Decongestion Strategies for Delhi Roads
PWD, Delhi
Presented By: Sh.Manoj Kumar(CPM); Sh.Ravi Kant (S.E); Sh.A.K.Agrawal (S.E) 1 Public Works Department - GNCTD Decongestion Strategies for Delhi Roads Agendas • • • • • Strategies for Improvement Best Likely Approaches Global CitiesComparison Traffic Scenario Main ChallengesDelhi in Multi integration, modal Junction Improvements, Elevated Corridors. and Enforcement Elevated Corridors Multi Commuters and Modal Share. Road Network, Vehicular Population, LandMultiplicity ,
Modal Integration,NMT, Junction Improvements,System,Bus & Issues in Issues & .
, ParkingManagement, Smart Transport Systems –
Pros in Cons & Growth, Delhi
of of
Authorities,Implementation Congestion,Air Quality. Delhi
2
Decongestion Strategies for Delhi Roads Main Main Challenges in Delhi
3
Decongestion Strategies for Delhi Roads
Abstract Report S Population: NCT S Sub ource: Census of Forest & Tree Cover Land : ource: Census of . . . . . NCR U.P Rajasthan Haryana NCT Growth Rate 2001 persons/ Pop Density: Urban Population: 16,787,941 Total Population (2011 Area - -
Region Wise DistributionPopulation of NCR (1981 -
Delhi Delhi: Availabilityland of and problems : 1483
I Sq.Km ndia ndia 2011 I ndia 1981, 1991, 2001, 2011* (*provisional) ndia 2011*2001, 1981,1991, Sq.Km
1,98,83,168 11,320 62,20,406 69,68,646 17,55,575 49,38,541 1981
-
Primary Primary Census :
- 20.2 % 20.2 (2009) aiming for33%.
97.5%.
2011
Census): : 21.2
2,73,62,532 94,20,644 90,01,704 22,96,580 66,43,604 Main Challenges in Delhi 1991
Population
in land -
1,38,50,507 Primary Primary Census Abstract Report 1,15,70,117 371,00,266
29,92,592 86,87,050 2001 acquisition have delayed many projects.
- 2011) 4,60,49,032 1,67,53,235 1,45,84,234 1,10,37,548 36,71,999 2011
Level of Urbanisation in Sub
1981 100.0 35.0 24.8 31.4 Share of Population in NCR (%)NCR Share of Populationin 8.8 Regions NCRof
1991 100.0 32.9 24.3 34.4 8.4
2001 100.0 - 31.2 23.4 37.3 2011
8.1
2011 100.0 31.6 24.0 36.4 -
8.0
4
Decongestion Strategies for Delhi Roads Implementation Agencies Responsible Policyfor and Roads Lands: ...... Delhi NDMC MCD PWD State Ministry Defenceof Railways PWD UTTIPEC MoUD NCRPB Delhi MCD DDA
Govts Cantt CantonmentBoard
Board (U.P, Haryana
Multiplicity of
)
Policy Implementation Issues: Multiplicity Differentof Modes of Transport Authorities ...... Absence various jurisdictions: Inter development. Budget allocationsfor planning and different departments. Ownership of landrests with Taxi Associations Railways DMRC DTC Transport Department . .
Parking: Traffic Police - related departments under -
. . Metro
of InnovativeApproaches
Maintenance Planning
-
- Central Govt.
MCD, NDMC
-
PWD
.
:
5
Decongestion Strategies for Delhi Roads Traffic Scenario inDelhi
6
Decongestion Strategies for Delhi Roads Glimpses Glimpses Issues of Traffic in in Delhi
7
Decongestion Strategies for Delhi Roads Traffic Congestion: Vehicles Urban Cities: in . . Assess Assess levelof sufficient to meetdemand levelsto a given Supply of road travelinfrastructure is not Defined . travel time variability Average speed, the level of service as excess demand for road travel.
congestion: L.O.S (V/C),
Traffic Traffic Scenario in Delhi
delay and Major Road Network in Delhi . Road Network& Current Scenario: . . . Km/hours Average reached 0.8 to 2.0 Volume Road density density / speed speed . Capacity
of about 20 Km per
Length: is from 5 Km/ hours to 20
R atio
of roads has Sq.Km
.
8
Decongestion Strategies for Delhi Roads Commuter Pain Index . . Air Quality Source: Online Marketing Trends on personal vehiclenumbers due to increased dependence Largely improvement in relocation of polluting industries and buses and threewheelers to natural gas, generation Delhi has lost the air quality gains of its first because of the explosiveincrease in : actions through public
vehicles. emissions.
:
Traffic Traffic Scenario in Delhi transport
9
Decongestion Strategies for Delhi Roads Traffic Traffic Issues Issues in in Delhi
10
Decongestion Strategies for Delhi Roads Land Land Area : sq.km 1483 Population : 16million
Modal ShareComparison in DifferentCities. Source: https://www.lta.gov.sg/ltaacademy/doc/J11Nov - p60PassengerTransportModeShares.pdf
11 11
Decongestion Strategies for Delhi Roads and and inducing people to towards shift privatetheirit from Target Best Strategies and Approaches in Delhi in Approaches and Best Strategies Smart Smart Transport Parking& Management Pricing Integrated Road Network Bus services Improvement junctions of NMT Multi Model IntegrationatMetro Stations,Railways ISBT.and : To: -
decongest decongest Delhi Bicycle systemsharing with bicycle
& BRT System Corridor development Corridor through through
- new bypass / elevated / bypass new roads
prioritization of public and promotion transport
tracks
throughout throughout vehicles.
the city the
12
Decongestion Strategies for Delhi Roads • • • • NMT • • • Multi Multi Model IntegrationatMetro Stations,Railways and Delhi Metro Last pedestrians Improved modal Need infrastructure Need rickshaws travel moving With totalling of Delhi
walking
- mile
Metro
Bicycle sharing systemBicyclesharing
a a Stations share has
for
Best Strategies and Approaches in Delhi comprehensive
mix
traffic nearly
by
accessibility connectivity
is a
and
and
shall
dedicated
of very high of .
to the
46 NMT on bicycle slow
cycling
soon
unsafe optimize %
mode
commuters the .
.
and
in be
within
cycling .
trips roads, strategy
share Metro the
trips and fast
city’s - .
a
and stations
2 for
life Km
connectivity
affecting -
line zone
design .
of
the for . all
MultiIntegration Model
ISBT:
13
Decongestion Strategies for Delhi Roads • • • Improvement Bus services & Bus services • • • users multiple geometric Adequate road junctions Less roads jams Poor thereby shown In as Bus transit passengers Delhi
an
network Delhi, . design
number .
and Rapid
efficient Best Strategies and Approaches in Delhi
ridership still directions,
that which
carrying design
also
on Transit number of
to carries on
and
the junctions
the pedestrian and throughput of junctions of greatly
–
buses –
more
help
higher
System, speed poor
BRT Corridor BRT Corridor Improvement: while
integrated pilot
more of
disperse reduces
passengers
is
from
design ensuring than corridor,
of primary
junctions when
and and
than
the
system the Metro
disperse
cyclist the
traffic
/ designed
bus
safety
reason management 60 per overall studies
capacity . .
%
and
increased min efficiently
fatalities
traffic of of
for
& .
mass
have all
run proper the
of traffic
. road
the
on of in
14
Decongestion Strategies for Delhi Roads • • • • Parking Elevated Roads Integrated • enforcement ‘ valuable Absence unregulated vehicles Attributed Delhi Parking D development as and alternative be To emand
no reduce
more . railway
other
Best Strategies and Approaches in Delhi
is
Pricing &Pricing road and of
one
to congestion
appropriate
links
and Road Network land organized
line M and
space .
their phenomenal
of
anagement
under
to and pricing is the
:
not
augment is use
Management:
major access
being
on -
priced parking
available
to policy and
the ’
increase used
problems identify
corridors
the existing
the parking .
approach - space
for new bypass / / bypass new
for current related
road parking
in additional
roads, .
being along
and
personalized
network network
aspect
facilities,
. it faced drain through
will
/
of in
15
Decongestion Strategies for Delhi Roads Smart Smart • • management Traffic systems Smart Transport
Transport
rules across Best ApproachesStrategies andin Delhi
in
and the
Delhi
Systems
world SystemEnforcement:& regulations .
.
like
ITS,
enforcement
have
long
been :
Responsible
the
backbone
for
efficient of
all
successful
operations
public
and
transport
traffic
16
Decongestion Strategies for Delhi Roads Multi Integration Integration Plan inDelhi - Modal Interchange
17
Decongestion Strategies for Delhi Roads Project Site Location: MULTIMODAL INTEGRATION AT PHASE III METRO STATIONS METRO IIIPHASE AT INTEGRATIONMULTIMODAL Multi - Modal Modal Interchange Integration Plan
-
Jama Jama Masjid
18
Decongestion Strategies for Delhi Roads MULTIMODAL INTEGRATION AT PHASE III METRO STATIONS METRO IIIPHASE AT INTEGRATIONMULTIMODAL Proposed Proposed Plan: Concept Multi - Modal Modal Interchange Integration Plan
-
Jama Jama Masjid
19
Decongestion Strategies for Delhi Roads Concept Concept Proposal: MULTIMODAL INTEGRATION AT PHASE III METRO STATIONS METRO IIIPHASE AT INTEGRATIONMULTIMODAL Multi - Modal Modal Interchange Integration Plan
-
Jama Jama Masjid
20
Decongestion Strategies for Delhi Roads Jama Masjid: MULTIMODAL INTEGRATION AT PHASE III METRO STATIONS METRO IIIPHASE AT INTEGRATIONMULTIMODAL Multi - Modal Modal Interchange Integration Plan
-
Jama Jama Masjid
21
Decongestion Strategies for Delhi Roads Jama Masjid Sections: Jama Masjid MULTIMODAL INTEGRATION AT PHASE III METRO STATIONS METRO IIIPHASE AT INTEGRATIONMULTIMODAL Multi - Modal Modal Interchange Integration Plan
-
Jama Jama Masjid
22
Decongestion Strategies for Delhi Roads MULTIMODAL INTEGRATION AT PHASE III METRO STATIONSMETRO IIIPHASEAT INTEGRATIONMULTIMODAL Lal Multi Quila - - Modal Modal Interchange Integration Plan
ExistingSituation:
-
Jama Jama Masjid
23
Decongestion Strategies for Delhi Roads MULTIMODAL INTEGRATION AT PHASE III METRO STATIONSMETRO IIIPHASEAT INTEGRATIONMULTIMODAL Lal Multi Quila - - Modal Modal Interchange Integration Plan
ExistingSituation:
. . ENCROACHMENT BY HAWKERS BYENCROACHMENT NO LANE. BUS FROM THE BUS
SPACE FOR PEDESTRIAN OR NMV MOVEMENT BECAUSE OF THE OF BECAUSE MOVEMENTOR NMV PEDESTRIAN FOR SPACE
STOP NOT BEING USED BECAUSE OF ITS ITS AWAYLOCATION OF BECAUSEUSED BEING NOT STOP
-
Jama Jama Masjid
24
Decongestion Strategies for Delhi Roads MULTIMODAL INTEGRATION AT PHASE III METRO STATIONSMETRO IIIPHASEAT INTEGRATIONMULTIMODAL Lal Multi Quila - -
Modal Modal Interchange Integration Plan ExistingSituation & Proposal:
-
Jama Jama Masjid
25
Decongestion Strategies for Delhi Roads MULTIMODAL INTEGRATION AT PHASE III METRO STATIONSMETRO IIIPHASEAT INTEGRATIONMULTIMODAL Lal Multi Quila -
Sections: Modal Modal Interchange Integration Plan
-
Jama Jama Masjid
26
Decongestion Strategies for Delhi Roads Flyovers and Junctions Plan in Delhi Improvement
27
Decongestion Strategies for Delhi Roads Flyovers and Junctions Opposite Introduction Introduction of avoid turn to cast U Dilshad
Garden MetroStation Improvement
28
Decongestion Strategies for Delhi Roads Providing Providing the with connection Flyovers Flyovers and Junctions Mansarover Improvement
Metro Station concourse. Station Metro
29
Decongestion Strategies for Delhi Roads Providing Providing Cross barriers centre onthe of Carriageway to avoid parking Flyovers Flyovers and Junctions ( ( near Shahdara
metro station) Improvement
30
Decongestion Strategies for Delhi Roads Improvement roadof Junctions Opp. Flyovers and Junctions Seelampur Improvement
metro station
31
Decongestion Strategies for Delhi Roads Junctions Junctions nearImprovement Flyovers and Junctions Shahdara Improvement
Flyover
32
Decongestion Strategies for Delhi Roads Elevated Corridors Planning by Kalindi Kalindi Kunj Bye Pass Proposed Proposed Elevatedin Corridor PWD, Delhi -
Faridabad to DND
Delhi
33
Kalindi Kunj Bye Pass Type of Corridor Single Elevated (
Kalindi
Length Length of Corridor Location Location of proposed Corridor
Kunj - 13.2 Km
Byepass DND
Faridabad
Noida -
3+3 Lanes (Total 6Lanes) Faridabad to DND
4. 3. 2. 1. Major Nodes Shaheen Jasola Okhla DND NoLanes of
DND
Bagh
(Road (Road 13a) 1
3 2
8. 7. 6. 5. 4
) 5
Faridabad Noida Badarpur Madanpur 6 8
7 Faridabad Noida
R.O.W
30m
Khadar
34
GT ROAD Kalindi Kunj Byepass Elevated Corridor Alignment in Delhi
NH1 Existing Internal roads UER-II UER-I UER-III Existing Main Roads & Ring Roads NARELA National Highways
NH10 Existing Metro Lines TO ROHTAK NH 24 Proposed Phase-3 OUTER RING ROAD OUTER RING ROAD Metro Lines
Proposed Urban UERs &
NAJAF GARH DWARKA Peripheral Roads INTERNATIONAL INNER RING ROAD AIRPORT DND Noida Proposed Elevated Corridor- Kalindi Kunj Byepass
NH 2
35 Kalindi Kunj Bye Pass Need of the Project ...... Planned DND DND interchange& Decongestedthe traffic onAshram chowk, roads movementHigh of frighttraffic on urban decrease the loadgenerated dueto To improve the traffic conditionsand centres needed which are comingup as a key work Centre and Mohan CooperativeEstate is Additional access road to on NH Road) and bypass routeup to An alternateroute tothe NH interchangeand ring road section As of Ring road. (Mathura Road) and toalleviate the traffic a solutionfor cloggedtheDND
- 2 and Delhi
todecongest NationalHighway
Maharanibagh Jasola - 2 (Mathura Ballabhgarh
Business
.
-
2
36
Kalindi Kunj Bye Pass
Corridor ViewFlyover DND Near Proposed Proposed of the 3d Views Corridor
37
Kalindi Kunj Bye Pass
View ofCorridor Metro aboveLine Proposed Proposed 3d Views of the Corridor
38
Kalindi Kunj Bye Pass
View Corridor of near Proposed Proposed 3d Views of the Corridor Byepass
39
Kalindi Kunj Bye Pass Kalindi Kunj Bye Pass Alignment -
Walkthrough Video
40
41