INTEGRATED GREEN INFRASTRUCTURE
Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE
WHY?
Landscape Urbanism Design Strategy THE WORLD IS MADE UP OF INTERCONNECTED SYSTEMS
Landscape Urbanism Design Strategy Landscape Urbanism Design Strategy Landscape Urbanism Design
HABITAT NETWORKS HABITAT ACCESS NETWORKS GREEN / OPEN SPACE MANAGEMENT WATER ROADS / TRANSPORT DEVELOPMENT BUILT Strategy Landscape Urbanism Design
HABITAT NETWORKS HABITAT ACCESS NETWORKS GREEN / OPEN SPACE MANAGEMENT WATER ROADS / TRANSPORT DEVELOPMENT BUILT Strategy Water Management Habitat Networks
hydrology - catchments & hydrology - flooding neutral grassland fen marsh swamp former John’s Burn
Green and Open Spaces Stewardship over Time
Integrated Green Infrastructure Strategy
existing green network: south-west Glasgow undefined amenity space landscape management plan Access Networks
Existing Woodland Proposed woodland creation proposed meadow creation proposed / consolodated developed public open space existing green belt Dams to Darnley Country Park
Landscape Urbanism Design barriers to movement: subdivision of urban area Strategy crossing points INTEGRATED GREEN INFRASTRUCTURE POLICY
DELIVERY
Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE
STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI
MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK
Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE
STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI
MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK
Landscape Urbanism Design Strategy SOUTH-WEST GLASGOW / NITSHILL IGI
Water Management Habitat Networks
hydrology - catchments & hydrology - flooding neutral grassland fen marsh swamp former John’s Burn
Green and Open Spaces Stewardship over Time
Integrated Green Infrastructure Strategy
existing green network: south-west Glasgow undefined amenity space landscape management plan Access Networks
Existing Woodland Proposed woodland creation proposed meadow creation proposed / consolodated developed public open space existing green belt Dams to Darnley Country Park
Landscape client: Urbanism Glasgow & Clyde Valley Green Network Partnership / GCC barriers to movement: subdivision of urban area crossing points Design team: ERZ & Enviro-centre (ecology / hydrology) Strategy HYDROLOGY: CATCHMENTS
River Clyde
White Cart Water
Levern Water Brock Burn
Landscape Urbanism Design Strategy HYDROLOGY: FLOODING
200 year pluvial flood
30 year pluvial flood
1984 flood event
Landscape Urbanism Design Strategy URBAN STRUCTURE: BARRIERS
Landscape Urbanism Design Strategy URBAN STRUCTURE: BARRIERS
Landscape Urbanism Design Strategy URBAN STRUCTURE: DESTINATIONS
800m = 10 min walk
400m = 5 min walk
Landscape Urbanism Design Strategy URBAN STRUCTURE: DENSITY
Landscape Urbanism Design Strategy WIDER GREEN NETWORK: GAPS
Pollok Country Park
Dams to Darnley Country Park Rouken Glen Park
Landscape Urbanism Design Strategy STRATEGY: GREEN NETWORK
green network that functions on both a local and citywide level
centre of Nitshill becomes a hub of the green network & a key point of arrival to Dams to Darnley Country Park and wider network
make the green network accessible & visible & redefine the character / identity of the area
Landscape Urbanism Design Strategy STRATEGY: WATER
Peat Road corridor redesigned to manage surface water thro’ SUDs features such as: swales, linear wetland, tree planting etc.
SUDs features associated with adjacent residential development site incorporated into linear park
SUDs feature created as terminus to boulevard on cleared site: addressing water management requirements of surrounding development sites
linear swale/wetland SUDs features incorporated into design of green link: management of surface water in upper portion of catchment (south of rail line)
Landscape Urbanism Design Strategy STRATEGY: OVERVIEW
Landscape Urbanism Design Strategy DETAIL AREAS:
Landscape Urbanism Design Strategy GREATER EASTERHOUSE IGI
Landscape Urbanism Design client: Glasgow City Council / GCVGNP team: ERZ & Enviro-centre (ecology / hydrology) Strategy HYDROLOGY: CATCHMENTS
Landscape Urbanism Design Strategy GREEN NETWORK: BREAKS
Landscape Urbanism Design Strategy WIDER GREEN NETWORK:
Glasgow
Strathkelvin Railway Path to Kirkintilloch Bishopbriggs
Glenboig Glasgow to Cumbernauld Gartcosh
Ruchazie
Cranhill Airdire Blairtummock
NCR 75 Bargeddie
Rutherglen
NCR 75
1km Coatbridge Glasgow 7 Lochs Cycle Link Coatbridge 0km 16km
Glasgow Coatbridge NCR 75 Landscape 0km 24km Urbanism Design Strategy STRATEGY:
Landscape Urbanism Design Strategy DETAIL AREAS:
Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE
STRATEGY NITSHILL / SW GLASGOW IGI GREATER EASTERHOUSE IGI
IN AREAS OF ANTICIPATED CHANGE
PLANNING / DESIGN GUIDANCE
CREATES COMMON PLATFORM OF UNDERSTANDING FOR ALL PARTIES
NEED TO EMBED IN STATUTORY PROCESSES Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE
MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK
Landscape Urbanism Design Strategy FORESTERHILL CAMPUS
Landscape Urbanism Design client: NHS Grampian / Green Exercise Partnership team: ERZ & Enviro-centre (ecology / hydrology) Strategy FORESTERHILL: 1944
Landscape Urbanism Design Strategy EXISTING: ROADS / PARKING
Landscape Urbanism Design Strategy FORESTERHILL GI MASTER PLAN
Landscape Urbanism Design Strategy FORESTERHILL CAMPUS
Landscape Urbanism Design Strategy FORESTERHILL CAMPUS
Landscape Urbanism Design Strategy HALFWAY PARK
Landscape Urbanism Design Strategy client: Southside Housing Association HALFWAY PARK Strategy Design Urbanism Landscape Project Title: Revision Number: Drawing Number: Client: NTS Site Section2 Drawing Title: Notes: 'Halfway Park' Moss Heights Scale: Date: Association Southside Housing 13.07.2015 erz/13/13/ Planning drawing priortoworkcommencing. any discrepanciescontainedinthis attention oftheLandscapeArchitect The contractoristobringthe D site. All dimensionsaretobeverifiedon o n o t s erz Limited c a
le 21 James Morrison Street f r P 09 o Glasgow G1 5PE m t h is d
r T/F: 0141 552 0888 a win E: [email protected] g .
W: www.erzstudio.co.uk MGP 2014: CAMLACHIE
Landscape Urbanism client: Design West of Scotland Housing Association / Strategy Glasgow City Council / CSGN MGP 2014: CAMLACHIE
Landscape Urbanism Design Strategy MGP 2014: CAMLACHIE
Landscape Urbanism Design Strategy MGP 2014: CAMLACHIE
Landscape Urbanism Design Strategy MGP 2014: CAMLACHIE
Landscape Urbanism Design Strategy INTEGRATED GREEN INFRASTRUCTURE
MASTERPLAN / DELIVERY FORESTERHILL HEALTH CAMPUS IGI HALFWAY PARK IGI GLASGOW 2014 MGP: BARROWFIELD PARK
PROBLEM SOLVING INTERVENTIONS
DRIVEN BY NEED FOR CHANGE
SEEK BETTER BALANCE OF ‘SYSTEMS’ IN BUILT ENVIRONMENT Landscape Urbanism Design Strategy Landscape Urbanism Design
HABITAT NETWORKS HABITAT ACCESS NETWORKS GREEN / OPEN SPACE MANAGEMENT WATER ROADS / TRANSPORT DEVELOPMENT BUILT Strategy