10 a Human Missions Cost Model V4

Total Page:16

File Type:pdf, Size:1020Kb

10 a Human Missions Cost Model V4 A Call For A New Human Missions Cost Model NASA 2019 Cost and Schedule Analysis Symposium NASA Johnson Space Center, August 13-15, 2019 Joseph Hamaker, PhD Christian Smart, PhD Galorath Human Missions Cost Model Advocates Dr. Joseph Hamaker Dr. Christian Smart Director, NASA and DoD Programs Chief Scientist • Former Director for Cost Analytics • Founding Director of the Cost and Parametric Estimating for the Analysis Division at NASA U.S. Missile Defense Agency Headquarters • Oversaw development of the • Originator of NASA’s NAFCOM NASA/Air Force Cost Model cost model, the NASA QuickCost (NAFCOM) Model, the NASA Cost Analysis • Provides subject matter expertise to Data Requirement and the NASA NASA Headquarters, DARPA, and ONCE database Space Development Agency • Recognized expert on parametrics 2 Agenda Historical human space projects Why consider a new Human Missions Cost Model Database for a Human Missions Cost Model • NASA has over 50 years of Human Space Missions experience • NASA’s International Partners have accomplished additional projects . • There are around 70 projects that can provide cost and schedule data • This talk will explore how that data might be assembled to form the basis for a Human Missions Cost Model WHY A NEW HUMAN MISSIONS COST MODEL? NASA’s Artemis Program plans to Artemis needs cost and schedule land humans on the moon by 2024 estimates Lots of projects: Lunar Gateway, Existing tools have some Orion, landers, SLS, commercially applicability but it seems obvious provided elements (which we may (to us) that a dedicated HMCM is want to independently estimate) needed Some of these elements have And this can be done—all we ongoing cost trajectories (e.g. SLS, need is the vision, the will and the Orion) while others are conceptual resources to do it 5 Functional Similarity (Selected Examples) Apollo CSM Skylab Apollo LEM Orion Gateway Artemis Lander 6 But Does That Old Cost and Schedule Data Apply? We have no The basic physics Human space flight better data and engineering engineering is are the same always on the bleeding edge We submit that the old cost and schedule data is applicable 7 A Few Example Projects (A Total of 70 Listed On Next Chart) Gemini Apollo CSM Apollo LEM ESA Spacelab ESA Jules Verne ATV ISS Unity (Node 1) Interim Control Module Skylab 8 About 70 Historical Human Space Projects Altogether Gemini Capsule Apollo Command & Service Module (CSM) Apollo Lunar Excursion Module (LEM) ISS Kibo Japanese Pressurized Module (JEM-PM) Skylab Space Station ISS H-II Transfer Vehicle (HTV) aka Kounotori ESA Spacelab Module ISS Cupola ESA Spacelab Pallet ISS Tranquility (Node 3) Soyuz-TM Dragon Capsule ISS Zarya aka Functional Cargo Block (FGB) ISS Leonardo (PMM) ISS Unity (Node 1), Pressurized Mating Adapter (PMA-1 and PMA-2) ISS International Docking Adapter (IDA ISS Pressurized Mating Adapter 1 (PMA-1) ISS Bigelow Expandable Activity Module [20] Progress M1 CST-100 Starliner ISS Interim Control Module Uzlovoy aka UDM, Prichal and also UM ISS Zvezda (Service Module)aka DOS-8, Service Module or SM (Russian: СМ) ISS Russian NEMS Module ISS Z1 Truss ISS Nauka aka Multipurpose Laboratory Module (MLM) or FGB-2 PMA-3 ISS Science-Power Module-1 (SPM-1)aka NEM-1 ISS P6 Truss ISS NanoRacks Airlock Module ISS Solar Array ESA Service Module for Orion ISS Destiny (also known as the US Laboratory) ISS External Stowage Platform-1 ISS Space Station Remote Manipulator System (SSRMS) aka Canadarm2 ISS Mobile Transporter (MT) ISS Quest (Joint Airlock) ISS ESP-2 (Esternal Stowage Platform) ISS Pirs (Docking Compartment & Airlock) ISS External TCS ISS S0 Truss aka the Center Integrated Truss Assembly Starboard 0 Truss ISS External C&T ISS Mobile Base System (MBS) ISS External GN&C ISS S1 Truss aka Starboard Side Thermal Radiator Truss ISS Japanese Logistics Module (ELM-PS) ISS P1 Truss aka Port Side Thermal Radiator Truss ISS JEM Robotic Arm aka JEM Remote Manipulator System (RMS) ISS Enhanced ISS Boom Assembly ISS Japanese Exposed Facility (JEM-EF) ISS P3/P4 Truss ISS Poisk aka Mini-Research Module 2 (MRM-2) ISS Solar Array 1 ISS ExPRESS Logistics Carriers 1 & 2 ISS P5 Truss [13] ISS EXPRESS Logistics Carrier 4 ISS S3/S4 Truss & Solar Arrays ISS Alpha Magnetic Spectrometer aka AMS-02 ISS S5 Truss and ESP-3 (External Stowage Platform) Orbiter Boom Sensor System (OBSS) ISS Harmony (Node 2) ISS EXPRESS Logistics Carrier 3 ISS Columbus (European Laboratory) ISS European Robotic Arm ISS Jules Verne Automated Transfer Vehicle (ATV) ISS Science-Power Module-2 (SPM-2)aka NEM-2 ISS Special Purpose Dexterous Manipulator (SPDM, aka Dextre or Canada hand Cygnus Capsule 9 ISS S6 Truss & Solar Arrays Orion Capsule Yes, There Are A Few Issues With The Data Many of these projects don’t have documented cost and schedule data Even if total cost exists, it is not at the subsystem level Some of the projects are commercial or even non-U.S. 10 Many of These Projects Don’t Have Documented Data • Don’t underestimate the power of… ° Industrial espionage ° Really determined data scroungers • The total cost, schedule and mass of many of these missions is given on various websites, in space news articles, etc. ° Sometimes wet mass, but dry mass can be estimated easily from wet mass ° Total cost and schedule can be sanity checked by comparing with some known analogies 11 Cost And Mass Does Not Exits At The Subsystem Level • We visualize the HMCM to initially operate at the subsystem level ° With mass as the principal independent variable at first ° Other variables can be added later to address numerous other cost drivers ° Let’s just get the basic first step done • We are proposing that “missing” subsystem data can be imputed ° The Galorath Chief Engineer, Dr. Christian Smart, is speaking at this symposium on imputation ° A simple way to think about how missing data could be estimated ° Tabulate subsystem cost and mass breakouts of all the known data points ° Select which historical projects with complete data are analogous to the projects with data holes ° Apply those percentages to the projects lacking subsystem data ° Balance the books so that all elements add to the total 12 Some Of The Projects Are Commercial or Even Non-U.S • The physics and engineering are the same • Institutional culture may be different ° NASA, ESA, ASI, JAXA cost scatterplot on top of each other ° ESA member countries “eat overruns” ° However, there are inefficiencies of assigning work to member nations ° These two things seem to about cancel out ° Commercial projects in comparison to NASA has been analyzed ° Somewhere in the 50% range give or take ° Therefore, upward adjustments can be made for commercial cost data to get everything on a level playing field ° Again, other variables can be added/re-introduced later ° NASA and Roscosmos differences will be more problematic ° But not an overwhelming problem 13 ° Christian and I could do this between morning coffee and lunch KEY CONCEPTS WE CAN DO THIS MODEL IS NEEDED DATA CAN BE FOUND/IMPUTED ENTERPRISE READY 14 THANK YOU [email protected] +1.321.3809 www.galorath.com 15 © Copyright Galorath Incorporated 2019.
Recommended publications
  • Russia's Posture in Space
    Russia’s Posture in Space: Prospects for Europe Executive Summary Prepared by the European Space Policy Institute Marco ALIBERTI Ksenia LISITSYNA May 2018 Table of Contents Background and Research Objectives ........................................................................................ 1 Domestic Developments in Russia’s Space Programme ............................................................ 2 Russia’s International Space Posture ......................................................................................... 4 Prospects for Europe .................................................................................................................. 5 Background and Research Objectives For the 50th anniversary of the launch of Sputnik-1, in 2007, the rebirth of Russian space activities appeared well on its way. After the decade-long crisis of the 1990s, the country’s political leadership guided by President Putin gave new impetus to the development of national space activities and put the sector back among the top priorities of Moscow’s domestic and foreign policy agenda. Supported by the progressive recovery of Russia’s economy, renewed political stability, and an improving external environment, Russia re-asserted strong ambitions and the resolve to regain its original position on the international scene. Towards this, several major space programmes were adopted, including the Federal Space Programme 2006-2015, the Federal Target Programme on the development of Russian cosmodromes, and the Federal Target Programme on the redeployment of GLONASS. This renewed commitment to the development of space activities was duly reflected in a sharp increase in the country’s launch rate and space budget throughout the decade. Thanks to the funds made available by flourishing energy exports, Russia’s space expenditure continued to grow even in the midst of the global financial crisis. Besides new programmes and increased funding, the spectrum of activities was also widened to encompass a new focus on space applications and commercial products.
    [Show full text]
  • Jules Verne ATV Launch Approaching 11 February 2008
    Jules Verne ATV launch approaching 11 February 2008 will carry up to 9 tonnes of cargo to the station as it orbits 400 km above the Earth. Equipped with its own propulsion and navigation systems, the ATV is a multi-functional spacecraft, combining the fully automatic capabilities of an unmanned vehicle with the safety requirements of a crewed vehicle . Its mission in space will resemble that, on the ground, of a truck (the ATV) delivering goods and services to a research establishment (the space station). A new-generation high-precision navigation system will guide the ATV on a rendezvous trajectory towards the station. In early April, Jules Verne will automatically dock with the station’s Russian Preview of the maiden launch and docking of ESA's Jules Verne ATV. Jules Verne will be lifted into space on Service Module, following a number of specific board an Ariane 5 launch vehicle. Credits: ESA - D. operations and manoeuvres (on 'Demonstration Ducros Days') to show that the vehicle is performing as planned in nominal and contingency situations. It will remain there as a pressurised and integral After the successful launch of ESA’s Columbus part of the station for up to six months until a laboratory aboard Space Shuttle Atlantis on controlled re-entry into the Earth’s atmosphere Thursday (7 February), it is now time to focus on takes place, during which it will burn up and, in the the next imminent milestone for ESA: the launch of process, dispose of 6.3 tonnes of waste material no Jules Verne, the first Automated Transfer Vehicle longer needed on the station.
    [Show full text]
  • Trace Contaminant Control During the International Space Station's On
    https://ntrs.nasa.gov/search.jsp?R=20170012333 2019-08-30T16:48:33+00:00Z National Aeronautics and NASA/TP—2017–219689 Space Administration IS02 George C. Marshall Space Flight Center Huntsville, Alabama 35812 Trace Contaminant Control During the International Space Station’s On-Orbit Assembly and Outfitting J.L. Perry Marshall Space Flight Center, Huntsville, Alabama October 2017 The NASA STI Program…in Profile Since its founding, NASA has been dedicated to the • CONFERENCE PUBLICATION. Collected advancement of aeronautics and space science. The papers from scientific and technical conferences, NASA Scientific and Technical Information (STI) symposia, seminars, or other meetings sponsored Program Office plays a key part in helping NASA or cosponsored by NASA. maintain this important role. • SPECIAL PUBLICATION. Scientific, technical, The NASA STI Program Office is operated by or historical information from NASA programs, Langley Research Center, the lead center for projects, and mission, often concerned with NASA’s scientific and technical information. The subjects having substantial public interest. NASA STI Program Office provides access to the NASA STI Database, the largest collection of • TECHNICAL TRANSLATION. aeronautical and space science STI in the world. English-language translations of foreign The Program Office is also NASA’s institutional scientific and technical material pertinent to mechanism for disseminating the results of its NASA’s mission. research and development activities. These results are published by NASA in the NASA STI Report Specialized services that complement the STI Series, which includes the following report types: Program Office’s diverse offerings include creating custom thesauri, building customized databases, • TECHNICAL PUBLICATION. Reports of organizing and publishing research results…even completed research or a major significant providing videos.
    [Show full text]
  • Pete Aldridge Well, Good Afternoon, Ladies and Gentlemen, and Welcome to the Fifth and Final Public Hearing of the President’S Commission on Moon, Mars, and Beyond
    The President’s Commission on Implementation of United States Space Exploration Policy PUBLIC HEARING Asia Society 725 Park Avenue New York, NY Monday, May 3, and Tuesday, May 4, 2004 Pete Aldridge Well, good afternoon, ladies and gentlemen, and welcome to the fifth and final public hearing of the President’s Commission on Moon, Mars, and Beyond. I think I can speak for everyone here when I say that the time period since this Commission was appointed and asked to produce a report has elapsed at the speed of light. At least it seems that way. Since February, we’ve heard testimonies from a broad range of space experts, the Mars rovers have won an expanded audience of space enthusiasts, and a renewed interest in space science has surfaced, calling for a new generation of space educators. In less than a month, we will present our findings to the White House. The Commission is here to explore ways to achieve the President’s vision of going back to the Moon and on to Mars and beyond. We have listened and talked to experts at four previous hearings—in Washington, D.C.; Dayton, Ohio; Atlanta, Georgia; and San Francisco, California—and talked among ourselves and we realize that this vision produces a focus not just for NASA but a focus that can revitalize US space capability and have a significant impact on our nation’s industrial base, and academia, and the quality of life for all Americans. As you can see from our agenda, we’re talking with those experts from many, many disciplines, including those outside the traditional aerospace arena.
    [Show full text]
  • Robotic Arm.Indd
    Ages: 8-12 Topic: Engineering design and teamwork Standards: This activity is aligned to national standards in science, technology, health and mathematics. Mission X: Train Like an Astronaut Next Generation: 3-5-ETS1-2. Generate and compare multiple possible solutions to a problem based on how well each is likely A Robotic Arm to meet the criteria and constraints of the problem. 3-5-ETS1-3. Plan and carry out fair tests in which variables are controlled and failure points are considered to identify aspects of a model or prototype that can be EDUCATOR SECTION (PAGES 1-7) improved. STUDENT SECTION (PAGES 8-15) Background Why do we need robotic arms when working in space? As an example, try holding a book in your hands straight out in front of you and not moving them for one or two minutes. After a while, do your hands start to shake or move around? Imagine how hard it would be to hold your hands steady for many days in a row, or to lift something really heavy. Wouldn’t it be nice to have a really long arm that never gets tired? Well, to help out in space, scientists have designed and used robotic arms for years. On Earth, scientists have designed robotic arms for everything from moving heavy equipment to performing delicate surgery. Robotic arms are important machines that help people work on Earth as well as in space. Astronaut attached to a robotic arm on the ISS. Look at your arms once again. Your arms are covered in skin for protection.
    [Show full text]
  • A Launch for the International Space Station
    A launch for the International Space Station For its first mission of the year, Arianespace will launch the first Automated Transfer Vehicle (ATV), dubbed “Jules Verne”, for the European Space Agency (ESA). Right from this first launch, the ATV will play a vital role in bringing supplies to the International Space Station (ISS). Weighing more than 20 tons, this will be by far the heaviest payload ever launched by Ariane 5. An Ariane 5 ES will inject the Jules Verne ATV into a circular orbit at an altitude of 260 kilometers, inclined 51.6 degre e s . With this launch, Ariane 5 further expands its array of missions, ranging fro m scientific spacecraft in special orbits to commercial launches into geostationary orbit. The ATV is designed to bring supplies to the ISS (water, air, food, propellants for the Russian section, spare parts, experimental hard w a re, etc.), and to reboost the ISS into its nominal orbit. The ISS now weighs more than 240 metric tons, including the recently attached European labora t o r y, Columbus. After being docked to the ISS for up to six months, the ATV will be loaded with waste items by the astronauts, and sent back down. After separating from the launch vehicle, the ATV will be autonomous, using its own systems for energy (batteries and four large solar panels) and guidance (GPS, star t racker), in liaison with the control center in Toulouse. During final approach, an optical navigation system will guide the ATV to its rendezvous with the Space Station, w h e re it will automatically dock several days after launch.
    [Show full text]
  • The International Space Station Partners: Background and Current Status
    The Space Congress® Proceedings 1998 (35th) Horizons Unlimited Apr 28th, 2:00 PM Paper Session I-B - The International Space Station Partners: Background and Current Status Daniel V. Jacobs Manager, Russian Integration, International Partners Office, International Space Station ogrPr am, NASA, JSC Follow this and additional works at: https://commons.erau.edu/space-congress-proceedings Scholarly Commons Citation Jacobs, Daniel V., "Paper Session I-B - The International Space Station Partners: Background and Current Status" (1998). The Space Congress® Proceedings. 18. https://commons.erau.edu/space-congress-proceedings/proceedings-1998-35th/april-28-1998/18 This Event is brought to you for free and open access by the Conferences at Scholarly Commons. It has been accepted for inclusion in The Space Congress® Proceedings by an authorized administrator of Scholarly Commons. For more information, please contact [email protected]. THE INTERNATIONAL SPACE STATION: BACKGROUND AND CURRENT STATUS Daniel V. Jacobs Manager, Russian Integration, International Partners Office International Space Station Program, NASA Johnson Space Center Introduction The International Space Station, as the largest international civil program in history, features unprecedented technical, managerial, and international complexity. Seven interna- tional partners and participants encompassing fifteen countries are involved in the ISS. Each partner is designing, developing and will be operating separate pieces of hardware, to be inte- grated on-orbit into a single orbital station. Mission control centers, launch vehicles, astronauts/ cosmonauts, and support services will be provided by multiple partners, but functioning in a coordinated, integrated fashion. A number of major milestones have been accomplished to date, including the construction of major elements of flight hardware, the development of opera- tions and sustaining engineering centers, astronaut training, and seven Space Shuttle/Mir docking missions.
    [Show full text]
  • IFC-AMC Motion to Dismiss
    Case 1:17-cv-01494-VAC-SRF Document 34-1 Filed 02/16/18 Page 1 of 1 PageID #: 1030 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF DELAWARE JUANA DOE I et al., § § Plaintiffs, § § vs. § § C.A. No. 17-1494-VAC-SRF IFC ASSET MANAGEMENT COMPANY, § LLC, § § Defendant. § [PROPOSED] ORDER WHEREAS, Defendant IFC Asset Management Company, LLC, having moved to dismiss the claims in Plaintiff Juana Doe I et al.’s Complaint (D.I. 1); and, WHEREAS, the Court having considered the briefs and arguments in support of and in opposition to said Motion; IT IS HEREBY ORDERED this _______ day of ____________, 2018, that the Motion is GRANTED. Plaintiffs’ Complaint is dismissed with prejudice. _______________________________ United States District Judge RLF1 18887565v.1 Case 1:17-cv-01494-VAC-SRF Document 34-1 Filed 02/16/18 Page 1 of 1 PageID #: 1030 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF DELAWARE JUANA DOE I et al., § § Plaintiffs, § § vs. § § C.A. No. 17-1494-VAC-SRF IFC ASSET MANAGEMENT COMPANY, § LLC, § § Defendant. § [PROPOSED] ORDER WHEREAS, Defendant IFC Asset Management Company, LLC, having moved to dismiss the claims in Plaintiff Juana Doe I et al.’s Complaint (D.I. 1); and, WHEREAS, the Court having considered the briefs and arguments in support of and in opposition to said Motion; IT IS HEREBY ORDERED this _______ day of ____________, 2018, that the Motion is GRANTED. Plaintiffs’ Complaint is dismissed with prejudice. _______________________________ United States District Judge RLF1 18887565v.1 Case 1:17-cv-01494-VAC-SRF Document 35 Filed 02/16/18 Page 1 of 51 PageID #: 1031 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF DELAWARE JUANA DOE I et al., § § Plaintiffs, § § vs.
    [Show full text]
  • A Call for a New Human Missions Cost Model
    A Call For A New Human Missions Cost Model NASA 2019 Cost and Schedule Analysis Symposium NASA Johnson Space Center, August 13-15, 2019 Joseph Hamaker, PhD Christian Smart, PhD Galorath Human Missions Cost Model Advocates Dr. Joseph Hamaker Dr. Christian Smart Director, NASA and DoD Programs Chief Scientist • Former Director for Cost Analytics • Founding Director of the Cost and Parametric Estimating for the Analysis Division at NASA U.S. Missile Defense Agency Headquarters • Oversaw development of the • Originator of NASA’s NAFCOM NASA/Air Force Cost Model cost model, the NASA QuickCost (NAFCOM) Model, the NASA Cost Analysis • Provides subject matter expertise to Data Requirement and the NASA NASA Headquarters, DARPA, and ONCE database Space Development Agency • Recognized expert on parametrics 2 Agenda Historical human space projects Why consider a new Human Missions Cost Model Database for a Human Missions Cost Model • NASA has over 50 years of Human Space Missions experience • NASA’s International Partners have accomplished additional projects . • There are around 70 projects that can provide cost and schedule data • This talk will explore how that data might be assembled to form the basis for a Human Missions Cost Model WHY A NEW HUMAN MISSIONS COST MODEL? NASA’s Artemis Program plans to Artemis needs cost and schedule land humans on the moon by 2024 estimates Lots of projects: Lunar Gateway, Existing tools have some Orion, landers, SLS, commercially applicability but it seems obvious provided elements (which we may (to us) that a dedicated HMCM is want to independently estimate) needed Some of these elements have And this can be done—all we ongoing cost trajectories (e.g.
    [Show full text]
  • Study of Autonomous Capture and Detumble of Non-Cooperative Target by a Free-Flying Space Manipulator Using an Air- Bearing Platform
    STUDY OF AUTONOMOUS CAPTURE AND DETUMBLE OF NON-COOPERATIVE TARGET BY A FREE-FLYING SPACE MANIPULATOR USING AN AIR- BEARING PLATFORM Lucas Santaguida A thesis submitted to the Faculty of Graduate Studies in partial fulfillment of the requirements for the degree of Master of Applied Science Graduate Program in Mechanical Engineering York University Toronto, Ontario June 2020 © LUCAS SANTAGUIDA, 2020 Abstract This thesis developed a 3-DOF satellite simulator with an attached 3-DOF manipulator to capture and detumble a target satellite simulator. Existing systems are heavily dependent on external systems to compute the position and orientation of the chaser and target satellite simulators. Using external sensors and high-power computers allows their systems to have high accuracy and high sampling frequencies. This approach is not reflective of the challenges faced by an on-orbit servicing spacecraft as all positioning of the space vehicle is computed on-board. In addition, their systems use the same external sensors to determine the position and orientation of the target simulator and transmit it to the chaser. A true on-orbit servicing vehicle would need to sense and compute the target simulators position and orientation relative to itself. The simulator developed in this thesis addresses these issues by computing its own position using a star-tracking system and computes the relative position and orientation of the target simulator using a monocular camera. The simulator was developed to act as a testbed for on-orbit servicing technologies. Different sensors, path planning and control algorithms can be implemented to test their effectiveness before implementation on a servicing vehicle.
    [Show full text]
  • Guidance, Navigation and Control System for Autonomous Proximity Operations and Docking of Spacecraft
    Scholars' Mine Doctoral Dissertations Student Theses and Dissertations Summer 2009 Guidance, navigation and control system for autonomous proximity operations and docking of spacecraft Daero Lee Follow this and additional works at: https://scholarsmine.mst.edu/doctoral_dissertations Part of the Aerospace Engineering Commons Department: Mechanical and Aerospace Engineering Recommended Citation Lee, Daero, "Guidance, navigation and control system for autonomous proximity operations and docking of spacecraft" (2009). Doctoral Dissertations. 1942. https://scholarsmine.mst.edu/doctoral_dissertations/1942 This thesis is brought to you by Scholars' Mine, a service of the Missouri S&T Library and Learning Resources. This work is protected by U. S. Copyright Law. Unauthorized use including reproduction for redistribution requires the permission of the copyright holder. For more information, please contact [email protected]. GUIDANCE, NAVIGATION AND CONTROL SYSTEM FOR AUTONOMOUS PROXIMITY OPERATIONS AND DOCKING OF SPACECRAFT by DAERO LEE A DISSERTATION Presented to the Faculty of the Graduate School of the MISSOURI UNIVERSITY OF SCIENCE AND TECHNOLOGY In Partial Fulfillment of the Requirements for the Degree DOCTOR OF PHILOSOPHY in AEROSPACE ENGINEERING 2009 Approved by Henry Pernicka, Advisor Jagannathan Sarangapani Ashok Midha Robert G. Landers Cihan H Dagli 2009 DAERO LEE All Rights Reserved iii ABSTRACT This study develops an integrated guidance, navigation and control system for use in autonomous proximity operations and docking of spacecraft. A new approach strategy is proposed based on a modified system developed for use with the International Space Station. It is composed of three “V-bar hops” in the closing transfer phase, two periods of stationkeeping and a “straight line V-bar” approach to the docking port.
    [Show full text]
  • Airbus Group
    Defense & Aerospace Companies, Volume II - International Airbus Group Outlook · In March 2015, Airbus Group initiated a second divestment of its shares in Dassault Aviation · Airbus Group is riding the boom in the commercial aircraft market that has fueled a record backlog of EUR857 billion · Airbus D&S is being restructured via mergers and divestments; some 5,000 jobs will be eliminated, primarily in Europe · The company has consolidated its focus in India in hopes of winning upcoming contracts Headquarters Airbus Group SE In mid-2013, following a failed merger attempt with 4, rue du Groupe d'Or BAE Systems, EADS's ownership structure was BP 90112 drastically altered as shareholders changed a Franco- 31703 – Blagnac Cedex, France German ownership pact in favor of greater management Telephone: + 33 0 5 81 31 75 00 freedom. Under the plan, France and Germany now Website: http://www.airbus-group.com hold core stakes of 12 percent each, Spain holds 4 percent, and the rest is floated freely to investors. In 2014, the European Aeronautic Defence and Space Prior to the changes, the triumvirate of nations held over Company (EADS) rebranded itself as Airbus Group, 50 percent of the firm. As part of the changes, France after its largest operation. agreed to give up veto powers over the company's Originally, EADS was formed through Europe's post- industrial policy. Cold War consolidation efforts. At the time of its At the start of 2015, Airbus Group employed about formation in 2000, EADS comprised the activities of the 138,622 people around the world. founding partners Aerospatiale Matra SA of France, Construcciones Aeronáuticas SA (CASA) of Spain, and Note: For details on Airbus Group's major subsidiaries, DaimlerChrysler Aerospace AG (DASA) of Germany.
    [Show full text]