Republic of Kenya Baringo County Government First Quarter 2019/2020 Budget Implementation Status Report

Total Page:16

File Type:pdf, Size:1020Kb

Republic of Kenya Baringo County Government First Quarter 2019/2020 Budget Implementation Status Report REPUBLIC OF KENYA BARINGO COUNTY GOVERNMENT FIRST QUARTER 2019/2020 BUDGET IMPLEMENTATION STATUS REPORT MINISTRY OF TRANSPORT, INFRASTRUCTURE AND PUBLIC WORKS AS AT 30TH DECEMBER, 2019. Department Overview The Transport and Infrastructure Department consists of Roads; Public Works; Transport Sub departments. Department Vision A world class provider of cost-effective physical infrastructure facilities and services. Department Mission To provide efficient, affordable and reliable infrastructure for sustainable economic growth and development through construction, modernization, rehabilitation and effective management of all infrastructure facilities. Objectives of the Sector: • Accelerating on-going infrastructure development, focusing on quality, aesthetics and functionality of the infrastructure services; • Infrastructure development to support identified flagship projects to ensure contribution to the economic growth and social equity goals; • Improving efficiency and effectiveness of the infrastructure development process at all levels of planning, contracting, and construction; • Providing a utility Sector that is modern, customer- oriented and technologically-enabled to provide efficient, cost-effective, quality services to all citizens; • Enable universal access to IT enabled services to promote a knowledge based society; • Develop modern County ICT infrastructure for sustainable development; • To ensure affordable, reliable, quality, safe and sustainable access to energy for all while protecting and conserving the environment; • To develop and enforce regulations and standards to ensure safe, secure and efficient transport and infrastructure systems; • To develop and maintain sustainable transport and infrastructure to facilitate efficient movement of goods and people; • To mobilize resources and build capacity for technical and professional staff. County Response to Department Vision and Mission 1. Poor physical infrastructure has been identified as a major setback in development in the county and hence the overall strategy is to provide physical infrastructural facilities through rehabilitation, improvement and effective management and expansion of the existing facilities. The road network will be maintained and improved through gravelling, grading and upgrading to bitumen standard. Power and telephone services, will be expanded to cover all the Sub-Counties targeting market centres, institutions and main community projects. 2. During the current financial year 2019/2020 the department was allocated Kshs to fund its expenditure; Kshs and Kshs for recurrent and development expenditures respectively. 3. By the end of the first quarter, it had used Kshs 0.00 and Kshs 0.00 on recurrent and development respectively. 0% absorption of the total budget earmarked for the financial year 2018/19. This represents 4. The total expenditure for the first quarter was Kshs. 0.00 on development and Kshs. 0.00 on recurrent expenditure. 5. The department of infrastructure has completed a total of at least 2,800 km of road projects in the county, installed street lights in major centres and initiated twenty six footbridges with twenty of them complete. PROJECT IMPLEMENTATION IN THE FIRST QUARTER The progress implementation status as at the end of the first quarter is as follows: FINANCIAL YEAR 2017/2018 PROJECTS NO. PROJECT NAME LOCATION STATUS 1. Storm drainage in Mogotio Town Mogotio Ongoing 2. Storm drainage in Marigat Town Marigat Complete 3. Emsos - Tinosiek - Olkokwe Road Kisanana Ongoing 4. Sambaka - Matare Footbridge Mochongoi Complete 5. Katuit Road Loyamorok Complete 6. Chebao Bridge Kabarnet Complete 7. Kibunder Bridge Kabarnet Complete 8. Chepirmolok - Lemuyek Road Loyamorok Complete 9. Christ the King – Ngasiani Footbridge Mogotio Insufficient fund 10. Isanta Footbridge Emining Complete 11. Game - Mumol - Water Tank Road Kapropita Complete 12. Kapting - Kapkinoi - Kamurian Road Emining Complete 13. Kipchobet Road Emining Complete 14. Embogong - Miti Moja - Borokwo Road Emining Complete 15. Cheberen - Kapkures Footbridge Emining Complete 16. Sagasagik - Barturgei - Chesingei Road Mogotio Complete 17. Ebenezer Footbridge Mogotio Complete 18. Kapkaran - Kenet -Igonwo Road Mogotio Ongoing 19. Kapchepkut - Rosoga Road Mogotio Complete 20. Poror - Tumol Road Lembus Kwen Complete 21. Menjeiwa - Kamatagei -Kaisor Road Tenges Complete 22. Ochii - Lelgut -Mogorwo Road Tenges Complete 23. Kapchemengich - Tumek Road Tenges Complete Kiptagich -Kesetan Road (Kapkongos 24. Sacho Complete Section Slab) 25. Kaseret - Orikwo -Kapyomat Road Tenges Ongoing 26. Kisonei - Eitui Road Tenges Complete 27. Benen - Kaptek Road Ewalel Chapchap Complete 28. Seretunin- Manaach Road Ewalel Chapchap Complete Togomin - Kapngetuny - Sengchan Water 29. Ewalel Chapchap Complete Intake Road 30. Awane Road Ewalel Chapchap Ongoing 31. Kabasis -Katipsogon -Timboiwo Road Sacho Complete 32. Chepketit - Kasau - Ngatibgoin road Sacho Complete 33. Kapsoo - Turur Road Kapropita Ongoing 34. Kimungur - Kipsubei Road Kapropita Ongoing 35. Ratabei - Latei Road Kapropita Complete 36. Kirdam - Kimagok - Riwo Road Kapropita Complete 37. Turkwo - Kapcherebet Road Kapropita Complete 38. Kaptumo - Kobin - Kangot Road Slab Ewalel Chapchap Complete Kapkut - Katyo - Kaplobot -Kaplogong - 39. Kapropita Complete Ketipbereke Road 40. Kapcherebet - Lolkoita _Kasitet Road Kapropita Complete 41. Ngelel - Terekor Road Kabarnet Compete 42. Dam - ICT Centre Road Kabarnet Complete 43. Ngolong - Kamwen Road Kabarnet Complete 44. Kaptumo Primary School Field Levelling Ewalel Chapchap Complete 45. Rosobet Primary School Field Levelling Ewalel Chapchap Complete 46. Andama - Osiemon - Kwa Thuko Road Maji Mazuri Complete 47. Kapsoit - Hilltea Road Maji Mazuri Complete 48. Naitili Bridge Koibatek Complete 49. Fuel for Machinery in Kiplombe/Sabatia Koibatek Complete 50. Seguton - Daraja Mbili Road Lembus Complete 51. Timboroa - Highway - Mwachon Road Lembus Complete 52. Mwachon - Bikwen - Kapchepkaro Road Lembus Complete 53. Kapcholoi - FGCK Road Lembus Complete 54. Nerkwo - Emnyunguny Road Lembus Complete 55. Main Road - Kabilwo Road Lembus Kwen Complete 56. Kiprotich Junction - Kapkoi Sarme Road Lembus Kwen Complete 57. Kamoskoi PAG Road Lembus Kwen Complete 58. Singorwe - Kamasaba Road Lembus Kwen Complete 59. Fuel for Maintenance Lembus Kwen Complete Bondeni - Shabab - Shauri - Kisarget 60. Ravine Complete Road Complete 61. Nubian - Kokorwonin Road Ravine ODM - Kamelilo - Kinyikwet and 62. Ravine Complete Chelunget - Kamelilo - Baronge Road 63. KCC Road Ravine Complete 64. Fuel for Road Opening Ravine Complete Kamelilo - Sogonin Land Purchasing for 65. Ravine Awaiting valuation Road Opening 66. Kamelilo - Sogonin Road Ravine To commence 67. Kaptana-Cheptilatil-Kibias Road Lembus Perkerra Complete 68. Ayatya - Seron - Kaptigit Road Barwessa Complete 69. Ketkor - Kibulwonin Road Barwessa Complete 70. Bartaragon Road Slab Kabartonjo Ongoing 71. Lelabei Footbridge Barwessa Complete 72. Senebo - Mohon - Kapsagas Road Barwessa Complete Barwessa Centre Public Baraza Park - 73. Barwessa Complete Steel fixed seats and fencing 74. Chepturot Footbridge Barwessa Complete Kuikui H/C - Chepturot - Kaptigit – 75. Barwessa Complete Chepngoi 76. Katebere - Sinende - Sogom Road Kabartonjo Complete 77. Benonin - Seremwo Road Kabartonjo Complete 78. Kapkwang - Urel - Kapkiamo Road Kabartonjo Complete 79. Kaptumin - Root - Releng Road Kabartonjo Complete 80. Kotor - Newai -Poi Junction Kabartonjo Complete 81. Kasirio - Kirinykalia - Kaptum Road Kabartonjo Complete 82. Kiplabal - Kiboino Road Kabarnet Complete 83. Chesosur - Tiloi - Maregut Road Kabartonjo Complete Fuel for Ward dozer and Supply of 84. Saimo Kipsaraman Ongoing balloons for roads 85. Arusin - Akoroyan Road Saimo Soi Complete Kapsoi - Kapkirwok - Ngenyin Primary 86. Saimo Soi Complete Road 87. Moinoinin Youth Field Levelling Saimo Soi Mobilizing 88. Sitek - Chemoigut Road Bartabwa Complete 89. Sogon - Ngolbelion Road Marigat Complete Manambil - Catholic - Koitilion - Egerton 90. Marigat Complete Road 91. KVDA - Kampi Samaki Road Ilchamus Complete 92. Leswaa - Ilawiyaki Road Ilchamus Complete 93. Kabel - Koitilil - Mochongoi Road Mochongoi Complete 94. Segutek Footbridge Mochongoi Complete 95. Kapedomor - Akarapet - Rotu Road Tirioko Complete Sikhin - Natan - Topelen - Lomechan 96. Silale Mobilizing Cave Road 97. Napukut - Achoru - Mukeluk Road Silale Complete 98. Kipsaa Footbridge Tenges Complete Chepkiswach road (Emining Technical- 99. Mogotio Complete Kakimoe-Keben Loation 100. Lelian Loop Road Kapropita Complete SolianJunction-Kapcheserem/Kirobon- 101. Koibatek Complete Kaptuisang Road 102. Lulunga Junction-Kapnyayo Road Kisanana Complete 103. Lorrok Foot bridge construction Mukutani Complete Kiserian - Noosukuro Road Opening, and 104. Mukutani Complete Structures Development Ol- Arabel river (Mosuro) drift, 105. Rehabilitation, Crosssing and Structures Mukutani Complete Development 106. Ol arabel River - Kiserian Road Mukutani Complete 107. Kaptum - Kapkomon Kabartonjo Complete 108. Members Club-Cereals-Kapkut Road Kabarnet Retendered 109. Tuluongoi Tian Road Marigat Complete 110. Timboiywo - Kaptarakwa - Katipsogon Ewalel Chapchap Complete 111. Cheblambus-Lelbatai- Nduro Road Tenges Complete 112. Muserechi - Noiwet Road Mogotio Complete 113. Emining - Oterit – Molosirwe Road Emining Complete 114. C577 Junct - Kebulwe - Magoi Road Kisanana Complete 115. Olng'arua - Mutitu – Kamailel Road Mochongoi Complete 116. Kabirmet - Rorobai – Kibingor
Recommended publications
  • Conserving Wildlife in African Landscapes Kenya’S Ewaso Ecosystem
    Smithsonian Institution Scholarly Press smithsonian contributions to zoology • number 632 Smithsonian Institution Scholarly Press AConserving Chronology Wildlife of Middlein African Missouri Landscapes Plains Kenya’sVillage Ewaso SitesEcosystem Edited by NicholasBy Craig J. M. Georgiadis Johnson with contributions by Stanley A. Ahler, Herbert Haas, and Georges Bonani SERIES PUBLICATIONS OF THE SMITHSONIAN INSTITUTION Emphasis upon publication as a means of “diffusing knowledge” was expressed by the first Secretary of the Smithsonian. In his formal plan for the Institution, Joseph Henry outlined a program that included the following statement: “It is proposed to publish a series of reports, giving an account of the new discoveries in science, and of the changes made from year to year in all branches of knowledge.” This theme of basic research has been adhered to through the years by thousands of titles issued in series publications under the Smithsonian imprint, com- mencing with Smithsonian Contributions to Knowledge in 1848 and continuing with the following active series: Smithsonian Contributions to Anthropology Smithsonian Contributions to Botany Smithsonian Contributions to History and Technology Smithsonian Contributions to the Marine Sciences Smithsonian Contributions to Museum Conservation Smithsonian Contributions to Paleobiology Smithsonian Contributions to Zoology In these series, the Institution publishes small papers and full-scale monographs that report on the research and collections of its various museums and bureaus. The Smithsonian Contributions Series are distributed via mailing lists to libraries, universities, and similar institu- tions throughout the world. Manuscripts submitted for series publication are received by the Smithsonian Institution Scholarly Press from authors with direct affilia- tion with the various Smithsonian museums or bureaus and are subject to peer review and review for compliance with manuscript preparation guidelines.
    [Show full text]
  • George Muia the “Turkana Grits”: Potential Hydrocarbon Reservoirs
    THÈSE / UNIVERSITÉ DE RENNES 1 sous le sceau de l’Université Européenne de Bretagne pour le grade de DOCTEUR DE L’UNIVERSITÉ DE RENNES 1 Mention : Sciences de la Terre Ecole Doctorale Sciences de la Matière présentée par George Muia Préparée à l’unité de recherche UMR 6118 Géosciences Rennes Observatoire des Sciences de l’Univers de Rennes Thèse soutenue à Rennes The “Turkana Grits”: le 24/07/2015 Potential Hydrocarbon devant le jury composé de : Jean-Luc POTDEVIN Reservoirs Professeur, Université de Lille 1 / rapporteur of the Northern Stéphane DUCROCQ Directeur de Recherche, and Central Kenya Rifts CNRS-Université de Poitiers / rapporteur Jean-Yves REYNAUD Professeur, Université de Lille 1 / examinateur Mathieu SCHUSTER Chargé de Recherche, CNRS Université de Strasbourg / examinateur Peter R. COBBOLD Directeur de Recherche Emérite, CNRS Université de Rennes 1/ examinateur Jean-Jacques TIERCELIN Directeur de Recherche, CNRS-Université de Rennes 1 / directeur de thèse Erwan HALLOT Maître de Conférences Université de Rennes 1 / co-directeur de thèse The “Turkana Grits”: Potential Hydrocarbon Reservoirs of the Northern and Central Kenya Rifts 3 Table of contents Acknowledgements 6 Abstract 8 General Introduction 9 Chapter I 21 1. Introduction 30 2. Field study, sampling and analytical methods 35 3. Regional background of the Central and Northern Kenya Rifts 37 3.1. Physiography and climate of the Central and Northern Kenya Rifts 37 3.2. Geological outline of the Kerio and Baringo Basins 40 3.3. Geological outline of the North Kerio Basin 43 4. The Kimwarer Formation 45 4.1. Lithostratigraphy 45 4.1.1. The “Lower Kimwarer Formation” 47 4.1.2.
    [Show full text]
  • Kenya's Indigenous Forests
    IUCN Forest Conservation Programme Kenya's Indigenous Forests Status, Management and Conservation Peter Wass Editor E !i,)j"\|:'\': A'e'±'i,?ai) £ ..X S W..T^ M "t "' mm~:P dmV ../' CEA IUCNThe World Conservation Union Kenya's Indigenous Forests Status, Management and Conservation IUCN — THE WORLD CONSERVATION UNION Founded in 1948, The World Conservation Union brings together States, government agencies and a diverse range of non-governmental organizations in a u nique world partnership : over 800 members in all, spread across some 130 countries. As a Union, IUCN seeks to influence, encourage and assist societies throughout the world to conserve the integrity and diversity of nature and to ensure that any use of natural resources is eq uitable and ecologically sustainable. A central secretariat coordinates the IUCN Programme and serves the Union membership, representing their views on the world stage and providing them with the strategies, servi- ces, scientific knowledge and technical support they need to achieve their goals. Through its six Com- missions, IUCN draws together over 6000 expert volunteers in project teams and action groups, focu- sing in particular on species and biodiversity conservation and the management of habitats and natural resources. The Union has helped many countries to prepare National ConseNation Strategies, and demons- trates the application of its knowledge through the field projects it supervises. Operations are increa- singly decentralized and are carried forward by an expanding network of regional and country offices, located principally in developing countries. The World Conservation Union builds on the strengths of its members, networks and partners to enhance their capacity and to support global alliances to safeguard natural resources at local, regional and global levels.
    [Show full text]
  • Laikipia – a Natural History Guide
    LAIKIPIA – A NATURAL HISTORY GUIDE LAIKIPIA – A NATURAL HISTORY GUIDE A publication of the LAIKIPIA WILDLIFE FORUM First published in 2011 by Laikipia Wildlife Forum P O Box 764 NANYUKI – 10400 Kenya Website: www.laikipia.org With support from the Embassy of the Kingdom of the Netherlands in Nairobi, Kenya Text: Copyright © Laikipia Wildlife Forum 2011 Artwork: Copyright © Lavinia Grant 2011 Illustration (p. 33): © Jonathan Kingdon Illustration (p. 78): © Stephen D Nash / Conservation International Illustrations (pp. 22, 45, 46): © Dino J Martins Maps: Copyright © Laikipia Wildlife Forum 2011 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form, or by any means – electronic, mechanical, photocopy, recording, or otherwise – without the prior consent of the publisher. ISBN 978–9966–05–363–3 Editor: Gordon Boy Contributing writers: Anthony King (AK); Chris Disclaimer: The Laikipia Wildlife Forum has made Thouless (CT); Dino J Martins (DJM); Patrick every effort to ensure the information conveyed in K Malonza (PKM); Margaret F Kinnaird (MFK); this guide is accurate in all respects. The Forum Anne Powys (AP); Phillipa Bengough (PB); cannot accept responsibility for consequences Gordon Boy (GB) (including loss, injury, or inconvenience) arising from use of this information. Original paintings by Lavinia Grant, reproduced with the kind permission of the artist Printed on Avalon paper – 100 % chlorine free, made from 60 % bagasse waste derived from Maps: Phillipa Bengough, Job Ballard sustainable afforestation. Design: Job Ballard Printed by The Regal Press Kenya Limited, P O Box Coordination: Phillipa Bengough 4166; 00100 – NAIROBI, Kenya Cover: African Wild Dogs against the backdrop of Mount Kenya.
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Page | ELRP-Integrated Pest Management Plan – IPMP-Component 1 1 TABLE OF CONTENTS EXECUTIVE SUMMARY .............................................................................................. 6 1 INTRODUCTION................................................................................................... 20 1.1 Emergency Locust Response Program ............................................................... 20 1.2 Project Development Objective ......................................................................... 20 1.3 ELRP Project Components ................................................................................ 20 1.4 Selected Pesticides ............................................................................................. 21 1.5 Project Activities ................................................................................................ 22 1.6 Project Beneficiaries .......................................................................................... 23 1.7 Aims and Objectives of IPMP ............................................................................ 23 1.8 Component 1 Implementation Arrangements .................................................... 24 2 STAKEHOLDER ENGAGEMENT ..................................................................... 25 2.1 Stakeholder Identification .................................................................................. 25 2.2 Stakeholder
    [Show full text]
  • Land Use/Land Cover Dynamics and Anthropogenic Driving Factors in Lake Baringo Catchment, Rift Valley, Kenya
    Natural Resources, 2019, 10, 367-389 https://www.scirp.org/journal/nr ISSN Online: 2158-7086 ISSN Print: 2158-706X Land Use/Land Cover Dynamics and Anthropogenic Driving Factors in Lake Baringo Catchment, Rift Valley, Kenya Molly Ochuka1,2*, Chris Ikporukpo2, Yahaya Mijinyawa3, George Ogendi4 1Department of Agricultural and Environmental Engineering, Pan African University, Life and Earth Sciences Institute, University of Ibadan, Ibadan, Nigeria 2Department of Geography, University of Ibadan, Ibadan, Nigeria 3Department of Agricultural and Environmental Engineering, University of Ibadan, Ibadan, Nigeria 4Department of Environmental Science, Egerton University, Njoro, Kenya How to cite this paper: Ochuka, M., Ik- Abstract porukpo, C., Mijinyawa, Y. and Ogendi, G. (2019) Land Use/Land Cover Dynamics and Anthropogenic activities have altered land cover in Lake Baringo Catchment Anthropogenic Driving Factors in Lake Ba- contributing to increased erosion and sediment transport into water bodies. ringo Catchment, Rift Valley, Kenya. Nat- The study aims at analyzing the spatial and temporal Land Use and Land ural Resources, 10, 367-389. https://doi.org/10.4236/nr.2019.1010025 Cover Changes (LULCC) changes from 1988 to 2018 and to identify the main driving forces. GIS and Remote Sensing techniques, interviews and field ob- Received: August 19, 2019 servations were used to analyze the changes and drivers of LULCC from Accepted: October 8, 2019 1988-2018. The satellite imagery was selected from SPOT Image for the years Published: October 11, 2019 1988, 1998, 2008 and 2018. Environment for Visualizing Images (ENVI 5.3) Copyright © 2019 by author(s) and was used to perform image analysis and classification. The catchment was Scientific Research Publishing Inc.
    [Show full text]
  • County Integrated Development Plan
    BARINGO COUNTY Office of the Governor, County Government of Baringo P.O. Box 53-30400 KABARNET Tel: 053-21077 Email:[email protected]/[email protected] Website: www.baringo.go.ke FIRST COUNTY INTEGRATED DEVELOPMENT PLAN 2013 – 2017 KENYA TOWARDS A GLOBALLY COMPETITIVE AND PROSPEROUS NATION AUGUST 2013 COUNTY INTEGRATED DEVELOPMENT PLAN 2013-2017- COUNTY OF BARINGO Page i County Vision and Mission 1.1 Preamble This county integrated development plan captures the aspirations, values and important qualities of diverse communities in Baringo County. It also provides a roadmap of working towards those important ends over the next five years. It is the result of the collaborative effort of the people and leadership of the county led by the governor and his executive team, the county assembly and other strategic stakeholders that respect the law and existing development plans such as the MDGs and Vision 2030. 1.2 Shared vision To be the most attractive, competitive and resilient county that affords the highest standard of living and security for all its residents. 1.3 Mission To transform the livelihoods of Baringo residents by creating a conducive framework that offers quality services to all citizens in a fair, equitable and transparent manner by embracing community managed development initiatives for environmental sustainability, adaptable technologies, innovation and entrepreneurship in all spheres of life. 1.4 Core values 1. Honesty, integrity and prudent use of public resources 2. Environmental sustainability 3. Good governance, Transparency and Accountability 4. Harmonious and peaceful coexistence 5. Equitable, inclusive and People-driven leadership 6. Commitment toeam work and appreciation for diversity 7.
    [Show full text]
  • Mau Complex – Importance, Threats and Way Forward
    Mau Complex and Marmanet forests Environmental and economic contributions Current state and trends Briefings notes compiled by the team that participated in the reconnaissance flight on 7 May 2008, in consultation with relevant government departments. 20 May 2008 Executive summary 1. Overview The Mau Complex forms the largest closed‐canopy forest ecosystem of Kenya, as large as the forests of Mt. Kenya and the Aberdare combined. It is the single most important water catchment in Rift Valley and western Kenya. Through the ecological services provided by its forests, the Mau Complex is a natural asset of national importance that supports key economic sectors in Rift Valley and western Kenya, including energy, tourism, agriculture (cash crops such as tea and rice; subsistence crops; and livestock) and water supply. The Mau Complex is particularly important for two of the three largest foreign currency earners: tea and tourism. 2. Economic contributions The market value of goods and services generated annually in the tea, tourism and energy sectors alone to which the forest of the Mau Complex and Marmanet have contributed, is in excess of Kshs 20 billion. This does not reflect provisional services such as water supply to urban areas (Bomet, Egerton University, Elburgon, Eldama Ravine, Kericho, Molo, Nakuru, Narok, and Njoro) or support to rural livelihoods, in particular in the Lake Victoria basin outside the tea growing areas. This figure also does not reflect potential economic development in the catchments of the Mau Complex and Marmanet, in particular in the energy sector. The estimated potential hydropower generation in the Mau Complex catchments is approx.
    [Show full text]
  • Geology and Geothermal Resource Utilization Options in the Arus-Lake
    Proceedings ARGeo 2 conference Entebbe, Uganda, 24-26 November 2008 Geology and Geothermal Resource Utilization Options in the Arus- Lake Bogoria Prospect, Northern Kenya Rift John Lagat, Kenya Electricity Generating Company Ltd, Olkaria Geothermal Project, P. O. Box 785, Naivasha 20117, Kenya [email protected] ABSTRACT area was carried to determine the potential and propose how best the resource could be Arus-Lake Bogoria geothermal prospect is utilized. located in the northern sector of the Kenyan Ethiopia Rift. Geothermal phenomena in form of a d n a a g i l U fumaroles, hot springs, steam jets, geysers, a KENYA L. Turkana m o sulphur deposits and high geothermal gradient S Nairobi expressed by anomalously hot ground and anomalous groundwater manifest the area. Tanzania Mombasa Detailed surface exploration surveys carried Barrier out in the prospect indicate presence of low to Namarunu 2oN intermediate temperature fracture controlled Emuruangogolak geothermal system(s) in the area. Silali Paka These low to medium enthalpy resources can Korosi be utilized in direct uses and electric power L. Baringo generation using binary-cycle power plants. L. Bogoria 0o The direct use applications that can be realized Nyanza Rift Menengai L. Nakuru in the area include tourism, spa pools, L. Elmenteita Eburru greenhouse heating, agricultural produce L. Naivasha Olkaria volcanic Longonot drying and industrial processes. The direct use complex application currently available in area is Suswa LEGEND tourism and a spa pool at one of the tourist Central volcanoes Lakes L. Magadi hotel. Advances in binary-cycle power and 2oS Faults submersible pump technologies have made L.
    [Show full text]
  • We Are Leading… KSG Tops Training Bodies in Values, Principles Compliance
    Vol. 9 Issue 7 22nd- 28th February, 2020 KSG Campuses Baringo Embu Matuga Mombasa Weekly Bulletin Institutes Published by the KSG Communications Office e-Learning and Development Institute Institute for Countering Violent Extremism We are leading… KSG tops training bodies in values, principles compliance KSG Centres of Excellence Centre for Devolution Studies Centre for Public Service Values, Ethics and Integrity Centre for Public Finance Centre for Leadership and Policy Centre for Advanced Training and Consultancy Centre for Research and Advisory Services Inside this issue: Photo: Kenya School of Government Lower Kabete Ties that bind Embu and 2 BY EPHLINE OKOTH training institutions, Jomo professional ethics in the Shanxi Kenya University of Science public service; performance he Kenya School and Technology, Chuka management; equitable Chweya: KSG is not there 3 of Government University and Karatina allocation of opportunities yet has emerged the University follow the School and resources; as well as Samboja: Forget the 4 best public respectively. public participation in policy politics Ttraining institution that The ranking of the making. complied with public service Ogopa trips out of Betway 5 institutions was based on The School, however, values and principles in Cup performance in seven achieved medium rating in Articles 10 and 232 of the 6 thematic areas. KSG had efficiency, effectiveness and Rejuvenating journey to Constitution in the Year Lake Baringo ‘high’ performance in four economic use of resources; 2018/2019. thematic areas: Service and good governance, Pictorial 8 The status of compliance delivery improvement and transparency and report released by the Public Homour/Quote 10 transformation; ensuring accountability parameters.
    [Show full text]
  • Geology Nakuru-Thomson's Falls
    Report No. 78 MINISTRY OF NATURAL RESOURCES GEOLOGICAL SURVEY OF KENYA GEOLOGY OF THE NAKURU-THOMSON'S FALLS- LAKE HANNINGTON AREA DEGREE SHEET No. 35 S.W. QUARTER AND 43 N.W. QUARTER (with coloured maps) by G. J. H. McCALL, B.Sc, A.R.C.S., Ph.D., D.I.C., F.G.S. Geologist I Thirty Shillings - 1967 JSBIC LIBRARY • KE - 1967.04 j'Wageningen lie Setherlands Scanned from original by ISRIC - World Soil Information, as ICSU World Data Centre for Soils. The purpose is to make a safe | depository for endangered documents and to make the accrued , information available for consultation, following Fair Use ', Guidelines. Every effort is taken to respect Copyright of the materials within the archives where the identification of the Copyright holder is clear and, where feasible, to contact the ' originators. For questions please contact soil.isric(â)wur.nl indicating the item reference number concerned. I GEOLOGY OF THE NAKURU-THOMSON'S FALLS- LAKE HANNINGTON AREA DEGREE SHEET No. 35 S.W. QUARTER AND 43 N.W. QUARTER (with coloured maps) by G. J. H. McCALL, B.Sc, A.R.C.S., Ph.D., D.I.C., F.G.S. Geologist |5*9> FOREWORD This report covers nearly 2,500 square miles of the central sector of the Great Rift Valley and its eastern shoulders, an area of great diversity of topography and rock-types in which are to be found many vital clues as to the origin and age of the rift. Dr. McCall's pains­ taking work in describing and unravelling all the evidence contained in this region therefore makes up a volume which is somewhat larger than the normal reports of the Geological Survey, but will nevertheless be of absorbing interest to geologists and geomorphologists.
    [Show full text]
  • Block 12A Seismic
    Earthview Geoconsultants Ltd. ENVIRONMENTAL IMPACT ASSESSMENT PROJECT REPORT FOR PROPOSED OIL AND GAS SEISMIC PROJECT IN BLOCK 12A: PARTS OF TURKANA EAST, EAST POKOT, MARAKWET WEST, BARINGO CENTRAL, MARIGAT, KEIYO SOUTH, BARINGO NORTH, MOGOTIO AND SAMBURU DISTRICTS BY TULLOW KENYA B.V. Prepared by EarthView GeoConsultants Limited P.O. BOX 10366-00100, Nairobi, Kenya Tel: 254-20-2496208 Email: [email protected] SEPTEMBER 2011 Block 12A: EIA project report for TKBV Earthview Geoconsultants Ltd. PROJECT REPORT FOR ENVIRONMENTAL IMPACT ASSESSMENT OF THE PROPOSED OIL AND GAS SEISMIC SURVEY PROJECT IN BLOCK 12A: PARTS OF TURKANA EAST, EAST POKOT, MARAKWET WEST, BARINGO CENTRAL, MARIGAT, KEIYO SOUTH, BARINGO NORTH, MOGOTIO AND PART OF SAMBURU DISTRICTS SEPTEMBER 2011 Block 12A: EIA project report for TKBV Earthview Geoconsultants Ltd. EXECUTIVE SUMMARY Tullow Kenya B.V. (TKBV) holds an Exclusive Prospecting Right (EPR) over Block 12A, which covers nine districts (Turkana East, East Pokot, Marakwet West, Baringo Central, Marigat, Keiyo South, Baringo North, Mogotio and part of Samburu Districts) in northwest Kenya. The main objective of the seismic survey is to study in detail the assigned area of 15389.39km2, in accordance with the contractual obligations under the Production Sharing Agreement (PSC) signed with the Kenya Government on 17th September 2008 in order to delineate potential hydrocarbon prospects. This Environmental Impact Assessment Project Report has been prepared for TKBV, in accordance with the objectives established by the Environmental Management and Coordination Act (EMCA) of 1999, and subsequent related regulations. Seismic surveys are a primary tool utilized during the exploration of hydrocarbons in both onshore (land) and offshore (marine) areas.
    [Show full text]