<<

A COMPANY OF

West of Shoreline Management Plan 2 and Ynys Enlli to the Great Orme Coastal Group

Section 6 Summary and Comparison of Policy

( coastline only)

November 2011 Final 9T9001 Document title West of Wales Shoreline Management Plan 2 Cardigan Bay and Ynys Enlli to the Great Orme Coastal Group Section Section 6 Summary and Comparison of Policy Document short title West of Wales SMP2 Status Final Date November 2011 Project name West of Wales SMP2 Project number 9T9001 Client Pembrokeshire County Council Reference 9T9001/RSection6v4/303908/PBor

Drafted by Gregor Guthrie and Victoria Clipsham

Checked by Greg Guthrie Date/initials check 11/11/11 Approved by Client Steering Group Date/initials approval 29/11/11 INTRODUCTION AND PROCESS

Section 1 Section 2 Section 3 Introduction to the SMP. The Environmental The Background to the Plan . Principles Assessment Process. . Historic and Current Perspective . Policy Definition . Sustainability Policy . The Process . Thematic Review

Appendix A Appendix B SMP Development Stakeholder Engagement

PLAN AND POLICY DEVELOPMENT

Section 4 Appendix C Introduction Appendix E Coastal Processes . Approach to policy development Strategic Environmental . Division of the Coast Assessment (including Appendix D Theme Review and the Estuary Assessment Issues and Objective Evaluation and Scenario Testing) Appendix F Economic Assessment

Coastal A Coastal B Coastal C St Ann’s Head to Strumble Head Strumble Head to New Quay Head New Quay Head to Sarn Gynfelyn (PDZs 1, 2 & 3) (PDZs 4, 5 & 6) (PDZs 7, 8 & 9) Description Description Description Coastal Process Summary Coastal Process Summary Coastal Process Summary Baseline Scenarios Baseline Scenarios Baseline Scenarios Discussion Discussion Discussion Management Summary Management Summary Management Summary

Coastal D Coastal E Coastal F Sarn Gynfelyn to Trwyn Cilan Trwyn Cilan to Carreg Ddu and Conwy (PDZs 10, 11, 12 & 13) (PDZ 14) (PDZS 15, 16 & 20) Description Description Description Coastal Process Summary Coastal Process Summary Coastal Process Summary Baseline Scenarios Baseline Scenarios Baseline Scenarios Discussion Discussion Discussion Management Summary Management Summary Management Summary

Coastal G Appendix G Ynys Mon (excluding the Menai Strait) Appendix H Habitats Regulation (PDZs 17, 18 & 19) Water Framework Assessment . Description Directive (WFD) . Coastal Process Summary . Baseline Scenarios . Discussion . Management Summary

OVERVIEW Section 5 Section 6 Overview of the Plan Summary and comparison of policy

Section 7 Action Plan 6 Summary and Comparison of Policy

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 Final CONTENTS

Page

6 POLICY SUMMARY 1 6.1 Introduction 1 6.1.1 Presentation of Information 1 6.1.2 Definition of Policies 2 6.2 Summary of Policies 4

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final November 2011

6 POLICY SUMMARY

6.1 Introduction

6.1.1 Presentation of Information

This section presents summary tables of the policies for the whole area covered by the Shoreline Management Plan. In developing the Plan, the coast has been spit into 7 general Coastal Areas. Within each Coastal Area the detail of the Plan has been considered within Policy Development Zones (PDZ). How the coast has been divided is explained in Section 4 and this is summarised below:

Coastal Area A - St Ann’s Head to Strumble Head  PDZ1 – St Ann’s Headland  PDZ2 – St Bride’s Bay  PDZ3 – South Cardigan Bay

Coastal Area B - Strumble Head to New Quay Head  PDZ4 – Fishguard Bay  PDZ5 – Teifi Estuary  PDZ6 – South Ceredigion

Coastal Area C - New Quay Head to Sarn Gynfelyn  PDZ7 – New Quay Bay  PDZ8 – Aberaeron Plateau  PDZ9 – Aberystwyth

Coastal Area D - Sarn Gynfelyn to Trwyn Cilan  PDZ10 – Dyfi Estuary  PDZ11 –  PDZ12 – Coastal  PDZ13 – Four Bays

Coastal Area E - Trwyn Cilan to Carreg Ddu  PDZ14 – West Llŷn Peninsula

Coastal Area F - Menai Strait and Conwy  PDZ15 – North Bays  PDZ16 – Menai Strait  PDZ20 – Conwy

Coastal Area G - Ynys Mon (excluding the Menai Strait)  PDZ17 – Holy Island and West  PDZ18 – North Anglesey  PDZ19 – East Bays, Anglesey

The plan is developed within each PDZ and policies set for individual sections of the coast: Policy Units (PU). These policies can change over the three epochs of the plan

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.1 - November 2011 to allow management of the coast to evolve. Also, in setting Individual policies, it has to be recognised that these cannot be treated in isolation. The policy in one section of the coast may depend on how the adjacent sections of coast are proposed to be managed. The policy units are, therefore, grouped into Management Areas (MA). This is shown schematically in the figure below.

Policy unit 1.1

MA 1 Policy unit 1.2 PDZ 1

Policy unit 1.3 MA 2 Coastal Policy unit 1.4 Area A Policy unit 2.1

MA 3 Policy unit 2.2

Policy unit 2.3 PDZ 2

Policy unit 2.4 MA 4

Policy unit 2.5

6.1.2 Definition of Policies

For each PU an assessment has been made of the preferred management policy to be implemented over three future epochs, namely: from now through to 2025; to 2055; and to 2105. Although given as specific years, this time scale is indicative and may be best interpreted as short term (typically over the next 20 years), medium term (typically over a period from twenty to fifty years) and long term (through to the 100 years nominally considered by SMP2). The intention is that management and the change in management would be a continuous process and dictated largely by such aspects as: . The need for major investment in further defence . The response of the coast, which would be monitored. . The need to resolve issues associated with adaptation.

Climate change and, in particular, sea level rise may be a significant factor in determining when policy may change.

The management policies under consideration are defined by Defra guidance on the production of SMPs and can be classified as follows:

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.2 - Final SMP Policy Abbreviation Definition SMP Policy Abbreviation Definition Maintain or upgrade the level of protection provided by defences Hold the Line HTL or the natural coastline. No Active A decision not to invest in providing or maintaining defences or NAI Intervention management of the coast. Managed Manage the coastal processes to realign the ‘natural’ coastline MR Realignment configuration, either seaward or landward of its present position. Advance the A decision to build new defences seaward of the existing A Line defence line where significant land reclamation is considered.

For further clarification of these policies reference should be made to Section 1 of the SMP document. It is, however, recognised that there may be significant overlap between policies; holding the line may still require some adjustment in the manner in which a risk is managed. How these polices are interpreted for any section of the coast is discussed in Section 4, together with a discussion of what issues may require change in management from one epoch to another.

Even so the policies provide a useful headline definition of the policy and the change in policy from one epoch to another. Section 6.2 of this document provides an overview of all policies, highlighting where there is a proposed change from the way in which the coast is managed at present. The With Present Management scenario is taken as being that defined within SMP1, updated in areas by subsequent strategies and studies.

These summaries are presented as an easily accessed reference. For further detail as to the full intent of the Plan in any area, these summaries have to be read in conjunction with the information presented in Section 4 of the SMP document.

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.3 - November 2011 Key: HTL - Hold The Line, A - Advance the Line, NAI – No Active Intervention MR – Managed Realignment Key: DN – do nothing, HTL – Hold The Line, SHTL – Selectively Hold The Policies in Black Italics indicate where present management is an undefended coast and the preferred policy is NAI for the next three Line, R – Retreat, deferred – subject to further monitoring or study. epochs Where there is a significant change in policy compared to that defined in SMP1, the policy is Where the policy defined by SMP1 has changed , the policy is shaded shaded

Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 Dyfi Junction to Gogarth 20 PU10.10 valley . MR MR MR 1.1 DN Halt

PU10.11 Gogarth HTL HTL HTL

1.2 Gogarth Halt to Penhelig HTL Management of road and rail PU10.12 Dyfi North HTL HTL HTL defences

PU10.13 HTL HTL HTL 2.1 Aberdyfi HTL

Support natural dune defence and PU10.14 Aberdyfi Dunes MR MR MR 2.2 Aberdyfi Golf Course R adapt use within the Golf Course

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.4 - Final Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105

Allow natural function of the PU10.15 Penllyn seaward face. Maintain defence to MR MR MR 2.3 Penllyn R the railway line and road.

PU10.16 HTL HTL HTL 2.4 Tywyn HTL Strategy for HTL. Consideration of future managed Recently realignment to entrance to the completed scheme PU10.17 Dysynni railway HTL HTL HTL 2.5 Morfa Gwyllt HTL Dysynni to Tywyn

PU10.18 Dysynni Estuary Developed with land owners HTL MR MR Not previously included

3.1 PU10.19 MR MR NAI Tonfanau DN

This relates specifically to defence 11 21 PU11.1 Rola HTL HTL HTL 3.2 Rola HTL of the railway line. This realignment is in relation to facilitating realignment of land PU11.2 MR MR MR 3.3 Llwyngwril R use, with the intent to maintain the natural function of the shoreline.

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.5 - November 2011 Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105

PU11.3 Cliffs HTL HTL HTL 3.4 Friog Cliffs HTL

PU11.4 Ro Wen coast HTL MR NAI This would involve relocation of Current strategy PU11.5 Ro Wen Spit property owners and businesses MR MR NAI 3.5 Ro Wen HTL for improvement of from Fairbourne defence PU11.6 HTL MR NAI Embankment This refers to the railway line PU11.7 Friog HTL HTL HTL Not previously included 22 behind Fairbourne. This would secure a cut off PU11.8 Morfa Mawddach defence to the back of the area to HTL HTL HTL the rear of Fegla Islands. Local consideration would be 4.1 Morfa Mawddach HTL PU11.9 Fegla given to defence of properties on HTL MR MR the Fegla Islands and to

23 PU11.10 Mawddach south MR MR MR

PU11.11 HTL HTL HTL 4.2 Penmaenpool HTL

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.6 - Final Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 This would require further investigation and would not PU11.12 Upper estuary MR MR MR Not previously included preclude local management of defences. The intent is solely to manage risk PU11.13 Mawddach north MR MR MR 4.3 Glandwr DN to the road.

4.4 Barmouth Harbour HTL PU11.14 Barmouth South HTL HTL HTL

This may include relocation of PU11.15 Barmouth North HTL MR MR 24 properties 5.1 Barmouth HTL This needs to be considered in PU11.16 term of management to the above HTL HTL HTL policy unit. 25 PU11.17 Egryn Marsh MR NAI NAI

The approach would be 5.2 Sunnysands DN developed locally based on the PU11.18 Sunnysands MR MR MR demonstration of no impact on designated areas.

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.7 - November 2011 Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 The approach would be developed locally based on the PU11.19 Islawffordd MR MR MR demonstration of no impact on 5.3 Bennar DN designated areas..

PU11.20 Morfa Dyffryn NAI NAI NAI

Relocation of assets during epoch 12 26 PU12.1 Mochras NAI NAI NAI 2 Maintain control of the spit while 6.1 Shell Island DN PU12.2 Artro Southern Spit considering overall management HTL MR MR plan Local management of defences subject to developing a PU12.3 Artro Estuary South HTL MR MR management plan. The default Not previously included policy would NAI. Maintain defence to the road and PU12.4 Artro Estuary East HTL HTL HTL railway. Local management of defences subject to developing a PU12.5 Dunes MR MR MR 6.1 Shell Island DN management plan. The default policy would NAI.

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.8 - Final Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 Llandanwg PU12.6 HTL HTL HTL 6.2 Llananwg HTL Headland This would preclude any actions 27 PU12.7 Morfa to intervene with natural NAI NAI NAI processes. Develop a water level and spatial management plan, considering 6.3 Harlech DN drainage issues, potential for PU12.8 Harlech Valley habitat recreation and long term HTL HTL HTL sustainable management of flood risk at Lower Harlech

Realignment either to railway line PU12.9 in the north or to the old cliff line. HTL MR MR 7.1 Talsarnau DN

Briwet and Dwyryd PU12.10 Maintain toll road and railway line NAI NAI NAI Gorge Not Previously included Upper Dwyryd Local management of defences to PU12.11 MR NAI NAI Estuary maintain main roads

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.9 - November 2011 Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105

This might not preclude local PU12.12 private management of defences NAI NAI NAI 7.2 Port Merion DN Headland subject to normal approvals.

Further investigation of improving The Cob and PU12.13 defences to town as identified by HTL HTL HTL 7.3 Cob HTL Porthmadog the CFMP. Consideration of adapting road to PU12.14 Borth-y-Gest ensure long term safe access to HTL HTL HTL community PU12.15 Samson Bay NAI NAI NAI 28 Sustain natural dune defence with management of access. Develop 7.4 Blackrock sands HTL a long term management plan for adaptation within Holiday Park PU12.16 MR MR MR area and potential future requirement of management of flood risk to village,.

Criccieth Shingle Consideration of potential to 29 PU12.17 HTL MR MR 8.1 Shingle Bank HTL Banks realign the railway

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.10 - Final Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 Look to realign the shoreline to the frontage through development PU12.18 Criccieth Harbour of the Harbour pier and eastern HTL HTL MR end of The Esplanade to retain the beach. 8.2 Criccieth HTL PU12.19 Castle Headland NAI NAI NAI

PU12.20 Criccieth West . HTL HTL HTL

PU12.21 Y Dryll NAI NAI NAI 8.3 Y Dryll DN

PU12.22 Dwyfor Consider impact on railway MR NAI NAI 8.4 West DN 30 PU12.23 Glanllynnau Cliffs Maintain geological exposure NAI NAI NAI Concerns over long term PU12.24 sustainability. Consider possible HTL MR MR realignment in land of the railway. 8.5 Afon Wen HTL This might not preclude local PU12.25 Pen ychain east private management of defences NAI NAI NAI subject to normal approvals.

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.11 - November 2011 Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 Pen ychain and 13 PU13.1 western section of NAI NAI NAI 9.1 Morfa R the bay Subject to national consideration PU13.2 Abererch HTL MR MR of railway 9.2 Abererch HTL Allow buffer zone for natural PU13.3 Glan Y Don HTL HTL HTL behaviour of the dunes Harbour PU13.4 . HTL HTL HTL and entrance 9.3 Pwllheli Harbour A Spatial planning for potential long PU13.5 Pwllheli Centre HTL HTL HTL Area being term adaptation 31 considered within Allow and manage development PU13.6 South Beach HTL HTL HTL the Pwllheli Pilot of the dunes. Study. Detailed study to allow transition 9.4 Pwllheli South Beach DN PU13.7 Golf Course between Traeth Crugan and HTL MR MR South Beach Intent to create new entrance estuary to the Afon Penrhos and PU13.8 Traeth Crugan HTL MR MR 9.5 Traeth Crugan HTL to manage new defence to the core of Pwllheli This would not preclude local PU13.9 NAI NAI NAI 9.6 Llanbedrog DN management of the slipway area.

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.12 - Final Coastal Area D Sarn Gynfelyn to Trwyn Cilan SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105

PU13.10 Mynydd Tir cwmwd NAI NAI NAI 10.1 Mynydd Tir y Cwmwd DN

Progressive management of the PU13.11 The Warren HTL MR MR 10.2 The Warren HTL retreating shoreline Consider opening up tidal flooding PU13.12 of the Afon Soch and planning of HTL MR MR 32 future use of the entrance 10.3 Abersoch HTL Local private management of PU13.13 Penbennar HTL HTL HTL defences

PU13.14 Borth Fawr Central Opportunity for adaptation HTL MR NAI

This would not preclude local PU13.15 Machroes HTL MR NAI 10.4 Borth Fawr DN management of the road. Machroes PU13.16 NAI NAI NAI headland

PU13.17 St Tudwal’s islands NAI NAI NAI Not specifically included previously 33 PU13.18 Porth Ceiriad NAI NAI NAI 11.1 Porth Ceiriad DN PU13.19 Cilan Headland NAI NAI NAI

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.13 - November 2011 Coastal Area E Trwyn Cilan to Carreg Ddu SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 Mynydd Cilan 14 PU14.1 . NAI NAI NAI west Hells Mouth Local readjustment and dune PU14.2 NAI NAI NAI south management Hells Mouth 34 PU14.3 NAI NAI NAI 12.1 Porth Neigwl DN centre Hells Mouth PU14.4 Future realignment or loss of road NAI NAI NAI north

PU14.5 Rhiw NAI NAI NAI

35 PU14.6 Ysgo NAI NAI NAI 13.1 Porth Ysgo DN

Consider how the transition between PU14.7 East Aberdaron Village frontage and this NAI NAI NAI 13.2 Aberdaron East DN unit is managed to allow adaptation. Develop Managed Realignment within Aberdaron 36 a framework for sustainable PU14.8 Village and HTL MR HTL 13.3 Aberdaron HTL development of the village. Address coastal slope transport issues.

PU14.9 Mynydd Uwch NAI NAI NAI 13.4 Trwyn y Gwyddel DN

37 PU14.10 Ynys Enlli Consider adaptation to landing stage NAI NAI NAI 1/1 Ynys Enlli DN

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.14 - Final Coastal Area E Trwyn Cilan to Carreg Ddu SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 Trwyn y Gwyddell to 1/2 DN Port Dinllaen DN/DN( 1/2a Porth Oer Local management would not be MR) South West precluded to allow adaptation of use DN/DN( 38 PU14.11 NAI NAI NAI 1/2b Porth Lago Lleyn within a principle of allowing natural MR) evolution of the coast. Porth Colmon to Porth DN/DN( 1/2c Melyn MR) DN/DN( 1/2d Porth Tywyn MR)

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.15 - November 2011 Coastal Area F Menai Strait and Conwy SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105 Carreg Ddu to Overarching policy setting the base PU15.1 NAI NAI NAI Trwyn y Tal intent for the zone. This would require detailed planning Porth Dinllaen, for adaptation at Porth Dinllaen and 39 PU15.2 including Morfa HTL MR MR Porth Dinllaen to Porth managed retreat at the access at 1.3 SHTL Bodeilas Porth Nefyn Overarching policy setting the base PU15.3 HTL HTL MR West intent for the zone. Trwyn y Tal to 15 Overarching policy setting the base PU15.4 Trwyn Maen NAI NAI NAI intent for the zone. 1.4 Porth Bodeilas to Trefor DN Dylan A detailed local plan would be needed PU15.5 Trefor MR MR MR 1.5 Trefor SHTL 40 to sustain amenity value of the area.

Local management of the shingle PU15.6 bank and river discharge to sustain MR MR MR 1.6 Trefor to SHTL natural defence of the area.

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.16 - Final Coastal Area F Menai Strait and Conwy SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105

This would not preclude maintenance of private defence during the first 16 PU16.1 Pontllyfni NAI NAI NAI epoch. Review flood risk to main road and sewage works

Pontllyfni to PU16.2 Maintain sediment supply to the north NAI NAI NAI Dinas Dinlle Manage transition between Dinas Dinlle Head and open coast with the 41 PU16.3 Dinas Dinlle HTL MR MR 1.7 Dinas Dinlle HTL intent to manage flood risk to village on higher ground. Develop management to self sustaining dune frontage. This would Dinas Dinlle to Fort PU16.4 Morfa Dinlle not specifically preclude management MR MR NAI 1.8 SHTL Belan of the local area at subject to normal approvals. Manage flood defence initially with the PU16.5 Foryd Bay intention of returning the bay to a HTL MR NAI 5.1b Foryd Bay SHTL naturally functioning system.

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.17 - November 2011 Coastal Area F Menai Strait and Conwy SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105

Subject to highway funding, with Ffordd Yr Aber Fort Belan to Port PU16.11 future adaption of property and HTL HTL MR 5.1 SHTL to Afon Carogg. Dinorwic (both sides) access.

Review the need for raising defence, PU16.12 co-ordinated with fluvial flood HTL HTL HTL 5.1c Caernarfon HTL management. 43 Waterloo Port to This would not preclude local Fort Belan to Port PU16.13 Glan y Mor -Y management through private funding NAI NAI NAI 5.1 SHTL Dinorwic (both sides) Felinheli subject to normal approvals.

PU16.14 Review flood risk with sea level rise. HTL HTL HTL 5.1d Port Dinorwic HTL

Port Dinorwic to Glan-y-mor PU16.15 NAI NAI NAI 5.2 Britannia Bridge (both SHTL Lodge to Bridge sides) Britannia Bridge to 45 PU16.26 Bridge to Garth NAI NAI NAI 5.3 Menai Bridge (both SHTL sides) Garth Point and Bangor Pier to Port PU16.27 . HTL HTL HTL 5.8 HTL Dock Yard Penrhyn (Hirael Bay) Consider options for re-development PU16.28 Hirael HTL HTL MR and flood proofing.

9T9001/RSection6v4/303908/PBor West of Wales SMP2 November 2011 -6.18 - Final Coastal Area F Menai Strait and Conwy SMP 2: Summary of Policies Previous Policy (SMP1) Studies since SMP2 Policy Boundaries Preferred Policies MU Location Policy SMP1 PDZ MAN PU Policy Name Policy Comments 2025 2055 2105

PU16.29 Porth Penrhyn Subject to alternative funding. HTL HTL HTL

Penrhyn PU16.30 NAI NAI NAI Headland to PU16.31 NAI NAI NAI Madryn Afon Ogwen to Adapt defences to maintain natural 46 6.2 Llanfairfechan (Lavan DN sediment drift with long term intent to PU16.32 Afon Aber MR MR HTL Sands) protect transport route from potential flooding.

West of Wales SMP2 9T9001/RSection6v4/303908/PBor Final -6.19 - November 2011