SPOT Pre-6 Division 6

Total Page:16

File Type:pdf, Size:1020Kb

SPOT Pre-6 Division 6 SPOT Online Specific Improvement Local comments (from Design notes from Coordination SpotID Project Category ROUTE Cross Street To Street First MPO/RPO First Division TTS Notes Description provided by Requestor Analysis Team Recommendation Design Comments Response to Requestor Submitter Type SPOT online) calls with MPOs/RPOs/DOT US 74/76 BUS @ SR 1005 ‐ Construct a US 76 BUS, US 74 BUS, NC SR 1005 (Peacock 10 ‐ Improve Will analyze and report H184044 Cape Fear RPO Regional Impact Cape Fear RPO Division 6 ‐19000 roundabout on US 74/64 BUS/NC 130 As requested 1 Lane Roundabout 130 (Chadbourn Hwy) Rd) Intersection travel time savings (Chadbourn Hwy) at SR 1005 (Peacock Hwy). What is different this time? H170193 analyzed from 701 to Pireway. This request is from Pireway to 5th Street (NC 410). They also US 701 BYP ‐ Widen US 701 Bypass to a 4‐lane US 701 Superstreet for intersections of US requested H184206 that goes to Joe Brown Hwy. R‐5952 only for Directional Cross‐Over Superstreet at Pireway and 5th SR 1305 4 ‐ Upgrade Arterial superstreet from R‐5952 at SR 1503 (Complex Will analyze and report H184205 Cape Fear RPO Regional Impact US 701 BYP BUS/NC 410 Cape Fear RPO Division 6 68000 701 with 5th and Pireway (R‐5952 Complex and 701? Have model Have counts. Expand Complex St OD. with 1‐Lane Bulb Outs Street. Discuss further with (Complex St) to Superstreet St) to US 701 Business/NC 410 (E 5th St) in travel time savings (E 5th St) was just for 701 and Complex) Take H170193 model, extend model to include NC 410 Bus (5th Street). (Superstreet) team. Tabor City Add 1 link to matrix. In build, superstreet Pireway and 5th. DTA project. 10 ‐ Improve Capital Area Will analyze and report H184385 Capital Area MPO Regional Impact NC 55 Broad Street Division 6 ‐254000 Construct roundabout As requested 1 Lane Roundabout Intersection MPO travel time savings Add dedicated right turn lane from NC WB NC 210 approaching NC 55, Add turning lanes and extend existing turning Add dedicated right turn lane from NC 210 WB at NC 55 and extend NC 10 ‐ Improve Capital Area 210 WB at NC 55 and extend NC 210 Will analyze and report backs up. RT blocks through. H184395 Capital Area MPO Regional Impact NC 55, NC 210 NC 210 Division 6 257000 lanes or other improvements recommended 210 WB left turn lane, also interested in any other recommendations Add 2 turn lanes Intersection MPO WB left turn lane. Add others as travel time savings Ok to remove parking to add by NCDOT by NCDOT – (project submitted on behalf of Division 6) needed. turn lanes. When we evaluated the No Build operations, we did not see any significant congestion at these intersections. Therefore, while the Connects to H184329. US 401 convert to 4 lane superstreet from Buck Rawls Build condition does show reduced Upgrade existing US 401 corridor to 4 lane 3 intersection superstreet analysis 4 ‐ Upgrade Arterial Capital Area Road at Central Carolina Comm College to Rawls Church Road – (project Will analyze and report H184397 Capital Area MPO Regional Impact US 401 Buck Road Church Division 6 27000 delays along US 401, the rerouted superstreet from Buck Road to Rawls Church (McKinney, Pine State, US 421). #N/A Have model for NC 210/US 401 to Superstreet MPO submitted on behalf of Division 6). 2 signals, one included in quadrant travel time savings Road movements from the side streets Road Coordination with RPO required. for H184329. Recommend submitting as a widening. create an additional overall travel times. This is particularly noticeable at the NC 210 intersection where around 600 – 1,000 vehicles were rerouted. NC 41 (Martin Luther King At the Jr Drive), NC 72 (West intersection of 10 ‐ Improve Lumber River Will analyze and report H184211 Division 6 Regional Impact Second St), SR 1599 Division 6 102000 Construct a roundabout Convert to roundabout Use model from P060007. Update for new OD calc method. 1 Lane Roundabout NC 41, NC 72 and Intersection RPO travel time savings (Martin Luther King Jr SR 1599 Drive) 10 ‐ Improve Mid‐Carolina Show what would be needed Will analyze and report Would be included in TIP H184258 Mid‐Carolina RPO Regional Impact US 301, US 421 Division 6 102000 Upgrade intersection No room for improvements Add 3 turn lanes Intersection RPO assuming road could be widened travel time savings project. Not in 1st 5 years. Intersection of Convert to quadrant intersection. CM 10 ‐ Improve Mid‐Carolina Will analyze and report At‐grade Quadrant (1 H184329 Mid‐Carolina RPO Regional Impact US 421, US 401 US 421 at US 401 Division 6 6000 Upgrade intersection. team to select location of quadrant Connects to H184397. Have previous analysis. Run cap X 1st. Intersection RPO travel time savings quadrant) in Lillington facility. Page 1.
Recommended publications
  • SIMULATION of DIFFERENT INTERSECTION DESIGN for IMPROVING TRAFFIC FLOW with FACTORS CONSIDERING LOCATION, POPULATION and DRIVER EXPECTANCY Sourabh Kumar Singh Dr
    Science, Technology and Development ISSN : 0950-0707 SIMULATION OF DIFFERENT INTERSECTION DESIGN FOR IMPROVING TRAFFIC FLOW WITH FACTORS CONSIDERING LOCATION, POPULATION AND DRIVER EXPECTANCY Sourabh Kumar Singh Dr. Anil kunte Associate Professor, Research Scholar, Associate Professor, Department of Civil Department of Civil Department of Civil Engineering Engineering, Shri JJT Engineering, Shri JJT Noida International University University University Dr. Paritosh Srivastava Abstract: In today’s economic growth the vehicular traffic is increasing day by day, which leads to failure of intersections before their time period. To increase the efficiency of these failed intersections the engineers added lanes to the existing major and minor roads, but this method do not give results which it used to deliver in the past, hence other methods were adopted. So to increase the efficiency and fulfil the criteria for successful intersection ,to cape with it several intersection are designed which are unconventional in nature like jug handle, bow tie, continuous flow intersection and median u turn which are very effective in increasing green time on highway and minor roads. The software used in this study is Auto- cad for planning and drawing purpose which can be used in sim-traffic software which will be used for simulation purpose of the traffic flow on different designs of intersections. The factors which are considered in this study are -location of town centre, population of the zone and driver expectancy. The final conclusion of this study is that continuous flow intersection provides the best results when the traffic is increased. The construction cost is least in median u turn and giving maximum result than all other intersections.
    [Show full text]
  • Median U-Turn Intersections Cost
    System Modification Innovative Intersections MEDIAN U-TURN INTERSECTIONS COST TIME MODERATE STATE MINOR STREET MINOR STREET O REGI NAL IMPACT LOCAL RID OR OR MAJOR STREET MAJOR STREET C PT HO HURDES MAJOR STREET MOVEMENTS MINOR STREET MOVEMENTS CITSTATE RIHT-O-A PUIC ACCEPTANCE More Information: tti.tamu.edu/policy/how-to-fix-congestion SUCCESS STORIES Description How Will This Help? Plano, Texas. In 2011, the City Median U-turn intersections (also called • Costs less and is faster to of Plano installed the state’s only a thruturn or Michigan left) guide all traf- deploy than other innovative median U-turn intersection at fic, except left-turning vehicles, through intersection designs. Legacy Drive and Preston Road. the main intersection. Left-turning vehi- • Simplifies the traffic signal cles turn through U-turn openings in the The intersection timings for the intersection and dramatically improved median beyond the main intersection. whole corridor by eliminating the congestion by reducing Eliminating the left turn at the main need for a left-turn arrow. intersection wait intersection simplifies signal timings and times by 65%. provides more green time and less con- • Increases safety at the gestion to the major direction. intersection by eliminating traffic However, the design conflicts caused by left turns. was abandoned in 2014 Median U-turn intersections are similar due to a lack of public to superstreets but differ in that medi- Implementation Issues understanding and an U-turns allow minor street traffic to This intersection design can require acceptance. pass straight through the intersection. additional right-of-way to accommodate Superstreet intersections require all the U-turn turning radius in the median.
    [Show full text]
  • In Safe Hands How the Fia Is Enlisting Support for Road Safety at the Highest Levels
    INTERNATIONAL JOURNAL OF THE FIA: Q1 2016 ISSUE #14 HEAD FIRST RACING TO EXTREMES How racing driver head From icy wastes to baking protection could be deserts, AUTO examines how revolutionised thanks to motor sport conquers all pioneering FIA research P22 climates and conditions P54 THE HARD WAY WINNING WAYS Double FIA World Touring Car Formula One legend Sir Jackie champion José Maria Lopez on Stewart reveals his secrets for his long road to glory and the continued success on and off challenges ahead P36 the race track P66 P32 IN SAFE HANDS HOW THE FIA IS ENLISTING SUPPORT FOR ROAD SAFETY AT THE HIGHEST LEVELS ISSUE #14 THE FIA The Fédération Internationale ALLIED FOR SAFETY de l’Automobile is the governing body of world motor sport and the federation of the world’s One of the keys to bringing the fight leading motoring organisations. Founded in 1904, it brings for road safety to global attention is INTERNATIONAL together 236 national motoring JOURNAL OF THE FIA and sporting organisations from enlisting support at the highest levels. over 135 countries, representing Editorial Board: millions of motorists worldwide. In this regard, I recently had the opportunity In motor sport, it administers JEAN TODT, OLIVIER FISCH the rules and regulations for all to engage with some of the world’s most GERARD SAILLANT, international four-wheel sport, influential decision-makers, making them SAUL BILLINGSLEY including the FIA Formula One Editor-in-chief: LUCA COLAJANNI World Championship and FIA aware of the pressing need to tackle the World Rally Championship. Executive Editor: MARC CUTLER global road safety pandemic.
    [Show full text]
  • Interchange Modification Report
    INTERSTATE 75 AND STATE ROAD 884 (COLONIAL BOULEVARD) INTERCHANGE LEE COUNTY, FLORIDA INTERCHANGE MODIFICATION REPORT Prepared for: Florida Department of Transportation – District One February 2015 Interchange Modification Report Interstate 75 and State Road 884 (Colonial Boulevard), Lee County, Florida I, Akram M. Hussein, Florida P.E. Number 58069, have prepared or reviewed/supervised the traffic analysis contained in this study. The study has been prepared in accordance and following guidelines and methodologies consistent with FHWA, FDOT and Lee County policies and technical standards. Based on traffic count information, general data sources, and other pertinent information, I certify that this traffic analysis has been prepared using current and acceptable traffic engineering and transportation planning practices and procedures. ______________________________ Akram M. Hussein, P.E. #58069 ______________________________ Date TABLE OF CONTENTS Page SECTION 1 EXECUTIVE SUMMARY ......................................................................... 1-1 SECTION 2 PURPOSE AND NEED .............................................................................. 2-1 SECTION 3 METHODOLOGY ...................................................................................... 3-1 SECTION 4 EXISTING CONDITIONS ......................................................................... 4-1 4.1 DATA COLLECTION METHODOLOGY ........................................................................ 4-5 4.2 TRAFFIC FACTORS .........................................................................................................
    [Show full text]
  • Intersection and Interchange Geometrics PROJECT CASE STUDY
    Intersection and Interchange Geometrics PROJECT CASE STUDY For North Carolina, Implementation of Superstreets Means Travel Time Improvement, Reduction in Collisions, and Fewer Injuries and Fatalities Increasing traffic delays at intersections are a common problem faced by Departments of Transportation (DOTs) across the nation. North Carolina is making strides in tackling delays in suburban, high-volume arterial areas through the implementation of “superstreets,” also known as restricted crossing U-turns (RCUTs). These arterial surface roads can move high-traffic volumes with less delay by re-routing left-hand turns and crossing maneuvers coming from the side streets. Instead, at an RCUT, drivers make a right turn onto the major highway and then make a U-turn through a median. While this may seem time-consuming, studies show it can result in significant time savings. At signalized intersections, the overall time savings efficiencies are due to the ability of the major highway to have a greater percentage of green time to allow the heavy through volumes of traffic to proceed. At unsignalized intersections, traffic from the minor street may actually save time since drivers are not stuck waiting for the long traffic gaps needed to go across the bust thoroughfare or make the left-hand turn. North Carolina has deployed the superstreet concept at intersections across the state, including a corridor of signalized intersections along U.S. Route 17 near Wilmington. BENEFITS OF SUPERSTREETS Safety Travel Time Economic Development Fewer conflict
    [Show full text]
  • GRE-35-4.40 Superstreets
    GRE-35-4.40 Superstreets Keith Smith, P.E. District 8 Environmental Engineer Project Manager John R. Kasich, Jerry Wray, Ohio Governor ODOT Director Project Background • 2004 Miami Valley Regional Planning Commission and ODOT completed the Greene 35 Corridor Study • Replace last 3 intersections on US 35 between Dayton and West Virginia carrying 40,000 vpd with 10% trucks • 2007 ODOT begins Preliminary Engineering studies on the configuration of interchanges to meet the needs of the traveling public while addressing local accessibility concerns • $120M solution is not obtainable it this time • In recognition of the importance of this corridor and the associated safety and congestion issues we are proposing an interim solution – conversion of the existing signalized intersections into signalized “Superstreets”. Freight Impact • 23,700 Tons of Freight per day • $71.75 Million per day • 20 hours of delay per peak hour for trucks • 100 hours of delay of commerce per day Recent Activities • TRAC Presentation – October 2015 Request for funding • Preliminary Development of Superstreet as an Interim Solution • Determine funding sources • Where do we go from here?? Interim Solution – Superstreets • Meets Project Purpose and Need • Improve Congestion & Safety • Fundable Solution • Approximately $5M per intersection • Project could potentially be funded through ODOT, Local and MVRPC funding sources • Provides Solution Commensurate with Cost • 1/10 th of ultimate project and will perform better than the existing signals for many years while interchange development and construction funding is pursued. What is a Superstreet • It is a non-traditional signalized intersection that can provide more capacity than a traditional traffic signal (like the one at Factory Road).
    [Show full text]
  • Superstreet Arterial Management (SSAM)
    Presented By: © Stephen E. Meyer, MSc, P.E. SSAM President, Superstreet Arterial Management System Meyer Transportation For Congested Corridors Consultants, Inc. red Meyer Transportation TSITETSITE Spring Spring Meeting Meeting 2015 Consultants, Inc. Today’s Agenda • SSAM © - What is it? • How can SSAM © be applied? • Pros and cons of SSAM © • Is SSAM © good for your client/city • SSAM © concept in Huntsville, Alabama Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. © SSAM - What is it? • Primarily used on multilane median divided arterials • Features limited access control • Minimizes arterial median openings • Reduces intersection conflict points by using indirect turns • Reduces the number of phases required at intersections • Increases available phase time for the major arterial Conventional 4-legged Intersection Superstreet Intersection Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. SSAM © - What is it? • Primary used on multilane median divided arterials • Features limited access control • MinimizesThe Results arterial median openings • Reduces• Improved intersection safety conflict points by using indirect turns • Reduced delay and congestion • Reduces the number of phases required at intersections • Increases available phase time for the major arterial Conventional 4-legged Intersection Superstreet Intersection Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. Superstreet Typical Intersection Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. Superstreet vs 4-legged Intersection How many conflict points? Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. 32 Conflict Points Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc. SSAM © - What is it? Intersection geometry AND WHAT? Restricted Crossing U-Turn (RCUT) Meyer Transportation TSITE Spring Meeting 2015 Consultants, Inc.
    [Show full text]
  • E John Street
    E JOHN STREET/ OUTER LOOP AREA SMALL AREA PLAN *DRAFT* Revised: 9-14-16 DL 10-7-16 9-21-16 DL 10-10-16 9-29-16 10-5-16 KI 10-6-16 Page 171 INTRODUCTION The land area around E John Street, south of I-485 and extending up to the CSX rail line, is one of the last large mostly- vacant sectors within the Town of Matthews. In the near future, this property is expected to become prime for development as E John Street/Old Monroe Rd is improved and widened. Planning the future conceptual build-out of this area therefore must be strategic and intentional. This study builds on the recommendations and strategies for this sector set forth in Chapter 4 of the Land Use Plan. This plan will create a vision for appropriate density of development for the study area and will provide recommendations for implementing the vision. This plan also identifies unique opportunities for development here due to the proximity to established neighborhoods, Central Piedmont Community College, the Mecklenburg County Sportsplex, and the future Entertainment District. Page 172 BACKGROUND The E John Street/Outer Loop Small Area Plan was determined by the Matthews Town Board of Commissioners in 2015 to be the top priority section of our jurisdiction to have an in-depth study prepared in advance of the expected E John St/Old Monroe Rd widening project. NCDOT intends to widen E John Street from Downtown Matthews to the Mecklenburg-Union County line where the street name changes to Old Monroe Rd as the widening continues to Wesley Chapel-Stouts Road in Indian Trail between the years 2022 and 2024.
    [Show full text]
  • Evaluation of Innovative Alternative Intersection Designs in the Development of Safety Performance Functions and Crash Modification Factors
    Final Report Contract BDV24-977-27 Evaluation of Innovative Alternative Intersection Designs in the Development of Safety Performance Functions and Crash Modification Factors Mohamed A. Abdel-Aty, Ph.D., P.E. Jaeyoung Lee, Ph.D. Jinghui Yuan, Ph.D. Lishengsa Yue, Ph.D. Ma’en Al-Omari, Ph.D. Student Ahmed Abdelrahman, Ph.D. Student University of Central Florida Department of Civil, Environmental & Construction Engineering Orlando, FL 32816-2450 May 2020 DISCLAIMER “The opinions, findings, and conclusions expressed in this publication are those of the authors and not necessarily those of the State of Florida Department of Transportation.” ii UNITS CONVERSION APPROXIMATE CONVERSIONS TO SI UNITS SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL LENGTH in inches 25.4 millimeters mm ft feet 0.305 meters m yd yards 0.914 meters m mi miles 1.61 kilometers km SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL AREA in2 square inches 645.2 square millimeters mm2 ft2 square feet 0.093 square meters m2 yd2 square yard 0.836 square meters m2 ac acres 0.405 hectares ha mi2 square miles 2.59 square kilometers km2 WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL SYMBOL VOLUME fl oz fluid ounces 29.57 milliliters mL gal gallons 3.785 liters L ft3 cubic feet 0.028 cubic meters m3 yd3 cubic yards 0.765 cubic meters m3 NOTE: volumes greater than 1000 L shall be shown in m3 SYMBOL WHEN YOU KNOW MULTIPLY BY TO FIND SYMBOL MASS oz ounces 28.35 grams g lb pounds 0.454 kilograms kg iii T short tons (2000 lb) 0.907 megagrams (or Mg (or "t") "metric ton") SYMBOL WHEN YOU KNOW
    [Show full text]
  • Jughandle Intersection
    TRAFFIC PERFORMANCE OF TECHBRIEF THREE TYPICAL DESIGNS OF NEW JERSEY JUGHANDLE INTERSECTIONS Publication No.: FHWA-HRT-07-032 FHWA Contact: Joe Bared, HRDS-05, 202–493–3314, or Wei Zhang, HRDS-05, 202–493–3317 Objective Although New Jersey jughandle intersections (NJJIs) have been around for over five decades, researchers have not yet developed a simplified procedure to evaluate their traffic performance and compare them with conventional at-grade intersections. A limited number of studies have reported qualitative and quantitative comparisons of NJJIs. There have been, however, no readily available tools for traffic engineers and planners to estimate average delays, average numbers of stops, and maximum queues. For this study, researchers used VISSIM simulations to model typical geometries over a wide distribution of traffic flow conditions for three NJJI design. Comparisons of NJJIs with conventional intersections for similar volume conditions revealed that NJJIs produced lower average intersection delays and higher intersection capacities for near-saturated traffic conditions and similar traffic performance for undersaturated conditions. Practitioners can use statistical models documented in this study to assess average intersection delays, average number of stops per vehicle, and maximum queue lengths for three types of NJJIs. Figure 1. Forward/reverse NJJI on Jackson Avenue in Pequannock Township, NJ (2). Research, Development, and Technology Turner-Fairbank Highway Research Center 6300 Georgetown Pike McLean, VA 22101-2296 www.tfhrc.gov data. Results from raw data indicated that Introduction conventional intersections tended to have High-volume intersections (especially during more head-on, left-turn, fatal plus injury, and peak hours) pose a particularly difficult property damage only accidents, and challenge to traffic engineers and planners relatively fewer rear-end accidents than interested in reducing delays and improving NJJIs.
    [Show full text]
  • Superstreets SUPERSTREETS
    System Modification Geometric Design Superstreets SUPERSTREETS Description A "superstreet" has intersections in which the minor cross-street traffic is prohibited from going straight through or left at a divided highway intersection. The minor cross street traffic must turn right but can then access a U- turn located in the median to proceed in the desired direction. Doing this reduces the number of traffic signal phases required to move traffic through the intersection thereby allowing for longer green times on the major roadway and Alamo RMA thus reducing congestion caused by the signals. Superstreets are best for an arterial intersection Cost: with a low-volume cross-street and a need to Time: Moderate maintain large throughputs on the major road. Impact: Corridor Target Market Who: State & Local Arterials with Heavy Delays at Intersection Hurdles: Right-of-Way, Signalized intersections commonly cause major Public Acceptance delays and congestion on corridors due to the time required for each phase. The delays can be . Superstreets can reduce delay, improve reduced if multiple phases run at the same time traffic flow, and simplify signal timing at and the through traffic on the minor street is the main intersection. Eliminating left redirected. turns and allowing multiple signal phases can simplify and improve the Arterial Intersections with Large Left Turn intersection. Volumes Left turns are a cause of major delay, as they . Superstreets can maintain existing interfere with opposing traffic and can also commercial access. The superstreet require their own signal at certain intersections. concept can work well with existing Congestion can be reduced if the left-turn access management plans to allow easy movements are removed from the main access to commercial areas, limiting the intersection and are made at a location away traffic effects on local businesses and from that area.
    [Show full text]
  • Maintenance of Traffic for Innovative Geometric Design Work Zones
    Maintenance of Traffic for Innovative Geometric Design Work Zones Final Report December 2015 Sponsored by Smart Work Zone Deployment Initiative Federal Highway Administration (TPF-5(081)) About SWZDI Iowa, Kansas, Missouri, and Nebraska created the Midwest States Smart Work Zone Deployment Initiative (SWZDI) in 1999 and Wisconsin joined in 2001. Through this pooled-fund study, researchers investigate better ways of controlling traffic through work zones. Their goal is to improve the safety and efficiency of traffic operations and highway work. ISU Non-Discrimination Statement Iowa State University does not discriminate on the basis of race, color, age, ethnicity, religion, national origin, pregnancy, sexual orientation, gender identity, genetic information, sex, marital status, disability, or status as a U.S. veteran. Inquiries regarding non-discrimination policies may be directed to Office of Equal Opportunity, Title IX/ADA Coordinator, and Affirmative Action Officer, 3350 Beardshear Hall, Ames, Iowa 50011, 515-294-7612, email [email protected]. Notice The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the information presented herein. The opinions, findings and conclusions expressed in this publication are those of the authors and not necessarily those of the sponsors. This document is disseminated under the sponsorship of the U.S. DOT in the interest of information exchange. The sponsors assume no liability for the contents or use of the information contained in this document. This report does not constitute a standard, specification, or regulation. The sponsors do not endorse products or manufacturers. Trademarks or manufacturers’ names appear in this report only because they are considered essential to the objective of the document.
    [Show full text]