners and not those of the Department for International Development, UK. #1903, Suggested Contribution M250/US$25 Contents Abbreviations 7 Contributors 9 Acknowledgements 13 Preface 15 Executive Summary 17 1. Introduction 23 Trade Connectivity: Existing and Proposed Initiatives 23 Salient Features of BBIN MVA 25 Significance of BBIN MVA 27 Standardisation and Formalisation of Trade 27 Economic and Developmental Significance 27 Integration with Larger Developmental Agenda 28 Strategic and Diplomatic Significance 29 2. Research Methodology and Implementation Plan 30 Define the Target Population 30 Connections among the Different Types of Stakeholders 31 Choice of Sampling Technique 32 Determination of Sample Size: Corridors, Products and Respondents 32 Data Collection 34 3.
    [Show full text]
  • Punjab ENVIS Centre NEWSLETTER Vol
    Punjab ENVIS Centre NEWSLETTER Vol. 11, No. 3, 2013-14 Indus River Dolphin (Platanista gangetica minor) : Status and Conservation in Punjab (India) l Inform ta at n io e n m S Status of Environment & Related Issues n y o s r t i e v m n E www.punenvis.nic.in INDIA EDITORIAL Dolphins are among the planet's most well known marine mammal. When we hear the word 'dolphin', what comes to mind is the endearing, intelligent bottlenose dolphin shown in movies and television shows. Though we often make the mistake of believing that there is only one kind of dolphin, there exist over 30 different types of dolphins, and including the river dolphins and porpoises, there are over 40 types of dolphins. To be precise, there are 32 types of oceanic dolphins, 5 species of river dolphins and 6 types of porpoises. Dolphins are important to the ecosystem in the sense that they are apex or top-level predators which control populations of fishes and squids and keep the ecosystem balance. They are the migratory species susceptible to a wide range of threats, including habitat shrinkage in breeding areas, excessive hunting along migration routes, and degradation of their feeding grounds. As a result of international concern over these threats, a UN Convention on the Conservation of Migratory (CMS) Species of Wild Animals, also known as Bonn Convention was adopted in 1979 and entered into force on 1st November 1983, to protect dolphins along their migration routes between their feeding and breeding grounds. Bonn Convention is a unique global advocate of reducing threats to their survival as well as to the ocean and river waters where they live.
    [Show full text]
  • India & Bangladesh
    Ministry of External Affairs Government of India INDIA & BANGLADESH Land Boundary Agreement ??? ??? CONTENT EXECUTIVE SUMMARY 02 NOTE on LAND BOUNDARY AGREEMENT 07 ANNEXURes ANNEXURE I: MAP DEPICTING UNDEMARCATED seGMENTS 29 AND ADVERse PossessIons ANNEXURE II: MAP DEPICTING ENCLAVES IN INDIA AND 30 BANGLADESH ANNEXURE III: AGREEMENT BETWEEN THE GOVERNMENT 31 OF THE REPUBLIC OF INDIA AND THE GOVERNMENT OF THE PeoPLE’S REPUBLIC OF BANGLADESH ConCERNING THE DEMARCATIon OF THE LAND BOUNDARY BETWeen InDIA AND BANGLADESH AND RELATED MATTERS – MAY 16, 1974 ANNEXURE IV: LETTERS EXCHANGED on THE TRANSFER OF 38 TIN BIGHA – MARCH 26, 1992 ANNEXURE V: PROTOCOL TO THE AGReeMenT BETWeen 42 THE GOVERNMENT OF THE REPUBLIC OF INDIA AND THE GOVERNMENT OF THE PeoPLE’S REPUBLIC OF BANGLADESH ConCERNING THE DEMARCATIon OF THE LAND BOUNDARY BETWEEN INDIA AND BANGLADESH AND RELATED MATTERS -SEPTEMBER 6, 2011 ANNEXURE VI: LIST OF BANGLADesH ENCLAVes IN InDIA 48 ANNEXURE VII: LIST OF InDIAN ENCLAVes IN BANGLADesH 50 ANNEXURE VIII: TERRITORIES IN ADVERse PossessIons TO 53 BE TRANSFERRED TO INDIA ANNEXURE IX: TERRITORIES IN ADVERse PossessIons TO BE 54 TRANSFERRED TO BANGLADESH FREQUENTLY ASKED QUESTIons 56 indiandiplomacy.in 2 Land Boundary Agreement between INDIA and BANGLADESH Land Boundary Agreement between INDIA and BANGLADESH 3 In building this agreement, the two sides (India and Bangladesh) have taken into account the situation on the ground and the wishes EXECUTIVE SUMMARY of the people residing in the areas involved. As such, the 2011 Protocol does not envisage the displacement of populations and ensures that all areas of economic activity relevant to the homestead have been preserved.
    [Show full text]
  • Environmental and Social Assessment (ESA)
    Private Investment and Digital Entrepreneurship (PRIDE) Project Bangladesh Economic Zones Authority (BEZA) Public Disclosure Authorized Environmental and Social Assessment (ESA) Package No. BEZA S-135 Public Disclosure Authorized Public Disclosure Authorized Draft Report Public Disclosure Authorized Appendices to ESA Report Vol II February 2020 1 Appendix D: Assessment of Air Quality and Water Quality 1.1 Air Quality Introduction The BSMSN area will generate huge traffic after full development both for passenger and goods. There will be wide range of vehicles such as two and three axle/ multi axle trucks, bus, car, two-wheeler etc. These type of transportation system are major contributors to air pollution as these emit harmful pollutants which has adverse impact on environment. It is difficult to project air pollution as because pollutant enters the air by different amounts at different times and also varies with places. It is expected that air pollutants which might be discharged by the operations of tenant in the industrial and logistic area would be well controlled and managed by the tenants. For indicative assessment of air quality of the project area, projection has been done for some pollutants due to vehicle emission only. Forecast Area The areas examined to forecast is the project area (Zone 2A and 2B of BSMSN) shown in the Figure 1- 1. The project area is about 1450 acres. At present, it is observed that the concentration of some pollutants such as SO2, NOX, CO, PM2.5, PM10 and SPM are below the allowable limit as per DoE standard (Bangladesh). All the surveyed data are given in the baseline data collection section of main report.
    [Show full text]
  • (1) Hydrological and Morphological Data of Padma River the Ganges River Drains the Southern Slope of the Himalayas
    The Study on Bheramara Combined Cycle Power Station in Bangladesh Final Report 4.6.5 Water Source (1) Hydrological and morphological data of Padma River The Ganges River drains the southern slope of the Himalayas. After breaking through the Indian shield, the Ganges swings to the east along recent multiple faults between the Rajmahal Hills and the Dinajpur Shield. The river enters Bangladesh at Godagari and is called Padma. Before meeting with the Jamuna, the river travels about 2,600km, draining about 990,400km2 of which about 38,880km2 lies within Bangladesh. The average longitudinal slope of water surface of the Ganges(Padma) River is about 5/100,000. Size of bed materials decreases in the downstream. At the Harding Bridge, the average diameter is about 0.15mm. The river planform is in between meandering and braiding, and varies temporally and spatially. Sweeping of the meandering bends and formation of a braided belt is limited within the active corridor of the river. This corridor is bounded by cohesive materials or man-made constructions that are resistant to erosion. Materials within these boundaries of the active corridor consist of loosely packed sand and silt, and are highly susceptible to erosion. Hydrological and morphological data of Padma River has been corrected by BWDB at Harding Bridge and crossing line of RMG-13 shown in the Figure I-4-6-4. Harding Bridge Origin (x=0) RMG-13 Padma River 3.66km Figure I-4-6-4 Bheramara site and Padma River Figure I-4-6-5 shows the water level at Harding Bridge between 1976 and 2006.
    [Show full text]