ANNUAL PERFORMANCE REPORT - 2014-15 BRIEF HISTORY OF N.F. RAILWAY

The tea, oil and coal industries were set up in Upper area around the 1860s and 70s. Transportation of the produce was by river routes down the Brahmaputra. A need was felt for construction of a Railway from the tea and oil producing centres in the hinterland to the river port at Dibrugarh. The Assam Railways and Trading Company Limited which was incorporated in July 1881, took up the task of construction of the first railway line - and the first Metre Gauge train in the Northeast region chugged from the river ghat in Dibrugarh to Jeypore road on 1st May 1882.

By February, 1884 the railway line had reached the coalfields of Margherita and by May, 1884 another line from Makum to Doomdooma was constructed. This network formed what was known as the Dibru Sadiya Railway (DSR).

About this time, an overseas market had been created for tea and jute, the principal products of Assam and Eastern . The (ABR) was formed in 1892 to connect the port of by rail to upper Assam and provide an outlet for these products for the overseas markets. The railway also expected to pick up some of the already existing road traffic between and Chittagong leading to the steady economic development of the area. The railway line from the port of Chittagong to Tinsukia (Makum) was constructed in three phases – from Chittagong to Badarpur with branch lines to Silchar and Laksham, from Badarpur to Lumding through the North Cachar Hills and in the third phase from Lumding further North to connect the DSR at Makum. The line from Lumding to Guwahati was constructed as a branch line to this alignment from Makum to Chittagong. The Chittagong-Badarpur section opened for traffic up to Badarpur on December 4, 1896 and was extended up to Silchar on November 8, 1898. It was for the first time that a part of the Northeast was rail-linked to the rest of (with a river crossing between Chandpur and Goalundo).

1 NORTHEAST FRONTIER RAILWAY Besides the Dibru-Sadiya Railway (DSR) and Assam Bengal Railway (ABR), the (EBR) was the third important constituent of the present N. F. Railway. These three Railways were merged during World War-II and came to be known as the Bengal Assam (BA) Railway. Thereafter, some of the company-owned railways viz, Bengal Railway, Jorhat Provincial Railway, Chaparmukh Silghat Railway, Katakhal Lalabazar Railway etc. were also merged with the Bengal Assam Railway system.

With the in August 1947, the Bengal Assam Railway was bifurcated according to the political boundaries leading to the formation of the Assam Railway with its headquarters at Pandu. In 1948, the Darjeeling Himalayan Railway (DHR) was taken over by the Government of India and merged with the Assam Railway.

The partition of India severed the links of the Assam Railway with the rest of the country, connected as the two were, till then, through the railway network in East Pakistan. For restoration of the link to the Assam Railway, the Assam Rail Link Project was taken up on top priority to provide the connection through the “chicken neck” corridor of North Bengal. This link was completed in January 1950.

The re-organization of the railway zones in 1951 led to the merger of the Assam Railway and Avadh Tirhut Railway and these two formed part of the North Eastern Railway with headquarters at Gorakhpur. The then North Eastern Railway thus extended right across northern India covering UP, Bihar, Bengal and Assam, from Bareilly to Tinsukia and Badarpur / Silchar.

The present day Northeast Frontier Railway was carved out of the North Eastern Railway and set up with its headquarters at Maligaon on 15th of January, 1958.



2 ANNUAL PERFORMANCE REPORT - 2014-15 AN OVERVIEW STATUS AS ON 01.04.2015 BG MG NG Total Route Length (Km) 3299.21 601.32 87.48 3988.01 Track K.M. 5038.95 866.25 96.98 6002.51 No. of Stations 436* 48 10 494 * including BG/MG - 2, BG/NG - 2 & BG/MG/NG - 1  State-wise route length (Km) : Assam - 2463.55 Arunachal - 11.67 Bihar - 327.42 Meghalaya - 8.76 Tripura - 151 Manipur - 1.35 West Bengal - 1009.51 Mizoram - 1.50 Nagaland - 12.85 Total - 3988.01 KM

 Coach Holding : 2673 (BG-2428, DEMU - 88, MG-93 & NG - 64)  Mail & Exp. Services : BG -98.57 trains/day, MG-Nil  Passenger Services : BG - 101.71 trains/day MG - Nil DEMU - 14.71 trains/day NG - 16 trains/day  Freight Daily Interchange (in Trains) : Taken Over Made Over (FY 2013-14) ER 15.4 16.3 ECR 11.6 10.5  Passengers carried : 90.84 million (2.49 lakhs/day) (FY 2014--15)  Wagon Holding (FY 2014-15) : BG = 5491

3 NORTHEAST FRONTIER RAILWAY  Loco Holding : Diesel (378 BG + 26 MG + 4 NG) + Steam (13 NG)  Diesel Sheds at : Malda, Siliguri, New Guwahati, Lumding  Workshop outturn : (In vehicle units of POH) Workshop Coaches/month Wagons/month New Bongaigaon 53.33 104.3 Dibrugarh 57 —  Originating Loading FY 2012-13 : 10.54 MT FY 2013-14 : 12.15 MT FY 2014-15 (Target) : 12.50 MT FY 2014-15 (Actual) : 11.53 MT  Commodities (Inward/Outward) : Coal, Dolomite, Cement, Food- grain, POL,Mize, Fertilizer, Bamboo, Paper.  Level crossing gates : Manned - 1155 (BG+MG) : Unmanned - 669 (BG+MG+NG)  PRS Centers : 132 Nos.  UTS Location : 365 Nos.  UTS cum PRS : 96 Nos.  Total Originating Earnings FY 2012-13 : ` 3108.91 Cr. FY 2013-14 : ` 3425.41 Cr. FY 2014-15 (Target) : ` 4240.82 Cr. FY 2014-15 (Actual) : ` 3679.83 Cr. Freight FY 2012-13 : ` 1314.11 Cr. FY 2013-14 : ` 1459.41 Cr. FY 2014-15 (Target) : ` 1985.59 Cr. FY 2014-15 (Actual) : ` 1449.52 Cr.

4 ANNUAL PERFORMANCE REPORT - 2014-15 Passenger FY 2012-13 : ` 1052.76 Cr. FY 2013-14 : ` 1222.13 Cr. FY 2014-15 (Target) : ` 1473.07 Cr. FY 2014-15 (Actual) : ` 1400.88 Cr. Sundry FY 2012-13 : ` 614.78 Cr. FY 2013-14 : ` 606.13 Cr. FY 2014-15 (Target) : ` 630.00 Cr. FY 2014-15 (Actual) : ` 673.89 Cr. Other Coaching FY 2012-13 : ` 127.26 Cr. FY 2013-14 : ` 137.74 Cr FY 2014-15 (Target) : ` 152.16 Cr. FY 2014-15 (Actual) : ` 155.54 Cr.  Working Expenses FY 2012-13 : ` 3853.85 Cr. FY 2013-14 : ` 4473.08 Cr. FY 2014-15 (Final Grant) : ` 4953.23 Cr. FY 2014-15 (Actual) : ` 4751.85 Cr.  Employees On Roll : 64729 (Gazetted - 988) : (Non-Gazetted - 63741)



5 NORTHEAST FRONTIER RAILWAY DIVISIONS KATIHAR –DIVISION A. Infrastructure BG MG NG Total Route K.M. 760 12 88 860 Single Line 520 12 88 620 Double Line 240 — — 240 Track K.M. 1477 12 109 1598  No. of Railway station: (Comm.Classification, No and Name) Total : 132 A1 - 1 (New Jalpaiguri), A - 6 (Katihar, Kishanganj, Siliguri Jn, Jogbani, Raiganj, Purnia) B - 7 (Barsoi, Forbesganj, Aluabari, Araria Court, Jalpaiguri Road, Dalkola, Samsi) D - 15, E - 60, F - 43)  Workshop : 1 (Tindharia)  Diesel Sheds : 2 (Malda - 75 Locos, Siliguri Jn 172 Locos)  Major Depots  Coaching maintenance Depot : Katihar & NJP  Wagon maintenance Depot : NJP  ROH Depot : NJP  DEMU Maintenance Depot : Siliguri  Stores Depot : NJP, KIR, MLDT & SGUJ  Ballast Depot : NJP & Harishchandrapur  Printing Press :Kurseong  Crew lobby : 3 (Katihar, NJP, MLDT)  Running Rooms :5 (NJP, KIR, Jogbani, Radhikapur & Balurghat ) 6 ANNUAL PERFORMANCE REPORT - 2014-15  Major fuelling points : 2 (Katihar, NJP)  Heritage line : NJP – DJ (Darjeeling Himalayan Railways) B. Freight & Parcel Business (a) Goods  Goods sheds/Sidings : 11 (NJP, BORA/BPMS, KNE, RNI, PRNA, JPG, KIR, JBN, DLK, MLFC, SJKL)

TOTAL DIVISIONAL OUTWARD LOADING

2012-13 2013-14 Rake Wagon Rake Wagon 96 4337 99 4379 2014-15 2014-15 TARGET ACTUAL - - 105 4798 TOTAL DIVISIONAL INWARD LOADING 2012-13 2013-14 Rake Wagon Rake Wagon 157 6652 174 7265 2014-15 2014-15 TARGET ACTUAL - - 194 8119  Earnings Year 2012-13 : ` 666.44 Cr. Year 2013-14 : ` 774.44 Cr. Year 2014-15 (Target) : ` 1052.26 Cr. Year 2014-15 (Actual) : ` 870.12 Cr. (b) Parcel  No. of Parcel Stations : 90 Nos.

7 NORTHEAST FRONTIER RAILWAY  Loading Year 2012-13 : 43065 Ton Year 2013-14 : 43113 Ton Year 2014-15(Target) : -- Year 2014-15 (Actual) : 45433 Ton  Earnings Year 2012-13 : ` 8.47 Cr. Year 2013-14 : ` 7.75 Cr. Year 2014-15(Target) : -- Year 2014-15 (Actual) : ` 10.99 Cr. C. Passenger Business  Passengers originating Year 2012-13 : ` 4.12 Cr. Year 2013-14 : ` 4.04 Cr. Year 2014-15(Target) : ` 3.30 Cr. Year 2014-15 (Actual) : ` 3.72 Cr.  Passengers Earning originating Year 2012-13 : ` 313.25 Cr. Year 2013-14 : ` 377.82 Cr. Year 2014-15(Target) : ` 557.53 Cr. Year 2014-15 (Actual) : ` 406.03 Cr. D. Sundry Earnings  Total Year 2012-13 : ` 16.67 Cr. Year 2013-14 : ` 19.31 Cr. Year 2014-15(Target) : ` 10.55 Cr. Year 2014-15 (Actual) : ` 21.39 Cr.  Commercial Publicity Year 2012-13 : ` 43.08 Lakhs Year 2013-14 : ` 45.61 Lakhs Year 2014-15(Target) : ` 61.50 Lakhs Year 2014-15 (Actual) : ` 45.57 Lakhs

8 ANNUAL PERFORMANCE REPORT - 2014-15 E. Personnel  Staff strength on roll : Gaz 115, Non.Gaz -13574, Total - 13689  Total No. of Rly. quarters : 11544  Railway Schools : 3 (NJP, Siliguri, Barsoi)  Railway Hospitals : 3 (NJP, Katihar, Tindharia) Health unit - 09 Subsidiary Dispensary - 01 F Passenger Amenity  Adarsh stations : 36  Clean Train Stations : 2 (Katihar & NJP)  Watering Stations : 7 (KIR, NJP for all trains) (SGUJ, HDB, RDP, BLGT & JBN for terminal trains)  24 Coach/ stations : 15 (KIR, NJP, KNE, BOE, SGUJ, AUB, ADQ, TKG, NAK, EKI, DLK, LAV, MFA, RDP & JBN)  Departmental linen Depot : 2 ( Katihar & NJP)  Catering - Food plaza : 2 (NJP, Katihar), Jan Ahar 1 (NJP) Mobile Pantry Services : Nil  Total PRS : 37 Total UTS : 82 UTS cum PRS - : 31 Non - rail Head PRS : 15  JTBS : 07(KIR-3,NJP-1,BOE-1, JBN-1, ARQ-1) RTSA : 01  Retiring Room Stations : 13 (KIR, NJP, SGUJ, KNE, BOE, PRNA, FBG, JBN, DLK, JPG, RGJ, SM, AUB)  9 NORTHEAST FRONTIER RAILWAY ALIPURDUAR –DIVISION A. Infrastructure BG MG Total Route Km. 587.98 61.72* 649.70 Single Line 494.99 61.72* 556.71 Double Line 92.99 — 92.99 Track Km. 886.90** 71.04* 957.94 * Under gauge conversion.  No. of Railway Stations Total : 72 A1 : Nil A : 04 (NCB, APDJ, COB, NOQ) B : 05 (KOJ, HSA, DHH, DQG, NMZ) D : 11 E : 45 F : 05  Workshop : Nil  Diesel Shed : Nil  Major Depots  Coaching Maintenence Depot : 01(Alipurduar Jn.)  Wagon Maintenence Depot : Nil  ROH Depot : Nil  Ballast Depot : 01 (JOQ)  DEMU Maintenence Depot : Nil  Stores Depot : Nil  Printing Press : Nil  Crew Lobby : 02 Alipurduar Jn. & New Coochbehar  Running Rooms : 01 (New coochbehar)  Major Fuelling Points : Nil

10 ANNUAL PERFORMANCE REPORT - 2014-15  Heritage Line : Nil B. Freight & Parcel Business (a) Goods  Goods Sheds/Sidings : 14(BNV,DLO,HSA,NOQ, GOGH,FKM,KOJ,BSGN, NCB, SXX, FLK, FLK/ PCAL, SLKX/NTPC & DQG

 Outward /Inward loading

TOTAL DIVISIONAL OUTWARD LOADING

2012-13 2013-14 Rake Wagon Rake Wagon 33 1711 46 2366 2014-15 2014-15 TARGET ACTUAL - - 49 2493.41 TOTAL DIVISIONAL INWARD LOADING 2012-13 2013-14 Rake Wagon Rake Wagon 43 1877 38 1661 2014-15 2014-15 TARGET ACTUAL - - 37 1593.91

 Earnings Year 2012-2013 : ` 123.13 Cr. Year 2013-2014 : ` 160.40 Cr. Year 2014-2015 (Target) : ` 280.32 Cr. Year 2014-2015 (Actual) : ` 203.75 Cr.

11 NORTHEAST FRONTIER RAILWAY a) Parcel -  No. of Parcel stations : 23 Loading Year 2012-2013 : 26557 Ton Year 2013-2014 : 41957 Ton. Year 2014-2015 (Target) : Year 2014-2015 (Actual) : 53615 Ton. b) Earnings Year 2012-2013 : ` 5.61 Cr. Year 2013-2014 : ` 8.31 Cr. Year 2014-2015 (Target) : Year 2014-2015 (Actual) : ` 13.13 Cr. C) Passenger Business Passengers Originating Year 2012-2013 : ` 1.40 Cr. Year 2013-2014 : ` 1.24 Cr. Year 2014-2015 (Target) : ` 11.00 Cr. Year 2014-2015 (Actual) : ` 1.20 Cr. Passenger earnings originating Year 2012-2013 : ` 134.49 Cr. Year 2013-2014 : ` 158.86 Cr. Year 2014-2015 (Target) : ` 175.86 Cr. Year 2014-2015 (Actual) : ` 172.78 Cr. D) Sundry Earnings Year 2012-2013 : ` 8.95 Cr. Year 2013-2014 : ` 9.99 Cr. Year 2014-2015 (Target) : ` 8.54 Cr. Year 2014-2015 (Actual) : ` 9.26 Cr. Commercial Publicity - Year 2012-2013 : NIL. Year 2013-2014 : ` 0.03 Cr. Year 2014-2015 (Target) : ` 0.07 Cr. Year 2014-2015 (Actual) : ` 0.02 Cr.

12 ANNUAL PERFORMANCE REPORT - 2014-15 E) Personnel Staff strength : 45+6(CMP) Non-Gaz.–Sanctioned: 8194 Actual: 6847 (including Security & Accounts) Total – Sanctioned::8194 Actual: 6892+ 6 (CMP) (including Security& Accounts)  Total No. of Railway Quarters : 6333  Railway Hospital : 01 (Alipurduar Jn.) Health Unit - 07  Railway School : 02 ( RHSS/ Boys & Girls/ Alipurduar Jn.) F) Passenger Amenity  Adarsh stations : 30 stations.  Clean Train Stations : Nil.  Watering Stations : 03 (APDJ, NCB & NOQ)  24 Coach/Stations : 14 (NOQ, NCB, FLK, DQG, NMX, JPE , GOGH, FKM, KOJ, APDJ, HSA, DLO, BNV & NMZ)  Departmental Linen Depot : Nil  Catering – Food plaza : Nil. Mobile Pantry Services : 01 (S. Mahananda Exp.)  PRS Centres : 13 (Exclusive PRS) Non-Rail Head PRS : 02 UTS-cum-PRS : 11 Total UTS : 62 (Inclusive of UTS-cum-PRS)  JTBS : Nil. RTSA : Nil.  Retiring Room Stations : 12 ( APDJ, NOQ, NCB, FKM, FLK, DQG, KOJ, NMZ, HSA, BNV, NMX & COB)



13 NORTHEAST FRONTIER RAILWAY RANGIYA –DIVISION A. Infrastructure BG MG(Under G.C.) Total Route K.M. 757.80 106.88 864.68 Single Line 757.80 106.88 864.68 Double Line — — — Track K.M. 858.89 187.92 1046.81  Number of Rly Stations: Total-84 A1 : NIL A3 : 3 (BNGN, BPRD & RNY ) B1 : 1 (New Bongaigan) D : 8 E : 53 F : 14, New stations-DKGN,GMTO, NHLN, NOLB & MNDP  Workshop : New Bongaigaon, Engineering Workshop/Bongaigaon  Major Depots : P. WAY-TD/Bongaigaon  Crew lobby : 2(NBQ & RPAN)  Running Rooms : 3 (RNY, NBQ & NLP)  Major fueling points : 1 (New Bongaigaon) B. Freight & Parcel Business (a) Goods -  Goods sheds/Sidings : 24 (CGS, BIZ, RNY, GOE, NLV, PTLD, BPRD, SBE, CPQ, NBQ, BPRL,JPZ, PNVT, GLPT, DDNI, BMGN, AZA, DKGN,MNDP, HMY, TNL, BKTBi, TBH, NLP)

14 ANNUAL PERFORMANCE REPORT - 2014-15  Outward /Inward loading (Rakes per month/Wagons per month) TOTAL DIVISIONAL OUTWARD LOADING 2012-13 2013-14 Rake Wagon Rake Wagon 109 4836 134 6072 2014-15 2014-15 TARGET ACTUAL - - 88 4138 Total Divisional Inward Unloading 2012-13 2013-14 Rake Wagon Rake Wagon 72 2868 72 3114 2014-15 2014-15 TARGET ACTUAL 65 2852 82 3474

 Goods Earnings Year 2012-13 : ` 485.12 Cr Year 2013-14 : ` 592.89 Cr Year 2014-15 (Target) : ` 675.34 Cr Year 2014-15 (Actual) : ` 410.24 Cr B. Parcel : No. of Parcel Stations : 8 (NBQ, BNGN, BPRD,NLV RNY,TNL,DKGN& RPAN)  Loading Year 2012-13 : 8080 Ton Year 2013-14 : 10370 Ton Year 2014-15 (Target) : - Year 2014-15 (Actual) : 22560.4 Ton  Earnings Year 2012-13 : ` 1.19 Cr. Year 2013-14 : ` 2.02 Cr. Year 2014-15 (Target) : Year 2014-15 (Actual) : ` 3.50 Cr. 15 NORTHEAST FRONTIER RAILWAY C. Passenger Business:  Passenger originating Year 2012-13 : ` 99.05 Lakhs Year 2013-14 : ` 115 Lakhs Year 2014-15 (Target) : ` 60 Lakhs Year 2014-15 (Actual) : ` 134 Lakhs  Passenger earning originating Year 2012-13 : ` 105.74 Cr. Year 2013-14 : ` 119.73 Cr. Year 2014-15 (Target) : ` 93.21 Cr. Year 2014-15 (Actual) : ` 155.79 Cr. D. Sundry Earnings Year 2012-13 : ` 5.21 Cr. Year 2013-14 : ` 15.46 Cr. Year 2014-15 (Target) : ` 4.21 Cr. Year 2014-15 (Actual) : ` 7.24 Cr  Commercial Publicity Year 2012-13 : ` 16.15 Lakhs Year 2013-14 : ` 9.08 Lakhs Year 2014-14 (Target) : ` 25.00 Lakhs Year 2014-15 (Actual) : ` 5 Lakhs E. Personnel  Staff strength on roll : Gaz. - 51, Non.Gaz - 7869, : Total - 7920  Total No. of Railway Quarters : 6299  Railway Hospitals : 2 (New Bongaigaon, Rangapara North) Health unit - 9 F. Passenger Amenity  Adarsh stations : 10  Watering Stations : 2 (New Bongaigaon, Rangapara North)  PRS : 22 (RH-9,NRH-13) UTS : 63 UTS cum PRS : 18  JTBS : 01  Retiring Room Stations : 06

 16 ANNUAL PERFORMANCE REPORT - 2014-15 LUMDING –DIVISION A. Infrastructure BG MG Total Route K.M. 638 400 1038 Single Line 615 400 1015 Double Line 23 — 23 Track K.M. 622 698 1320  Number of Rly Stations Total-147 A1 : 1 (GHY) A : 4 (KYQ, LMG, DMV, SCL) B : 4 (HJI, DPU, HBN, AGTL) D : 14 E : 104 F : 20  Workshops : Nil

 Diesel Sheds : 02 (New Guwahati-(BG)-103, Lumding-(MG)-63  Fueling points : Lumding,Karimganj, Guwahati, New Guwahati & Kamakhya.  Crew Lobbies : Lumding,Badarpur, Guwahati & New Guwahati  Running Rooms : 07 at Lumding, New Guwahati, Guwahati, Shilghat, Mairabari, Agartala & Karimganj)  Rest Rooms : 01 at Chaparmukh B.Freight & Parcel Business  Goods Sheds – 21 Nos (BG – 06 Nos + MG – 15 Nos.) Goods Sheds Siding – 12 Nos (IOC Siding – 05 + FCI Siding– 05 + HPC Siding – 02). 17 NORTHEAST FRONTIER RAILWAY (a) Goods –  Outward/Inward loading (Rakes/Wagons per month) TOTAL DIVISIONAL OUTWARD LOADING 2012-13 2013-14 Rake Wagon Rake Wagon 343 14391 438 18411 2014-15 2014-15 TARGET ACTUAL 696 29381 686 28835 TOTAL DIVISIONAL INWARD LOADING 2012-13 2013-14 2474 103909 2623 110161 2014-15 2014-15 TARGET ACTUAL

- - 2842 119387

 Earnings Year 2012-13 : ` 117.21 Cr Year 2013-14 : ` 135.38 Cr Year 2014-15 (Target) : ` 210.36 Cr Year 2014-15 (Actual) : ` 176.86 Cr (b) Parcel  No. of Parcel Stations : 60 Nos.  Loading Year 2012-13 : 143636 Ton Year 2012-13 : 129213 Ton Year 2014-15 (Target) : Year 2014-15 (Actual) : 131721 Ton

18 ANNUAL PERFORMANCE REPORT - 2014-15  Earnings

Year 2012-13 : ` 39.53 Cr Year 2013-14 : ` 41.17 Cr Year 2014-15 (Target) : - Year 2013-14 (Actual) : ` 52.95 Cr

C. Passenger Business

 Passengers originating Year 2012-13 : ` 2.67 Cr Year 2012-13 : ` 2.75 Cr Year 2014-15 (Target) : ` 3.70 Cf Year 2013-14 (Actual) : ` 2.33 Cr

 Passengers Earning originating

Year 2012-13 : ` 381.34 Cr Year 2013-14 : ` 450.90 Cr Year 2014-15 (Target) : ` 598.20 Cr Year 2014-15 (Actual) : ` 487.31 Cr

D. Sundry Earnings

 Total

2012-13 : ` 17.19 Cr. 2013-14 : ` 18.54 Cr. 2014-14 (Target) : ` 2.40 Cr. 2014-15 (Actual) : ` 23.79 Cr.

 Commercial Publicity

Year 2012-13 : ` 52.08 Lakhs Year 2013-14 : ` 71.40 Lakhs Year 2014-15 (Target) : ` 84.00 Lakh Year 2014-15 (Actual) : ` 34.33 Lakhs

19 NORTHEAST FRONTIER RAILWAY E. Personnel

 Staff Strength : Gaz. - 112, Non-Gaz -16539, Total -16651

 Total Number of Qrs. : 18975

 Total Rly. Hospitals/Dispensaries : 2

 Total No of Health Unit : 13

 Total Railway Schools : 3

F. Passenger Amenity

 Adarsh Stations : 06 Nos.

 Clean Train Station : 01 No.

 Watering Stations : 04 Nos.

 Departmental Linen Depot : 01 at KYQ

 Catering - Jan Ahar : 01(Guwahati)

 PRS : 17

 UTS : 110

 Non rail Head PRS : 34

 Retiring Room Stations : 13



20 ANNUAL PERFORMANCE REPORT - 2014-15 TINSUKIA-DIVISION A. Infrastructure BG MG NG Total Route K.M. 534 20.58(closed) — 555 Single Line 534 20.58(closed) — 555 Double Line — — — — Track K.M. 734 — — 734  Number of Rly Stations: Total : 72 A1 : NIL A : 3 (TSK, JTTN, DBRT) B : 3 (MXN, NTSK, DBRG) D : 14 E : 27 F : 25  Workshop : 1 (Dibrugarh Town)  Diesel Shed : NIL  Major Depots : 3 (DBRG-Coaching, NTSK-Wagon-coaching & DBWS - Stores)  Crew lobbys : 3 (Mariani, New Tinsukia, Dibrugarh)  Running Rooms : 7 (MXN, NTSK, DBRT, LLO, SLGR, NLR & FKG)  Major fuelling points : 1 (New Tinsukia) B. Freight & Parcel Business (a) Goods  Goods sheds/Sidings : 17 nos. (G.Shed=9,Sdg=8)

21 NORTHEAST FRONTIER RAILWAY

 Outward /Inward loading (Rakes per month/Wagons per month)

TOTAL DIVISIONAL OUTWARD LOADING

2012-13 2013-14 Rake Wagon Rake Wagon 54 2363 46 2068 2014-15 2014-15 TARGET ACTUAL - 50 - 2214 TOTAL DIVISIONAL INWARD LOADING 2012-13 2013-14 Rake Wagon Rake Wagon 52 2008 49 1330 2014-15 2014-15 TARGET ACTUAL - 56 - 2636

 Goods Earnings Year 2012-13 : ` 351.67 Cr. Year 2013-14 : ` 271.96 Cr. Year 2014-15 (Target) : ` 248.84 Cr. Year 2014-15 (Actual) : ` 295.26 Cr. (b) Parcel  No. of parcel Stations : 31 nos.  Loading Year 2012-13 : 36664 Ton Year 2013-14 : 25757.8 Ton Year 2014-15 (Target) : - Year 2014-15 (Actual) : 11808 Ton

22 ANNUAL PERFORMANCE REPORT - 2014-15  Earnings Year 2012-13 : ` 14.04 Cr. Year 2013-14 : ` 11.04 Cr. Year 2014-15 (Target) : - Year 2014-15 (Actual) : ` 5.02 Cr. C. Passenger Business  Passenger originating Year 2012-13 : ` 86.26 Lakhs Year 2013-14 : ` 84.71 Lakhs Year 2014-15 (Target) : ` 130.00 Lakhs Year 2014-15 (Actual) : ` 80.26 Lakhs  Passengers Earning originating Year 2012-13 : ` 141.76 Cr. Year 2013-14 : ` 154.52 Cr. Year 2014-15 (Target) : ` 212.61 Cr. Year 2014-15 (Actual) : ` 170.82 Cr. D. Sundry Earnings  Total Year 2012-13 : ` 11.22 Cr. Year 2013-14 : ` 20.39 Cr. Year 2014-15 (Target) : ` 1.10 Cr. Year 2014-15 (Actual) : ` 16.97 Cr.  Commercial Publicity Year 2012-13 : ` 16.27 Lakhs Year 2013-14 : ` 17.20 Lakhs Year 2014-15 (Target) : ` 23.00 Lakhs Year 2014-15 (Actual) : ` 16.51 Lakhs E. Personnel  Staff strength on roll : Gaz-47, Non.Gaz-6401 Total - 6448  Total No. of Railway Quarters : 7351  Railway Hospitals : 2 (New Tinsukia , Dibrugarh Town), Dispensary/H. Unit : 6

23 NORTHEAST FRONTIER RAILWAY  Railway Schools : 3 (NTSK, MXN & DBRT-2) F. Passenger Amenity  Adarsh stations : 01 (Jorhat Town)  Watering Stations : 05  24 Coach stations : 07  Catering - Food plaza : 02 NTSK & Jan Ahar(IRCTC) NTSK  PRS : 09 UTS : 46 UTS cum PRS : 14 Non rail Head PRS : 07 (Majuli, Dinjan, Sadiya, Tezu, Along, Roing & Hayuliang)  Retiring Room Stations : 10



24 ANNUAL PERFORMANCE REPORT - 2014-15 KEY PERFORMANCE PARAMETERS SAFETY Category wise analysis of consequential Accidents

Category 2012-2013 2013-14 2014-15 Apr.-Mar

RB Z T RB Z T RB Z T

1. Collision 1 0 1 0 0 0 1 0 1

2. Derail- a) Station 0 1 1 0 0 0 0 0 0 ment

b) Mid- Section 2 1 3 2 0 2 2 0 2

3. L. Xing a) Manned 0 0 0 0 0 0 0 0 0

b) Un- Manned 3 1 4 3 0 3 0 0 0

4. Fire in Trains 0 0 0 1 0 1 1 0 1

5. Misc 0 0 0 0 0 0 0 0 0

TOTAL 6 3 9 6 0 6 4 0 4

* Z-Zonal T-Total

25 NORTHEAST FRONTIER RAILWAY

Summary of All Accidents

RB Zonal Total 10 9 8 6 6 6 6 4 4 4 3 2 0 0 0 2012-13 2013-14 2014-15

Accidents at Level Crossing

Manned Un-manned

4 4 3 3

2

1 0 0 0 0 0 2012-13 2013-14 2014-15

26 ANNUAL PERFORMANCE REPORT - 2014-15

Manning Of Level Crossing

80 75

70 65 60 60

50 40 40 30 30

20

10 3 0 Target Progress Target Progress Prop. Progres Target 2012-13 2013-14 2014-15

Number Of Unauthorised X-ings

6 49 263 111 ALIPURDUAR KATIHAR LUMDING 121 RANGIYA TINSUKIA

27 NORTHEAST FRONTIER RAILWAY FRIEGHT LOADING & EARNINGS

Freight Loading (MT) Target 2014-15 = 12.5(MT)

12.5

12.5 12.149

12 11.527

11.5

11 10.536

10.5

10

9.5 2012-13 2013-14 2014-15 2014-15 Target

 Loading dropped due to ban imposed by National Green Tribunal for transportation of Coal in Meghalaya  Loading is affected due to closure of LMG-BPB-SCL-AGTL meter gauge section for gauge conversion. MG POL loading, Stone-chips and Bamboo loading, Rebooking of Foodgrain for MG terminals are affected. Change of freight class rate of Bamboo traffic from LR-4 to LR-3

28 ANNUAL PERFORMANCE REPORT - 2014-15 Loading On B.G. (In Wagons/Day) 0.4% Improvement in comparison to same period of last year

530 521 523

520

510

500

490

480 472

470

460

450

440 2012-13 2013-14 2014-15 Loading On M.G. (In Wagons/Day)

90 81 80

70 58 56 60 46 50

40

30

20 10

0 2012-13 2013-14 up to Sept up to Sept 2013-14 2014-15

 Gauge conversion work for LMG-BPB-SCL section started from 1st Oct/ 2014, thus MG section closed for traffic on 30th. Sept’2014. 29 NORTHEAST FRONTIER RAILWAY Transhipment via LMG (Wagons/Day) 47 47

46

45

44

43 42

42 41 41

41

40

39

38 2012-13 2013-14 2013-14 2014-15 (Up to Sept) (Up to Sept) Induction of FCI FG via LMG (in thousand ton)

800000 724680 672480 700000

600000

500000 412056

400000 326592

300000

200000

100000

0 2012-13 2013-14 2013-14 2014-15 (Up to Sept) (Up to Sept)

 Gauge conversion work for LMG-BPB-SCL secion started from 1st Oct/2014, thus MG section closed for traffic on 30th Sept’2014

30 ANNUAL PERFORMANCE REPORT - 2014-15 M.G. Throughput (Wagons/Day)

121 122

120 118 118

116 113 114

112 110 110

108

106

104 2012-13 2013-14 2013-14 2014-15 (up to Sept) (up to Sept)  Gauge conversion work for LMG-BPB-SCL secion started from 1st Oct/2014, thus MG section closed for traffic on 30th. Sept’2014

Freight earnings (Originating) Rs. in Crs. 1985.59 2000 1800 1600 1459.41 1449.52 1314.11 1400 1200 1000 800 600 400 200 0 2012-13 2013-14 2014-15 2014-15 Target (Actual)

31 NORTHEAST FRONTIER RAILWAY Comparative Originating Earnings

Passenger Other Coaching Goods Sundry Total

4500 4000

3500 4240.82 3000 3679.83 3425.41 3425.41

2500 3108.91 3108.91 2000 1985.59 1459.41 1449.52 1400.88 1473.07 1314.11 1500 1222.13 1052.76 630.00 673.89

1000 606.13 614.78 137.74 500 127.26 152.16 155.54 0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual)

Comparative Apportioned Earnings

Passenger Other Coaching Goods Sundry Total

4000

3500 3724.5 3000 3708.32 3325.66

2500 3067.87 1871.88 3325.66 1904.32

2000 3067.87 1672.42 1541.47 1500 1023.03 1021.00 904.96

1000 782.89 673.89 614.78 630.00 606.13 500 155.70 153.00 142.15 128.73 0 2012-13 2013-2014 2014-15 2014-15 (Target) (Actual )

32 ANNUAL PERFORMANCE REPORT - 2014-15 Punctuality Performance(%) Of Mail/Exp. Trains (BG) Figure in % 9 0 9 0

8 9 8 8 8 7 8 7 8 6 8 6

8 5 8 4 8 4

8 3

8 2

8 1 2 01 2-13 20 13 -14 201 4-1 5 2 014 -15 Remarks :- (Target) • Punctuality performance of Mail/Exp trains has deteriorated for the period from April/14 to Mar/15 as compared to corresponding period of previous year mainly due to - • Trains taken over excessively late from other Railways became out of path (617 trains lost). • Re-scheduling of link trains for late arrival of trains (769 trains lost). • Imposition of SR in APDJ-SGUJ section for wild Elephant movement (370 trains lost). • Piloting and running of trains in convoy in entire Assam area, part of North Bengal upto NJP & from KIR to KNE for security reason in connection with Independence Day, 2014 (118 trains lost ). • Restriction imposed in flood affected KYQ-GLPT-NBQ section of RNY Div & Sinkage of bank between AJRE-SNBR stations of LMG Div. due to heavy rain. Trains diverted due to breach and thereby creating congestion in KYQ-RNY-NBQ section. Excessive engineering loss for PQRS work in TSK Div. (310 trains lost). • NI work for patch doubling between ABFC-BLK section of KIR Div. (85 trains lost). • Over saturated BLK-SMTA 137 Kms single line section (utilization 189/ 157%). In addition, sections are congested because of diversion of freight trains due to 25 Kmph SR in APDJ-SGUJ Elephant corridor. • Frequent Rail Roko/Agitation/Bundh called by different organizations (135 trains lost). • Excessive failure of S&T gears/Locomotives (332/255 trains lost). • For want of line clear/keeping outside signal by Eastern Railway (260 trains lost). • Fog mostly in KIR & APDJ Divisions (494 trains lost). 33 NORTHEAST FRONTIER RAILWAY

Punctuality Performance(%) Of Passenger Trains (BG)

Figure in % 95 95 95

94

93 92 92

91 90 90

89

88

87 2012-13 2013-14 2014-15 2014-15 (Target)

34 ANNUAL PERFORMANCE REPORT - 2014-15 Induction of FCI via LMG 12.9% improvement in current year In Tonnes

800000

700000

600000 724680 672480

500000

400000

300000 412056

200000 326592

100000

0 2012-13 2013-14 2013-14 2014 - 15 up to Sept up to Sept  Gauge conversion work for LMG-BPB-SCL secion started from 1st Oct/2014, thus MG section closed for traffic on 30th Sept’2014

Induction of FG for NE States 12.9% improvement in current year In Tonnes 3 7 0 0 0 0 0

3 6 0 0 0 0 0

3 5 0 0 0 0 0 3663828

3 4 0 0 0 0 0 3523212 3 3 0 0 0 0 0

3 2 0 0 0 0 0

3 1 0 0 0 0 0

3 0 0 0 0 0 0 3118290 2 9 0 0 0 0 0

2 8 0 0 0 0 0 2 0 1 2 -1 3 2 0 1 3 -1 4 2 0 1 4 -1 5

35 NORTHEAST FRONTIER RAILWAY

PASSENGER COMPLAINTS

SL Month 2013-14 2014-15 Improvement No. (in %) 1. April 19 19 --

2. May 34 16 -52.94

3. June 28 21 -25.00

4. July 27 24 -11.11

5. August 22 32 +45.45

6. September 25 25 --

7. October 24 19 -20.83

8. November 23 26 +13.04 9. December 27 16 -40.74%

10. January 20 17 -15%

11. Febrruary 15 12 -20%

12. March 17 18 +5.88

Total 281 245 -12.81

Nature of complaints:-

Type of complaints % (Nos.) i) Improper behavior, passenger booking /Resevation 21.63% 53 ii) Theft and pilferages, Bribary and Corruption 4.08% 10 iii) Cleanliiness at station 4.08% 10

36 ANNUAL PERFORMANCE REPORT - 2014-15 FINANCIAL REVIEW EARNINGS 2014-15 Originating Earnings Earnings Actual Actual Revised Actual Variation Variation 2012-13 2013-14 Target 2014-15 with with 2014-15 Target last year (1) (2) (3) (4) (5) (6=5-4) (7=5-3)

Passenger 1052.76 1222.13 1473.07 1400.88 -72.19 178.75

Other 127.26 137.74 152.16 155.54 3.38 17.80 Coaching

Goods 1314.11 1459.41 1985.59 1449.52 -536.07 -9.89

Sundries 614.78 606.13 630.00 673.89 43.89 67.76

Total 3108.91 3425.41 4240.82 3679.83 560.99 254.42 Originating Earnings

Passenger Other Coaching Goods Sundry Total

4500 4000 3500 4240.82 3000 3425.41 3679.83 3108.91

2500 3425.41 3108.91 1985.59 2000 1459.41 1473.07 1449.52 1400.88 1314.11

1500 1222.13 1052.76 1000 606.13 673.89 630.00 614.78 500 137.74 155.54 127.26 152.16 0 2012-13 2013-2014 Revised Target 2014-15 2014-15

37 NORTHEAST FRONTIER RAILWAY

Apportioned Earnings (Figs in Crs of `) Earnings Actual Actual Revised Actual Variation Variation 2012-13 2013-14 Target 2014-15 with with 2014-15 Target last year (1) (2) (3) (4) (5) (6=5-4) (7=5-3)

Passenger 782.89 904.96 1021.00 1023.03 2.03 118.07

Other 128.73 142.15 153.00 155.70 2.70 13.55 Coaching

Goods 1541.47 1672.42 1904.32 1871.88 -32.44 199.46

Sundries 614.78 606.13 630.00 673.89 43.89 67.76

Total 3067.87 3325.66 3708.32 3724.50 16.18 398.84

Apportioned Earnings

Passenger Other Coaching Goods Sundry Total

4000

3500 3724.5 3000 3708.32 3325.66

2500 3067.87 3325.66 3067.87 1904.32 2000 1871.88 1672.42 1541.47 1500 1021.00 1023.03 904.96

1000 782.89 673.89 630.00 606.13 614.78 500 153.00 155.70 142.15 128.73 0 Actual 2012-13 Actual 2013-2014 Revised Target Actual 2014-15 2014-15

38 ANNUAL PERFORMANCE REPORT - 2014-15 ANALYSIS OF REVENUE EXPENDITURE (Fig in ` Cr) Earnings Actual Actual Final Actual Variation Variation 2012-13 2013-14 Grant 2014-15 with with 2014-15 FG last year (1) (2) (3) (4) (5) (6=5-4) (7=5-3) Dem-3(Genl. Sup. & Services) 294.04 316.30 342.27 341.26 -1.01 24.96 Dem-4(Repairs & Main P/Way 617.79 617.30 706.03 698.23 -7.80 80.93 and works) Dem-5(Repairs & Main Motive 136.57 165.25 204.34 178.61 -25.73 13.36 Power) Dem-6(Repairs & Main Carriage 446.05 480.62 553.34 538.44 -14.90 57.82 & Wagaon) Dem-7(Repairs & Plant & 215.36 224.83 264.35 246.17 -18.18 21.34 Equipment) Dem-8 (Operating Expanses Rolling 260.10 286.91 342.19 316.28 -25.91 29.37 Stk. & Equipment) Dem-9 (Opera- ting Expanses 443.90 413.59 521.38 497.45 -23.93 83.86 Traffic) Dem-10 (Operating857.13 1345.10 1307.59 1230.66 -76.93 -114.44 Expanses Fuel) Dem-11 (Staff Welfare & 307.28 326.87 366.75 366.13 -0.62 39.26 Amenities) Dem-12 (Misc. 245.44 253.03 288.99 285.21 -3.78 32.18 Working Expences) Dem-13 (PF, Pen & Other 30.19 43.28 56.00 53.41 -2.59 10.13 Retirement benefits) Total 3853.85 4473.08 4953.23 4751.85 -201-38 278.77 39 NORTHEAST FRONTIER RAILWAY CAPITAL EXPENDITURE PLANHEAD WISE (Fig in ` Cr) PLAN - HEAD Actual Actual Final Actual Utiliza- 2012-13 2013-14 Grant 2014-15 tion (in %) 1100 new Lines 1651.32 1801.51 3080.23 3081.18 100.03

1400 Guage Conversion 1075.33 12596.52 2107.85 2104.31 99.83

1500 Doubling 12.69 103.19 217.04 217.58 100.25

1600 Traffic Facilities 18.07 23.25 31.35 29.24 93.27

1700 Computerisation 2.10 2.35 9.61 2.95 30.70

2100 Rolling 289.58 54.71 395.69 406.41 102.71

2200 Leased Assets 114.58 144.01 174.58 174.97 100.22

2900 Safety Works LC 56.50 22.76 20.75 22.09 106.46

3000 Safety Works 7.77 21.94 45.01 44.93 99.82 RUB/ROB

3100 Track Renewals 208.48 104.34 155.00 149.23 96.28

3200 Bridge Works 15.91 -0.56 19.87 18.52 93.21

3300 S & T Works 39.09 35.34 33.43 33.34 99.73

3600 Other Elec. Woeks 6.95 8.29 11.42 8.33 72.94

4100 Plant & Machinery 11.70 16.26 11.22 15.98 142.42

4200 Workshops 20.19 19.73 40.10 26.26 65.49

5100 Staff Quarters 18.76 28.12 25.47 24.67 96.86

5200 Amenities for Staff 20.96 23.87 27.07 21.66 80.01

5300 Pass. Amenities 64.82 41.89 52.62 44.71 84.97

6400 Other Specified 28.58 28.03 31.45 25.62 81.46 Works

Gross Exclu. Susp) 3663.38 4075.55 6489.76 6451.98 99.42 40 ANNUAL PERFORMANCE REPORT - 2014-15 COMMODITIES WISE LOADING

COAL POL FOOD GRAINS DOLOMITE OTHERS TOTAL Figs in “000” Tonnes 14000 12000 12500 10000 12149 11527

8000 10536 6000 4510 3799 3623 2476 3804 3410 4000 3486 2622 2100 2054 1970 1570 1493 1587 1264 1346 1310 1340 910 2000 1038 0 Actual Actual Target Actual 2012-13 2013-14 2014-15 2014-15

OPERATING RATIO (%) Actual Actual Target Actual 2012-13 2013-14 FG 2014-15 2014-15 178.39% 193.08% 193.33% 187.08%

193.08 193.33 195

190 187.08

185 178.39 180

175

170 2012-13 2013-14 2014-15 2014-15 (Target) (Actual)

41 NORTHEAST FRONTIER RAILWAY

NUMBER OF ORIGINATING PASSENGER (FIGS. IN MILLION)

100.56 102 100

100 97.62 98

96

94 90.84 92

90 88

86

84 2012-13 2013-14 2014-15 2014-15 (Target) (Actual) Number of Originating passengers in 2014-15 has decreased by 6.95% over 2013-14 and decreased by 9.16% over the target.

ORIGINATING PASSENGER EARNINGS(FIGS. IN MILLION)

1473.07 1600 1400.88

1400 1222.13

1200 1052.76

1000

800

600

400

200

0 2012-13 2 013-14 2014-15 2014-15 (Target) (Actual) Originating Passenger earnings in 2014-15 has increased by 14.63% over 2013-14 and decreased by 4.90% over the target 42 ANNUAL PERFORMANCE REPORT - 2014-15

ORIGINATING FREIGHT EARNINGS 2014-15

(` In Crs.) 1985.59 2000 1800 1459.41 1449.52 1600 1314.11 1400 1200 1000 800 600 400 200 0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual)

43 NORTHEAST FRONTIER RAILWAY PERFORMANCE REVIEW

OPERATING DEPARTMENT

BG Loaded Receipt (in wagons/day)

14.6% improvement in current year in comparison to same period of last year

1200 1031 1000 845 900 800 600 400 200 0 2012-13 2013-14 2014-15

44 ANNUAL PERFORMANCE REPORT - 2014-15

BG Release (No. Of Wagons/Day) 8.7% improvement in comparison to same period of last year

900 873

850 803 800 755 750

700

650 2012-13 2013-14 2014-15

MG Release (No. Of Wagons/Day) LMG Division 1.6% improvement in comparison to same period of last year

134 135 131

130

125 118 120

115

110 2012-13 2013-14 2014-15

45 NORTHEAST FRONTIER RAILWAY

Interchange with ER (No. Of Trains/Day) 8.6% improvement in comparison to same period of last year

Figure in % 31.4 35 29.2 30 25.4 25 20 15 10 5 0 2012-13 2013-14 2014-15

Interchange With ECR (No. Of Trains) 7.3% improvement in comparison to same period of last year

Figure in %

23.5 24 23 22.1 22 20.6 21 20 19 18 2012-13 2013-14 2014-15

46 ANNUAL PERFORMANCE REPORT - 2014-15

BG Diesel KM/Day

589 600 586 580 560 540 509 520 500 480 460 2012-13 2013-14 2014-15

Diesel KM has been affected due to speed restrictions imposed for movement of elephans on NJP-APDJ section due to congestion on NJP-ROJ-NCB ad KYQ-GHY line. Utilization is also affected due to locos held up on ballast rakes to secttion under gauge conversion

MG Diesel KM/Day(LMG Div)

215 215 216 214 212 210 208 205 206 204 202 200 2012-13 2013-14 2014-15

47 NORTHEAST FRONTIER RAILWAY COMMERCIAL DEPARTMENT lakhs) ` year Over last Over (-) 17.79 (-) (+) 18.59 (+) 25.65 (+) - (Figurein Over Target (-) 4.52 (-) (-) 39.69 (-) lakhs) ` 5594.57 31.03.2015 Actual 120.62 8838.90 2830.54 Closing Balance Closing 2014-2015 (Figure in (Figure 2014 2014-15 5484.98 146.72 Clearance 704017 2252.64 Actual 2013- Actual (Originating) 6718.53 Accrual 2014-15 7988 2015 200.00 Commercial Earnings Trg. not rec not Trg. from Rly Bd. Rly from Target 2014- Target 146.72 7040.17 2252.64 Station Outstanding (Goods (Goods & Coaching) Outstanding Station 2013-14 4361.02 Achivement Opening Balance Opening as on 01.04.2014 on as 127.58 2012-13 6961.75 1933.15 Earning Particulars Parcel & Parcel Luggage Ticket Checking Commercial Publicity

48 ANNUAL PERFORMANCE REPORT - 2014-15 MECHANICAL DEPARTMENT Ineffective % (Loco/Coach/Wagon)

BG Coach BG Wagon BG Loco

10 9.27 8.67 8.5 10 7.74 8.3 8 6 4.4 4 4.1 3.9 3.5 3.3 3.7 4 2 2 2 Number/Month 0 2012-13 2013-14 2013-14 2014-15 2014-15 (Target) (Actual)

Diesel Loco availibility (BG&MG)

200 155.6 159.5 163.43 132.05 150

100

50 Number/Month

0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual)

49 NORTHEAST FRONTIER RAILWAY Workshop Out Turn (Coaching/Wagon)

Coach Wagon ROH

5000 4000 3000 2000

Numbers/Month 1000 0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual)

Diesel Loco Reliabilty

10 8.22 8 7.13 6.15 6

4

2 Failure/100 loco/month

0 2012-13 2013-14 2014-15

50 ANNUAL PERFORMANCE REPORT - 2014-15

Specific Fuel Consumption

Passenger Goods

5 4.17 4.06 4.04 4.01 4

3 1.94 1.98 1.9 1.89 2

Ltrs./1000 GTKM 1 0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual)

51 NORTHEAST FRONTIER RAILWAY ELECTRICAL DEPARTMENT Target SN Item/Activity 2012-13 2013-14 2014-15 2014-15 A Train lighting & Air conditioning 1 Certified Non-AC cases (Nos) 0 0 5 1 2 Punctuality loss (AC & Non-AC) 30 29 45 43 (Nos) 3 Provision of Emergency Light 163 135 150 58 (Nos) 4 Modification of Fuse Distribution Board in GS & SCN Coaches 450 402 450 170 B Electrical Power 1 Electric energy consumption in 137.65 139.33 136.90 143.23 non traction area in MU 2 Electrification of Railway 190 250 30 126 Quarters (Nos) 3 Provision of energy efficient 60 1975 1740 1590 1597 Woeiling fans (Nos) 4 Use of CFL fittings at corridors, staircases, toilet and bathroom 4335 4199 775 5565 in place of incandescent lamps (Nos) 5 Rewiring of Staff quarters (Nos) 1613 1388 590 1171 6 Replacemnt of Convertional KW meters by electronic KWh 3102 1998 1500 1716 meters (Nos) 7 HSD oil consumption in DG set 795.19 574.48 604 571 in KL 8 Provision of electric fan regula- tors in place of conventional fan 2131 2111 2250 2025 regulators in ceiling fan (nos) 9 Use of solar street lights for (a) Remote places & colories (b) Training Institute 30 16 76 122 (c) Retiring room (d) Officers rest house 10 Electrification of manned LC 52 63 9 57 gates 52 ANNUAL PERFORMANCE REPORT - 2014-15 Punctuality Loss Cases of Train Lighting & AC

45 50 43 40 30 29 30 20 10 0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual) Emergency Light

200 163 150 135 150

100 58 50

0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual) Modification of FBD covers 450 450 500 402 400

300 170 200

100 0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual) 53 NORTHEAST FRONTIER RAILWAY Electric energy consumption in non traction area in MU Electric Energy Consumption in MU 143.23 144 142 139.9 139.33 140 137.65 138 136 134 2012-13 2013-14 2014-15 2014-15 Target (Actual) Rewiring of staff quarter

2000 1613 1388 1500 1171

1000 590

500

0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual) Replacement of Conventional KWH meter by Electronic KWH meters 3500 3102 3000 2500 1998 1716 2000 1500 1500 1000 500 0 2012-13 2013-14 2014-15 2014-15 (Target) (Actual) 54 ANNUAL PERFORMANCE REPORT - 2014-15 ENGINEERING DEPARTMENT

SN Item Unit 2012-13 2013-14 2014-15 Target Progress

1 Track renewal CTR 75.97 75.55 27.5 34.09

2 Ballast Supply ‘000 387.88 400.00 360 407.76 cum

3 Rail/Weld failure No. 61 34 - 53

4 Insertion of PSC Eq. 65 94.50 80.25 61 Turnout sleeper Set

5 Scrap Offered MT 14082 10055.25 8800 9121.375

6 Removal of PSR No. 1 19 6 57

7 manning of UMLCs No. 3 65 40 30

8 Closure of LCs No. 25 23 40 18

9 Sundry Earnings Cr. of 28.80 29.39 30 44.21 Rs.

10 USFD testing KM 12359 12936.36 11700 13582.25

11 Rehabilitation of Br. No. 32 28 30 55

12 CSM (incl. TEX & DOU) Km 2796 4017.08 3506 3385.28

13 ISD Km 79.029 93.30 60 65.298

55 NORTHEAST FRONTIER RAILWAY ASSET RELIABILITY

Rail Weld Total

61 53 80 34 37 35 60 16 24 40 18 18 Total 20 Weld Rail 0 2012-13 2013-14 2014-15

Introduction of 30 Kmph Loopline

200 173

150

100

50 7 0 5 0 2012-13 2013-14 2014-15 Total

56 ANNUAL PERFORMANCE REPORT - 2014-15 SIGNAL & TELECOM DEPARTMENT ment 34.27 Achive- 18 68 34 16 16 20 ------2013-14 Upto tionate Propor- Target - 8 6 22 30 12 35.00 Target ------Upto ment Achive- 2013-14 30 33 29 53 31 120 ment 35.67 Achive- 2013-14 - 5 5 14 20 16 34.68 Target 3 4 2 20 14 14

ment 39.24

Achive- 2012-13 2 2 2 12 17 12 37.3 Target (PH 33) (PH ` ITEM RRI/PI/EI Circuiting Track Total Locatins) of (No. Axle by Proving Block (BPAC) Counter Signal Lit LED Stations) of (Nos. Loggers Data Crossing Level Interlocking Expenditure Financial Crores

1

2

3

4

5

6

7 SN

57 NORTHEAST FRONTIER RAILWAY ASSET RELIABILITY: (S&T)

Total Signal Failure

Total Actual Actual Target Actual % Signal 2012-13 2013-14 2014-15 14-15 Improvement Failures in comparision to 2013-14

5070 4725 4489 4538 3.96%

5200 5070 5000 4725 4800 4489 4538 4600 4400 4200 4000 2012-13 2013-14 2014-15 2014-15 (Target) (Actual)

58 ANNUAL PERFORMANCE REPORT - 2014-15 14 25 19 58 Total 0 5 1 6 aneous Miscell- Incident to 1 2 2 5 Threat Exctortion 1 3 2 6 ping Kidnap 1 1 0 2 Attack Ambush/ of 8 5 8 21 Recovery Explosive INSURGENCY INSURGENCY - CRIME RELATED 1 3 1 5 Bomb Explosion 2 6 5 13 Track- Sabotage/ Tempering to to to year Total Apr.’12 Mar,’13 Apr.’13 Mar,’14 Apr.’14 Mar,’15

59 NORTHEAST FRONTIER RAILWAY INCIDENCE OF AGITATIONS : State-wise

Financial Rail- Obstruction/ State Bundh Total Year Roko Dharna

Assam 65 18 38 121

Apr’12 Bengal 7 1 16 24

to Bihar 4 0 6 10

Mar,’13 Manipur 1 0 0 1

Tripura 1 0 0 1

Total 78 19 60 157

Assam 130 42 31 203

Bengal 7 4 6 17

Apr’13 Bihar 8 3 1 12

to Tripura 1 0 0 1

Mar,’14 Nagaland 2 0 0 2

Manipur 1 0 0 1

Total 149 49 38 236

Assam 69 59 34 162

Bengal 5 13 6 24

Apr’14 Bihar 11 3 5 19

to Mizoram 1 4 1 6

Mar,’15 Tripura 1 0 0 1

Arunachal 1 0 0 1

Total 88 79 46 213 60 ANNUAL PERFORMANCE REPORT - 2014-15 STORE DEPARTMENT -34% Variation 55.33

` 2014-15 (Actual) 84 Cr. 84

` 2014-15 (Target) Financial Year 2014-15 Year Financial 82.57

` 2013-14 103.58

2012-13 ` Cr.)

To meet To Board’s target, Engg. Scrap arising should have been approx 35000 MT. ` Scrap disposal (in However Engg. Directorate, Railway Board fixed target for P-way for FY 2014-15 as 8800 as2014-15 FY for P-way fortarget fixedBoard Railway Directorate,Engg. However ConstructtionRailway Organization) only F. (N. 4000MT & Railway) F. (N. MT A 61 NORTHEAST FRONTIER RAILWAY

Earnings from Scrap Disposal

(Figure in ` Cr.) 120 103.58 100 82.27 84 80 55.33 60 40 20 0 2012-13 2013-14 2014-15 2014-15 (Target)

Turn over Ratio with Fuel and without Fuel

Target Achievement

60% 49 49 % 50% 28.18%

40% 30 % 28 28 % 28.18 % 26 26 %

30% 19 % 18.58 % 18.82 % 18.40 % 17 % 17.28 % 13 13 % 20% 18.58% 10% 0% -10% Without With Fuel Without With Fuel Without With Fuel Fuel Fuel Fuel

2012-13 2013-14 2014-15 (upto Oct'14)

62 ANNUAL PERFORMANCE REPORT - 2014-15 MAN POWER PLANNING

MANPOWER - SALIENT FEATURES Gazetted Cadre ('A' & 'B') Sanctioned - 1161 On-roll - 988 (including NFR Con. Org.)

Non-Gazetted Cadre  Sanctioned - 73016 On-Roll - 63741 Total Vacancies - 9275  Safety Category Vacancies - 3504 (11.18%) [Cadre of 31,351].

Man Power Planning  Surrenders- 1442(in redundant & diminishing categories)  Creations - 303 (In Safety and operational categories for New Assets/Activities)

Indents for Recruitment (Placed/Under Process):  With RRBs - 6010 With RRCs - 1230 posts  415 Court cases pending (as on 01.04.2015). Winning percentage of Court case is 75% (114 cases won during Apr’14 to Mar’15).  Single unified wage period successfully implemented.  99.32% disbursement of salary through banks.



63 NORTHEAST FRONTIER RAILWAY ACHIEVEMENTS/SYSTEM/IMPROVEMENT

Operating : A) 1 Instroduction of new trains :- i) 55613/55614 Passenger between Dekargaon and Naharlagun (Daily) w.e.f. 07.04.14. ii) 13063/13064 Exp. between Howrah-Balughat (Bi-weekly) w.e.f. 13.10.14. iii) 55820/55819 Passenger between Guwahati and Mendipathar w.e.f. 29.11.14. iv) 22504/22503 Premium Exp. between Kamakhya and Bangalore Cantt. (weekly) w.e.f. 29.01.15. v) 18629/18630 Exp between Ranchi-New Jalpaiguri (weekly) owned by SER w.e.f. 19.02.15. vi) 12528/12527 Kamakhya-MAS. Premium (AC) Exp introduced w.e.f. 18.01.2015. vii) 22411/22412 AC Exp. between Naharlagun-New Delhi (weekly) w.e.f. 20.02.15. viii) 15617/15618 I/C Exp. between Guwahati-Naharlagun (Daily) w.e.f. 20.02.15.

2 Extension of trains :- i) 55909/55910 (SLGR-DBRG) Pass. To DBRT w.e.f. 22.5.2014. ii) 15609/15610 A. A. Exp from GHY to NTSK w.e.f. 21.6.14 & new No. is 15909/15910 w.e.f.29.8.14. iii) 15605/15606 (KYQ-JTTN-MXN) I/C Exp to DBRG via MRHT w.e.f. 01.11.14.

3. Speeding Up :- i) By speeding up of 15611 LTT-KYQ Exp. to 65 mts the pairing train 15612/15611 has been upgraded to Superfast Exp by renumbering as 22512/22511.

64 ANNUAL PERFORMANCE REPORT - 2014-15 B) Clearance of extra rush for tourists and other passengers.

No of Spl Trains No of Trips Total Seat/Berth

32 1770 22,45,328

C) Coaches Augmented:- i) 3867 coaches augmented temporarily with provision of 3,17,078 seat/berths. ii) 21 coaches augmented permanently with provision of 1872 berths. D) Parcel Cargo Exp. :-91 rakes of Parcel Cargo Exp. were run during 2014-15 between NGC-PTNR-NGC via CP with earnings of more than Rs.17.6 crore (approx). E) Premium Special :- 67 trips Premium special trains were run during 2014-15 between KYQ-NDLS, KYQ-BNC, KYQ-PUNE, KYQ-MAS & NJP-MAS respectively with earnings of Rs.12.9 crore. (approx). F) Piecemeal Demand VPs:- 2132 VPs were loaded during 2014- 15 with earnings of Rs. 20.5 Cr.(Approx).  To increase freight loading, the following new loading points were opened for booking of all goods traffic – (i) Dekargaon (DKGN) (ii) Harmuti (HMY) (iii) Tetelia (TTLA) (iv) Jalalgarh (JAG) (v) Naharlagun (NHLN) (vi) Senchoa (SCE) (vii) Tangla (TNL) (viii) Raiganj (RGJ) (ix) Surajkamal (SJKL)  New automatic freight incentive scheme. Cement and Clinker are being loaded from terminals of NGC, TTLA, CGS and Dolomite from Dalgaon. Upto March’15, 78 rakes have been loaded. Due to capturing of this additional traffic, there has been increase of 94.3%, 25.6% and 20.7 % loading in Cement,  Interchange has increased by 11.1%. Loaded Inward has increased by 14.6 % & Release has increased by 8.7%.

65 NORTHEAST FRONTIER RAILWAY  Terminal Management System (TMS) has been commissioned at Dekargaon (DKGN), Bindukuri (BKTB) , Harmuti (HMY) newly Gauge converted section of RNY-RPAN-MZS Section and Jalalgarh (JAG), Ranipatra (RNX) at KIR Division, in addition to existing locations. On NFR 69 (Sixty nine) location have TMS and 23 number are likely to be provided shortly.  First Goods train carrying Potato was run on 27.03.15 from Dhupguri to Salchapra on newly constructed BG section of LMG- BPB-SCL. System Improvement in Coaching Operation Decongestion of GHY yard by integration of rakes viz. • 12507 (TVC-GHY) Exp. & 15636 (GHY-Okha) Exp. lie over utilized to run special trains. • 15644/15643 KYQ-PURI Exp & 15640/15639 GHY-PURI Exp lie over utilized to run special trains. • 15651/15652 Lohit Exp &15653/15654 Amarnath Exp integrated lie over used to run special trains. • Using of rake of 15645 LT(T)-GHY to run 12501 GHY-NDLS Sampark Kranti Exp for late running of link rake. ENGINEERING 1.1 Problems of ERCs coming out of the Xing body inserts due to elongation of insert eye holes was encountered in yards. A cylindrical ferrule type liner of thickness like 0.5 to 1 mm was developed and used in yard which is successfully working.

66 ANNUAL PERFORMANCE REPORT - 2014-15 1.2 Gauges for checking moulds for PSC BG line sleepers: No specific standard tool for measuring the defects in moulds for manufacturing of PSC BG line sleepers was available. Only various dimensions at different locations are given. The prevailing practice is to check the different dimensions by inserting go/no go measuring plates at various location, which was time consuming. A comprehensive gauge has been developed at CSP Mirza for checking the mould dimensions in one go of mould. This has resulted in improving quality of finished PSC sleepers. This has been extensively used and found to be very handy.

1.3 TWR by in situ flash butt welding

TWR by MFBW has been started in N. F. Railway and during the year, 1233 joints have been welded in situ. In stretches where this work has been executed, the work has been planned and executed in a way that all Thermit Welds, Defective/Wheel burnt Rails, Fishplated joint etc. have been eliminated. Simultaneously, SEJs/Glued joints etc have been renewed. A presentation was made at IRICEN/ Pune by CTE/NFR during CTEs Seminar. Further, Tenders for 19575 nos joints for TWR by FBW have been invited and are under finalization.

67 NORTHEAST FRONTIER RAILWAY 1.4 Rail Wheel Burns : At locations where Train engines stop and start, often rail table is damaged due to wheel slipping, resulting in wheel burns, causing pits upto 2mm/3mm depth at wheel contact. Trial have been made in one such location in SSE/P.Way section by grinding the wheel burn locations with rail profile grinder with proper ramping of depth of burn and obtaining near new rail finish.

1.5 Mechanical Workshop and Dangtal Colony in New Bongaigaon fall physically within the jurisdiction of Rangiya Division but being maintained partly by Alipurduar and partly by Rangiya Division. This was causing some managerial and maintenance problems. In order to have smooth functioning and proper maintenance, re-organization has been done and all assets at NBQ have been transferred to Rangiya division.

1.6 Web and SMS based system of complaint redressal for maintenance of quarters has been started at Katihar by Katihar division.

1.7 A USFD Rail Museum has been set up in Alipurduar division where Rail/Weld failure pieces have been kept to educate the P. Way Supervisors and trackmen regarding rail/weld failures and related issues.

68 ANNUAL PERFORMANCE REPORT - 2014-15 2.1 Production of BG line Sleepers: Despite contracts of two CSPs having been terminated, the production of PSC sleepers has been all time high during the FY.

Production of BG line Sleepers in Nos. 679284 700000 601331 600000 505860 500000 420925 359935 400000 300000 200000 100000 0 2010-11 2011-12 2012-13 2013-14 2014-15

2.2 Removal of Permanent Speed Restrictions:- 57 Nos. PSR has been removed against the annual target of 6. This is the best ever achievement in the history of the NFR.

Removal of PRS (in Nos.)

57 60 50 40 30 19 16 20 7 10 1 0 2010-11 2011-12 2012-13 2013-14 2014-15

69 NORTHEAST FRONTIER RAILWAY 2.3 Sundry Earning:- Sundry Earning of Rs.44.2 Crores have been made against Annual target of Rs.30 Crore, which is best in last five years.

Sundry Earnings (in ` Crs.)

50 44.2 40 26.96 28.59 30 20.93 22.44 20 10 0 2010-11 2011-12 2012-13 2013-14 2014-15

2.4 USFD Testing:- 13582.25 Km of USFD has been done against the Annual target of 11700 Kms . This is the highest achievement in last five years.

USFD (In Kms)

116614.4 120000 100000 80000 60000 40000 10207.97 10569.37 11244.65 13582.25 20000 0 2010-11 2011-12 2012-13 2013-14 2014-15

70 ANNUAL PERFORMANCE REPORT - 2014-15 2.5 Encroachment Removal:- Despite resistance of public 1939 Nos. of encroachments have been removed and consequently 21.321 hectares of Railway Land could be realized up to the month. This is the highest achievement in last five years.

Removal of Encroachment (In Nos.) 1939 2000

1500 1191

1000 624 500 88 42 0 2010-11 2011-12 2012-13 2013-14 2014-15

2.6 Construction of LHS/RUB by Pre-cast Segmental method and Mega Traffic Blocks has been started in this Railway, 21 LHS had been constructed in 2013-14. In 2014-15, 53 LHS have been constructed so far. This has been achieved despite serious problem of water logging, high water table, less working season due to high rainfall area etc.

71 NORTHEAST FRONTIER RAILWAY 2.7 Deep Screening:- 144.94 Km of track has been deep screened (88.64 Km by Machine and 56.30 Km Manually) which is 4.27% higher than the annual target.

1 4 4 .9 4 1 4 6 1 4 4 1 4 2 1 3 9 1 4 0 1 3 8 1 3 6 A n nu al P ro g re ss targe t 2 0 1 4 -1 5 2.8 Track Renewal: 34.09 CTR units (both Primary and Secondary) have been achieved upto the month against the annual target of 27.5 CTR units thus exceeding the target by 23.96%.

4 0 3 4 .0 9 3 0 2 2 .5 2 0 1 0 0 A n n ual P ro gre ss Targ e t 2 0 1 4 -1 5 2.9 Ballast Supply:- 407,760 cums of ballast has been supplied against the target of 360,000 cums upto the month. Progress is 13.26% higher than the Annual Target.

4 0 7 .7 6 4 2 0 4 0 0 3 8 0 3 6 0 3 6 0 3 4 0 3 2 0 A n n u al P ro gr e ss Targ e t 2 0 1 4 -1 5

72 ANNUAL PERFORMANCE REPORT - 2014-15 2.10 Prevention of Rail Corrosion:- To prevent corrosion of rail, precautionary measures like Greasing of ERCs (968.52 Km), Painting of rails (313.98 Km), Shifting of liners (407.07 Km) etc. has been adopted. We have exceeded annual targets in all these activities.

Annual Target Progress 2014-15

968.52 1000 750 800 600 313.98 407.07 400 225 275 200 0 Greasing of Painting of rail Shifting of liner ERC (in km) corrosion prone contact area area (in km) by destressing (in km) 2.11 Raising of Speed on Simaluguri – New Tinsukia Jn. (101.25 Km) of Tinsukia Division increased from 75 Kmph to 100 Kmph for WDG3A, WDP4B & WDP4D locos. 2.12 Raising of Speed on loop lines increased from 15 Kmph to 30 Kmph on looplines in Katihar – Mukuria section (5 stations) of Katihar Division. 2.13 Major Restoration Works: Due to incessant rain on 21.09.2014, the railway track between Krishnai (Km 60/7-8) to Boko (Km 119/ 2-3) of New Bongaigaon-Goalpara town-Kamakhya section got washed out in many locations. There were breaches at 18 locations. At km 64/7-8 between Krishnai - Dudhnoi, 70 m (approx) of embankment got washed out. Train running was suspended from 22.09.2014 to 30.09.2014. All trains of New Bongaigaon- Goalpara town-Kamakhya section were diverted through Kamakhya-Rangiya- New Bongaigaon section. Due to untiring efforts of the Railway, the train running resumed on 01.10.2014 on restricted speed after restoration of track. 2.14 Performance of Track Machines:- (i) CSM/TEX/DUO:- 3334 Kms of Track has been tamped by CSM/ TEX/Duomatic machines against the Annual target of 3506 Kms i.e. 95.01% of Annual target has been achieved. (ii) PQRS:- 66.42 Km of progress of ISD work has been achieved against annual target of 69 Km, i.e. 96% of Annual target has been achieved. 73 NORTHEAST FRONTIER RAILWAY 2.15 SAFETY MEASURES:- (i) Manning of Unmanned Level Crossing:- Year Target Progress 2012-13 75 3 2013-14 60 65 2014-15 40 30 (i) Closure of Level Crossing:- Unmanned level Crossing

Year Low TVU LHS Divisions Manned Total

Tar Prog Tar Prog Tar Prog Tar Prog Tar Prog

‘12-13 0 1 16 2 5 17 5 5 26 25

‘13-14 2 7 25 10 8 5 4 1 39 23

‘14-15 3 0 25 6 7 7 5 5 40 18 I) Painting of rails has been done in a length of 313.98 Km against target of 225 Km. II) Greasing has been done in a length of 968.52 Km against target of 750 Km. 3.0 MEDICAL: 3.1. 302 numbers of Multipurpose Healtth checkup camps were organised in all the division of N. F. Railway & 6962 no’s of beneficiaries were covered during this period 3.2. Special cleanliness drive was undertaken in taken in all A-1, A&B category Rly Station in the month of June/2014. 3.3. 497 no. of registration & 98 no. of food licences under food safety & standad Act/2006 have been issued. More over 70 no. of food samples under food safety & standard Act/20006 have been collected & sent to Food Analysist/GHY & Kolkatta where 15 no. of Food samples have beenn declared unsafe substandard & misbranded which have been put under Adijudication & prosecution in the Court of Law. 3.4. Two round pulspolio vaccination campign was organized in the entirre N. F. Railway on 18.01.15 to 20.01.15 to 25.02.15 & 21766 74 ANNUAL PERFORMANCE REPORT - 2014-15 & 26277 nos (both Rly non Rly) of children between age group of (0-5) years were immunized. A seminarr on CKD -Cum-Abdomen perit9oneal Dialysis was organized at DBRT Railway Hospital on 2103-2015. 4.0 MECHANICAL: 4.1. Steam condensate recovery system for saving boiler operation cost of Kamakhya laundry was adjudged as 2nd best innovation at Railway Board’s level and an award of Rs. 2 lakhs has given by Board. 4.2. Trial for 12 coach DEMU formation has been successfully conducted in KIR division. It will mitigate the woes of commuters due to rampant overcrowding of trains in that area. 4.3. NFR has achieved 2nd best Goods SFC figure(1.78 litre/1000 GTKM) amongst 16 Zonal Railways. This has been possible by strict enforcing of trip ration and focused maintenance of Diesel Locomotives in NFR Sheds.

4.4. First ever multi formation of WDG4 loco was done by Siliguri Diesel Shed on 16-12-2014 for movement of ballast train in extremely difficult terrain of LMG-BPB section having gradient of 1 in 60. Goods trains are regularly running on LMG-BPB-SCL section hauled by WDG4 multi locomotives. 4.5. New 2(two) bedded Running Room as per Railway Board’s norms has been commissioned at New Jalpaiguri for providing improved comfort and un-disturb rest of Running staff. 55 (fifty five ) sets of crew can take rest at any given time in this Running Room. 4.6. Restoration of train services has been done in sections affected by landslide in DHR. Now NG trains are running from Siliguri to Darjeeling on trial basis wef 25.12.2014. 4.7. High speed self propelled accident relief train (HS-SPART) of Rangiya division has been commissioned in August-2014 and is working satisfactorily. This is the First HS-SPART of N.F.Railway 4.8. A model of bio-toilet from Coaching Depot/GHY was exhibited in technical exhibition cum presentation at IIT/GHY which was held w.e.f 05-09-14 to 07-09-14. At this exhibition, the working of Bio- Toilet and its components was described to the enthusiastic viewers, which was well appreciated by them. 