PROJECT CASE STUDY AIS ARENA AUSTRALIA, CANBERRA AIS ARENA CASE STUDY BACKGROUND INSTALLED 1980
. AIS arena is situated in Bruce, Canberra and is part of the Australian Institute of Sport . The construction is a hollow core concrete panel roof . The roof membrane that was installed was Sarnafil G214-44e PVC, fully adhered with Sarnacol 2170 adhesive . The roof was installed in 1980… . …so that’s 33 years of trouble-free service . Canberra’s climate is one of the harshest in Australia with regular temperature differentials of between -5 and +25 degrees C . In January 2013, Sarnafil G410-20L Felt was installed over the existing membrane, fully adhered with Sarnacol 2170 . The reason the existing membrane was left in place is because it was impossible to remove AIS ARENA CASE STUDY INSTALLED 1980
3 AIS ARENA CASE STUDY INSTALLED 1980
4 AIS ARENA CASE STUDY INSTALLED 1980
5 AIS ARENA CASE STUDY INSPECTION 2012
6 AIS ARENA CASE STUDY INSPECTION 2012
7 AIS ARENA CASE STUDY INSPECTION 2012
8 AIS ARENA CASE STUDY INSPECTION 2012
9 AIS ARENA CASE STUDY PATCH INSTALLED 2008 Beware of cheap imitations. This is the competitor’s membrane that was used to repair a pipe on the roof; the patch was only five years old
10 THE RE-ROOF PROJECT - JANUARY 2013 AIS ARENA RE-ROOF
. The client was that happy with the performance of the initial Sarnafil PVC system they didn’t look at any other brand when it came to the re-roof project
. We discussed the requirements of the project with the client and it soon became apparent that a white energy smart membrane was required to save on cooling costs in the summer months
. Also, a 20 year warranty was required so a 2.0mm membrane was installed
. The re-roof installation took six weeks to complete
AIS ARENA CASE STUDY INSTALLATION JAN/FEB 2013
13 AIS ARENA CASE STUDY INSTALLATION JAN/FEB 2013
14 AIS ARENA CASE STUDY INSTALLATION JAN/FEB 2013
15 AIS ARENA CASE STUDY INSTALLATION JAN/FEB 2013
16 AIS ARENA CASE STUDY INSTALLATION JAN/FEB 2013
17 AIS ARENA CASE STUDY INSTALLATION JAN/FEB 2013
18 AIS ARENA CASE STUDY INSTALLATION JAN/FEB 2013
19 END