Ecolibrium NUMBER PP352532/00001
Total Page:16
File Type:pdf, Size:1020Kb
THE OFFICIAL JOURNAL OF AIRAH NOVEMBER 2019 · VOLUME 18.10 RRP $14.95 PRINT POST APPROVAL Ecolibrium NUMBER PP352532/00001 AIRAH HVAC&R SALARY SURVEYSPECIAL Analyse this The brave new world of big data and analytics. FEATURE Warm reception The Reliable Controls Headquarters Annex in Canada’s Victoria (British Columbia) boasts a raft of impressive sustainability elements. Indeed, the building is rated LEED Platinum, the equivalent of 6 star Green Star. A world leader, in other words. Main image: Franc D’Ambrosio. Inset images: Jesse Moore. FEATURE FEATURE The Annex has achieved 56 LEED sustainability credits. Image: Franc D’Ambrosio. In late 2012 Reliable Controls opened its BACnet integration of the HVAC, Ecolibrium: Where did the Headquarters Annex in Victoria, a city lighting, and security systems inspiration come from for a boasting a population of about 350,000 allows occupied comfort settings LEED Platinum headquarters? to be enabled, which is designed and located in the Pacific Northwest. Tom Zaban: We needed to expand to maximise energy savings. our facilities, and the architect we “The Reliable Controls Headquarters Individual control of temperature, had worked with on previous projects Annex is a demonstration of our collective light, sunshades, and occupancy is recommended we shoot for LEED commitment to sustainability and provided via LAN or wireless access. resilience,” says the firm’s Tom Zaban. Platinum. At first this seemed like “It effectively demonstrates leadership Ecolibrium chatted with Zaban about an overly ambitious idea, but after in our own field, showing we can work the building and its performance. learning more about the commitments together to implement a reality that involved, we felt we could overcome minimises pollution, waste, and provides the challenges and meet the goal. a lasting benefit to our community.” Eco: Could you provide an overview Home to the firm’s R&D, sales and of the building’s sustainability marketing, and administration features, and why these departments, the facility includes design particular ones were chosen? elements such as rain gardens and TZ: planters, bioswales, green roofs, cisterns, In LEED New Construction 1.1 and trees. The building consumes (the scorecard we were registered 60 per cent less potable water than under) there were 70 LEED credits a baseline equivalent. possible, and this facility was awarded 56 (Platinum required a minimum of Naturally vented, the Annex design 52). All the credits and details of how relies on 57 trickle vents and hydronic we achieved 56 points are explained heating and cooling to keep the in our Green Facility website at occupants thermally comfortable and www.reliablecontrols.com/corporate/ the overall energy consumption low. facility/leed.php 26 NOVEMBER 2019 • ECOLIBRIUM FEATURE The trickle-vents, wind tower, the materials, by cost. Tough credit Here’s a sample of the 56 heat-recovery ventilator, and radiant to obtain, but sure makes for a warm sustainability credits achieved. cooling/heating hydronic system allowed and comfortable environment to work in. us to earn eight of the 10 points for Sustainable Sites Credit 4 – Indoor Environmental Control this important credit. We modelled Credit 6 – Controllability of Systems Alternative Transportation the design thermodynamically to For our staff and our local municipality it make sure the comfort levels could be This was an interesting credit to obtain is very important to minimise the need for maintained in an unusually hot or cold because it demanded a high percentage parking spaces, especially for combustion- ambient condition. The final design of individual occupant control for engine automobiles. So maximising resulted in a very comfortable space temperature, lighting, and airflow. the incentives for staff to come to work that performed 50 per cent better in I would guess we have one of the highest without the need to use a parking space energy than ASHRAE Standard 90.1. density of hardpoint monitoring and for a combustion-engine vehicle was control in any commercial building. important in our design. Our proximity to Energy & Atmosphere Credit 5 – Measurement & Verification But we achieved the credit, even though mass transit, plentiful bicycle storage and some of the LEED requirements shower facilities, and financial incentives Being a manufacturer of building automation systems, this credit was a for interior ventilation control were to take mass transit, carpool, walk, arguably impractical for a passively or bike has been very popular for staff. no-brainer for us. However, we did not sit on our laurels. We set ourselves up for ventilated building. Forty per cent of staff use alternative some real challenges by specifying a new One of the great things that came out transportation to come to work each day. controller which we had not even finished of this credit was the use of occupant Water Efficiency Credit 1 – designing, a new wireless lighting smart phones to control the temperature, Water Efficient Landscaping technology supplied by a third party, and lighting, occupancy, and exterior We live in Victoria, British Columbia, a new exterior sunshade product which sunshades of spaces, all with a single app. a beautify garden city, so we like plants we had never integrated, and more. Occupants can even see the daily and here. But we want to be conservative on Overall, we integrated eight different year-to-date energy usage and targets wasting potable water for irrigation. So we BACnet vendors, two different Modbus for the building from their phone. decided to capture rainwater and store vendors, and one EnOcean vendor Indoor Environmental Control it in a large underground cistern, and together into a single seamless system. Credit 7 – Thermal Comfort use the cistern exclusively for landscape We automatically generate detailed The intent of this credit really speaks to irrigation. For eight or nine months of measurement and verification reports the heart of why we build commercial the year, we can irrigate with captured and post the results weekly to our buildings – so the occupants have a rainwater, and in the months of June, July, Green Facility public domain website. thermally comfortable environment and August, we supplement the rainwater After working out the bumps and that is safe and productive to work in. irrigation with potable water. kinks for the first couple of years, the Water Efficiency Credit 2 – performance of the building proved I like the ASHRAE Standard 55 because it promotes actually surveying the Innovative Wastewater Technologies outstanding, with an Energy Use building occupants on a regular basis to With wastewater we implemented a Intensity well below our aggressive goal of 58.8 kWh/m2 per annum. “verify” and trend comfort. We survey two-pronged approach, in an effort to our staff twice a year using a hybrid minimise our impact on municipal Materials & Resources Credit 2 – method of ASHRAE 55 and others in infrastructure. Similar to our Construction Waste Management the industry. The employee comfort irrigation cistern, we built a second This was an area that really surprised survey shows the staff give the facility underground cistern to store captured many people, and really exemplified the an 84 per cent satisfaction rating. rainwater for flushing toilets in the need to have a good general contractor We are pretty happy with that. Headquarters Annex. with excellent experience with LEED Innovation & Design Process new construction. It’s not unusual to In conjunction with this effort, Credit 1 – Innovation in Design we installed waterless urinals in the have 50 per cent or 75 per cent (by weight) or more of the construction waste The facility earned exemplary men’s washrooms. We were a little bit performance credits in two separate apprehensive about these ideas, but generated from the site to be recycled to avoid landfills and incinerators. areas: Sustainable Sites for committing to after working out the kinks with the relocating all the surface vehicle parking system it worked out surprising well. For this project over 98 per cent of to 100 per cent underground parking; Approximately 70 per cent of the water the construction waste was diverted. and Water Efficiency for exceeding the used to flush toilets comes from rainwater. This benefit alone speaks volumes next three logical increments above the Energy & Atmosphere Credit 1 – for justifying LEED. WEc3.2 credit, demonstrating the facility Optimise Energy Performance Materials & Resources Credit 7 – uses more than 60 per cent less potable water than a typical efficient building. As a LEED Platinum facility we Certified Wood needed the building design to perform This was a very challenging credit to The facility received further credit exceptionally well from an energy obtain. When you look at the amount of by committing to Green Building perspective. We were very fortunate to certified wood used in the construction Education, which is demonstrated by be located in a temperate climate on the of this building most people think it our Green Facility website, updated Pacific Northwest of North America, and comprises the large majority of the performance reporting, and public this allowed us to implement a passively structural materials. In fact it only tours. We also committed to Green ventilated design. amounted to just over 56 per cent of House Keeping practices. NOVEMBER 2019 • ECOLIBRIUM 27 FEATURE There are many benefits to full integration, but the one with the most value is that when an employee presents their access card to enter the building in the morning, the individual light(s) in their office turns on and modulates to their preferred setpoint, the exterior blinds rotate to the last position from the previous day, and their trickle vent opens and controls to their preferred setpoint. In addition to BACnet, we have Modbus integrations to a weather station and power meters. Eco: “What isn’t measured isn’t managed.” How does this apply to the Annex and to buildings in general? TZ: Good question.