20161124 SIITS Draft Options Appraisal Report Vfinal

Total Page:16

File Type:pdf, Size:1020Kb

20161124 SIITS Draft Options Appraisal Report Vfinal Shetland Inter-Island Transport Study Strategic Business Case - Options Appraisal Report On behalf of Shetland Islands Council Project Ref: 35580 | Rev: SC | Date: November 2016 Office Address: 3rd Floor, Exchange Place 3, 3 Semple Street, Edinburgh EH3 8BL T: +44 (0)131 297 7010 E: [email protected] Strategic Business Case - Options Appraisal Report Shetland Inter -Island Transport Study Document Control Sheet Project Name: Shetland Inter-Island Transport Study Project Ref: 35580 Report Title: Strategic Business Case - Options Appraisal Report Date: 24 November 2016 Name Position Signature Date Stephen Associate – Prepared by: SC 13/06/2016 Canning Transport Planner Reviewed by: Dr Scott Leitham Senior Associate SL 17/06/2016 Approved by: Dr Scott Leitham Senior Associate SL 17/06/2016 For and on behalf of Peter Brett Associates LLP Revision Date Description Prepared Reviewed Approved First full draft taking account of all V3.0 19/07/16 SC SL SL SIC comments Draft final report taking account of V4.0 07/10/16 SIC comments and updated fixed SC SL SL links material Final report taking account of SIC FINAL 24/11/16 SC SL SL comments Peter Brett Associates LLP disclaims any responsibility to the Client and others in respect of any matters outside the scope of this report. This report has been prepared with reasonable skill, care and diligence within the terms of the Contract with the Client and generally in accordance with the appropriate ACE Agreement and taking account of the manpower, resources, investigations and testing devoted to it by agreement with the Client. This report is confidential to the Client and Peter Brett Associates LLP accepts no responsibility of whatsoever nature to third parties to whom this report or any part thereof is made known. Any such party relies upon the report at their own risk. © Peter Brett Associates LLP 2016 ii Strategic Business Case - Options Appraisal Report Shetland Inter -Island Transport Study Contents 1 Introduction ................................................................................................................................. 9 1.1 This Report .................................................................................................................... 9 1.2 The Shetland Inter-Island Transport Network ............................................................... 9 1.3 Project Overview ......................................................................................................... 10 1.4 Appraisal Methodology ................................................................................................ 11 1.5 Consultation ................................................................................................................. 18 2 Vessels ....................................................................................................................................... 20 2.1 Vessel Replacement Strategy ..................................................................................... 20 2.2 Vessel Characteristics – Key Assumptions ................................................................. 22 2.3 Phasing & Cascade of Vessels ................................................................................... 25 2.4 Assumptions and Packaging of Capital & Revenue Options ...................................... 26 2.5 Other Investment Related to the Ferry Service ........................................................... 26 3 Air Infrastructure Options ........................................................................................................ 27 3.1 Overview ...................................................................................................................... 27 3.2 Accountable Management ........................................................................................... 27 3.3 Current and Potential Aircraft ...................................................................................... 28 3.4 Navigational Aids ......................................................................................................... 35 3.5 Mainland Airfield .......................................................................................................... 38 3.6 Use of Existing Assets & Resources ........................................................................... 41 3.7 Appraisal of Capital Options ........................................................................................ 42 4 Bluemull Sound ......................................................................................................................... 49 4.1 Capital Investment Timeframe .................................................................................... 49 4.2 Identified Problems ...................................................................................................... 49 4.3 Appraisal of Capital Options ........................................................................................ 52 4.4 Appraisal of Revenue Options ..................................................................................... 60 4.5 Annual Operating Cost Estimates ............................................................................... 63 4.6 Public Consultation – Prioritisation .............................................................................. 64 4.7 Rationale for Selection / Rejection .............................................................................. 67 5 Bressay ...................................................................................................................................... 69 5.1 Capital Investment Timeframe .................................................................................... 69 5.2 Identified Problems ...................................................................................................... 69 5.3 Appraisal of Capital Options ........................................................................................ 70 5.4 Appraisal of Revenue Options ..................................................................................... 75 5.5 Annual Operating Cost Estimates ............................................................................... 77 5.6 Public Consultation – Prioritisation .............................................................................. 79 5.7 Rationale for Selection / Rejection .............................................................................. 81 6 Fair Isle ....................................................................................................................................... 83 6.1 Capital Investment Timeframe .................................................................................... 83 iii Strategic Business Case - Options Appraisal Report Shetland Inter -Island Transport Study 6.2 Identified Problems ...................................................................................................... 83 6.3 Appraisal of Capital Options ........................................................................................ 85 6.4 Appraisal of Revenue Options ..................................................................................... 92 6.5 Annual Operating Cost Estimates ............................................................................... 95 6.6 Public Consultation – Prioritisation .............................................................................. 97 6.7 Rationale for Selection / Rejection .............................................................................. 98 7 Foula ......................................................................................................................................... 100 7.1 Capital Investment Timeframe .................................................................................. 100 7.2 Identified Problems .................................................................................................... 100 7.3 Appraisal of Capital Options ...................................................................................... 102 7.4 Appraisal of Revenue Options ................................................................................... 106 7.5 Annual Operating Cost Estimates ............................................................................. 110 7.6 Public Consultation – Prioritisation ............................................................................ 110 7.7 Rationale for Selection / Rejection ............................................................................ 112 8 Papa Stour ............................................................................................................................... 113 8.1 Capital Investment Timeframe .................................................................................. 113 8.2 Identified Problems .................................................................................................... 113 8.3 Appraisal of Capital Options ...................................................................................... 114 8.4 Appraisal of Revenue Options ................................................................................... 117 8.5 Annual Operating Cost Estimates ............................................................................. 121 8.6 Public Consultation .................................................................................................... 122 8.7 Rationale for Selection / Rejection ...........................................................................
Recommended publications
  • 2015 Guide to the Village at Machrihanish Dunes Table of Contents
    2015 Guide to The Village at Machrihanish Dunes Table of Contents The Village at Machrihanish Dunes Overview Pg 1-3 The Ugadale Hotel Pg 4-5 The Ugadale Cottages Pg 6-7 The Royal Hotel Pg 8-9 Machrihanish Dunes Golf Club Pg 10-11 Restaurants & Pubs Pg 12-13 Testimonials Pg 14 The Area Pg 15 Suggested Golf Tour Itineraries Pg 16 2015 Events Pg 17 Getting Here Pg 18 Fact Sheets Pg 19-21 The Village at Machrihanish Dunes he world’s most natural golf course. Luxurious seaside cottages. Historic hotels restored to their former grandeur. A wealth of fine Tdining options. And a tranquil full-service spa. All of these things and more are why The Village at Machrihanish Dunes has fast become Scotland’s most exciting resort destination. For golfers, or anyone looking to enjoy a rejuvenating holiday in one of Scot- land’s most scenic corners, Machrihanish Dunes offers the best of everything. The amenities and personal service are nothing short of first-class. And all the magic of Kintyre is right at your doorstep. 2013 Resort Experience of the Year Golf Tourism Scotland 2013 Scotland’s Best Experience Bunkered Magazine Readers 1 The Village at Machrihanish Dunes 2 3 The Ugadale Hotel 2012 Golf Hotel of the Year , Scottish Hotel Awards. TripAdvisor® Certificate of Excellence nce regarded as the pinnacle of luxury accommodation in the west of Scotland, The Ugadale Hotel has been restored to its former glory and Oserves as the centerpiece of The Village at Machrihanish Dunes. In its heyday, The Ugadale regularly welcomed captains of industry and their families from Scotland, Europe and the U.S., who descended on Machrihanish for summer holidays with their steamer trunks for relaxing times on the beach and golf links.
    [Show full text]
  • Shetland Mainland North (Potentially Vulnerable Area 04/01)
    Shetland Mainland North (Potentially Vulnerable Area 04/01) Local Plan District Local authority Main catchment Shetland Shetland Islands Council Shetland coastal Summary of flooding impacts Summary of flooding impacts flooding of Summary At risk of flooding • <10 residential properties • <10 non-residential properties • £47,000 Annual Average Damages (damages by flood source shown left) Summary of objectives to manage flooding Objectives have been set by SEPA and agreed with flood risk management authorities. These are the aims for managing local flood risk. The objectives have been grouped in three main ways: by reducing risk, avoiding increasing risk or accepting risk by maintaining current levels of management. Objectives Many organisations, such as Scottish Water and energy companies, actively maintain and manage their own assets including their risk from flooding. Where known, these actions are described here. Scottish Natural Heritage and Historic Environment Scotland work with site owners to manage flooding where appropriate at designated environmental and/or cultural heritage sites. These actions are not detailed further in the Flood Risk Management Strategies. Summary of actions to manage flooding The actions below have been selected to manage flood risk. Flood Natural flood New flood Community Property level Site protection protection management warning flood action protection plans scheme/works works groups scheme Actions Flood Natural flood Maintain flood Awareness Surface water Emergency protection management warning raising plan/study plans/response study study Maintain flood Strategic Flood Planning Self help Maintenance protection mapping and forecasting policies scheme modelling Shetland Local Plan District Section 2 20 Shetland Mainland North (Potentially Vulnerable Area 04/01) Local Plan District Local authority Main catchment Shetland Shetland Islands Council Shetland coastal Background This Potentially Vulnerable Area is There are several communities located in the north of Mainland including Voe, Mossbank, Brae and Shetland (shown below).
    [Show full text]
  • Chapter 7: Aviation and Telecommunications
    Viking Wind Farm Chapter 7 Section 36 Variation Application – EIA Report Aviation and Telecommunications 7. AVIATION AND TELECOMMUNICATIONS Executive Summary The ES and ES Addendum determined that the consented Viking Wind Farm would have no significant effects on existing telecommunications and microwave links following the application of mitigation measures. The same mitigation measures would be implemented for the proposed varied development, which will ensure no significant effects on existing telecommunications and microwave links. On this basis there is no difference in the effects associated with the consented Viking Wind Farm and the proposed varied development. The Applicant engaged in detailed consultation with Scatsta Airport owners, licensee and operators as part of the development of the consented Viking Wind Farm layout regarding mitigation for the potential significant effects on aviation operations at the airfield. Following consultation and through the determination of the relevant section 36 consent, turbines are no longer proposed for the Delting quadrant. As a result, the consented Viking Wind Farm, subject to the compliance with relevant conditions of the consent, would have no significant effect on operations at Scatsta Airport. The proposed varied development would introduce an additional requirement for aviation lighting. Current regulations1 requires ‘en-route obstacles’ taller than 150 m to be provided with aviation lighting scheme. The Applicant would seek to agree suitable lighting scheme with the planning authority in consultation with the Scatsta Airport Operator and the Civil Aviation Authority (CAA) as part of agreeing an Aviation Mitigation Scheme2. On the basis that the proposed varied development would also comply with the pre-commencement condition3, there would be no significant effects on aviation operations, and there would be no difference between the consented Viking Wind Farm and the proposed varied development.
    [Show full text]
  • Water Safety Policy in Scotland —A Guide
    Water Safety Policy in Scotland —A Guide 2 Introduction Scotland is surrounded by coastal water – the North Sea, the Irish Sea and the Atlantic Ocean. In addition, there are also numerous bodies of inland water including rivers, burns and about 25,000 lochs. Being safe around water should therefore be a key priority. However, the management of water safety is a major concern for Scotland. Recent research has found a mixed picture of water safety in Scotland with little uniformity or consistency across the country.1 In response to this research, it was suggested that a framework for a water safety policy be made available to local authorities. The Royal Society for the Prevention of Accidents (RoSPA) has therefore created this document to assist in the management of water safety. In order to support this document, RoSPA consulted with a number of UK local authorities and organisations to discuss policy and water safety management. Each council was asked questions around their own area’s priorities, objectives and policies. Any policy specific to water safety was then examined and analysed in order to help create a framework based on current practice. It is anticipated that this framework can be localised to each local authority in Scotland which will help provide a strategic and consistent national approach which takes account of geographical areas and issues. Water Safety Policy in Scotland— A Guide 3 Section A: The Problem Table 1: Overall Fatalities 70 60 50 40 30 20 10 0 2010 2011 2012 2013 Data from National Water Safety Forum, WAID database, July 14 In recent years the number of drownings in Scotland has remained generally constant.
    [Show full text]
  • Tingwall Aerodrome Manual of Flight Information Services MAFIS
    Tingwall Aerodrome Manual of Flight Information Services MAFIS Issue 12 Issue date 01 January 2021 MANUAL of FLIGHT INFORMATION SERVICE Part 1 Page 1 Document Administration Preface The Tingwall Airport Manual of Flight Information Service (MAFIS) provides information, procedures and guidance primarily related to Tingwall Airport. The Flight Information Service is provided in accordance with CAP 670, CAP 1032, CAP 797 and CAP 774. The MAFIS is to be used in conjunction with CAP 797. Details of MAFIS amendment procedures are contained in the following pages of Section 1. AFISOs may, in the interest of safety and when circumstances dictate, depart from MAFIS procedures. Any such actions, together with the reasons are to be recorded in the Watch Log. The AFIS service at Tingwall Airport is primarily to provide an ATS to the Base Operator’s scheduled aircraft and other visiting / transiting aircraft during the operational hours of the airport. There is also a commitment to provide a service to ambulance and SAR aircraft operating outside these hours. The AFIS and AFISOs should provide information to all aircraft wishing to participate in the AFIS service in the AFISOs area of responsibility. This will assist all pilots in the safe conduct of flight. AFISOs at Tingwall Airport are only permitted to provide a Basic Flight Information Service. As a general principle and in the interest of sound document management, the duplication of local information and procedures is avoided. Information contained in the Tingwall Airport Aerodrome Manual will be cross-referenced in the MAFIS. Any section of this document which is found to be at variation to the contents of CAP 797 must be brought to the immediate attention of the Aerodrome Manager and Accountable Manager.
    [Show full text]
  • The Second World War in Shetland 1931 Census 1941 NO CENSUS 1951 Census 21, 421 20, 000 Troops Garrisoned in Shetland 19, 352
    1931 census 1941 NO CENSUS 1951 census 21, 421 20, 000 troops garrisoned in Shetland 19, 352 The Second World War in Shetland 1931 census 1941 NO CENSUS 1951 census 21, 421 20, 000 troops garrisoned in Shetland 19, 352 Second World War: Shetland “In 1939 Shetland was flooded with more than 20,000 servicemen to garrison the islands. They found a friendly, hospitable race of Shetlanders living simple, reasonably contented lives but (in many places) without such facilities as “At the outbreak of the electricity, piped water, Second World War, Shetland, drainage and good roads. a virtually forgotten backwater in the United Suddenly Shetland was thrust Kingdom, was rediscovered th into the 20 Century as by London and became the Whitehall sought to remedy northern base of the war the situation, at least for effort, playing a vital the benefit of the armed role in the North Sea forces, and millions of blockade. pounds were spent in improving roads and providing basic amenities. The influx of servicemen, The islands began to enjoy with troops possibly full employment, wages ran outnumbering civilians, led at a level never before to a welcome increase in experienced and a dramatic well paid full- and part- rise occurred in living time local employment, and conditions.” thereby to an increased standard in living; Nicolson, James R., 1975. Shetland even in rural areas, basic and Oil. p. 38 amenities like water, electricity and roads were gradually installed.” Fryer, L.G., 1995. Knitting by the Fire- side and on the Hillside. p. 131 1931 census 1941
    [Show full text]
  • Download: Appendix J
    Part 1 Appraisal Summary Tables Proposal Details Name and address of authority or organisation promoting the proposal: Mr Michael Craigie, 01595 744 160, [email protected] Shetland Islands Council, Development Service, Transport Planning (Also provide name of any subsidiary organisations also involved in promoting the Service, 6 North Ness, Lerwick, Shetland, ZE1 0LZ proposal) Stephen Canning, Peter Brett Option CO3: Replace the MV Dagalien and MV Proposal Name: Name of Planner: Associates Daggri with three TYPE 3 vessels. The working assumption with this option is that the Capital costs/grant MV Dagalien and MV Daggri would be replaced by £38.8 million. three TYPE 3 vessels. However, various vessel mixes could apply and the final decision should be Current revenue support informed by analysis of demand in the Final Business Case (FBC), which would be used to £2.27m (rounded) per annum. determine this. Estimated Total Public Proposal Description: Sector Funding One of the three vessels would need to lie Requirement: Annual revenue support overnight at Toft. This would require the construction of a 210m detached breakwater to £3.49m (rounded) per annum, although it provide shelter from northerly or easterly waves should be noted that frequency would be allowing vessels to safely overnight. There would increased with this option. also need to be a small investment in improved parking / waiting facilities at Toft. Present Value of Cost to Govt. Funding Sought From: Transport Scotland Amount of Application: Costs in this study are all reported in 2016 (if applicable) prices only. The costs would reflect those set out above.
    [Show full text]
  • 30 Bus Time Schedule & Line Route
    30 bus time schedule & line map 30 Ulsta - West Sandwick View In Website Mode The 30 bus line (Ulsta - West Sandwick) has 3 routes. For regular weekdays, their operation hours are: (1) Mid Yell: 3:50 PM (2) Ulsta: 6:30 AM - 4:55 PM (3) West Sandwick: 9:40 AM - 6:20 PM Use the Moovit App to ƒnd the closest 30 bus station near you and ƒnd out when is the next 30 bus arriving. Direction: Mid Yell 30 bus Time Schedule 14 stops Mid Yell Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 3:50 PM Ferry Terminal, Ulsta Tuesday 3:50 PM Copister Rd End, Ulsta Wednesday 3:50 PM Road End, Hamnavoe Thursday 3:50 PM Road End, Houlland Friday 3:50 PM Public Hall, Burravoe Saturday 3:20 PM School, Burravoe Road End, Gossabrough 30 bus Info Road End, Otterswick Direction: Mid Yell Stops: 14 Trip Duration: 35 min Queyon Rd End, Otterswick Line Summary: Ferry Terminal, Ulsta, Copister Rd End, Ulsta, Road End, Hamnavoe, Road End, South Rd End, Aywick Houlland, Public Hall, Burravoe, School, Burravoe, Road End, Gossabrough, Road End, Otterswick, North Rd End, Aywick Queyon Rd End, Otterswick, South Rd End, Aywick, North Rd End, Aywick, Vatsetter Rd End, Mid Yell, Vatsetter Rd End, Mid Yell Whiteƒeld Cottage, Mid Yell, School, Mid Yell Whiteƒeld Cottage, Mid Yell School, Mid Yell Direction: Ulsta 30 bus Time Schedule 20 stops Ulsta Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:30 AM - 4:55 PM Village, West Sandwick Tuesday 6:30 AM - 4:55 PM Hjarkland Rd End, West Sandwick Wednesday 6:30 AM - 4:55 PM Grimister Rd End, Mid
    [Show full text]
  • CITATION NESS of CULLIVOE SITE of SPECIAL SCIENTIFIC INTEREST Shetland Islands Site Code: 1217 NATIONAL GRID REFERENCE: HP552024
    CITATION NESS OF CULLIVOE SITE OF SPECIAL SCIENTIFIC INTEREST Shetland Islands Site code: 1217 NATIONAL GRID REFERENCE: HP552024 OS 1:50,000 SHEET NO: Landranger Series 1 1:25,000 SHEET NO: Explorer Series 470 AREA: 11.07 hectares NOTIFIED NATURAL FEATURES Geological: Structural and metamorphic geology: Moine DESCRIPTION: The Ness of Cullivoe is a small peninsula which projects into Bluemull Sound from the north east of the island of Yell. Most of Yell is composed of rocks which are believed to be related to rocks in northern Scotland known as the Moine. Underlying these are ancient rocks similar to the Lewisian gneiss found in the Western Isles and along the north west coast of Scotland, whilst to the east the rocks forming the western sides of Unst and Fetlar are younger and are correlated with the Dalradian rocks of the southern Highlands of Scotland. All three groups are metamorphic rocks, i.e. rocks which have been altered by intense heat and pressure. The Ness of Cullivoe lies within a geological unit known as the Hascosay Slide - a zone of intensely deformed and sheared rocks, up to a kilometre wide, which marks the boundary between the Moine rocks of Yell and the Dalradian rocks to the east. The Hascosay Slide Zone mainly comprises fine grained, banded blastomylonite; a type of rock produced by intense shearing under very high temperature conditions deep in the Earth’s crust. Caught up within these fine grained rocks are large bodies of coarse grained Lewisian gneiss. The rocks of the Hascosay slide provide important evidence about the geological evolution of Shetland and the formation, around 430 million years ago, of the Caledonian Mountain Belt of Britain and Scandinavia.
    [Show full text]
  • Energy Isles Wind Farm
    1 Background 1.1 This document is a Non-Technical Summary of the Energy Isles Wind Farm Environmental Impact Assessment (EIA) Report which supports the application by Energy Isles Ltd (the Applicant), proposing the development of a wind farm (the Proposed Development) in Yell, in the Shetland Islands (refer to Figure 1). The Applicant is submitting an application to the Scottish Government’s Energy and Consents Unit under Section 36 of the Electricity Act 1989, seeking consent to construct and operate the Proposed Development for a period of 30 years. The Applicant is also applying for a direction under Section 57(2) of the Town and Country Planning (Scotland) Act 1997 that planning permission for the development be deemed to be granted. The Applicant 1.2 The Applicant is a consortium of over fifty mainly Shetland-based companies working together to develop a large-scale wind farm in the north of Yell, with the intention of ensuring that the communities of Shetland realise the substantial benefits associated with renewable energy development. Companies in the group come from a wide variety of existing sectors including fishing, aquaculture, crofting, marine engineering, renewable energy and support services. Several are based in the North Isles of Shetland. ENERGY ISLES WIND FARM 1 NON-TECHNICAL SUMMARY 2 Purpose of the Proposed Development EIA Report 2.1 ITPEnergised is appointed by the Applicant to undertake an EIA of the Proposed Development in accordance with the Electricity Works (Environmental Impact Assessment) (Scotland) Regulations 2017 (the EIA Regulations). EIA is the systematic process of identifying, predicting and evaluating the environmental impacts of a proposed development.
    [Show full text]
  • Vebraalto.Com
    Middlesbrough Gossabrough, Shetland, ZE2 9AU Offers over £170,000 'Middlesbrough’ is a four bedroom, detached house set in just under ? acre at the end of the side road in a quiet, very rural situation on the east side of the island of Yell, enjoying spectacular panoramic views eastwards over the Wick of Gossabrough and beyond to the island of Fetlar. In addition to the four bedrooms all of which have built-in wardrobes, the spacious, single storey accommodation which benefits from central heating provided by an air-to-air heat pump, also includes a generously proportioned living room with wide picture window enjoying the views, a large kitchen / dining room with solid-fuel stove, a recently re-fitted contemporary bathroom plus an en-suite shower room. Externally there is plenty of parking, a large deck along the front of the house, and a front lawn. The tenancy of the surrounding croft is for sale separately at offers over £50,000. Harper Macleod LLP, St Olaf’s Hall Church Road, Lerwick, Shetland, ZE1 0FD Tel: 01595 695 583 Email: [email protected] www.estateagencyshetland.co.uk General Information air-to-air heat pump system with two units in the hall, and ‘Middlesbrough’ is situated in the small hamlet of further units in the living room and kitchen, a solid-fuel stove Gossabrough on the east side of the island of Yell, the larger in the kitchen providing a cosy alternative heat source. Hot of Shetland’s North Isles, which sits between Mainland water is provided by a pressurised ‘Megaflo’ tank with dual Shetland and the neighbouring island of Unst, Yell being immersion heaters.
    [Show full text]
  • Download a Leaflet on Yell from Shetland
    Yell The Old Haa Yell Gateway to the northern isles The Old Haa at Burravoe dates from 1672 and was opened as a museum in 1984. It houses a permanent display of material depicting the history of Yell. Outside there is a monument to the airmen who lost their lives in 1942 in a Catalina crash on the moors of Some Useful Information South Yell. Accommodation: VisitShetland, Lerwick The Old Haa is also home to the Bobby Tulloch Tel: 08701 999440 Collection and has rooms dedicated to photographic Ferry Booking Office: Ulsta Tel: 01957 722259 archives and family history. Neighbourhood The museum includes a tearoom, gallery and craft Information Point: Old Haa, Burravoe, Tel 01957 722339 shop, walled garden and picnic area, and is also a Shops: Cullivoe, Mid Yell, Aywick, Burravoe, Neighbourhood Information Point. and Ulsta Fuel: Cullivoe, Mid Yell, Aywick, Ulsta and Bobby Tulloch West Sandwick Bobby Tulloch was one of Yell’s best-known and Public Toilets: Ulsta and Gutcher (Ferry terminals), loved sons. He was a highly accomplished naturalist, Mid Yell and Cullivoe (Piers) photographer, writer, storyteller, boatman, Places to Eat: Gutcher and Mid Yell musician and artist. Bobby was the RSPB’s Shetland Post Offices: Cullivoe, Gutcher, Camb, Mid Yell, representative for many years and in 1994 was Aywick, Burravoe, and Ulsta awarded an MBE for his efforts on behalf of wildlife Public Telephones: Cullivoe, Gutcher, Sellafirth, Basta, and its conservation. He sadly died in 1996 aged 67. Camb, Burravoe, Hamnavoe, Ulsta and West Sandwick Leisure Centre: Mid Yell Tel: 01957 702222 Churches: Cullivoe, Sellafirth, Mid Yell, Otterswick, Burravoe and Hamnavoe Doctor and Health Centre: Mid Yell Tel: 01957 702127 Police Station: Mid Yell Tel: 01957 702012 Contents copyright protected - please contact shetland Amenity Trust for details.
    [Show full text]