Quick viewing(Text Mode)

Atlas V Insight Mission Overview

Atlas V Insight Mission Overview

A (ULA) V 401 on to study its deep interior. The two-year MISSION will deliver the InSight to an InSight mission seeks to understand the evo- interplanetary trajectory to Mars. Liftoff will lutionary formation of rocky , including occur from Launch Complex-3 at , by investigating the interior structure Vandenberg Air Force Base, . and processes of Mars. InSight will also investi- gate the dynamics of Martian tectonic activity MISSION NASA’s InSight (Interior Exploration using Seis- and impacts, which could offer clues mic Investigations, Geodesy and Heat Transport) about such phenomena on Earth. mission will place a single geophysical OVERVIEW Part of NASA’s , InSight builds on the proven of NASA’s Mars lander. The reuse of this , developed and built by Space, provides a low-risk path to Mars. In addition to InSight, this mission includes two which will launch from dispensers mounted on the aft bulkhead carrier on the second stage. The (MarCO) CubeSats, designed and built by the Jet Propulsion Laboratory, will be the first to travel interplanetary. The small Mars-bound provide a real- communication Image Courtesy NASA/JPL-Caltech relay to cover the entry, decent and landing of InSight on Mars. ATLAS V The Atlas V 401 rocket has become the workhorse of the Atlas V fleet, delivering about half of all Atlas V LAUNCH (PLF) InSight missions to date. In its more than The spacecraft is encapsulated in the 4-m (14-ft) Spacecraft 15 years of service, the 401 has diameter large payload fairing (LPF). The LPF is a bisector (two-piece shell) fairing consisting launched a diverse set of missions of aluminum skin/stringer construction with including national security, vertical split-line longerons. The vehicle’s height 4-m Payload and exploration, commercial and with the LPF is approximately 189 ft. Fairing International resupply. Centaur The Centaur second stage is 10 ft in diameter Payload Adapter First Launch: Aug. 21, 2002 and 41.5 ft in length. Its propellant tanks are Launches to date: 37 constructed of -stabilized, corrosion- resistant stainless steel. Centaur is a cryogenic Centaur Performance to GTO: vehicle, fueled with liquid and liquid 4,750 kg (10,470 lb) , powered by an RL10C-1 engine produc- Aft Bulkhead Performance to LEO-Reference: ing 22,900 lb of thrust. The cryogenic tanks are Carrier insulated with a combination of -purged 9,800 kg (21,600 lb) blankets, radiation shields and spray-on foam RL10C-1 Engine insulation (SOFI). The Centaur forward adapt- Aft Stub er (CFA) provides structural mountings for the Adapter fault-tolerant avionics system and structural and electrical interfaces with the spacecraft. MISSION With more than a century of Interstage combined heritage, United Launch Adapter SUCCESS Alliance is the nation’s expe- The booster is 12.5 ft in diameter and 106.5 ft in rienced and reliable launch service length. The booster’s tanks are structurally rigid provider. ULA has successfully deliv- and constructed of isogrid aluminum barrels, ered more than 125 satellites to spun-formed aluminum domes and intertank that provide critical capabilities for skirts. Booster propulsion is provided by the troops in the field, aid meteorologists RD-180 engine system (a single engine with two thrust chambers). The RD-180 burns RP-1 (Rocket in tracking severe , enable Propellant-1 or highly purified kerosene) and liq- Booster personal device-based GPS naviga- uid oxygen and delivers 860,200 lb of thrust at tion and unlock the mysteries of our level. The Centaur avionics system, provides system. guidance, flight control and vehicle sequenc- ing functions during the booster and Centaur phases of flight.

RD-180 Engine ulalaunch.com Copyright © 2018 United Launch Alliance, LLC. All Rights Reserved. II VAFB, CA CAPE ATLAS V 401 CAPE ATLAS V 411 CAPE ATLAS V 421 CAPE ATLAS V 431

10-ft Payload Fairing Interstage Solid Rocket 1 Solid Rocket 1 Solid Rocket 1 Adapter 1 Second Booster Booster Booster Boosters Booster Boosters Booster Stage Boattail Boattail Boattail Boattail Solid Rocket ISA ISA ISA Motors ISA Booster 1 Centaur Centaur Centaur Centaur 2 2 2 2 2

Spacecraft Spacecraft Spacecraft Payload Spacecraft Payload Payload Payload Fairing Fairing Fairing Fairing 1 Atlas 1 Atlas Spaceflight Halves 1 Atlas Spaceflight Halves 1 Atlas Spaceflight 1 Building 1670 Halves Halves Receiving, Inspection, Staging, Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Final Processing & Material Stores & Launch Control Center & Mission Launch Control Center & Mission Launch Control Center & Mission Payload Mission Director’s Center Director’s Center Director’s Center Director’s Center 3 Adapter 2 Building 936 Fitting Receiving, Inspection & Booster 2 Delta Operations Center 2 Delta Operations Center 2 Delta Operations Center 2 Delta Operations Center Transfer ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical 5 Integration Integration Integration Integration 3 Hazardous Processing Receiving, Inspection, Destruct 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 4 Installation & Second Stage Nozzle Spacecraft Processing, Testing Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Installation 3 & Encapsulation 3 Encapsulation 3 Encapsulation 3 Encapsulation 4 Spacecraft Processing Mobile 4 Vertical Integration Facility Mobile 4 Vertical Integration Facility Mobile 4 Vertical Integration Facility Mobile 4 Vertical Integration Facility Spacecraft Processing, Testing & 4 Launch Integration & 4 Launch Launch Vehicle Integration & 4 Launch Launch Vehicle Integration & 4 Launch Launch Vehicle Integration & Encapsulation Platform Testing, Spacecraft Mate & Platform Testing, Spacecraft Mate & Platform Testing, Spacecraft Mate & Platform Testing, Spacecraft Mate & Integrated Operations Integrated Operations Integrated Operations Integrated Operations Fixed Umbilical 5 Mobile Service Tower Tower (FUT) Launch Vehicle Integration & Testing, Spacecraft Mate & Integrated Operations

CAPE ATLAS V 501 CAPE ATLAS V 511 CAPE ATLAS V 521 CAPE ATLAS V 531 CAPE ATLAS V 541

1 1 1 1 1 Booster Booster Booster Booster Booster Solid Rocket Boattail Solid Rocket Boattail Solid Rocket Boattail Boattail Solid Rocket Boattail Boosters Boosters Boosters Boosters CISA CISA CISA CISA CISA CFLR CFLR CFLR CFLR CFLR

Centaur Centaur Centaur Centaur Centaur 2 2 2 2 2 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight 1 Atlas Spaceflight Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Operations Center (ASOC) Launch Control Center & Mission Launch Control Center & Mission Launch Control Center & Mission Launch Control Center & Mission Launch Control Center & Mission Spacecraft Director’s Center Spacecraft Director’s Center Spacecraft Director’s Center Spacecraft Director’s Center Spacecraft Director’s Center Payload Payload Payload Payload Payload Fairing Halves 2 Delta Operations Center Fairing Halves 2 Delta Operations Center Fairing Halves 2 Delta Operations Center Fairing Halves 2 Delta Operations Center Fairing Halves 2 Delta Operations Center ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical ISA, Centaur, Boattail & Vertical DELTA II ATLAS V 401 Integration ATLAS V 411 Integration ATLAS V 421 IntegrationATLAS V 431 Integration Integration PRODUCTION 3 Spacecraft Processing Facility FLIGHT 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility 3 Spacecraft Processing Facility Payload Spacecraft Processing, Testing & Payload Spacecraft Processing, Testing & Payload Spacecraft Processing, Testing & Payload Spacecraft Processing, Testing & Payload Spacecraft Processing, Testing & Transporter Encapsulation PROFILE Transporter Encapsulation Transporter Encapsulation Transporter Encapsulation Transporter Encapsulation 1 Sacramento, CA 1 Sacramento, CA 1 Sacramento, CA 4 Vertical Integration Facility Solid Rocket4 Vertical Booster Integration Fabrica- Facility Fabrica-4 Vertical Integration Facility Solid Rocket Booster Fabrica- 4 Vertical Integration Facility 4 Vertical Integration Facility Launch Vehicle Integration & tion at Aerojet Launch Vehicle Integration & tion at Aerojet Rocketdyne Launch Vehicle Integration & tion at Aerojet Rocketdyne Launch Vehicle Integration & Launch Vehicle Integration & Testing,1 , Spacecraft CO Mate & 2 Denver, CO Testing, Spacecraft Mate & 2 Denver, CO Testing, Spacecraft Mate & 2 Denver, CO Testing, Spacecraft Mate & Testing, Spacecraft Mate & Integrated Operations Integrated Operations Integrated Operations Integrated Operations Integrated Operations 3 ULA Headquarters & Design 3 ULA Headquarters & Design ULA Headquarters3 & Design ULA Headquarters & Design 3 3 Center Center Engineering Center Engineering Center Engineering Mobile Mobile Mobile Mobile Mobile 4 Launch 2 Harlingen, TX Launch 3 Harlingen, TX 3 Harlingen, TX 3 Harlingen, TX 1 4 4 Launch 4 Launch 4 Launch Platform Payload Fairing, Payload Platform Payload Fairing, Payload Platform Payload Fairing, Payload PayloadPlatform Fairing, Payload Platform 2 1 Fairing Adapter, Booster 1 2 Fairing Adapter, Booster 1 2 Fairing Adapter, Booster 1 2 Fairing Adapter, Booster Adapter & Centaur Adapter Adapter & Centaur Adapter Adapter & Centaur Adapter Adapter & Centaur Adapter Time Fabrication Fabrication Fabrication Fabrication Event (hr:min:sec) 4 Decatur, AL 4 Decatur, AL 4 Decatur, AL 1 Brigham City, UT 3 Decatur, AL 3 3 1 RD-180 Engine Ignition -0:00:02.74 Booster Fabrication & Final 4 Booster Fabrication & Final 4 Booster Fabrication & Final Solid Rocket Motor Booster Fabrication & Final INSIGHT Liftoff (Thrust to Weight> 1) 0:00:01.1 Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank Fabrication at Orbital ATK Assembly, Centaur Tank MISSION Fabrication & Centaur Final Begin Pitch/Yaw Maneuver 0:00:17.18 9 Fabrication & Centaur Final Fabrication & Centaur Final Fabrication & Centaur Final 2 Denver, CO 6 7 10 11 Assembly 12 Assembly Assembly ULA Headquarters & Assembly 1 5 0:01:17.8 PROFILE 5 West Palm Beach, FL13 5 West Palm Beach, FL 5 West Palm Beach, FL Design Center Engineering 4 4 West Palm Beach, FL 5 5 5 5 6 Maximum Dynamic4 Pressure 0:01:26.9 RL10C1 Engine Fabrication RL10C1 Engine Fabrication RL10C1 Engine Fabrication 3 Decatur, AL 2 RL10C1 Engine Fabrication 3 6 3 6 3 2 Atlas Booster Engine Cutoff (BECO) 0:04:04.3 at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne Booster, Payload Fairing & at Aerojet Rocketdyne 6 Khimki, 6 Khimki, Russia 6 Khimki, Russia Second Stage Fabrication 5 Khimki, Russia 3 Atlas Centaur Separation 0:04:10.3 RD180 Engine Fabrication at 4 Centaur First Main Engine Start (MES-1) 0:04:20.3 RD180 Engine Fabrication at RD180 Engine Fabrication at RD180 Engine Fabrication at NPO Energomash NPO Energomash NPO Energomash NPO Energomash VAFB ATLAS V 401 VAFB5 Payload ATLAS Fairing Jettison V 411 0:04:28.3 Vandenberg Air Force Base, California VAFB ATLAS V 421 VAFB ATLAS V 431 3 VAFB DIV_5Œ2 6 Centaur First Main Engine Cutoff (MECO-1) 0:13:16.2 Time SPACE 7 Centaur Second MainEv entEngine Start (MES-2) 1:18:56.9(hr:min:sec) 8 9 LAUNCH 8 Centaur Second Main1 Engine Cutoff (MECO-2) 1:24:19.8-0:00:02.7 ATLAS V 501 ATLAS V 511 ATLAS V 521 0:00:01.1 ATLAS V 531 ATLAS V 541 Graphite/Epoxy 9 InSight Separation 1:33:19.8 COMPLEX-3 Begin Pitch/Yaw Maneuver 0:00:17.1 Motors (GEM) PROCESSING 10 MarCO-A SeparationMach 1 1:33:53.80:01:17.8 1 Sacramento, CA Maximum Dynamic Pressure 0:01:26.9 1 Sacramento, CA 1 Sacramento, CA 1 Sacramento, CA 11 MarCO-B2 Separation 1:34:41.80:04:04.3 1 Solid Rocket Booster Fabrication 2 1 Solid Rocket Booster6 Fabrication 1 Solid Rocket Booster Fabrication 1 Solid Rocket Booster Fabrication 1 Remote Launch Control Center 1 Denver, CO 12 Start Blowdown 3 Atlas Centaur Separation 1:59:39.80:04:10.3 (RLCC) at Aerojet Rocketdyne 4 at Aerojet Rocketdyne at Aerojet Rocketdyne at Aerojet Rocketdyne Second ULA Headquarters & Design Centaur Centaur 0:04:20.3 Centaur Centaur 2 Booster Launch Control Center & Mission 2 Denver, CO 13 End of Mission 5 Payload Fairing Jettison 2:41:19.80:04:28.3 2 Denver, CO 2 Denver, CO 2 Denver, CO Stage Center Engineering Director’s Center ULA Headquarters & Design 6 0:13:16.2 ULA Headquarters & Design ULA Headquarters & Design ULA Headquarters & Design Fairing 2 Harlingen, TX InSight Orbit at Separation7 1:18:56.9 Ascent 2 2 Halves 2 Building 945 Center Engineering Inclination: 63.4 deg | 8C3: 8.19 km /s 1:24:19.8 Boattail Center Engineering Center EngineeringBoattail Center Engineering Payload Adapter, Booster 1 Booster ASA Boattail Solid Rocket Booster ASA Solid Rocket Booster ASA Solid Rocket Booster ASA Boattail Receiving, Inspection, Staging 3 Harlingen,1 Remote TX Launch Control Center DLA: -40.83 deg | RLA: 328.14InSight degSeparation 1:33:19.8 3 Harlingen, TX 1 Remote Launch Control Center 3 Harlingen, TX 1 Remote Launch Control Center 3 Harlingen, TX 1 Remote Launch Control Center 3 Boosters9 ISA Boosters ISA Boosters ISA Mobile Adapter & Centaur Adapter ISA (RLCC) MarCO-A Separation (RLCC) (RLCC) (RLCC) & Final Processing Payload Adapter, Booster 1 10 1:33:53.8 Payload Adapter, Booster Payload Adapter, Booster Payload Adapter, Booster Assembly Fabrication Launch Control Center & 11 MarCO-B Separation 1:34:41.8 Launch Control Center & Mission Launch Control Center & Launch Control Center & Mission Payload Adapter & Centaur Adapter (deg) InSight Orbit at S Adaptereparation & Centaur Adapter Adapter & Centaur Adapter Adapter & Centaur Adapter Shelter 3 Horizontal Integration Facility 3 Decatur, AL Mission Director’s Center 12 Start Blowdown 1:59:39.8 Flight Azimuth 63.4 deg | C3: 8.19 km2/s2 Director’s Center Mission Director’s Center Director’s Center Adapter Fabrication DLA: -40.83 deg | RLA: Fabrication 328.14 deg Fabrication Fabrication 5 Receiving, Inspection & Second Booster Fabrication & Final 2 Centaur 13 End of Mission 2 2:41:19.8 Centaur 2 Centaur 2 Centaur Fittings 4 Decatur,2 Operations AL Center 80 4 Decatur, AL 2 Operations Center 4 Decatur, AL 2 Operations Center 4 Decatur, AL 2 Operations Center Stage Integration 1 Assembly, Centaur Tank 1 2 1 2 1 2 1 2 Booster Receiving Fabrication & Inspection & Final Booster Fabrication & Receiving Final & Inspection Booster Fabrication & Final Receiving & Inspection Booster Fabrication & Final Receiving & Inspection Fabrication & Final Assembly 4 Spacecraft Processing Facility Assembly, Centaur Tank 60 Assembly, Centaur Tank Assembly, Centaur Tank Assembly, Centaur Tank 4 West Palm Beach, FL 3 Building 8337 8 3 Building 8337 3 Building 8337 3 Building 8337 Spacecraft Processing, Testing & 5 Fabrication & Final Assembly 5 Fabrication & Final Assembly 5 Fabrication & Final Assembly 5 Fabrication & Final Assembly RL10C1 Engine Fabrication at Spacecraft PLF/Adapter Receiving & Spacecraft7 PLF/Adapter Receiving & PLF/Adapter Receiving & Spacecraft PLF/Adapter Receiving & Encapsulation 3 4 5 West Palm Beach, FL 4 5 West Palm Beach, FL 4 5 West Palm Beach,Spacecraft FL 4 5 West Palm Beach, FL Aerojet Rocketdyne Inspection 40 Inspection Inspection Inspection 4 RL10C1 Engine Fabrication at 9 TEL-4 RL10C1 Engine Fabrication at RL10C1 Engine Fabrication at RL10C1 Engine Fabrication at 5 Mobile Service Tower 5 Khimki, Russia 5 6 4 Aerojet4 Spacecraft Rocketdyne Processing Facility 6 10 4 Aerojet Rocketdyne4 Spacecraft Processing Facility 6 4 Aerojet Rocketdyne 4 Spacecraft Processing6 Facility Aerojet Rocketdyne4 4 Spacecraft Processing Facility Launch Vehicle Integration & Testing, RD180 Engine Fabrication at 20 11 Spacecraft Mate & Integrated Fairing 6 Khimki, Spacecraft Russia Processing, Testing 6 Khimki, Russia Spacecraft Processing, Testing & 6 Khimki, Russia Spacecraft Processing, Testing 6 Khimki, Russia Spacecraft Processing, Testing & NPO Energomash & Encapsulation Fairing Encapsulation Fairing & Encapsulation Fairing Encapsulation Operations 4 5 Halves RD180 Engine Fabrication at 5 RD180 Engine Fabrication at 5 RD180 Engine Fabrication at 5 RD180 Engine Fabrication at Halves 6 Zurich, Switzerland Payload TDRS 171 6 Payload Halves Payload Halves Payload 6 7 Transporter NPO Energomash 0 7 TransporterTDRS 41 NPO Energomash 7 Transporter NPO Energomash 7 TransporterNPO Energomash Fixed Payload Spacecraft 2 5-m Payload Fairing 3 5 Mobile Service Tower 3 TDRS 275 5 Mobile Service Tower 3 5 Mobile Service Tower 3 5 Mobile Service Tower 3 7 Zurich, Launch Switzerland Vehicle Integration & 3 7 Zurich, Switzerland Launch Vehicle Integration & 7 Zurich, Switzerland3 Launch Vehicle Integration & 7 Zurich, Switzerland 3 Launch Vehicle Integration & Launch Transporter Fabrication at RUAG Space 13 Platform 5-m Testing,Payload SpacecraftFairing Mate & -20 5-m Payload Fairing Testing, Spacecraft Mate & 5-m Payload Fairing Testing, Spacecraft Mate & 5-m Payload Fairing Testing, Spacecraft Mate & Integrated Operations Integrated Operations Integrated Operations Integrated Operations Fabrication at RUAG Space Fabrication at RUAG Space Fixed Fabrication at RUAG Space Fabrication at RUAG Space Fixed Fixed Geodetic (deg) Launch Fixed Launch -40 Launch Platform Launch Platform Platform Platform

-60

Launch Vehicle /Spacecraft Groundtrack DELTA IV HEAVY DELTA IV 5,2 TDRS Asset Geostationary Orbital Position DELTA IV 5,4 ATLAS V 551 -80

-135 -90 -45 0 45 90 135 All Values Approximate 1 Sacramento, CA Solid Rocket Booster Fabrication at Aerojet Rocketdyne 2 Denver, CO ULA Headquarters & Design Center Engineering 3 Harlingen, TX VAFB ATLAS V 501 1 De Soto, CA VAFB ATLAS V 511 1 De Soto, CA VAFB ATLAS V 521 1 De Soto, CA VAFB ATLAS V 531 Payload Adapter, Booster VAFB ATLAS V 541 RS68A Engine Fabrication at RS68A Engine Fabrication at RS68A Engine Fabrication at Adapter & Centaur Adapter Aerojet Rocketdyne 2 Aerojet Rocketdyne 2 Aerojet Rocketdyne Fabrication 2 2 Denver, CO 3 2 Brigham City, UT 3 2 Brigham City, UT 1 2 4 Decatur, AL ULA Headquarters & Design Solid Rocket Motor Fabrication at Solid Rocket Motor Fabrication at Booster Fabrication & Final 1 Center Engineering 1 Orbital ATK 1 Orbital ATK Assembly, Centaur Tank 3 Decatur, AL 1 3 Denver, CO 1 3 Denver, CO 1 Fabrication & Final Assembly 1 Centaur Centaur Centaur Centaur Centaur 4 ULA Booster, Payload Fairing and 4 ULA Headquarters & Design 4 ULA Headquarters & Design 4 5 West Palm Beach, FL Second Stage Fabrication Center Engineering Center Engineering RL10C1 Engine Fabrication at Booster 4 West Palm Beach, FL 4 Decatur, AL 4 Decatur, AL Aerojet Rocketdyne Booster Booster Booster 6 Booster CISA RL101 RemoteEngine Fabrication Launch Control at Aerojet Center CISA ULA Booster, Payload1 Remote Fairing Launchand Control Center ULA Booster,CISA Payload Fairing and 1 Remote Launch Control Center 6 Khimki, Russia CISA 1 Remote Launch Control Center CISA 1 Remote Launch Control Center 1 5Boattail Rocketdyne(RLCC) 5 BoattailSecond Stage Fabrication(RLCC) 5 Second Stage FabricationBoattail (RLCC) 5 RD180 Engine Fabrication at Boattail (RLCC) Boattail (RLCC) Launch Control Center & Solid Rocket 5 West Palm Beach, FL Launch Control Center & Mission Solid Rocket 5 West Palm Beach, FL Launch Control Center & Mission Solid Rocket Launch Control Center & Solid Rocket Launch Control Center & Mission Mission Director’s Center Director’s Center Director’s Center 7 3 NPO Energomash Mission Director’s Center Director’s Center Boosters RL10 Engine Fabrication at Aerojet Boosters RL10 Engine Fabrication at Aerojet Boosters Boosters Centaur Centaur Centaur 7 Zurich, Switzerland Centaur Centaur 2 Operations Center Rocketdyne 2 Operations Center Rocketdyne 2 Operations Center 5-m Payload Fairing 2 Operations Center 2 Operations Center 2 Receiving & Inspection 2 Receiving & Inspection 2 Receiving & Inspection Fabrication2 at RUAG Space Receiving & Inspection 2 Receiving & Inspection 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 3 Building 8337 PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & PLF/Adapter Receiving & 5 Inspection 5 Inspection 5 Inspection 5 Inspection 5 Inspection Spacecraft Spacecraft Spacecraft Spacecraft 4 Spacecraft Processing Facility Spacecraft 4 Spacecraft Processing Facility 4 Spacecraft Processing Facility current as of 1.31.18 4 Spacecraft Processing Facility 4 Spacecraft Processing Facility Spacecraft Processing, Testing Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & Spacecraft Processing, Testing & & Encapsulation Encapsulation Encapsulation Encapsulation Encapsulation 4 4 4 4 4 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower 5 Mobile Service Tower Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Launch Vehicle Integration & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Payload 3 Testing, Spacecraft Mate & Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations Transporter Integrated Operations

Fixed Fairing Halves, Fixed Fairing Halves, Fixed Fairing Halves, Fixed Fairing Halves, Fairing Halves, Fixed Base Modules, CFLR Base Modules, CFLR Base Modules, CFLR Base Modules, CFLR Launch Base Modules, CFLR Launch Launch Launch Launch Platform Platform Platform Platform Platform