General Notes
Total Page:16
File Type:pdf, Size:1020Kb
PANELBOARD: MDP FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL CKT. CIRCUIT BREAKER NO. LOAD WIRE & CONDUIT SIZE TOTAL GENERAL NOTES: 450 PANELBOARD: LPA FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL CIRCUIT BREAKER FLOURESCENT LIGHT FIXTURE CKT. WIRE & CONDUIT SIZE NO. LOAD MOUNTING DETAIL SCALE: NTS PANEL BOARD DIAGRAM SCALE: NTS LEGEND: PANELBOARD: LPB FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL CIRCUIT BREAKER CKT. WIRE & CONDUIT SIZE NO. LOAD VOLT POLE AT AF kAIC 5000mm 1800mm ELECTRICAL RISER DIAGRAM RECOMMENDED SIZE OF TRANSFORMER SCALE: NTS PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 1 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GENERAL NOTES DPWH-IV-B Mamburao, Occidental Mindoro OCCIDENTAL MINDORO E 03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8 32000 4500 4500 4500 4500 4500 4500 5000 A P.W.D. SHE HE CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 30AT, 2P, 230V C.B. IN 7000 CHALK BOARD CHALK BOARD CHALK BOARD 4 6 NEMA 1 ENCLOSURE 10 11 LPA LPA 10 9 9 12 11 8 13 12 8 9500 7 7 14 13 6 15 14 6 5 FACP 5 16 UP TO F.A. 3 4 4 17 LPA 3 STATION AT 2ND MDP 18 MDP 3 2 FLOOR M OVERHEAD SERVICE 19 2 1 20 1 ENTRANCE REFER TO B UP F UP RISER DIAGRAM B TO FACP WP 2500 C UP UP RAMP UP GF POWER LAYOUT SCALE: 1:100 MTS. 1 2 3 4 5 6 7 8 32000 4500 4500 4500 4500 4500 4500 5000 A SHE HE CLASSROOM - 4 CLASSROOM - 5 CLASSROOM - 6 7000 CHALK BOARD CHALK BOARD CHALK BOARD 4 10 15 11 LPB 10 14 9 9 12 11 13 8 8 12 13 12 11 9500 7 7 14 13 10 6 9 15 14 6 8 5 5 16 15 7 4 4 6 17 16 5 3 3 18 LPB 17 4 2 2 19 18 3 1 2 19 1 20 DN DN 1 B F UP B WP DOWN TO F.A. 2500 STATION AT GROUND FLOOR C 2F POWER LAYOUT SCALE: 1:100 MTS. PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 2 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GF AND 2F POWER LAYOUT DPWH-IV-B E 03 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO E 03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8 32000 4500 4500 4500 4500 4500 4500 5000 A SFC SFC SFC WF WF WF P.W.D. SHE 2 2 2 2 2 2 2 2 2 S S a b c a b c a b c HE S2 CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 7000 CHALK BOARD CHALK BOARD CHALK BOARD 10 11 1 10 9 1 9 12 11 8 LPA 8 13 12 9500 2 2 2 2 2 2 7 2 2 2 7 14 13 6 15 a b c a b c a b c 14 6 5 5 16 3 UP TO S3Wd @ 4 4 17 LPA 3 LPA 3 2ND FLOOR 18 2 WF WF WF 19 2 1 20 S 1 UP S2ab SFC Sc S2ab SFC Sc S2ab SFC Sc 2 S UP B 2S3Wab 2ScWab S3Wd LPA 1 1 1 1 1 1 1 2500 a b a b a b a C UP UP RAMP UP GF LIGHTING LAYOUT SCALE: 1:100 MTS. 1 2 3 4 5 6 7 8 32000 4500 4500 4500 4500 4500 4500 5000 A SFC SFC SFC WF WF WF SHE 2 2 2 2 2 2 2 2 2 HE a b c a b c a b c S2 S2 CLASSROOM - 4 CLASSROOM - 5 CLASSROOM - 6 1 7000 CHALK BOARD CHALK BOARD CHALK BOARD 10 15 11 10 1 14 9 1 9 12 11 13 8 LPB 12 13 12 8 11 9500 7 2 2 2 2 2 2 2 2 2 7 14 13 10 6 9 15 a b c a b c a b c 14 6 DOWN8 TO S3Wd @ 5 5 16 3 15 7 4 4 GROUND6 FLOOR 17 LPB 16 LPB 5 3 3 18 17 4 2 WF WF WF S 19 18 2 3 1 S3Wab 2 19 1 20 DN DN 1 S2ab SFC Sc S2ab SFC Sc S2ab SFC Sc 2 B 2S3Wab 2ScWab UP LPB 1 1 1 1 1 1 1 2500 a b a b a b a C 2F LIGHTING LAYOUT SCALE: 1:100 MTS. PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 2 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 3 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GF AND 2F LIGHTING LAYOUT DPWH-IV-B E 03 E 03 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO E 03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER PLAN SPOT DETAIL SECTION PLAN SECTION AIR CHAMBER DETAIL CLEAN-OUT DETAIL SCALE: NTS SCALE: NTS CATCH BASIN DETAIL SCALE: NTS SECTION WATER DISTRIBUTION SYSTEM WATERLINE TYP. UNDERGROUND WATER TANK FIRELINE GV GATE VALVE DETAIL (DOMESTIC) FV FLOAT VALVE WSP WET STAND PIPE SCALE: NTS DSP DRY STAND PIPE FHC FIRE HOSE CABINET BI BLACK IRON PIPE WASTE, SEWER & VENT SYSTEM SANITARY LINE SERVICE PIPE (mm)RISER (mm) VENT LINE 2-STOREY / 2 CLASSROOM 3600 L FCO FLOOR CLEAN-OUT PLAN 2-STOREY / 4 CLASSROOM 7200 L 2-STOREY / 6 CLASSROOM 10800 L FD SHOWER/FLOOR DRAIN 2-STOREY / 8 CLASSROOM 14400 L VS VENT STACK SCHEDULE OF DIMENSIONS 2-STOREY / 10 CLASSROOM 18000 L SS SOIL STACK 2-STOREY / 12 CLASSROOM 21600 L VAC VENT ACROSS CEILING VP VENT PIPE PVC POLYVINYL CHLORIDE WP WET PIPE SP SOIL PIPE VTR VENT THRU ROOF TYP. UNDERGROUND WATER TANK ST SEPTIC TANK AC AIR CHAMBER WASTE, SEWER & VENT SYSTEM CAPACITY (DOMESTIC) DRAINAGE LINE FLOOR DRAIN DETAIL SCALE: NTS DS DOWNSPOUT SCALE: NTS CB CATCH BASIN RD ROOF DRAIN CD CORRIDOR DRAIN L W D PLUMBING FIXTURES 2.40 1.50 1.00 LAV LAVATORY SECTION 2-STOREY / 2 CLASSROOM WC WATER CLOSET 2-STOREY / 4 CLASSROOM 3.00 2.00 1.20 EWT ELEVATED WATER TANK 2-STOREY / 6 CLASSROOM 3.00 2.50 1.40 2-STOREY / 8 CLASSROOM 3.50 2.80 1.50 2-STOREY / 10 CLASSROOM 4.00 3.00 1.50 TYPICAL SEPTIC TANK DETAIL 2-STOREY / 12 CLASSROOM 4.30 3.00 1.70 SCALE: NTS L W H Lc 2-STOREY / 2 CLASSROOM 3.00 2.00 1.20 1.20 UNDERGROUND WATER TANK 2-STOREY / 4 CLASSROOM 4.00 2.50 1.50 1.50 2-STOREY / 6 CLASSROOM 4.80 2.50 1.80 1.50 2-STOREY / 8 CLASSROOM 5.80 2.50 2.00 1.50 DIMENSION (DOMESTIC) 2-STOREY / 10 CLASSROOM 6.00 3.00 2.00 1.80 SCALE: NTS 2-STOREY / 12 CLASSROOM 6.60 3.00 2.20 1.80 ROOF DRAIN DETAIL SCALE: NTS SEPTIC TANK DIMENSION SCALE: NTS PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 1 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GENERAL NOTES DPWH-IV-B Mamburao, Occidental Mindoro OCCIDENTAL MINDORO P 05 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8 32000 4500 4500 4500 4500 4500 4500 5000 '6 '6 '6 '6 '6 '6 '6 A 9$& FD WC WC CO LAV WC 63 FD FD SEPTIC TANK 63 P.W.D. SHE (SEE TABLE FOR LAV UR FD DIMENSION) FD CO HE 63 FD LAV CS CO CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 66 7000 CHALK BOARD CHALK BOARD CHALK BOARD 96 10 10 11 9 9 12 11 8 8 13 12 9500 7 7 14 13 6 15 14 6 5 5 16 4 4 17 3 3 18 2 19 2 1 20 1 39& B UP UP CONNECT TO MAIN SEWAGE SYSTEM 2500 C CD CD CD CD CD CD CD CD UP UP RAMP '6 '6 '6 '6 '6 '6 UP '6 '6 GF SANITARY LINE LAYOUT 39&&211(&772 SCALE: 1:100 MTS.