INTEGRATED GREEN INFRASTRUCTURE

Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE

WHY?

Landscape Urbanism Design Strategy THE WORLD IS MADE UP OF INTERCONNECTED SYSTEMS

Landscape Urbanism Design Strategy Landscape Urbanism Design Strategy Landscape Urbanism Design

HABITAT NETWORKS HABITAT ACCESS NETWORKS GREEN / OPEN SPACE MANAGEMENT WATER ROADS / TRANSPORT DEVELOPMENT BUILT Strategy Landscape Urbanism Design

HABITAT NETWORKS HABITAT ACCESS NETWORKS GREEN / OPEN SPACE MANAGEMENT WATER ROADS / TRANSPORT DEVELOPMENT BUILT Strategy Water Management Habitat Networks

hydrology - catchments & hydrology - flooding neutral grassland fen marsh swamp former John’s Burn

Green and Open Spaces Stewardship over Time

Integrated Green Infrastructure Strategy

existing green network: south-west undefined amenity space landscape management plan Access Networks

Existing Woodland Proposed woodland creation proposed meadow creation proposed / consolodated developed public open space existing green belt Dams to Country Park

Landscape Urbanism Design barriers to movement: subdivision of urban area Strategy crossing points INTEGRATED GREEN INFRASTRUCTURE POLICY

DELIVERY

Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE

STRATEGY / SW GLASGOW IGI GREATER IGI

MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: PARK

Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE

STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI

MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK

Landscape Urbanism Design Strategy SOUTH-WEST GLASGOW / NITSHILL IGI

Water Management Habitat Networks

hydrology - catchments & hydrology - flooding neutral grassland fen marsh swamp former John’s Burn

Green and Open Spaces Stewardship over Time

Integrated Green Infrastructure Strategy

existing green network: south-west Glasgow undefined amenity space landscape management plan Access Networks

Existing Woodland Proposed woodland creation proposed meadow creation proposed / consolodated developed public open space existing green belt Dams to Darnley Country Park

Landscape client: Urbanism Glasgow & Clyde Valley Green Network Partnership / GCC barriers to movement: subdivision of urban area crossing points Design team: ERZ & Enviro-centre (ecology / hydrology) Strategy HYDROLOGY: CATCHMENTS

River Clyde

White Cart Water

Levern Water Brock Burn

Landscape Urbanism Design Strategy HYDROLOGY: FLOODING

200 year pluvial flood

30 year pluvial flood

1984 flood event

Landscape Urbanism Design Strategy URBAN STRUCTURE: BARRIERS

Landscape Urbanism Design Strategy URBAN STRUCTURE: BARRIERS

Landscape Urbanism Design Strategy URBAN STRUCTURE: DESTINATIONS

800m = 10 min walk

400m = 5 min walk

Landscape Urbanism Design Strategy URBAN STRUCTURE: DENSITY

Landscape Urbanism Design Strategy WIDER GREEN NETWORK: GAPS

Pollok Country Park

Dams to Darnley Country Park Rouken Glen Park

Landscape Urbanism Design Strategy STRATEGY: GREEN NETWORK

green network that functions on both a local and citywide level

centre of Nitshill becomes a hub of the green network & a key point of arrival to Dams to Darnley Country Park and wider network

make the green network accessible & visible & redefine the character / identity of the area

Landscape Urbanism Design Strategy STRATEGY: WATER

Peat Road corridor redesigned to manage surface water thro’ SUDs features such as: swales, linear wetland, tree planting etc.

SUDs features associated with adjacent residential development site incorporated into linear park

SUDs feature created as terminus to boulevard on cleared site: addressing water management requirements of surrounding development sites

linear swale/wetland SUDs features incorporated into design of green link: management of surface water in upper portion of catchment (south of rail line)

Landscape Urbanism Design Strategy STRATEGY: OVERVIEW

Landscape Urbanism Design Strategy DETAIL AREAS:

Landscape Urbanism Design Strategy GREATER EASTERHOUSE IGI

Landscape Urbanism Design client: / GCVGNP team: ERZ & Enviro-centre (ecology / hydrology) Strategy HYDROLOGY: CATCHMENTS

Landscape Urbanism Design Strategy GREEN NETWORK: BREAKS

Landscape Urbanism Design Strategy WIDER GREEN NETWORK:

Glasgow

Strathkelvin Railway Path to Kirkintilloch Bishopbriggs

Glenboig Glasgow to Cumbernauld Gartcosh

Ruchazie

Cranhill Airdire Blairtummock

NCR 75 Bargeddie

Rutherglen

NCR 75

1km Coatbridge Glasgow 7 Lochs Cycle Link Coatbridge 0km 16km

Glasgow Coatbridge NCR 75 Landscape 0km 24km Urbanism Design Strategy STRATEGY:

Landscape Urbanism Design Strategy DETAIL AREAS:

Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE

STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI

IN AREAS OF ANTICIPATED CHANGE

PLANNING / DESIGN GUIDANCE

CREATES COMMON PLATFORM OF UNDERSTANDING FOR ALL PARTIES

NEED TO EMBED IN STATUTORY PROCESSES Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE

MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK

Landscape Urbanism Design Strategy FORESTERHILL CAMPUS

Landscape Urbanism Design client: NHS Grampian / Green Exercise Partnership team: ERZ & Enviro-centre (ecology / hydrology) Strategy FORESTERHILL: 1944

Landscape Urbanism Design Strategy EXISTING: ROADS / PARKING

Landscape Urbanism Design Strategy FORESTERHILL GI MASTER PLAN

Landscape Urbanism Design Strategy FORESTERHILL CAMPUS

Landscape Urbanism Design Strategy FORESTERHILL CAMPUS

Landscape Urbanism Design Strategy HALFWAY PARK

Landscape Urbanism Design Strategy client: Southside Housing Association HALFWAY PARK Strategy Design Urbanism Landscape Project Title: Revision Number: Drawing Number: Client: NTS Site Section2 Drawing Title: Notes: 'Halfway Park' Moss Heights Scale: Date: Association Southside Housing 13.07.2015 erz/13/13/ Planning drawing priortoworkcommencing. any discrepanciescontainedinthis attention oftheLandscapeArchitect The contractoristobringthe D site. All dimensionsaretobeverifiedon o n o t s erz Limited c a

le 21 James Morrison Street f r P 09 o Glasgow G1 5PE m t h is d

r T/F: 0141 552 0888 a win E: [email protected] g .

W: www.erzstudio.co.uk MGP 2014:

Landscape Urbanism client: Design West of Housing Association / Strategy Glasgow City Council / CSGN MGP 2014: CAMLACHIE

Landscape Urbanism Design Strategy MGP 2014: CAMLACHIE

Landscape Urbanism Design Strategy MGP 2014: CAMLACHIE

Landscape Urbanism Design Strategy MGP 2014: CAMLACHIE

Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE

MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK

PROBLEM SOLVING INTERVENTIONS

DRIVEN BY NEED FOR CHANGE

SEEK BETTER BALANCE OF ‘SYSTEMS’ IN BUILT ENVIRONMENT Landscape Urbanism Design Strategy Landscape Urbanism Design

HABITAT NETWORKS HABITAT ACCESS NETWORKS GREEN / OPEN SPACE MANAGEMENT WATER ROADS / TRANSPORT DEVELOPMENT BUILT Strategy