Chapter 2 of the Draft EIS, BRT Stations Would Have Been Similar to Metrorail Stations

Total Page:16

File Type:pdf, Size:1020Kb

Chapter 2 of the Draft EIS, BRT Stations Would Have Been Similar to Metrorail Stations 2.0 Alternatives Considered A. Draft EIS Comments Federal Agency Comments Need for Implementation of the Full Metrorail Alternative Federal Comment: BRT stations and stops should be designed as if they were rail stations. (0492 02) Response: The Project Team recommended and the decision-makers selected the Metrorail Extension with Alignment T6 in Tysons Corner as the Locally Preferred Alternative. BRT was eliminated from further consideration after the public and interagency review and comment on the Draft EIS. As described in Chapter 2 of the Draft EIS, BRT stations would have been similar to Metrorail stations. BRT stops would have had Metrorail like amenities, such as a fare pavilion with ticket vending machines and faregate arrays. Stops may also have included bus bays for feeder buses, a Kiss & Ride area for short-term parking, and commuter park-and-ride spaces. Federal Comment: For portions of the project in the freeway medians, air rights above the freeway right- of-way should be transferred and developed so that walkable uses can be placed within ¼ and ½ mile from the stations. (0492 03) Response: As stated in Chapter 5 of the Final EIS, the land use plans adopted by local government within the Dulles Corridor all contain guidelines to support transit, higher densities, mixed-use development, and walkable, bike-friendly development patterns in close proximity to the transit stations. DRPT will work with the local governments to support access to transit stations for pedestrians and cyclists and to implement transit-oriented development initiatives, although implementation of this form of development on private land is under the jurisdiction of the local government’s in the area. With respect to air rights development above Metrorail stations, the Project Team acknowledges that the two Counties govern land use and that FAA, MWAA, VDOT and TRIP II, as the owners and operators of the DIAAH, Dulles Toll Road and Dulles Greenway, must be involved. Therefore, the Project Team will await any initiative of the two Counties with the involvement of the highway owners and operators. Pedestrian walkways are provided from stations in the median of the highways to both roadsides. State Agency Comments Recognition of Programmed Study Area Highway Projects State Comment: Pg. 2-13 - The adopted FY-01 TIP/CLRP specifically identifies the following projects in the Route 28 Corridor between I-66 and VA 7: § Partial interchange at Barnsfield Road, open to traffic in 2003 § VA 606 Interchange, open to traffic in 2005 § VA 625 Interchange, open to traffic in 2005 § VA 606 Interchange, open to traffic in 2005 § Westfields Road Interchange, open to traffic in 2006 § McLearen Road Interchange, open to traffic in 2006 § Innovation Avenue Interchange, open to traffic in 2006 § Study widening to 8 lanes and upgrading to a freeway between I-66 and the Dulles Toll Road, study to be § completed by 2020 § Study upgrading to a freeway between the Dulles Toll Road and VA 7, study to be completed by 2020 Dulles Corridor Rapid Transit Project J-2-1 Final Environmental Impact Statement APPENDIX J CHAPTER 2 § The draft FY-03 TIP/CLRP specifically identifies the following projects in the Route 28 Corridor between I-66 and VA7: § Partial interchange at Barnsfield Road, open to traffic in 2003 § VA 606 Interchange, open to traffic in 2007 § VA 625 Interchange, open to traffic in 2005 § Upgrade VA 28 to a freeway (construct/interchanges/eliminate at-grade access points) and widen to eight lanes between I-66 and VA 7, open to traffic in 2015. Interchanges and widening could occur in the 2006 to 2015 time frame with all improvements open to traffic by 2015. (0421, 0421-A –15) Response: For the analyses in support of the Final EIS, the information provided by the commenter has been used to identify the significant roadways. Need to Reference Planning and Programming Documents State Comment: Planned Roadway Improvements - It is suggested that, when discussing Planned Roadway Improvements, the DCRTP DEIS report make specific reference to their source official document(s): the Six Year Program, the Transportation Improvement Program (TIP) and the Constrained Long Range Plan (CLRP), and the Fairfax County Comprehensive Plan. Please refrain from using statements about "VDOT's decisions" that are not backed up by the approved Six Year Program or referred to in official correspondence. For projects beyond the Six Year Program time horizon, reference should be made to the source document: TIP, CLRP as appropriate (noting that these documents are the result of cooperative efforts of multiple agencies at various levels -- federal, state, local - - and subject to public review), and/or the Fairfax County Comprehensive Plan. Example planned improvements that need source clarification. (0421, 0421-A –17) Response: As suggested, all discussion of transportation programs and projects, including those of VDOT, has been appropriately referenced in the Final EIS. Need for Rail Improvements to Meet Existing and Future Demand State Comment: Rail also responds to the phenomenal growth expected in this corridor; 56 percent in population and 71 percent in employment by 2025. With a capacity to carry 50 to 60,000 passengers maximum per hour, rail can in the future not simply meet the needs of today, but it can meet the needs of tomorrow. Rail will help us meet the needs of a rapidly expanding Dulles Airport, where passenger trips forecast for 2010 have been increased from 30 million to 37 million. Rail will help meet the demands of the National Air and Space Museum, which is expected to generate 3 to 5 million visits per year. (0131, 0163-T –7) State Comment: I will highlight just a couple of the major reasons why I say we should move forward with rail now. First and foremost is the tremendous impact on the quality of life that rail transit will have for residents and employees in the corridor. People will be able to choose to take high quality, efficient rail transit service long envisioned for the corridor. Rail transit will enhance mobility and access to jobs and to cultural and educational facilities throughout the region. By providing a high capacity alternative to the single-occupant vehicle, we can use incentives in transportation measures to reduce vehicle miles of travel and improve air and water quality, a particularly important objective now. (0131, 0131-T –3) State Comment: The Dulles Corridor Rail Association recommends the rail option now. It responds to our needs today, but most importantly, it provides a key element for a quality future for our communities in the corridor. Rail enhances our mobility in the corridor and eases access to jobs, but it also, and I think importantly, opens the region to a myriad of cultural and educational programs that are available throughout the area. (0131, 0163-T –6) State Comment: I come to you tonight as an elected official saying that from my studies and my conclusions, looking at the alternatives proposed, I recommend that we choose as the Locally Preferred Alternative the rail option. (0131, 0239-T –2) Final Environmental Impact Statement J-2-2 Dulles Corridor Rapid Transit Project CHAPTER 2 APPENDIX J State Comment: And finally, as Mr. Klinge had mentioned, I chair a group called the Dulles Corridor Rail Association, and likewise our analysis says that we should go to the rail option. (0131,0239-T –4) State Comment: The organizations I have just listed [Dulles Rail Now coalition] have studied the alternatives analyzed in the draft environmental impact statement of the Dulles Corridor Rapid Transit Project, and recommend that the Commonwealth of Virginia select as the Locally Preferred Alternative the rail option that produces the most ridership and has the most flexibility for increasing ridership in the future. While the organizations in the coalition will testify at the hearings on issues of particular concern to our individual organizations, we are united in our support of bringing rail transit to the corridor of the region that is second only to the District of Columbia in terms of employment, and contains several major activity centers. (0131,0239-T –5) State Comment: Then in my capacity as chairman of the Dulles Corridor Rail Association, as I indicated, we are a membership organization made up of business and community leaders. We likewise have looked at the alternatives proposed in the project study. We unequivocally support the rail option now. (0131,0239-T –6) State Comment: The organizations I have just listed issued a statement yesterday saying that having studied the alternatives analyzed in the draft environmental impact statement of the Dulles Corridor Rapid Transit Project, recommends that the Commonwealth of Virginia select as the Locally Preferred Alternative the rail option that produces the most ridership and has the most flexibility for increasing ridership in the future. (0131, 0163-T –1) State Comment: Having studied the alternatives analyzed in the study, I strongly support Metrorail to Dulles Airport and Loudoun County as the locally preferred alternative. This alternative will provide both the highest transit ridership and the highest number of new riders, resulting in a higher percentage of people using transit. More commuters will benefit from shorter travel times than other alternatives. The best option is to build rail the full length of the project from the beginning. Most people living in my Senate district, which extends from McLean to the Loudoun County border, clearly prefer this alternative. They view rail as an attractive way to commute. They also want to have the entire system at the earliest possible date. (0298, 0298-L –1) State Comment: Likewise, as an organizer with others of the Dulles Rail Coalition Now, I want to bring to you a statement brought forth by a number of organizations supporting again the rail option.
Recommended publications
  • TOOLKIT for RIDERS Brought to You by Godcgo
    Plan Ahead for WMATA’s Platform Improvement Project You’ve got options and goDCgo can help. ORANGE / SILVER LINE STATION CLOSURES TOOLKIT FOR RIDERS Brought to you by goDCgo WHAT IS goDCgo? goDCgo is an initiative of the District Department of Transportation (DDOT) focusing on reducing solo-driving trips within the District of Columbia and its surrounding communities. goDCgo encourages employees, residents, and visitors to use more sustainable, affordable, and healthy transportation options such as bicycling, walking, carpooling, and using public transit. WHAT IS THE PLATFORM IMPROVEMENT PROJECT? During summer 2020, the Washington Metropolitan Area Transportation Association (WMATA) will reconstruct four Orange Line platforms and connect the Silver Line to Metrorail’s existing network. Starting Saturday, May 23, all Orange and Silver Line stations west of Ballston will be closed and Silver Line service will be temporarily suspended. Orange Line service will run from Ballston to New Carrollton. There will be no Silver Line service. The station closures are part of Metro’s three-year Platform Improvement Project (PIP) that will completely reconstruct the outdoor platforms at 20 Metrorail stations, making platforms safer and more accessible for customers with disabilities, while also addressing safety concerns and longstanding structural issues. During this time, free express and local shuttle buses will be available to provide alternative travel options for essential workers. To best handle the station closures, commuters should prepare
    [Show full text]
  • Washington Metropolitan Area Transit Authority Board Action/Information Summary MEAD Number: Resolution: Action Information 200054 Yes No
    Report by Customer Service and Operations Committee (A) 04-25-2013 Washington Metropolitan Area Transit Authority Board Action/Information Summary MEAD Number: Resolution: Action Information 200054 Yes No TITLE Consolidated Silver Line Service Plan and Title VI PRESENTATION SUMMARY The presentation will provide details of the coordinated Silver Line service plans, review the public outreach/input and the Title VI analysis and results. PURPOSE Obtain Board approval for the consolidated Silver Line service plan and the Title VI Staff Report. DESCRIPTION The Silver Line is the first opening of a new line since the original design of the Washington Metropolitan Area Transit Authority (WMATA) system. Key Highlights • The planning and development of the Silver Line has been conducted over many years following the FTA standard process for federally-funded “New Starts” projects • WMATA led the coordination and integration of a consolidated rail and bus service plan working with all of the bus carriers in the region • FTA requirements C4702.1B Title VI Equity Analysis and Public Involvement, effective October 1, 2012, are required on all "New Starts" projects • WMATA conducted public outreach for the Title VI analysis and commenced the overall public outreach that will be ongoing until revenue operations BACKGROUND AND HISTORY Phase 1 of the Silver Line is an 11.4 mile, 5 station extension being constructed under the Metropolitan Washington Airports Authority (MWAA) by the Dulles Transit Partners (DTP). In December 2012: • WMATA Board approved
    [Show full text]
  • Emily Hamilton. “The Politics of Redevelopment Planning in Tysons
    Emily Hamilton. “The Politics of Redevelopment Planning in Tysons and Outcomes 10 Years Later.” Mercatus Working Paper, Mercatus Center at George Mason University, Arlington, VA, June 2020. Abstract Following the allocation of funds for a new line on the Washington Metropolitan Area Transit Authority’s Metrorail system, the Board of Supervisors in Fairfax County, Virginia, undertook redevelopment planning for its Tysons area. The redevelopment plan was the first of its kind. The board adopted a comprehensive plan that established the objective of transforming Tysons from highway-oriented suburban office park development into a walkable, mixed-use area. The redevelopment effort has received extensive attention for its goal to turn a highly car-oriented area into walkable, transit-oriented development. But what is perhaps more notable about the Tysons redevelopment planning effort is its objective to allow extensive multifamily housing construction in a wealthy suburban community. So far, more progress has been made toward the goal of housing construction than walkability. JEL codes: R520, R310, R380 Keywords: Tysons, zoning, redevelopment planning, home building, housing, walkability, transit-oriented development Author Affiliation and Contact Information Emily Hamilton Research Fellow, Mercatus Center at George Mason University [email protected] Acknowledgments I thank Isaac LaGrand, Robert Orr, and Ann Miller for research assistance on this project. All remaining errors are my own. © 2020 by Emily Hamilton and the Mercatus Center at George Mason University This paper can be accessed at http://www.mercatus.org/publications/urban-economics /politics-redevelopment-planning-tysons-outcomes-10-years-later The Politics of Redevelopment Planning in Tysons and Outcomes 10 Years Later Emily Hamilton 1.
    [Show full text]
  • Fairfax County Silver Line Station Names
    FAIRFAX COUNTY SILVER LINE STATION NAMES: STAFF RECOMMENDATIONS, SURVEY RESULTS, AND SUPPORTING INFORMATION Nick Perfili, Dulles Rail Project Planner Fairfax County Department of Transportation April 10, 2012 BACKGROUND On March 29, 2011, the Board of Supervisors endorsed recommended names for the Fairfax County Silver Line stations. These names were reviewed by staff from the Washington Metropolitan Area Transit Authority (WMATA). WMATA staff informed the County that all but two of the proposed station names (Tysons I&II and Reston Town Center) were repetitive, confusing, or not distinctive enough to assist in way-finding and travel on Metrorail (“Tysons,” “Tysons,” “Tysons,” “Tysons;” “Reston,” “Reston;” “Herndon–Reston,” “Herndon”). WMATA’s staff recommendation was based in part on customer research that included both riders and non-riders of the Metrorail system. Ultimately, the WMATA Board of Directors rejected the station names submitted by Fairfax County. As a result of the WMATA Board action and Supervisor Hudgins’ July 26, 2011, Board Matter, Fairfax County Department of Transportation (FCDOT) staff, in partnership with WMATA staff, worked to engage the public on Silver Line station names that fit WMATA’s Station Naming Policy. The policy states station names should be: Relevant: Identify station locations by geographical features, centers of activity or be derived from the names of cities, communities, neighborhoods or landmarks within one-half mile (walking distance) of the station; Brief: Limited to 19 characters with spaces and punctuation, including both primary and secondary names; Unique: Distinctive and not easily confused with other station names; and Evocative: Evoke imagery in the mind of the patron.
    [Show full text]
  • TYSONS CORNER Mclean
    Located on the northwest side of Dolley Madison WELCOME TO THE 1824 Dolley Madison Boulevard | McLean, VA 22102 Getting to Dulles McLEAN Blvd (Route 123) at Scotts Crossing Rd/Colshire Dr SILVER LINE International Airport McLean station is the fi rst of the fi ve new Silver silverlinemetro.com Opening in 2014, Metro’s new Silver Line will Line stations branching off of the existing system, When the Silver Line opens in 2014, located two miles from central McLean. Several operate between Wiehle-Reston East station the new Metrorail service will end at large employers are nearby. in Virginia and Largo Town Center station Wiehle-Reston East and will not go in Maryland, making all stops through to Washington Dulles International STATION FACILITIES:: downtown D.C. Airport. However, there will be multiple options for taking public transportation to 2 Station Entrances The Silver Line will provide new connections Dulles until the airport rail connection is completed. North and south side of Route 123, with to several of the region’s most dynamic and metrobus Metrobus Route 5A: Service a pedestrian bridge crossing Route 123 rapidly growing economic centers. Coupled from L’Enfant Plaza station to Dulles Airport, with Kiss & Ride with integrated bus service, the Silver Line’s stops at Rosslyn station and Herndon-Monroe Park & Available on the south side high-quality, high-capacity transit service Ride Lot. Departing every 30-40 minutes, Monday- will give riders new, traffi c-free access to Friday; every 60 minutes, Saturday and Sunday. Find Bicycles employment, entertainment, and current fare information at wmata.com/fares.
    [Show full text]
  • January 2013
    Dulles Metro is Coming January 2013 Clearance Car Launches Months of Pre-Opening Testing Phase 1 Construction Tops 87 Percent, Pedestrian Bridges Move into Place at All Five Stations Construction of Phase 1 of the Dulles Corridor Metrorail Project from East Falls Church to Wiehle Avenue in Reston has reached the 87 percent mark. Work is on track for a completion in summer of this year, according to rail project officials. When that work is completed, the Metropolitan Washington Airports Authority (MWAA) will turn the project over to the Washington Metropolitan Area Transit Authority. That agency will determine the start of revenue service. Meanwhile, construction has shifted from heavy TESTING TRACKS AT SPRING HILL STATION: The clearance car rolls through the Spring Hill (aka Tysons West) construction to systems. The track work for the Metrorail Station. Photo by Leslie Pereira, Dulles Transit Partners 11.6-mile alignment, including the track over the on rail, drove approximately 1,000 feet in front of the car to aerial guideway (bridges) in Tysons Corner and at the I-66/Dulles ensure that the track was clear. Connector Road, is essentially done. The car’s trips along the tracks from East Falls Church to the Here are some January/February highlights: Wiehle-Reston East stations were the first obvious testing of the new line that will take place over the next nine months for · All five stations – McLean (aka Tysons East), Tysons Corner Phase 1 of the Silver Line, Dulles Corridor Metrorail Project (aka Tysons Central 123), Greensboro (aka Tysons Central 7), officials said.
    [Show full text]
  • Comprehensive Silver Line Plan & Title VI
    Customer Service and Operations Committee Board Action Item III-A April 11, 2013 Comprehensive Silver Line Plan & Title VI Page 3 of 28 Washington Metropolitan Area Transit Authority Board Action/Information Summary MEAD Number: Resolution: Action Information 200054 Yes No TITLE Consolidated Silver Line Service Plan and Title VI PRESENTATION SUMMARY The presentation will provide details of the coordinated Silver Line service plans, review the public outreach/input and the Title VI analysis and results. PURPOSE Obtain Board approval for the consolidated Silver Line service plan and the Title VI Staff Report. DESCRIPTION The Silver Line is the first opening of a new line since the original design of the Washington Metropolitan Area Transit Authority (WMATA) system. Key Highlights • The planning and development of the Silver Line has been conducted over many years following the FTA standard process for federally-funded “New Starts” projects • WMATA led the coordination and integration of a consolidated rail and bus service plan working with all of the bus carriers in the region • FTA requirements C4702.1B Title VI Equity Analysis and Public Involvement, effective October 1, 2012, are required on all "New Starts" projects • WMATA conducted public outreach for the Title VI analysis and commenced the overall public outreach that will be ongoing until revenue operations BACKGROUND AND HISTORY Phase 1 of the Silver Line is an 11.4 mile, 5 station extension being constructed under the Metropolitan Washington Airports Authority (MWAA) by the Dulles
    [Show full text]
  • New Suburbanism: Sustainable Spatial Patterns of Tall Buildings
    buildings Article New Suburbanism: Sustainable Spatial Patterns of Tall Buildings Kheir Al-Kodmany Department of Urban Planning and Policy, College of Urban Planning and Public Affairs, University of Illinois at Chicago, Chicago, IL 60607, USA; [email protected] Received: 18 August 2018; Accepted: 10 September 2018; Published: 13 September 2018 Abstract: Much of the anticipated future growth in North America will occur in suburbia. The critical challenge that we will face is how to accommodate this growth in a sustainable and resilient manner. While the past 50 years have been characterized by suburban sprawl and low-rise development, “suburban sustainability” is increasingly making its way into the planning and urban design policy realm. This research investigates the spatial patterns of tall buildings in 24 suburban communities of three different regions including, Washington, D.C., Miami, and Chicago. The study identifies 10 different spatial patterns that prevail in suburbia and provides a concise summary of these patterns and reflects on their spatial and urban design aspects. The research concludes that the Tall Buildings and Transit-Oriented-Development (TB-TOD) model, an urban design approach that refers to vertical mixed-use clusters centered on mass-transit nodes, is one of the sustainable options for large regions going forward. The paper also discusses the challenges to the TB-TOD model implementation, mainly limited transit lines and community resistance. It ends by offering directions for future research. Keywords: suburban growth; population increase; spatial patterns; vertical density; mass transit 1. Introduction Much of the anticipated future building development in North America will occur in suburbs, defined generally as areas that fall between the outskirts of cities and rural areas [1].
    [Show full text]
  • Silver Line Schedule Comments Do You Anticipate Any Changes to The
    Silver Line Schedule Comments Do you anticipate any changes to the Reverse Commute bus service between West Falls Church and Verizon/AOL when then Silver starts? Why is there no service from Dulles South? Your proposed new schedule from Ashburn-area stops into Tysons is not adequate. I will not take a bus to the Silver Line, to then take a train into Tysons, to then take another bus to my workplace (USA Today). That's too many transfers and too many fares. It will be easier to just drive to work. I am a huge fan of the bus service from Ashburn into Tysons. And I know that a lot of other people are too. It is convenient and efficient. I appreciate that you are keeping some of this service, but you need a later return bus than what you have on this schedule. Currently, I usually take the 6:07 or the 6:37 return bus from USA Today (BL6 or BL7). You need to maintain an equivalent to at least one of those runs. I cannot be sure to be done with work by 5:30. If you had one more later returning run, this would work for me. With your proposed schedule as it exists, I do not see myself ever riding the bus again. And I would prefer to ride the bus rather than drive. Why would I want to go to Spring Hill Metro, if I could get on metro at Wiehle. You have ALL buses that pick-up in Leesburg bypass the Wiehle-Reston station?!? That is just short-sided!! There are NO buses from South Riding and Chantilly and NO early buses from Dulles North.
    [Show full text]
  • A Building Designed to Cultivate Great Experiences Designed for the Inspired in Life
    A BUILDING DESIGNED TO CULTIVATE GREAT EXPERIENCES DESIGNED FOR THE INSPIRED IN LIFE Work is about more than just earning a living—it’s a powerful source of meaning for people. But the world of work still has a lot of ordinary spaces and not enough great places. That’s what inspired us to create One Tysons East—a building designed to cultivate great experiences for people who crave meaningful work and are making a positive mark in the world. Developed by Akridge and the Ronald D. Paul Companies, One Tysons East is a boutique building for businesses committed to giving their talented people what they need to do great work. An extraordinary place that challenges the Tysons status quo with the total comfort of seamless access and joy of an engaging environment for those seeking a higher experience at work. BUILDING 1690 OLD MEADOW ROAD ONETYSONSEAST.COM OVERVIEW TYSONS, VIRGINIA 22102 703.485.8800 IDEALLY SITUATED FOR SEAMLESS ACCESS One Tysons East provides paramount access and the most transportation options. · Capital Beltway · Tysons Corner station (I-495 North) 0.2 miles One Metro stop · 495 Express Lanes · Wiehle-Reston East station 0.2 miles Four Metro stops · I-66 · Ballston-MU station 0.4 miles Two Metro stops · Dulles Toll Road · Clarendon station Two minutes Three Metro stops · McLean station · Foggy Bottom-GWU station Two minute walk Seven Metro stops FEATURE ONETYSONSEAST.COM 1690 OLD MEADOW RD LOCATION 1690 OLD MEADOW ROAD ONETYSONSEAST.COM CALL-OUT 123456789 MCLEAN, VA 22102 & ACCESS TYSONS, VIRGINIA 22102 703.485.8800 GREAT
    [Show full text]
  • Tysons Circulator Study
    This page left intentionally blank. Tysons Circulator Study Table of Contents Executive Summary ................................................................................................................................. ES -2 1 Introduction ..................................................................................................................................... 2 2 Project Goals and Objectives ........................................................................................................... 7 2.1 Introduction ........................................................................................................................ 7 2.2 Project Goals and Objectives .............................................................................................. 7 3 Preliminary Network Development ............................................................................................... 10 3.1 Introduction ...................................................................................................................... 10 3.2 Determination of Route Alignments ................................................................................. 10 3.3 Circulator Planning Objectives Incorporated into Route Design ...................................... 10 3.4 Design Principles for Tysons Circulator Route Design ...................................................... 11 3.5 Route Design – Individual Routes ..................................................................................... 12 3.6 Route Networks ...............................................................................................................
    [Show full text]
  • Bus Bridge Guidebook
    Bus Bridge Guidebook Recent Change Log Updated 10/1/2016: Updated contact sheet, renumbered priority list of service blocks to pull from for a bridge, added addresses, added Wiehle Response plan Updated 5/11/2016: Added additional stations. Made the document one Word file. Updated the contact list. Added supplemental materials for Wiehle Response Options. Overview map Updated 8/27/2015: Revised priority list of blocks (section 3). Updated 7/28/2015: Revised Herndon priority list of blocks. Updated cover sheet. Updated 6/9/2015: New strategic route list, contact sheet, and map change for the Spring Hill metro station turn around Bus Bridge Guidebook Document Sections 1. Bus bridge call chain and key contacts 2. SOP for bus bridge 3. Priority list of blocks to redirect for bridge by time 4. Routing guide with maps, turn sheets and turn around instructions 5. Sample reporting form 6. Response options if the Wiehle Reston East is inaccessible 7. Excerpt from Mutual aid agreement between WMATA and Fairfax County BUS BRIDGE CALL CHAIN UPDATED MAY 31, 2016 SCENARIO: A METRORAIL DISRUPTION OCCURS, SINGLE TRACKING IS NOT POSSIBLE, AND FAIRAX CONNECTOR'S TEMPORARY ASSISTANCE IS NEEDED FOR A BUS BRIDGE BETWEEN STATIONS SPECIFIED IN THE MOA AGREEMENT (SILVER LINE, BLUE LINE AND YELLOW LINE STATIONS WITHIN FAIRFAX COUNTY PLUS EISENHOWER AND VAN DORN STATIONS IN Rail Operations Communication Center (ROCC) 202-962-1652 Bus Operations Communication Center( BOCC) 202-962-1811 FAIRFAX CONNECTOR BUS OPERATIONS COMMUNICATIONS OFFICE: 571-522-6232 FASS
    [Show full text]