Greenford West (Ruislip Road)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Greenford Square, London Ub6
TWO GREENFORD SQUARE A self-contained office and education facility GREENFORD SQUARE, LONDON UB6 0HE (dual D1 & B1 use), set in a six acre landscaped From 9,418 sq ft - 97,028 sq ft campus, offering secure on-site car parking, with excellent transport links into central London. BUILDING OVERVIEW Two Greenford Square is set in a six Only a 9 minute walk to Sudbury Hill • Dual D1 & B1 use. acre, multi-use, campus providing an tube (Piccadilly Line) and overground • HQ Campus of 97,028 sq ft. attractive working environment within station, with direct connections to a landscaped setting. London Marylebone in just 16 minutes. TO LET • Self-contained options for 28,269 sq ft and 68,759 sq ft. The building is adjacent to the Ferrero Within an 8 minute walk from Greenford UK HQ and the mixed-use Greystar tube (Central Line) and overground • 275 car parking spaces at a regeneration, Greenford Quay. station, with direct links to West Ealing ratio of 1:353 sq ft. in only 11 minutes, one of five Crossrail stations that the London Borough of Ealing has to offer. 01 VEHICLE ACCESS OLDFIELD LANE NORTH FERRERO UK & IRELAND HQ 275 SPACE CAR PARK VEHICLE ACCESS B E PEDESTRIAN R K E ACCESS L E Y A V E N U E A4127 D A O R D R O F N E E R G GREENFORD QUAY REDEVELOPMENT 1,965 NEW HOMES AND 200,000 SQ FT OF COMMERCIAL ACCOMMODATION 02 Greystar is creating a new canal-side neighbourhood, • 1,965 residential units and 200,000 sq ft of • High-quality and well-managed public which is inclusive of the surrounding community and retail and commercial space. -
Gateway Places
Drayton Green Green Drayton Drayton Proposals: Gateway Places The Avenue Drayton Argyle Road Green 1 West Ealing 4 GATEWAY PLACES 2 ad Drayton Green Road Green Drayton o Road Green Drayton dria R 3 Alexan Squirrel Felix Road Connaught R Bed Kir Mews Green Man P c f hen R ord Roa ad St Johns oa leigh Ro Scool d d Ends a o 5 s a s d 1. Manor Road crossing a ad g Ro e Jacob’s Ladder Royal Borough of Tewkesbury Bayham Road 2. Eccleston Road Kensington and Chelsea - Gre Uxbridge Road Wit ad ham Road Hanwell Cemetery e Ro e r n Man 3. Jacob’s plaza Singapo L a n 4. Station approach gateway e ns Mosque de Shi y Gar Leeland R hirle S r Dean Gardens 5. Culmington Road gateway le y 6 Ga Broadway Tawny Close r Mattock Lane o a 6. Mattock Lane junction and crossing d Leeland Terrace oad 10 7. Forester Pub Uxbridge R Canberra Road Library Northfield Sainsbury’s Melbourne Avenue Avenue 8. Leighton Road: Coldershaw Road & Leeland Terrace Allotments St . Sydney Road J am od Close rwo es’ e Sh A v Regina Road 9. The Grosvenor Pub Hatfield Road e Northfield Avenue Northfield nu Avenue Northfield Grosvenor Road e Milford Road 10. Uxbridge Road / Grosvenor Road W estfield A S y de d S n e l a aide Road ey Roa Road Bonchurch Road f o r d R d City of Westminster - o a Hanwell Cemetery d Glenfield Terrace S Brisbane Road aint Kilda R 9 Co ld o e a Chesham Terrace rsha d w R o 7 ad 8 8 M id h Gateway Places urst Road 116 WEST EALING LIVEABLE NEIGHBOURHOOD Jacob’s Ladder Gateway This will improve the look and feel of this key route into West Ealing shopping area from the north, and encourage greater use of it, thereby improving natural surveillance and the perception of crime 1. -
HNL Appraisal Package 2 Pinn and Cannon Brook Initial Assessment Plus Document
FINAL HNL Appraisal Package 2 Pinn and Cannon Brook Initial Assessment Plus Document The Environment Agency March 2018 HNL Appraisal Package 2 Pinn and Cannon Brook IA plus document Quality information Prepared by Checked by Approved by Andy Mkandla Steve Edwards Fay Bull Engineer, Water Associate Director, Water Regional Director, Water Laura Irvine Graduate Engineer, Water Stacey Johnson Graduate Engineer, Water Revision History Revision Revision date Details Authorized Name Position Distribution List # Hard Copies PDF Required Association / Company Name Prepared for: The Environment Agency AECOM HNL Appraisal Package 2 Pinn and Cannon Brook IA plus document Prepared for: The Environment Agency Prepared by: Andy Mkandla Engineer E: [email protected] AECOM Infrastructure & Environment UK Limited Royal Court Basil Close Derbyshire Chesterfield S41 7SL UK T: +44 (1246) 209221 aecom.com © 2018 AECOM Infrastructure & Environment UK Limited. All Rights Reserved. This document has been prepared by AECOM Infrastructure & Environment UK Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared for: The Environment Agency AECOM HNL -
A31 Note: Gunnersbury Station Does Not Have OWER H91 E D
C R S D E A U T S A VE N E R A N B B D L W Based on Bartholomews mapping. Reproduced by permission of S R E i N U st A R O HarperCollins Publishers Ltd., Bishopbriggs, Glasgow. 2013Y ri E E A Y c W R A t D A AD www.bartholomewmaps.com N C R 272 O Y V L D R i TO T AM 272 OL E H D BB N n A O CAN CO By Train e N Digital Cartography by Pindar Creative N U L E n w i a L Getting to BSI m lk 5 i AVE 1 ng N A Acton0- t V 1 im • The London Overground runs between E t e e LD ROAD B491 D N a SOUTHFIE E Y Town fr R Address: Chiswick Tower, U imR B o B E U O 440 m Richmond and Stratford stopping at Travel to E x L D B A R o S L AD R r O E RO O s 389 Chiswick High Road, London, W4 4AL Y R G R E p EY L i SPELDHUR Gunnersbury. ID ST R A R R t RO M p NR B E A O N e D NU O H L A A UB E LL C D GS BO T Y British Standards 1 R E RSET E E 9 N L SOM T N All visitors must enter the building through F 44 U N H • The ‘Hounslow Loop’ has stations at G SOUTH ROAD BEDFORD B E3 E B E R the main entrance on Chiswick High Road O Kew Bridge, Richmond, Weybridge, N O L PARK D Institution S ACTON L A A A D N E O R E O D and report to Reception on arrival. -
Ickenham Calling …
Ickenham Calling ….. The Newsletter of the Ickenham Residents’ Association Spring 2018 Affiliated to the Hillingdon Alliance of Residents’ Associations. Member of Herts. & Middx. Wildlife Trust, and London Green Belt Council. The Community Voice—monitoring the NHS in NW London and SW Herts. INSIDE THIS ISSUE: Ickenham Residents’ Association: E-Mail Address [email protected] CHAIRMAN’S WebSite www.ickenhamresidents.co.uk COMMENTS Twitter Acc. www.twitter.com/IckenhamRA AGM 2018 CHAIRMAN’S COMMENTS and community inclusive”. We very much HS2 welcome such suggestions, and indeed My last Chairman’s Comments referred to the often ask for opinions and suggestions on quarterly Residents Planning Forum organ- what we do. Sadly, this latest letter was PLANNING ised by LBH. The January meeting attended anonymous — we would welcome the INFORMATVES by committee members focussed on the new opportunity to discuss the issues raised in draft “London Plan” written by the Mayor’s person, and perhaps invite help from GOSPEL OAK 2018 Greater London Authority, out for consultation villagers to further some of the proposals. until 2nd March. The Plan aims for many ICKENHAM NATURE more affordable homes whilst creating a saf- We look forward to seeing as many of you RESERVES er, greener city that supports the health and as possible at our 2018 AGM on Friday, well-being of all Londoners. 20th April in the Village Hall. HEALTH MATTERS Jill Dalton In recent years the inner London Boroughs have delivered most of the capital’s housing POLICE MATTERS growth. With 66,000 new homes each year needed to meet demand, the new draft Lon- AGM of the ICKENHAM ICKENHAM don Plan aims to distribute new homes more RESIDENTS’ ASSOCIATION FESTIVAL 2018 evenly around the capital. -
LICENSING SUB COMMITTEE Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall (Dormers Wells Ward)
Ealing Council Democratic Services Officer: Town Hall Lee Teasdale New Broadway tel: 020 8825 7919 London W5 2BY fax: 020 8825 6909 e-mail: [email protected] LICENSING SUB COMMITTEE Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall (Dormers Wells Ward) nd Date: Wednesday, 2P P March 2016 Time: 4pm or upon conclusion of the previous hearing Venue: Liz Cantell Room , Ealing Town Hall MEMBERSHIP: Councillors Kate Crawford, Munir Ahmed and Roz Reece. AGENDA 1. Apologies for Absence 2. Urgent Matters Any urgent matters that the Chair has agreed should be considered. 3. Matters to be Considered in Private 4. Declarations of Interest 5. Opposed Variation to a Premises Licence Fairway Pavilion, West Middlesex Golf Club, Greenford Road, Southall MARTIN SMITH CHIEF EXECUTIVE rd 23P PPP February 2016 SUMMARY OF PROCEDURE FOR LICENSING SUB-COMMITTEE HEARINGS 1. The procedure to be followed at Licensing Sub Committee Hearings will be outlined by the Chairman at the beginning of each hearing. 2. Parties to the hearing can be represented by a friend or legal adviser who acts as their spokesperson. 3. The procedure to be followed is summarised* below and will generally be followed although the procedure may be varied at the Chair’s discretion • The Licensing Officer will introduce the Report and provide clarification on any factual issues. • The applicant will present the application and call any witnesses in respect of whom permission to appear has been given and answer any questions put to them. • Those who have made relevant representations will make their representations and call any witnesses in respect of whom permission to appear has been given and answer any questions put to them. -
30Hr Childcare: Analysis of Potential Demand and Sufficiency in Ealing
30hr Childcare: Analysis of potential demand and sufficiency in Ealing. Summer 2016 Introduction: Calculating the number of eligible children in each Ward of the borough The methodology utilised by the DfE to predict the number of eligible children in the borough cannot be replicated at Ward level (refer to page 14: Appendix 1 for DfE methodology) Therefore the calculations for the borough have been calculated utilising the most recent data at Ward level concerning the proportions of parents working, the estimates of 3& 4 year population and the number of those 4yr old ineligible as they are attending school. The graph below illustrates the predicted lower and upper estimates for eligible 3&4 year olds for each Ward Page 1 of 15 Executive Summary The 30hr eligibility criteria related to employment, income and the number of children aged 4 years attending reception class (who are ineligible for the funding) makes it much more likely that eligible children will be located in Wards with higher levels of employment and income (potentially up to a joint household income of £199,998) and lower numbers of children aged 4years in reception class. Although the 30hr. childcare programme may become an incentive to work in the future, in terms of the immediate capital bid, the data points to investment in areas which are quite different than the original proposal, which targeted the 5 wards within the Southall area. The 5 Southall Wards are estimated to have the fewest number of eligible children for the 30hr programme. The top 5 Wards estimated to have the highest number of eligible children are amongst the least employment and income deprived Wards in Ealing with the lowest numbers of children affected by income deprivation. -
Reasons-For-Closure-West-Ealing
This branch is closing – but we're still here to help Our West Ealing branch is closing on Friday 30 October 2020 Reasons for closure, and alternative ways to bank This branch is closing – but your bank is always open This first booklet will help you understand why we’ve made the decision to close this branch. It also sets out the banking services and support that will be available to you after this branch has closed. In a second booklet, which will be available from the branch prior to it closing or online at home.barclays/ukbranchclosures, we'll share concerns and feedback from the local community. We'll also detail how we are helping people transition from using the branch with alternative ways to carry out their banking requirements. Here are the main reasons why the West Ealing branch is closing: • The number of transactions has gone down in the previous 24 months, and additionally 89% of our branch customers also use other ways to do their banking such as online and by telephone. • Customers using other ways to do their banking has increased by 21% since 2012. • In the past 12 months, 66% of this branch's customers have been using nearby branches. • We've identified that only 126 customers use this branch exclusively for their banking Proposals to close any branch are made by the Barclays local leadership teams and verified at a national level ahead of any closure announcement. If you have any questions and concerns about these changes then please feel free to get in touch with Steve Day, your Market Director for North West London. -
Park Royal Workforce Skills Analysis Employer Skills Demand and Training Supply on London’S Largest Industrial Estate May 2016
Park Royal workforce skills analysis Employer skills demand and training supply on London’s largest industrial estate May 2016 Park Royal workforce skills analysis Employer skills demand and training supply on London’s largest industrial estate Contents 1. Introduction ..................................................................................................................... 1 2. Employer skills demand ................................................................................................. 4 3. Training supply ............................................................................................................. 13 4. Conclusion .................................................................................................................... 19 Annex A: Survey analysis................................................................................................. 21 Annex B: Secondary analysis .......................................................................................... 32 Contact: Chris Gibbon Tel: 020 7391 4100 email: [email protected] Approved by: Michael Frearson Date: 20 May 2016 Director www.sqw.co.uk Park Royal workforce skills analysis Employer skills demand and training supply on London’s largest industrial estate 1. Introduction The brief 1.1 Park Royal is the largest industrial estate in London. It covers around 500 hectares of land stretching across three local authorities (Brent, Ealing, and Hammersmith and Fulham), making it equivalent in size to the City of London. Its fortunes have -
Marine Mammal Noise Exposure Criteria: Updated Scientific Recommendations for Residual Hearing Effects Brandon L
Aquatic Mammals 2019, 45(2), 125-232, DOI 10.1578/AM.45.2.2019.125 Marine Mammal Noise Exposure Criteria: Updated Scientific Recommendations for Residual Hearing Effects Brandon L. Southall,1, 2 James J. Finneran,3 Colleen Reichmuth,2 Paul E. Nachtigall,4 Darlene R. Ketten,5, 6 Ann E. Bowles,7 William T. Ellison,8 Douglas P. Nowacek,9, 10 and Peter L. Tyack5, 11 1Southall Environmental Associates, Inc., 9099 Soquel Drive #8, Aptos, CA 95003, USA E-mail: [email protected] 2Institute of Marine Sciences, Long Marine Laboratory, University of California, Santa Cruz, Santa Cruz, CA 95060, USA 3U.S. Navy Marine Mammal Program, Space and Naval Warfare Systems Center Pacific, Code 71510, 53560 Hull Street, San Diego, CA 92152, USA 4Hawaii Institute of Marine Biology, University of Hawaii, 46-007 Lilipuna Road, Kaneohe, HI 96744, USA 5Woods Hole Oceanographic Institution, Woods Hole, MA 02543, USA 6Harvard Medical School, Department of Otology and Laryngology, Boston, MA 02114, USA 7Hubbs-SeaWorld Research Institute, 2595 Ingraham Street, San Diego, CA 92109, USA 8Marine Acoustics, Inc., 2 Corporate Place, Middletown, RI 02840, USA 9 Nicholas School of the Environment, Duke University Marine Laboratory, Beaufort, NC 28516, USA 10Pratt School of Engineering, Duke University, Durham, NC 27708, USA 11Sea Mammal Research Unit, Scottish Oceans Institute, University of St Andrews, St Andrews, Fife KY16 8LB, Scotland This publication is dedicated with great respect and admiration to Dr. Jeanette Thomas who was an original panel member, valued colleague, and dear friend. Jeanette was a champion of marine mammal science who set higher standards for all in terms of scholarship, integrity, and professionalism. -
Standard-Tube-Map.Pdf
Tube map 123456789 Special fares apply Special fares Check before you travel 978868 7 57Cheshunt Epping apply § Custom House for ExCeL Chesham Watford Junction 9 Station closed until late December 2017. Chalfont & Enfield Town Theydon Bois Latimer Theobalds Grove --------------------------------------------------------------------------- Watford High Street Bush Hill Debden Shenfield § Watford Hounslow West Amersham Cockfosters Park Turkey Street High Barnet Loughton 6 Step-free access for manual wheelchairs only. A Chorleywood Bushey A --------------------------------------------------------------------------- Croxley Totteridge & Whetstone Oakwood Southbury Chingford Buckhurst Hill § Lancaster Gate Rickmansworth Brentwood Carpenders Park Woodside Park Southgate 5 Station closed until August 2017. Edmonton Green Moor Park Roding Grange Valley --------------------------------------------------------------------------- Hatch End Mill Hill East West Finchley Arnos Grove Hill Northwood Silver Street Highams Park § Victoria 4 Harold Wood Chigwell West Ruislip Headstone Lane Edgware Bounds Green Step-free access is via the Cardinal Place White Hart Lane Northwood Hills Stanmore Hainault Gidea Park Finchley Central Woodford entrance. Hillingdon Ruislip Harrow & Wood Green Pinner Wealdstone Burnt Oak Bruce Grove Ruislip Manor Harringay Wood Street Fairlop Romford --------------------------------------------------------------------------- Canons Park Green South Woodford East Finchley Uxbridge Ickenham North Harrow Colindale Turnpike Lane Lanes -
In Your Area 3: Ruislip and Ickenham
LOCAL AREA High Speed Rail Consultation In Your Area 3: Ruislip and Ickenham Find out here about: • what is proposed between Ruislip and Ickenham; • what this means for people living in and around Ruislip and Ickenham; and • what would happen during construction. What is proposed between What this means for people Ruislip and Ickenham? living in and around Ruislip and Ickenham. From Northolt Junction heading north west the proposed route for the high speed line would Property and Land be joined by the existing Chiltern Line from For much of its length the existing railway Marylebone, and from that point the two lines, corridor is bounded by residential and light and the Central Line, would run alongside each industrial or commercial properties. While we other to West Ruislip. have kept the amount of land needed to a minimum, we expect that around 10 homes This would mean widening the existing railway would need to be demolished. These are corridor to accommodate the two high speed scattered along this section of the route. tracks, which – from Northolt Junction Additionally, a number of properties could be westwards – would lie on the north-eastern at risk of having some land taken, generally edge of the existing railway. where gardens back onto the line although it The route would pass to the north of West may prove that many of these may not be Ruislip station and would pass under Ickenham affected after all. Road. It would then pass through the southern If a decision is taken to go ahead with the high edge of Ruislip Golf Course crossing the River speed line, we will carry out more detailed Pinn and Breakspear Road South on a new design of the route, including considering the bridge, before passing westwards into a cutting.