LTP2 Main Document

Total Page:16

File Type:pdf, Size:1020Kb

LTP2 Main Document Greater Manchester Local Transport Plan 2 2006/07 – 2010/11 March 2006 Final Local Transport Plan 2006/07 - 2010/11 Contents Foreword 4 Summary 6 1 Introduction 12 1.1 The Greater Manchester Area and its Regional Context 13 1.2 Challenges for Greater Manchester 15 2 Greater Manchester's Longer-Term Vision and Integrated Transport Strategy 16 2.1 The Vision for Greater Manchester 17 2.2 The Greater Manchester Integrated Transport Strategy 19 3 Development of LTP2 22 3.1 Lessons Learned from LTP1 23 3.2 Work Completed Since Submission of Provisional LTP2 24 3.3 Strategic Environmental Assessment 25 3.4 Consultation and Engagement 27 3.5 Greater Manchester's Administrative Structure 30 4 Problems, Issues and Desired Outcomes 33 4.1 Overall Approach 33 4.2 General Results of Analysis 33 4.3 Problems in Shared Priority Areas 38 4.3.1 Congestion 38 4.3.2 Accessibility 41 4.3.3 Road Safety 43 4.3.4 Air Quality 47 4.3.5 Public Transport 49 4.4 Regional Centre 51 4.5 Other Quality of Life Issues 54 4.6 Rural Issues 55 4.7 Cross-boundary issues 56 Final Local Transport Plan 2006/07 - 2010/11 Contents 5 The 5-Year Programme 60 5.1 Introduction 60 5.2 Achieving Desired Outcomes by Tackling Shared Priorities 60 5.2.1 Managing Congestion 60 5.2.2 Delivering Accessibility 78 5.2.3 Improving Transport Safety and Security 84 5.2.4 Better Air Quality 91 5.2.5 Public Transport Case Studies 94 5.2.6 Other Quality of Life Issues 99 5.3 Regional Centre 105 5.4 Manchester Airport 107 5.5 Rural Issues 109 5.6 Asset Management 109 5.7 Corridor Partnerships 115 5.8 The SEMMMS Programme 118 5.9 Transport Infrastructure Fund 120 5.10 Major Schemes 122 5.10.1 Metrolink 122 5.10.2 Progress on Fully Approved Schemes 124 5.10.3 Schemes with Programme Entry or Conditional Approval Status 126 5.10.4 Schemes where Further Information has been Requested 127 5.10.5 Major Schemes Bids 128 5.11 Transport Innovation Fund 129 5.12 Achieving Value for Money 130 5.13 Risk Management 134 5.14 Linkages with Other Strategies 134 5.15 Use of Revenue Funding to Meet LTP2 Objectives 137 5.16 Spending Programme Summary 137 5.16.1 Internal Distribution of Integrated Transport Block Funding 137 5.16.2 Complementary Funding Sources 138 5.16.3 LTP2 Spending Programme Summary 141 6 Performance Indicators and Targets 142 6.1 Introduction 142 6.2 Targets for the Wider Vision 142 6.3 Choice of Indicators 142 6.4 The Basis for the Development of Targets 143 6.5 Target Setting and Programme Development 144 6.6 Monitoring Framework 145 6.7 Improving Performance 146 6.7.1 Annual Review of Targets and Programmes 146 6.7.2 Strengthening the Relationship Between Performance and Actions 147 6.8 Working with the DfT 148 6.9 Headline Targets 149 7 Final LTP2 Checklist 155 8 Glossary 163 Final Local Transport Plan 2006/07 - 2010/11 Contents 0 Figures Figure 1.1 - Location of Greater Manchester 12 Figure 1.2 - Journeys to Work within and between Segments and to Key Centres 14 Figure 4.1 - Driving Licence Holding in GM 34 Figure 4.2 - Motorway Traffic Flows 1991-2004 35 Figure 4.3 - Traffic Flows on 'A' and 'B' Roads 1991-2004 36 Figure 4.4 - Greater Manchester Morning Peak (7 to 10am) Average Delay 39 Figure 4.5 - Congestion 40 Figure 4.6 - Accessibility to Key Centres with Interchanges 42 Figure 4.7 - KSI Clusters for Motorways, 'A' and 'B' Roads 45 Figure 4.8 - Child KSI Statistics for All Roads 46 Figure 4.9 - Air Quality Management Areas 48 Figure 4.10 - Public Transport Journeys in Greater Manchester 49 Figure 4.11 - Cross Boundary Journeys to Work 59 Figure 5.1 - LTP2 Cycle Investment Priorities 65 Figure 5.2 - Corridor Partnerships 117 Figure 5.3 - Metrolink Network 123 Figure 6.1 - The Target Setting Loop 145 Figure 6.2 - Target Review Process 146 0 Tables Table 3.1 - Response to recommendations of the SEA 26 Table 4.1 - Road Casualties Greater Manchester, 2000 to 2004 43 Table 4.2 - 2005 Modal Split Weekdays Between 7:30 and 9:30 am 53 Table 4.3 - 2011 Projected Modal Split 53 Table 4.4 - Cross Boundary Issues by Authority Area 56 Table 5.1 - Results of Cleaner Vehicles Tests 92 Table 5.2 - RoWIPs can assist the shared priorities 111 Table 5.3 - Appraisal Summary Table for LTP2 Integrated Transport Block compared 132 to reference case Table 5.4 - Relative weightings of national and local funding distribution mechanisms 138 Table 5.5 - Examples of complementary funding sources 139 Table 5.6 - Summary of support sought from LTP capital settlement (£k) 141 Table 6.1 - Local LTP Performance Indicators 143 Table 6.2 - Summary of LTP2 Headline Indicators and Targets 149 1 Index 166 4 Final Local Transport Plan 2006/07 - 2010/11 Foreword This document is the second Greater Manchester Local Transport Plan. It sets out our five year programme for investment in local transport, in order to help deliver our long term vision and strategy for Greater Manchester. If you would like more information on this document, or would like to obtain a large print, Braille, audiotape or an alternative language version, please telephone 0161 242 6085, or visit our website www.gmltp.co.uk Final Local Transport Plan 2006/07 - 2010/11 5 Foreword We are pleased to present to Government our Second Local Transport Plan, which has been produced by the Ten Greater Manchester Local Authorities and the Greater Manchester Passenger Transport Authority. This Plan builds on the strategy and work undertaken as part of our first Local Transport Plan (2001/2-2005/6), our longer-term Greater Manchester Integrated Transport Strategy (GMITS) launched in Spring 2005, and our provisional Second Local Transport Plan (LTP2) which was published in July 2005. It also takes account of the Strategic Environmental Assessment which was undertaken on the provisional LTP2. The Plan sets out our five-year programme as the starting point for delivering our longer-term vision and strategy for Greater Manchester. It sets out the targets we are seeking to achieve, which are fully in line with the Government's White Paper on Transport and the LGA/DfT Shared Priorities and are consistent with the funding guidelines set by central government. It also describes how we intend to monitor and manage the Plan over time. Expansion of Metrolink remains key for Greater Manchester, and we will continue to work hard with DfT to reach agreement on the expansion of the network in line with the Government's declared objective. We are currently taking forward the renewal and refurbishment of the Phase 1 and 2 network. Another key component of the Plan, and of our successful Transport Innovation Fund pump priming bid, is the development of corridor partnerships with key delivery organisations. These partnerships are looking at how we can integrate regeneration and land-use plans in individual corridors with transport modes, including the use of other complementary measures including travel planning, technology and demand management. They will commit partners, via a local area agreement mechanism, to delivery of their components of the plan and work is well advanced in the first four corridors. Buses remain central to our delivery plans and hence we have been working with the bus industry and other stakeholders to develop robust bus and accessibility strategies as part of LTP2. We believe that the partnership of the ten Greater Manchester local authorities plus the Passenger Transport Authority is, despite its size, one of the most effective in the country. We have achieved much by working together on transport matters, and this cooperation is being strengthened further with this final second Local Transport Plan. It will ensure that Greater Manchester continues to become a better place to live, work and invest, increasing its economic competitiveness, and improving social inclusion and the quality of the environment. We look forward to working in partnership with Government to deliver our shared vision for a fully integrated transport system which makes best use of existing infrastructure and supports the continued economic and urban regeneration of Greater Manchester. Councillor Peter Smith Councillor Roger Jones Leader of AGMA Chair of GMPTA 6 Final Local Transport Plan 2006/07 - 2010/11 Summary Final Local Transport Plan 2006/07 - 2010/11 7 Summary This second Greater Manchester Local Transport Plan (LTP2) outlines the approach being taken by the Greater Manchester authorities towards transport planning and investment for the period 2006/7 to 2010/11. It builds upon the principles and context of the Provisional LTP2, submitted in July 2005. Since that time work has continued on strategy development, including the Accessibility, Air Quality and Bus Strategies, which are being submitted alongside this final Plan. Programmes of individual authorities have been further developed, along with the Plan’s targets and trajectories. Greater Manchester - A Dynamic City Region Government is increasingly framing national economic policy around the economic success of City Regions and their direct relationship to, and major impact on, national economic competitiveness. Closing the productivity gap between London/the South East and the rest of the Country is a national priority, and the Northern Way Growth Strategy, Regional Economic Strategy and other national, regional and local strategies have identified the Manchester City Region as having the potential to make the most significant contribution to the future growth of the North of England.
Recommended publications
  • BOUNDARY COMMISSION for ENGLAND PROCEEDINGS at The
    BOUNDARY COMMISSION FOR ENGLAND PROCEEDINGS at the 2018 REVIEW OF PARLIAMENTARY CONSTITUENCIES IN ENGLAND HELD AT THE COTTON EXCHANGE BUILDING, OLD HALL STREET, LIVERPOOL, L3 9JR ON FRIDAY 21 OCTOBER 2016 DAY TWO Before: Mr Neil Ward, The Lead Assistant Commissioner ______________________________ Transcribed from audio by W B Gurney & Sons LLP 83 Victoria Street, London, SW1H 0HW Telephone Number: 0203 585 4721/22 ______________________________ At 9.00 am: THE LEAD ASSISTANT COMMISSIONER: Good morning, ladies and gentlemen. Thank you for joining us today. My name is Neil Ward. I am the Lead Assistant Commissioner appointed by the Boundary Commission to conduct two things: To conduct the hearings across the whole of the North West into their Initial Proposals for the revised parliamentary boundaries for the North West region and, along with two fellow assistant Commissioners, Nicholas Elliott and Graeme Clarke, to take on board all the representations that are either made in the hearings or in written representations and to consider, in the light of them, whether we think it is appropriate to recommend changes, revised proposals to the Boundary Commission on their Initial Proposals. I should say that I am, in a sense, essentially independent of the Boundary Commission. Although I am appointed by them, I had no hand in the drafting of the proposals and I received them the same time as everyone else and I am, in a sense, an honest broker in this process, considering whether or not changes ought to be made. This is the second day of the Liverpool hearing. Just a couple of words on process.
    [Show full text]
  • Rochdale News July 2005 Page 1
    ROCHDALE FREENews Save our Vital Services! The new MP for Rochdale, Paul Rowen, Maternity and Child Care gets a big hug from Mum How must stay in Rochdale Rochdale aul Rowen MP and future of these vital services. The encouraging everybody to take Voted Rochdale Liberal Government talk about investing part in this consultation - I will in the P Democrats are calling more in the National Health be telling them to keep their Paul for the future of Child Care Service – and here we have what hands off our services - staff 2005 and Maternity Services to be is basically a cost cutting exercise. morale at the Infirmary is at an Rowen MP General guaranteed. This is in the light There is no better investment all time low, this is another kick Labour of a controversial review that than in our children’s lives, we in the teeth everybody involved.” Lib Dem Election has been announced that were told 2 years ago that these Rochdale Liberal Democrat 41.1% 40.0% could put the future of our services will continue in Rochdale Leader - Cllr. Alan Taylor said, “If services under threat. - we have saved them once and we stand together we can send a Conservative NHS Bosses have threatened to we will do again.” clear message to NHS bosses that 10.5% dramatically slash the number of Kingsway Resident - Annette Child and Maternity Services are hospitals in Greater Manchester Foster said, “This really is a bolt so important. We are worried that - that provide Child Care and from the blue - I believe it is to if we lose these services the Maternity Services from 13 to do with staff shortages across residents of Rochdale will have to between 6 and 8.
    [Show full text]
  • Manchester 1874-1876 New Church ACCRINGTON St
    Locality Church Name Parish County Diocese Date Grant reason ACCRINGTON School Chapel ACCRINGTON, St. James Lancashire Manchester 1874-1876 New Church ACCRINGTON St. Mary Magdalene ACCRINGTON, St. James Lancashire Manchester 1897-1904 New Church ACCRINGTON St. Paul, Barnfield ACCRINGTON, Christ Church Lancashire Manchester 1911-1913 New Church ACCRINGTON St. Peter ACCRINGTON, St. James Lancashire Manchester 1885-1889 New Church ALTHAM St. James ALTHAM Lancashire Manchester 1858-1859 Enlargement ASHTON-UNDER-LYNE Christ Church ASHTON-UNDER-LYNE, Christ Church Lancashire Manchester 1858-1860 Repairs ASHTON-UNDER-LYNE St. Peter ASHTON-UNDER-LYNE, St. Peter Lancashire Manchester 1934-1935 Repairs AUDENSHAW St. Hilda AUDENSHAW, St. Hilda Lancashire Manchester 1936-1938 New Church BACUP St. John the Evangelist BACUP, St. John the Evangelist Lancashire Manchester 1854-1874 Rebuild BACUP St. John the Evangelist BACUP, St. John the Evangelist Lancashire Manchester 1878-1884 Rebuild BAMBER BRIDGE St. Saviour BAMBER BRIDGE Lancashire Manchester 1869-1870 Enlargement BARROW-IN-FURNESS Mission Church WHALLEY, St. Mary Lancashire Manchester 1891 New Church BELFIELD St. Anne MILNROW, St. James Lancashire Manchester 1911-1913 New Church BENCHILL St. Luke the Physician BENCHILL Lancashire Manchester 1937-1939 New Church BIRCH St. Mary BIRCH Lancashire Manchester 1951-1952 Repairs BIRTLE CUM BAMFORD St. Michael, Bamford BIRTLE CUM BAMFORD, St. Michael, Bamford Lancashire Manchester 1883-1885 New Church BLACKBURN Mission Church BLACKBURN, All Saints Lancashire Manchester 1881 New Church BLACKBURN School Chapel BLACKBURN, St. Paul Lancashire Manchester 1876 Other BLACKBURN St. Bartholomew, Ewood LIVESEY, St. Andrew Lancashire Manchester 1908-1911 New Church BLACKBURN St. James BLACKBURN, St. John the Evangelist Lancashire Manchester 1872-1874 New Church BLACKBURN St.
    [Show full text]
  • Planning Applications Registered by the Council During Week Ending 30Th September 2016
    Economy Directorate Rochdale Metropolitan Borough Council Number One Riverside, Smith Street Rochdale, OL16 1XU EMAIL: [email protected] Planning Applications Registered by the Council During Week Ending 30th September 2016 Application Ward Registered Application Decision Number Description Date Type Level 16/01180/DOC Balderstone And Kirkholt 29 September 2016 Approval of detail reserved by condition Delegated (subject to call up) PROPOSAL: Submission of details to comply with condition 3 on planning permission 16/00009/AM LOCATION: St Cuthberts Rc Business And Enterprise College Shaw Road Rochdale OL16 4RX APPLICANT: AGENT: Mr Michael Flinders frankshaw associates Penmore House Hasland Road Hasland Chesterfield Derbyshire S41 05J Case Officer: Ben Sandover ____________________________________________________________________________________ 16/01150/DOC Balderstone And Kirkholt 22 September 2016 Approval of detail reserved by condition Delegated (subject to call up) PROPOSAL: Submission of details to comply with condition 3 on planning permission 16/00325/FUL LOCATION: 16 The Strand Rochdale OL11 2JG APPLICANT: AGENT: Miss Maddi Mooney Triangle Architects Emma Carlin Great Places Housing Group Raven House 729 Princess Road 113 Fairfield Street Manchester Manchester M20 2LT M12 6EL United Kingdom Case Officer: Ben Sandover ____________________________________________________________________________________ Application Ward Registered Application Decision Number Description Date Type Level 16/01079/HOUS Balderstone
    [Show full text]
  • Impact Report 2019 Introduction
    IMPACT REPORT 2019 INTRODUCTION • Mission Statement • Improving peoples’ lives across our community through the power of sport • Respect • Opportunities for all • Caring • Health & wellbeing • Diversity • Ambitious • Life changing • Empowering Rochdale AFC Community Sports Trust works in partnership with Rochdale AFC to provide all members of the local community with the opportunity to access quality sport provision whatever their age, gender or ethnicity. We aim to increase participation in schools, improve health and wellbeing, while developing programmes that engage the whole of the community using football as the driving force. PARTNERSHIPS ■i®i!Ji � Premier '11League EFL TRUST Rochdale Rochdale Youth Service Boroughwide Housing ,.. (j)DALE SUPP□RTERS Level Playing Field � TRAIELSAFE T R U S T www.llfflplaylngfltld.org.uk -L Link4Life PARTNERSHIP _,..,, :1TOUT EFL TACKLING RACISM& DISCRIMINATION TRUST SPORT{?, FUTSAL ENGLAND PROJECT ACTIVITIES • SCHOOLS PROGRAMME - Intensive Week/PPA/Lunch Clubs/After school coaching/Match Day Visits/ EFL Trust Kids Cup & Girls Under 13’s Cup • SOCIAL INCLUSION – Premier League Kicks/Ability Counts/Open Arms/ Estates/Asylum seekers & refugees/Community Cohesion Programme • DISABILITY PROVISION – Schools/Under 16’s/Adults • HEALTH – Dale’s Silver 60s’/MIND/Walking Football • EDUCATION – Futsal BTEC Scholarship/NCS/Internship/Primary Stars/ Numeracy & Respect • MATCH DAY ACTIVITIES – Mascots/Birthday Parties/Half time events • SPORTS PARTICIPATION – Holiday courses/Weekend Clubs/Futsal/ Birthday Parties/Festivals/Open
    [Show full text]
  • Codebook for IPUMS Great Britain 1851-1881 Linked Dataset
    Codebook for IPUMS Great Britain 1851-1881 linked dataset 1 Contents SAMPLE: Sample identifier 12 SERIAL: Household index number 12 SEQ: Index to distinguish between copies of households with multiple primary links 12 PERNUM: Person index within household 13 LINKTYPE: Link type 13 LINKWT: Number of cases in linkable population represented by linked case 13 NAMELAST: Last name 13 NAMEFRST: First name 13 AGE: Age 14 AGEMONTH: Age in months 14 BPLCNTRY: Country of birth 14 BPLCTYGB: County of birth, Britain 20 CFU: CFU index number 22 CFUSIZE: Number of people in individuals CFU 23 CNTRY: Country of residence 23 CNTRYGB: Country within Great Britain 24 COUNTYGB: County, Britain 24 ELDCH: Age of eldest own child in household 27 FAMSIZE: Number of own family members in household 27 FAMUNIT: Family unit membership 28 FARM: Farm, NAPP definition 29 GQ: Group quarters 30 HEADLOC: Location of head in household 31 2 HHWT: Household weight 31 INACTVGB: Adjunct occupational code (Inactive), Britain 31 LABFORCE: Labor force participation 51 MARRYDAU: Number of married female off-spring in household 51 MARRYSON: Number of married male off-spring in household 51 MARST: Marital status 52 MIGRANT: Migration status 52 MOMLOC: Mothers location in household 52 NATIVITY: Nativity 53 NCHILD: Number of own children in household 53 NCHLT10: Number of own children under age 10 in household 53 NCHLT5: Number of own children under age 5 in household 54 NCOUPLES: Number of married couples in household 54 NFAMS: Number of families in household 54 NFATHERS: Number of fathers
    [Show full text]
  • The WEA in Manchester.Indd
    wea.org.uk The WEA in Greate Manchester combined Littleborough authority Ramsbottom Milnrow Bury Horwich Rochdale Bolton Bury Crompton Bolton Rochdale Oldham Middleton Saddleworth Wigan Oldham Wigan Atherton Prestwich Worsley Mossley Tydesley Ashton Salford under-lyne Manchester Leigh Salford Droysden Tameside Stretford Irlam Denton Manchester Trafford Stockport Stockport Marple Altrincham Cheadle & Gatley Hale The WEA is a charity registered in England and Wales (no. 1112775) and in Scotland (no. SC039239). The WEA in Greater Manchester combined authority ADAB Creative Living Centre Prestwich Manchester Cathedral St James the Apostle All Saints Church Hall Crossley Centre Manchester Chinese Centre St Johns Centre All Saints Hale Barns with Ringway Parish Deeplish Community Centre Mayo Building St Mary and the Baum Church Church Deeplish Primary Academy Meadowfields Community and Children~s St Mary Magdalene Church Centre Altrincham Methodist Church Centre Denton Methodist church St Peter~s Church Apna Ghar Daycare Centre (KYP) Mechanics Institute Each Step St Peters Primary School Ashfield Valley Primary Methodist Church Cheadle Hulme East Didsbury Methodist Church St Phillips with St Stephens Ashton Central Library, Old Street Mind Wellbeing Centre Edge Lane Methodist Church STAG HQ (South Trafford Archaeological AVANTA Oldham Monton Memorial Hall Group) Falinge Community Hubb Bangladeshi Womens Organisation NEESA Woodville Community Resource Unit Sudden Community Centre Fallowfield Library Befriending Asylum Seekers and Refugees Old
    [Show full text]
  • Chapter II Normans and Plantagenets
    Chapter Two NORMANS AND PLANTAGENETS : 1086-1485 THE DOMESDAY BOOK . OCHDALE'S written history begins in 1086, when William the Conqueror sent his men all over England to find out how much land was being cultivated and how much revenue he might expect R to collect : the result was the Domesday (or Doomsday) Book, so called because of its uncompromising thoroughness and detail . Its two volumes, written in crabbed Latin, with words occasionally scored through in red for emphasis, instead of being underlined, are now displayed at the Public Record Office, London . One can imagine the difficulties of the Norman inspectors : how unwillingly and in what various dialects the English land-holders gave their answers when the " day of reckoning " came upon them . Perhaps this may account for the fact that "Rochdale" is set down as " Recedham ." It was probably then, as we still hear it today, pro- rounced as " Ratchda ' " with a long " a," and a soft Cheshire " c." Very freely translated and abbreviated, this is the gist of the Domesday entry concerning Rochdale as it was in the time of Edward the Confessor (1042-1066), excluding such details as the King's personal property and lands in the Salford Hundred : King Edward held Salford . To this Hundred belonged 21 manors held by as many thanes ; in which there were 112 hides and 102 carucates of land . Camel, a tenant of 2 of these hides in Recedham, was free of all customs but these six : theft, housebreaking, premeditated assault, breach of the peace, not answering the reeve's summons, and 1 4 ROCHDALE RETROSPECT continuing a fight after swearing on oath to desist .
    [Show full text]
  • Local Government Boundary Commission for England Report No
    Local Government Boundary Commission For England Report No. 322 LOCAL GOVERNirfKHT BOUNDARY COAIMISSIOH FOR ENGLA1ID REPORT NO. LOCAL GOVERNMENT BOUNDARY COMMISSION FOR ENGLAND CHAIRMAN Sir Nicholas Morrison KGB DEPUTY CHAIRMAN Mr J M Rankin QC MEMBERS Lady Bowden Mr J T Brockbank Mr R R Thornton CB DL Mr D P Harrison PH To the Rt Hon Merlyn Rees, MP Secretary of State for the Home Department PROPOSALS FOR REVISED ELECTORAL ARRANGEMENTS FOR THE METROPOLITAN BOROUGH OF ROCHDALE 1. We, the Local Government Boundary Commission for England, having carried out our initial review of the electoral arrangements for the metropolitan borough of Rochdale in accordance with the requirements of section 63 of, and Schedule 9 to, the Local Government Act 1972, present our proposals for the future electoral arrangements for that borough. 2. In accordance with the procedure laid down in section 60(1) and (2) of the 1972 Act, notice was given on 28 August 1975 that we were to undertake this review. This was incorporated in a consultation letter addressed to the Rochdale Borough Council, copies of which were circulated to Greater Manchester County Council, the Members of Parliament for the constituencies concerned and the headquarters of the main political parties. Copies were also sent to the editors of local newspapers circulating in the area and of the local government press. Notices inserted in the local press announced the start of the review and invited comments from members of the public and from interested bodies. 3. Rochdale Borough Council were invited to prepare a draft scheme of representation for our consideration.
    [Show full text]
  • Kitchen Street, Rochdale: an Archaeological Desk-Based Assessment
    Kitchen Street, Rochdale: An Archaeological Desk-Based Assessment. Report By: Vicky Nash & Dr Michael Nevell Centre for Applied Archaeology CUBE University of Salford 113-115 Portland Street Manchester M1 6DW Tel: 0161 295 3821 Email: [email protected] Contents Summary 2 1. Introduction 3 2. Methodology Statement 4 3. The Setting 5 4. Archaeological & Historical Background 7 5. Gazetteer of Sites 13 6. Significance of the Remains 18 7. Impact of the Development 22 8. Recommendations for Mitigation 26 9. Sources 27 Appendix 1: Figures 30 Appendix 2: Photographic Archive 42 Kitchen Street, Rochdale: An Archaeological Desk-Based Assessment Page | 1 Report Number 09/2010 Summary The Centre for Applied Archaeology (CfAA) was commissioned by The Regenda Housing Group to carry out an archaeological Desk-Based Assessment of a proposed development on the land bounded by Kitchen Street, Ramsey Street and the rear properties facing South Court, Rochdale ( SD 9022 1365). The study area contains potential archaeological remains of the 19th and 20th centuries. These remains belong to four main types of activity: the tanning factory (sites 1a to 1d, early to mid-19th century); the remains of workers’ housing (sites 3a, 3b and 9, 19th century); the church mission (sites 11a and 11b, early to mid-20th century) and the nursery (site 13, mid- to late 20th century). None of the potential remains within the study area are considered to have national significance. However the study area does contain potential remains of regional and local significance, which will be destroyed by the proposed development and will therefore require appropriate recording to be made.
    [Show full text]
  • Rochdale Township Green Infrastructure Action Plan Draft: May 2013
    Rochdale Township Green Infrastructure Action Plan draft: May 2013 Contents: Chapter 1 Why a Green Infrastructure Plan for Rochdale 1 Township? Chapter 2 What is Green Infrastructure? 4 Chapter 3 Policy Context for Green Infrastructure in Rochdale 10 Township Chapter 4 What do we want Green Infrastructure in Rochdale 12 Township to do? Chapter 5 Green Infrastructure in Rochdale Township by Area 19 Chapter 6 Green Infrastructure Objectives for Rochdale 53 Township Chapter 7 Key Partnerships for Delivery 66 Appendix Policy Context 68 Glossary & Abbreviations 70 Further References and links (Text to be finalised) Chapter 1: Why a Green Infrastructure Plan for Rochdale Township? Introduction Rochdale Township is home to the largest proportion of the borough’s population and is the main centre for shopping, services, leisure, local government and employment within the Borough. It has a strong sense of identity with distinct ambitions to create sustainable communities for its people, environment and economy. The quality of the environment including its green spaces, watercourses and surrounding countryside is important in shaping how the Township is perceived and experienced both by residents and visitors, along with potential investors. The environment is also part of the essential infrastructure for the Township, Borough and beyond including the core of Greater Manchester. This Action Plan sets out Rochdale Township’s particular green infrastructure assets and a series of key objectives and projects to ensure that their value to the Township is fully realised in supporting economic growth, community health and well being and a sustainable environment which can help address the impacts of climate change.
    [Show full text]
  • (Including the "Infra" Wills) Now Preserved in the Probate
    THE RECORD SOCIETY FOR THE $uMtcation of OMøraai Bømtnrate RELATING TO LANCASHIRE AND CHESHIR] FHl TITI 239 VOLUME LXX VII I. By i 1 Be O I BEING THE VOLUME FOR THE YEAR ^ 1923-24. V, COUNCIL. 1927-8. WM. FERGUSSON IRVINE, M.A., F.S.A., Bryn Llwyn, Corwen, North Wales, President. Col. JOHN PARKER, C.B., D.L., F.S.A., Browsholme, Clitheroe, Vice-President. F. C. BEAZLEY, F.S.A., 4 Arnside Road, Oxton, Birken­ head. J. H. E. BENNETT, F.S.A., Shavington, Nr. Crewe. HENRY BRIERLEY, LL.D., 26 Swinley Road, Wigan. E. W. CROSSLEY, F.S.A., Broad Carr, Holywell Green, Halifax. W. E. GREGSON, 43 Moor Lane, Great Crosby, Liverpool. G. T. SHAW, M.A., Chief Librarian, Liverpool Public Library. J. P. SMITH, Arndene, Barrow-in-Furness. RONALD STEWART-BROWN, M.A., F.S.A., Bryn-y-Grög, Nr. Wrexham. HONORARY TREASURER. WM. ASHETON TONGE, P.O. Box, No. 450, 16 Cumberland Street, Manchester. HONORARY SECRETARY. ROBERT GLADSTONE, B.C.L., M.A., 9 Bluecoat Chambers, School Lane, Liverpool. TO THE Mills; antr Siimmtsítrattonsi (ïïncluoíng tíje " Snfra " WLíUx) NOW PRESERVED IN tKíje probate ^egtátrp, AT CHESTER, FOR THE YEARS I8II—1820, BOTH INCLUSIVE. PART I—A TO L. EDITED BY WM. ASHETON TONGE, HONORARY TREASURER. PRINTED FOR THE RECORD SOCIETY OF LANCASHIRE AND CHESHIRE. 1928. PREFACE This volume contains Part I, (A—L) of an Index to the Wills proved, Administrations granted, Inventories filed, and other kindred documents preserved in the Probate Registry at Chester during the years 1811 to 1820, both inclusive.
    [Show full text]