PANELBOARD: MDP FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL

CKT. CIRCUIT BREAKER NO. LOAD WIRE & CONDUIT SIZE

TOTAL GENERAL NOTES:

450

PANELBOARD: LPA FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL CIRCUIT BREAKER FLOURESCENT LIGHT FIXTURE CKT. WIRE & CONDUIT SIZE NO. LOAD MOUNTING DETAIL SCALE: NTS

PANEL BOARD DIAGRAM SCALE: NTS

LEGEND:

PANELBOARD: LPB FLUSH MOUNTED, NEMA 1 ENCLOSURE WITH GROUND TERMINAL CIRCUIT BREAKER CKT. WIRE & CONDUIT SIZE NO. LOAD VOLT POLE AT AF kAIC

5000mm 1800mm

ELECTRICAL RISER DIAGRAM RECOMMENDED SIZE OF TRANSFORMER SCALE: NTS

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the DEPARTMENT OF PUBLIC WORKS & HIGHWAYS OCCIDENTAL CONSTRUCTION OF STANDARD DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 1 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GENERAL NOTES DPWH-IV-B , OCCIDENTAL MINDORO E 03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

A

P.W.D. SHE

HE

CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 30AT, 2P, 230V C.B. IN 7000 CHALK BOARD CHALK BOARD CHALK BOARD 4 6 NEMA 1 ENCLOSURE 10 11 LPA LPA 10 9 9 12 11 8 13 12 8

9500 7 7 14 13 6 15 14 6 5 FACP 5 16 UP TO F.A. 3 4 4 17 LPA 3 STATION AT 2ND MDP 18 MDP 3 2 FLOOR M OVERHEAD SERVICE 19 2 1 20 1 ENTRANCE REFER TO B UP F UP RISER DIAGRAM B TO FACP WP 2500 C UP UP RAMP UP

GF POWER LAYOUT SCALE: 1:100 MTS.

1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

A

SHE

HE

CLASSROOM - 4 CLASSROOM - 5 CLASSROOM - 6 7000 CHALK BOARD CHALK BOARD CHALK BOARD 4 10 15 11 LPB 10 14 9 9 12 11 13 8 8 12 13 12 11 9500 7 7 14 13 10 6 9 15 14 6 8 5 5 16 15 7 4 4 6 17 16 5 3 3 18 LPB 17 4 2 2 19 18 3 1 2 19 1 20 DN DN 1 B F UP B WP DOWN TO F.A.

2500 STATION AT GROUND FLOOR C

2F POWER LAYOUT SCALE: 1:100 MTS.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 2 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GF AND 2F POWER LAYOUT DPWH-IV-B E 03 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO E 03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

A SFC SFC SFC

WF WF WF

P.W.D. SHE 2 2 2 2 2 2 2 2 2 S S a b c a b c a b c HE S2

CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 7000 CHALK BOARD CHALK BOARD CHALK BOARD

10 11 1 10 9 1 9 12 11 8 LPA 8 13 12

9500 2 2 2 2 2 2 7 2 2 2 7 14 13 6 15 a b c a b c a b c 14 6 5 5 16 3 UP TO S3Wd @ 4 4 17 LPA 3 LPA 3 2ND FLOOR 18 2 WF WF WF 19 2 1 20 S 1 UP S2ab SFC Sc S2ab SFC Sc S2ab SFC Sc 2 S UP B 2S3Wab 2ScWab S3Wd LPA 1 1 1 1 1 1 1

2500 a b a b a b a C UP UP RAMP UP

GF LIGHTING LAYOUT SCALE: 1:100 MTS.

1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

A SFC SFC SFC

WF WF WF

SHE

2 2 2 2 2 2 2 2 2 HE a b c a b c a b c S2 S2

CLASSROOM - 4 CLASSROOM - 5 CLASSROOM - 6 1 7000 CHALK BOARD CHALK BOARD CHALK BOARD

10 15 11 10 1 14 9 1 9 12 11 13 8 LPB 12 13 12 8 11

9500 7 2 2 2 2 2 2 2 2 2 7 14 13 10 6 9 15 a b c a b c a b c 14 6 DOWN8 TO S3Wd @ 5 5 16 3 15 7 4 4 GROUND6 FLOOR 17 LPB 16 LPB 5 3 3 18 17 4 2 WF WF WF S 19 18 2 3 1 S3Wab 2 19 1 20 DN DN 1 S2ab SFC Sc S2ab SFC Sc S2ab SFC Sc 2 B 2S3Wab 2ScWab UP LPB 1 1 1 1 1 1 1

2500 a b a b a b a C

2F LIGHTING LAYOUT SCALE: 1:100 MTS.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 2 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 3 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GF AND 2F LIGHTING LAYOUT DPWH-IV-B E 03 E 03 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO E 03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER PLAN

SPOT DETAIL

SECTION

PLAN

SECTION AIR CHAMBER DETAIL CLEAN-OUT DETAIL SCALE: NTS SCALE: NTS CATCH BASIN DETAIL SCALE: NTS

SECTION

WATER DISTRIBUTION SYSTEM WATERLINE TYP. UNDERGROUND WATER TANK FIRELINE GV GATE VALVE DETAIL (DOMESTIC) FV FLOAT VALVE WSP WET STAND PIPE SCALE: NTS DSP DRY STAND PIPE FHC FIRE HOSE CABINET BI BLACK IRON PIPE WASTE, SEWER & VENT SYSTEM SANITARY LINE SERVICE PIPE (mm)RISER (mm) VENT LINE 2-STOREY / 2 CLASSROOM 3600 L FCO FLOOR CLEAN-OUT PLAN 2-STOREY / 4 CLASSROOM 7200 L 2-STOREY / 6 CLASSROOM 10800 L FD SHOWER/FLOOR DRAIN 2-STOREY / 8 CLASSROOM 14400 L VS VENT STACK SCHEDULE OF DIMENSIONS 2-STOREY / 10 CLASSROOM 18000 L SS SOIL STACK 2-STOREY / 12 CLASSROOM 21600 L VAC VENT ACROSS CEILING VP VENT PIPE PVC POLYVINYL CHLORIDE WP WET PIPE SP SOIL PIPE VTR VENT THRU ROOF TYP. UNDERGROUND WATER TANK ST SEPTIC TANK AC AIR CHAMBER WASTE, SEWER & VENT SYSTEM CAPACITY (DOMESTIC) DRAINAGE LINE FLOOR DRAIN DETAIL SCALE: NTS DS DOWNSPOUT SCALE: NTS CB CATCH BASIN RD ROOF DRAIN CD CORRIDOR DRAIN L W D PLUMBING FIXTURES 2.40 1.50 1.00 LAV LAVATORY SECTION 2-STOREY / 2 CLASSROOM WC WATER CLOSET 2-STOREY / 4 CLASSROOM 3.00 2.00 1.20 EWT ELEVATED WATER TANK 2-STOREY / 6 CLASSROOM 3.00 2.50 1.40 2-STOREY / 8 CLASSROOM 3.50 2.80 1.50 2-STOREY / 10 CLASSROOM 4.00 3.00 1.50 TYPICAL SEPTIC TANK DETAIL 2-STOREY / 12 CLASSROOM 4.30 3.00 1.70 SCALE: NTS

L W H Lc 2-STOREY / 2 CLASSROOM 3.00 2.00 1.20 1.20 UNDERGROUND WATER TANK 2-STOREY / 4 CLASSROOM 4.00 2.50 1.50 1.50 2-STOREY / 6 CLASSROOM 4.80 2.50 1.80 1.50 2-STOREY / 8 CLASSROOM 5.80 2.50 2.00 1.50 DIMENSION (DOMESTIC) 2-STOREY / 10 CLASSROOM 6.00 3.00 2.00 1.80 SCALE: NTS 2-STOREY / 12 CLASSROOM 6.60 3.00 2.20 1.80 ROOF DRAIN DETAIL SCALE: NTS SEPTIC TANK DIMENSION SCALE: NTS

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 1 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GENERAL NOTES DPWH-IV-B Mamburao, Occidental Mindoro OCCIDENTAL MINDORO P 05 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 A ‘9$&

FD WC WC CO LAV WC ‘63 FD FD SEPTIC TANK ‘63 P.W.D. SHE (SEE TABLE FOR LAV UR FD DIMENSION) FD CO HE ‘63 FD

LAV CS

CO CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 ‘66 7000 CHALK BOARD CHALK BOARD CHALK BOARD ‘96

10 10 11 9 9 12 11 8 8 13 12

9500 7 7 14 13 6 15 14 6 5 5 16 4 4 17 3 3 18 2 19 2 1 20 1 ‘39& B UP UP CONNECT TO MAIN SEWAGE SYSTEM 2500 C CD CD CD CD CD CD CD CD UP UP RAMP ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 UP ‘'6 ‘'6

GF SANITARY LINE LAYOUT ‘39&&211(&772 SCALE: 1:100 MTS. ‘39&&211(&772 MAIN DRAINAGE SYSTEM MAIN DRAINAGE SYSTEM 1 2 3 4 5 6 7 8

CO

600 32000 4500 4500 4500 4500 4500 4500 5000

4100 (TYPICAL)

‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 A ‘9$& 1100 CO FD CO WC WC

SHE FD CS ‘63 ‘63 WC HE FD

CLASSROOM - 4 CLASSROOM - 5 CLASSROOM - 6 ‘66 7000 CHALK BOARD CHALK BOARD CHALK BOARD ‘96

10 15 11 10 14 9 9 12 11 13 8 8 12 13 12 11

9500 7 7 14 13 10 6 9 15 14 6 8 5 5 16 15 7 4 4 6 17 16 3 5 3 18 17 4 2 19 18 2 3 1 2 19 1 20 DN DN 1 B UP 2500 C CD CD CD CD CD CD CD CD ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6

2F SANITARY LINE LAYOUT SCALE: 1:100 MTS.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 2 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GF AND 2F SANITARY LINE LAYOUT DPWH-IV-B P 05 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO P 05 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

A ‘

GV ‘3(5)25$7('3,3( LAV WC WC WC

P.W.D. ‘ GV SHE MANHOLE LAV UR 600x600mm ‘ HE

LAV

CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 7000 CHALK BOARD CHALK BOARD CHALK BOARD RISER UP 10 11 10 9 9 12 11 8 13 12 8 CISTERN

9500 7 7 14 13 CAP=60,000 LITERS 6 15 14 6 (15,000 GALLONS) 5 5 16 4 4 17 3 3 18 2 19 2 1 20 1 B UP UP

WP2 2500 WP1 MANHOLE C 600x600mm UP UP RAMP UP

GF WATER LINE LAYOUT SCALE: 1:100 MTS.

1 2 3 4 5 6 7 8

600 32000 4500 4500 4500 4500 4500 4500 5000

A 1100 ‘

GV ‘3(5)25$7('3,3( WC WC LAV SHE GV ‘

WC UR ‘ HE

LAV

CLASSROOM - 4 CLASSROOM - 5 CLASSROOM - 6 7000 CHALK BOARD CHALK BOARD CHALK BOARD RISER DOWN 10 15 11 10 14 9 9 12 11 13 8 12 13 12 8 11

9500 7 7 14 13 10 6 9 15 14 6 8 5 5 16 15 7 4 4 6 17 16 5 3 3 18 17 4 2 19 18 2 3 1 2 19 1 20 DN DN 1 B UP 2500 C

2F WATER LINE LAYOUT SCALE: 1:100 MTS.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 2 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 3 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GF AND 2F WATER LINE LAYOUT DPWH-IV-B P 05 P 05 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO P 05 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

RD RD RD RD RD RD RD A ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6

ELEVATED WATER TANK LOCATION

‘9675 3529,'(67$,1/(66 7000 STEEL PROTECTION SCREEN) 9500

B 2500 C ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 ‘'6 RD RD RD RD RD RD RD RD

ROOF STORM DRAINAGE LAYOUT SCALE: 1:100 MTS.

1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

A

GV STAINLESS STEEL OVERHEAD WATER TANK (CAP.=2,000 GALS)

LANDING 7000 RISER 9500

B 2500 C

ROOF PLAN WATER LINE LAYOUT SCALE: 1:100 MTS.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 2 3 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 4 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN ROOF STORM DRAINAGE LAYOUT DPWH-IV-B P 05 P 05 P 05 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO ROOF PLAN WATER LINE LAYOUT P 05 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER ISOMETRIC DIAGRAM ISOMETRIC DIAGRAM (WATERLINE LAYOUT) (SEWER AND DRAINAGE LAYOUT) SCALE: NTS. SCALE: NTS.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 2 3 4 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING ISOMETRIC DIAGRAM OF 5 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN WATER LINE LAYOUT AND SEWER AND DPWH-IV-B P 05 P 05 P 05 P 05 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO DRAINAGE LAYOUT P 05 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000

A

P.W.D. SHE

HE MANHOLE RISER DOWN (600x600mm)

CLASSROOM - 1 CLASSROOM - 2 CLASSROOM - 3 FHC 7000 CHALK BOARD CHALK BOARD CHALK BOARD

10 11 10 9 9 12 11 8 8 13 12 CISTERN 9500 7 7 14 13 6 15 14 6 CAP= 43,000 LITERS 5 5 16 ( 1,1360 GALLONS) 4 4 17 3 FE FE FE 3 18 2 19 2 1 1 20 MANHOLE B UP UP (600x600mm) 2500 C UP UP RAMP UP

100x63x63mm SIAMESE TWIN FIRE DEPT. CONNECTION GF FIRE PROTECTION PLAN SCALE: 1:100 MTS. 1 2 3 4 5 6 7 8

32000 4500 4500 4500 4500 4500 4500 5000 6 7 8

4500 5000 A 1800

SHE A

HE 3000 RISER DOWN

CLASSROOM - 4 CLASSROOM - 5 CLASSROOM - 6 FHC 7000

CHALK BOARD CHALK BOARD CHALK BOARD 7000

10 15 11 10 14 9 9 12 11 13 8 8 12 9500 13 12 11 9500 7 7 14 13 10 6 9 15 14 6 8 5 5 16 15 7 4 17 16 4 6 5 3 FE FE FE 3 18 17 4 2 19 18 2 3 B 1 2 19 1 20 DN DN 1 B UP 2500

2500 C C

2F FIRE PROTECTION PLAN PARTIAL ROOF PLAN SCALE: 1:100 MTS. SCALE: 1:100 MTS.

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 1 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN GF AND 2F FIRE PROTECTION PLAN DPWH-IV-B Mamburao, Occidental Mindoro OCCIDENTAL MINDORO FP03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER LEGEND: GENERAL NOTES: FIRE EXTINGUISHER WEIGHT TYPE QUANTITY MAXIMUM VOLUME DESIGNATION (LOCATION) DISCHARGE RANGE DIAMETER OF PROTECTION EXTINGUISHING AGENT REMARKS GROSS AGENT

PIPE SLEEVE TWO WAY BRACE PIPE HANGER PIPE HANGER SCALE: NTS SCALE: NTS SCALE: NTS

E L E V A T I O N

FIRE HOSE CABINET (FHC) FIRE DEPT. CONNECTION DETAIL FIRE HOSE CABINET DETAIL FIRE EXTINGUISHER DETAIL DRY STAND PIPE RISER DIAGRAM CONN. SCALE: NTS SCALE: NTS SCALE: NTS SCALE: NTS

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 2 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN FP BLOW-UP DETAILS DPWH-IV-B FP03 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO FP03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER LEGEND :

GATE VALVE CHECK VALVE PRESSURE GUAGE

TEE

ELBOW

FOOT VALVE

LWL LOW WATER LEVEL IWL INTERMEDIATE WATER LEVEL OVERHEAD WATER TANK ELEV. HWL HIGH WATER LEVEL SCALE: NTS MCB MAIN CIRCUIT BREAKER CB CIRCUIT BREAKER MC MAGNETIC CONTACTOR TO TO PUMP "1" PUMP "2" MC MC MCB MC MC

ALT 1&2

1 1 P P 8 6 2 2 6 8 9 7 7 9 3 BH TYPE S 4 3 S BW TYPE 2 RH RELAY 5 RH RELAY

3 4

A

B 500FINISHED GROUND LEVEL

C

PARTIAL GROUND FLOOR ISOMETRIC DIAGRAM OF SCHEMATIC DIAGRAM OF SHOWING THE LOCATION OF CISTERN WATER PUMPING SYSTEM WATER LEVEL CONTROL SCALE: 1:100 MTS SCALE: NTS SCALE: NTS

PROJECT TITLE SHEET CONTENTS REVISION(S) DATE TRACED THRU DOWNLOADED FILE OF DPWH CHECKED/ SUBMITTED BY: VERIFIED FROM DOWNLOADED FILE BY: APPROVED BY: SET NO. SHT NO. Republic of the Philippines DEPARTMENT OF PUBLIC WORKS & HIGHWAYS MINDORO OCCIDENTAL CONSTRUCTION OF STANDARD 1 2 DISTRICT ENGINEERING OFFICE 2STY-6CL SCHOOL BUILDING 3 REGIONAL OFFICE IV - B CONCEPCION NHS, CALINTAAN FP BLOW-UP DETAILS DPWH-IV-B FP03 FP03 Mamburao, Occidental Mindoro OCCIDENTAL MINDORO FP03 JOY L. HISTORILLO NELSON E. MABULAY RUEL V. UMALI JOSEFINO M. MELGAR, JR. AIRPORT ROAD BRGY. 9, MAMBURAO OCC. MINDORO LOCATION : CALINTAAN, OCCIDENTAL MINDORO ENGINEER II - BUILDING COORDINATOR CHIEF ,PLANNING & DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER