Transit Master Plan Recommendations December 2020
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Feasibility Study for Intercity Rail Service to T.F. Green Airport April 2017
Feasibility Study for Intercity Rail Service to : RIAC Credit T.F. Green Airport Photo Infrastructure and Investment April Development Department 2017 and Feasibility Study for Intercity Rail Service to T.F. Green Airport April 2017 EXECUTIVE SUMMARY ...................................................................................................................................... 1 1 INTRODUCTION ......................................................................................................................................... 1 1.1 CONTEXT FOR STUDY .............................................................................................................................................................. 1 1.2 SCOPE FOR STUDY ................................................................................................................................................................. 1 1.3 REFERENCE STUDIES .............................................................................................................................................................. 2 2 EXISTING RAIL SERVICE ............................................................................................................................ 3 2.1 RHODE ISLAND ...................................................................................................................................................................... 3 2.2 SOUTHEASTERN CONNECTICUT .......................................................................................................................................... -
Expand Service to New Areas
Transit Forward RI 2040 Initiative 2 Expand Service to New Areas Transit Forward RI will provide a vareity of new services: • Bus services to new areas • New crosstown bus routes • Wickford/Quonset Flex service • Network of mobility hubs • Amtrak station at TF Green Airport • Expanded seasonal and special event services • A Service Partnership program to encourage public- private partnerships to expand transit service 22 Initiative 2 | Expand Service to New Areas New Local Fixed-Route Services Will Bring Transit to More People New local fixed-route services would be developed in areas where there is moderate to high demand, but are currently either unserved or underserved. These routes would be: • Providence • N7 Valley Street • Woonsocket • N16 Bellingham-Manville • Newport • N18 Hillside/Valley • N20 Newport-Narragansett • Narragansett • N20 Newport-Narragansett • Westerly • N19 Westerly-Bradford • New crosstown routes in the Providence Metro Area (see following page) Woonsocket Newport Westerly 23 Transit Forward RI 2040 New Crosstown Services Will Make Non-Downtown Trips Faster Most of RIPTA’s services operate to and from downtown Proposed Crosstown Routes Providence, while large numbers of people make “crosstown” trips to other places. A major impediment to providing more crosstown service is that few crosstown roads exist in the Providence Metro Area. Still, a number of opportunities exist, and four new crosstown routes are recommended: • N9 VA Hospital - Eddy Street via Dean Street • N10 Mineral Spring Ave • N11 Cranston/Park Ave • N13 Olneyville Square - Eddy Street In addition, Route 58 Branch Ave would be converted to a crosstown route and Route 29 Kent County would continue to provide crosstown service across Warwick. -
South Station Expansion Project
Final Environmental Impact Report Chapter 5 – Response to Comments on the DEIR Chapter 5 – Response to Comments on the DEIR South Station Expansion June 2016 Massachusetts Department of Transportation Chapter 5 – Response to Comments on the DEIR Final Environmental Impact Report This Page Intentionally Left Blank June 2016 South Station Expansion Massachusetts Department of Transportation Final Environmental Impact Report Chapter 5 – Response to Comments on the DEIR 5.1. Introduction This Chapter presents comments received on the DEIR (EEA No. 15028). Section 5.2 includes the Certificate of the Secretary of Energy and Environmental Affairs dated December 31, 2014. Section 5.3 provides the original comment documents (including letters and emails) annotated with unique identifying codes for each comment. Section 5.3 provides responses to each comment in a tabular format. South Station Expansion June 2016 Massachusetts Department of Transportation Page 5-1 Chapter 5 – Response to Comments on the DEIR Final Environmental Impact Report This Page Intentionally Left Blank June 2016 South Station Expansion Page 5-2 Massachusetts Department of Transportation Final Environmental Impact Report Chapter 5 – Response to Comments on the DEIR 5.2. Secretary’s Certificate on the DEIR (December 31, 2014, EEA No. 15028) South Station Expansion June 2016 Massachusetts Department of Transportation Page 5-3 Chapter 5 – Response to Comments on the DEIR Final Environmental Impact Report This Page Intentionally Left Blank June 2016 South Station Expansion Page 5-4 Massachusetts Department of Transportation <Tlie Commonwea{t/i of Massacliusetts ~cutive Office of!Energy ana !Environmenta{}ljfairs 100 Cam6ricfge Street, Suite 900 <Boston, :M}l 02114 Deval L. -
Washington County Transit Oriented
PARE PROJECT NO. 04196.00 WASHINGTON COUNTY TRANSIT-ORIENTED DEVELOPMENT PLANNING STRATEGY SEPTEMBER 2005 Washington County Transit-Oriented Development Planning Strategy September 2005 Rhode Island Statewide Planning Program One Capital Hill Providence, Rhode Island 02908 Washington County Regional Planning Council P.O. Box 28 Saunderstown, Rhode Island 02874 Town of North Kingstown 80 Boston Neck Road North Kingstown, Rhode Island 02852-5702 Prepared by: Pare Engineering Corp. 8 Blackstone Valley Place Lincoln, RI 02865 This project was supported by the Rhode Island Statewide Planning Program with funding provided by the US Department of Transportation, Federal Highway Administration Washington County Transit-Oriented Development Planning Strategy Table of Contents Page Number EXECUTIVE SUMMARY 1 Section 1 ASSESSMENT OF COMMUTER RAIL EXTENSION ADVANTAGES 8 Introduction 8 Pilgrim Partnership Agreement 8 Wickford Junction Station 10 Demand 10 SCCRS Schedule 12 Ridership Projections 14 Supporting State and Local Plans 15 Previous Studies 17 Rhode Island Rail Corridor Feasibility Study 17 Final Environmental Impact Statement/Report Northeast Corridor Improvement Project Electrification 18 South County Commuter Rail Environmental Assessment 18 Section 2 ASSESSMENT OF GROWTH POTENTIAL 21 Introduction 21 Population 21 Exeter 24 North Kingstown 24 Land Use 24 Exeter 25 North Kingstown 25 Housing 25 Exeter 26 North Kingstown 27 Build-out Analysis 27 Exeter 28 North Kingstown 32 Similar Commuter Rail Projects 36 MBTA New Bedford – Fall River -
South County Commuter Rail Operations Plan
SOUTH COUNTY COMMUTER RAIL SERVICE OPERATIONS PLAN PROVIDENCE TO WESTERLY, RI JULY 2001 RHODE ISLAND DEPARTMENT OF TRANSPORTATION South County Commuter Rail Service Rhode Island Department of Transportation Operations Plan Providence to Westerly, RI Prepared by: Edwards and Kelcey, Inc 95 Cedar Street, Suite 101 Providence, RI 02903 In Association With: Parsons Brinckerhoff Quade and Douglas, Inc One State Street Providence, RI 02908 July 2001 RIDOT South County Commuter Rail TABLE OF CONTENTS EXECUTIVE SUMMARY......................................................... ES-1 Introduction ............................................................... ES-1 SECTION 1.0 OPERATIONS PLAN..................................................1-1 1.1 Operational Overview............................................1-1 1.2 Facilities Overview ..............................................1-7 1.3 Introduction to Service Alternatives ................................1-12 1.4 Stand-Alone Commuter Service (Alternative 1) ......................1-14 1.5 CDOT Service Extension (Alternative 2)............................1-18 1.6 MBTA Service Extension (Alternative 3) ...........................1-19 SECTION 2.0 SERVICE OPTIONS, OPERATING ASSUMPTIONS AND COSTS .............2-1 2.1 Introduction ....................................................2-1 2.2 Alternatives 1A and 1B: Rhode Island DOT Stand-Alone Service (Pawtucket or Westerly Layover Facility) ........................................2-2 2.3 Alternative 2: Shore Line East Service Extension......................2-5 -
Case 1:15-Cv-00165-ML-PAS Document 15 Filed 06/20/16 Page 1 of 26 Pageid #: 496
Case 1:15-cv-00165-ML-PAS Document 15 Filed 06/20/16 Page 1 of 26 PageID #: 496 UNITED STATES DISTRICT COURT DISTRICT OF RHODE ISLAND CONSERVATION LAW FOUNDATION ) ) Plaintiff, ) ) v. ) Case No. 1:15-cv-165-ML-PAS ) UNITED STATES ENVIRONMENTAL ) NO JURY TRIAL PROTECTION AGENCY, ) Regina McCarthy, Administrator ) ) and ) ) UNITED STATES ENVIRONMENTAL ) PROTECTION AGENCY, REGION 1, ) H. Curtis Spalding, Regional Administrator ) ) Defendants. ) ) FIRST AMENDED COMPLAINT FOR DECLARATORY AND INJUNCTIVE RELIEF The Conservation Law Foundation (“CLF”), on behalf of itself and its individual members who live in Rhode Island and throughout New England, now comes and alleges as follows: I. NATURE OF THE ACTION 1. This is a citizen suit against Regina McCarthy in her capacity as Administrator of the United States Environmental Protection Agency (respectively, “the Administrator” and “EPA”) and H. Curtis Spalding in his capacity as Regional Administrator of the EPA for Region 1 (collectively, “Defendants”) for failure to carry out two non-discretionary duties under the Clean Water Act, 33 U.S.C. §§ 1251 et seq. (“the Clean Water Act,” “the Act,” or “CWA”): first, they have failed to notify certain commercial and industrial dischargers Page 1 of 26 Case 1:15-cv-00165-ML-PAS Document 15 Filed 06/20/16 Page 2 of 26 PageID #: 497 that they are required to obtain discharge permits under the Rhode Island Pollution Discharge Elimination System because Defendants have determined that these dischargers are contributing to water quality violations and require stormwater controls; and second, they have failed to provide each of these commercial and industrial dischargers with an application for permit coverage. -
New Haven to Boston
_final cover.3 5/26/04 10:44 Page 1 AMTRAK’S HIGH SPEED RAIL PROGRAM NEW HAVEN TO BOSTON HISTORY AND HISTORIC RESOURCES _final cover.3 5/26/04 10:44 Page 2 PAL Final 5/26/04 11:21 Page 1 AMTRAK’S HIGH SPEED RAIL PROGRAM NEW HAVEN TO BOSTON HISTORY AND HISTORIC RESOURCES This document was prepared by PAL (The Public Archaeology Laboratory,Inc.) with funding provided by the National Railroad Passenger Corporation, Amtrak. Printed in Rhode Island 2001 PAL Final 5/26/04 11:21 Page 2 2 CONTENTS NEW HAVEN TO BOSTON NEW HAVEN 3 Introduction 7 History 39 Stations 52 Railroad Maintenance and Service Facilities 55 Signals and Switches 61 Grade Crossing Eliminations 65 Bridges 73 Freight and Industries 80 Image Credits 80 Recommended Reading In the year 2000, Amtrak inaugurated its new Acela Express high-speed rail service on the Northeast Corridor, ushering in a premium level of service that will set the standard for transportation in this country. Achieving this mile- stone has required a Herculean effort by many states, agencies, companies and individuals. Indeed, between 1992 and 1999, the railroad between New Haven and Boston was transformed from a sleepy, 1940s era line to the INTRODUCTION premier rail line in North America, capable of train speeds up to 150 mph. This has required some $1.7 billion in new rails and ties, signal system upgrades, In the year 2000, the National Railroad Passenger Corporation, Amtrak, ushered bridge replacements, capacity and station improvements, curve realignments, in a new era of railroading in America with the initiation of Acela high-speed and at-grade crossing upgrades. -
Comprehensive Community Plan 2020 – 2040
TOWN OF WESTERLY, RHODE ISLAND COMPREHENSIVE COMMUNITY PLAN 2020 – 2040 2020 Comprehensive Plan | 1 REVISED WORKING DRAFT FEBRUARY May 18, 2020 2020 2020 Comprehensive Plan | 2 ACKNOWLEDGEMENTS The Town of Westerly extends its sincere thanks to the many residents, community advocates, business leaders, stakeholders, and staff who have participated in the creation of this Comprehensive Plan. The sharing of your knowledge and experiences and the volunteering of your skills and time has been instrumental to the future we have envisioned herein. Town Manager J. Mark Rooney TOWN COUNCIL PLANNING BOARD Council President Christopher A. Duhamel Chairman James A. Hall, IV Council Vice President Suzanne K. Giorno Vice Chairman Richard W. Constantine Sharon E. Ahern Secretary Christopher K. Lawlor William J. Aiello Alternate Secretary Justin M. Hopkins Karen A. Cioffi Catherine DeNoia Jason A. Parker Caswell Cooke, Jr. Jason A. ParkerDylan A. Kosten Brian H. McCuin Dylan A. KostenJoseph Montesano Joseph Montesano DEPARTMENT OF DEVELOPMENT SERVICES COMPREHENSIVE PLAN CITIZENS’ ADVISORY COMMITTEE Lisa Pellegrini, Director of Development Services Chairwoman Gail E. Mallard Nancy E. Letendre, Esq., AICP, Town Planner Vice Chairman Joseph T. MacAndrew Nathan Reichert, Zoning Official Faith Bessette-Zito Benjamin R. Delaney, Principal Planner Stuart G. Blackburn James J. Federico, III LEGAL COUNSEL Gina T. Fuller Bengtson & Jestings, LLP Nancy N. Richmond Catherine DeNoia CONSULTANTS Salvatore Zito Mason & Associates, Inc. John Armstrong New England GeoSystems -
H 7209 Substitute a As Amended ======Lc00811/Sub a ======State of Rhode Island
2012 -- H 7209 SUBSTITUTE A AS AMENDED ======= LC00811/SUB A ======= STATE OF RHODE ISLAND IN GENERAL ASSEMBLY JANUARY SESSION, A.D. 2012 ____________ A N A C T RELATING TO REDISTRICTING OF THE GENERAL ASSEMBLY Introduced By: Representative Stephen R. Ucci Date Introduced: January 19, 2012 Referred To: House Judiciary It is enacted by the General Assembly as follows: 1 SECTION 1. Section 22-1-2 of the General Laws in Chapter 22-1 entitled "Composition 2 of Senate" is hereby amended to read as follows: 3 22-1-2. Districts. -- The state is hereby divided into thirty-eight (38) senatorial districts 4 bounded and described as follows: 5 (1) It is understood and intended that for the purpose of this section a line described as 6 running on, along, to or through any street (including road, avenue, lane, way, parkway, 7 expressway, divided highway, state route or interstate route, or trail), stream or river, is intended 8 to mean the center line of that street, stream or river, and a line described as the shoreline is 9 intended to mean the line along the mean low water level, and a feature extension is intended to 10 mean the imaginary straight-line extension from the end of a map feature, usually a street or road, 11 to another feature, as for example, from the end of a dead-end street to a nearby river, in all 12 instances, unless it shall be otherwise specified. 13 (2) It is further understood and intended that for the purpose of this section, the districts 14 described in this section shall be composed of United States census geography (tracts and blocks), 15 as defined by the 2000 2010 version of the "TIGER" files from the United States Census Bureau, 16 whose boundaries correspond to the below metes and bounds set forth in this section and which 17 are hereby made a part of this chapter. -
Comprehensive Community Plan for Town Council Public Hearing on January 4, 2021
TOWN OF WESTERLY, RHODE ISLAND COMPREHENSIVE COMMUNITY PLAN 2020 – 2040 DECEMBER 3, 2020 FOR PUBLIC HEARING ON JANUARY 4, 2021 ACKNOWLEDGEMENTS The Town of Westerly extends its sincere thanks to the many residents, community advocates, business leaders, stakeholders, and staff who have participated in the creation of this Comprehensive Plan. The sharing of your knowledge and experiences and the volunteering of your skills and time has been instrumental to the future we have envisioned herein. Town Manager J. Mark Rooney TOWN COUNCIL PLANNING BOARD Council President Christopher A. Duhamel Chairman James A. Hall, IV Council Vice President Suzanne K. Giorno Vice Chairman Richard W. Constantine Sharon E. Ahern Secretary Christopher K. Lawlor William J. Aiello Alternate Secretary Justin M. Hopkins Karen A. Cioffi Jason A. Parker Caswell Cooke, Jr. Dylan A. Kosten Joseph Montesano Brian H. McCuin Salvatore Zito DEPARTMENT OF DEVELOPMENT SERVICES COMPREHENSIVE PLAN CITIZENS’ ADVISORY COMMITTEE Lisa Pellegrini, Director of Development Services Former Chairwoman Gail E. Mallard Nancy E. Letendre, Esq., AICP, Town Planner Vice Chairman Joseph T. MacAndrew Nathan Reichert, Zoning Official Faith Bessette-Zito Benjamin R. Delaney, Principal Planner Stuart G. Blackburn Alyse Y. Oziolor, Principal Planner James J. Federico, III John Armstrong LEGAL COUNSEL Atty. Scott Levesque, Bengtson & Jestings, LLP Gina T. Fuller Nancy N. Richmond CONSULTANTS Catherine DeNoia Mason & Associates, Inc. New England GeoSystems 2020 Comprehensive Plan | i TABLE OF CONTENT -
Economic Development in Rhode Island Policies and Strategies
University of Rhode Island DigitalCommons@URI Open Access Master's Theses 1979 ECONOMIC DEVELOPMENT IN RHODE ISLAND POLICIES AND STRATEGIES David R. Westcott University of Rhode Island Follow this and additional works at: https://digitalcommons.uri.edu/theses Recommended Citation Westcott, David R., "ECONOMIC DEVELOPMENT IN RHODE ISLAND POLICIES AND STRATEGIES" (1979). Open Access Master's Theses. Paper 395. https://digitalcommons.uri.edu/theses/395 This Thesis is brought to you for free and open access by DigitalCommons@URI. It has been accepted for inclusion in Open Access Master's Theses by an authorized administrator of DigitalCommons@URI. For more information, please contact [email protected]. ECONOMIC DEVELOPMENT IN RHODE ISLAND POLICIES AND STRATEGIES BY DAVID R. WESTCOTT A THESIS PROJECT SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF COMMUNITY PLANNING UNIVERSITY OF RHODE ISLAND 1979 MASTER OF COMMUNITY PLANNING THESIS PROJECT OF DAVID R. WESTCOTT Approved: I Major Prof'essor n Community Planning and UNIVERSITY OF RHODE ISLAND 1979 ACKNOWLEDGEMENTS I would like to thank President Frank Newman of the University of Rhode Island who was instrumental in my in volvement with economic development in Rhode Island. I would also like to thank my advisor, Dr. Dennis c. Muniak, for services rendered and my wife, Iris K. Westcott for her infinite patience. AHSTRACT This project consists of a brief history of the Rhode Island economy, a discussion of the need for economic de velopment, and some of the advantages and disadvantages of development. It also discusses Rhode Island's assets, resources, and limiting factors to economic development, leading to recommendations of p olicy priorities and stra tegies for action to improve Rhode Island's economy. -
2010 NEC Infrastructure Master Plan
[THIS PAGE INTENTIONALLY LEFT BLANK] March 24, 2010 Thomas Carper Joseph H. Boardman Chairman of the Board President and Chief Executive Officer National Railroad Passenger Corporation National Railroad Passenger Corporation 60 Massachusetts Avenue, N.E. 60 Massachusetts Avenue, N.E. Washington, DC 20002 Washington, DC 20002 Dear Messrs. Carper and Boardman: As members of the Amtrak Northeast Corridor (NEC) Infrastructure Master Plan Policy Group, the twelve northeast states and the District of Columbia have worked cooperatively and collaboratively with Amtrak and the Federal Railroad Administration (FRA) to develop and review the Amtrak Northeast Corridor Railroad Infrastructure Master Plan (Master Plan). Started in 2007 and refined over three years, the Master Plan is a first. It is the first passenger rail infrastructure plan to incorporate a regional, corridor-wide perspective of the NEC Main Line and all its feeder lines. It is the first planning process to involve all the northeast states and the District of Columbia with Amtrak. It is the first to consider the plans and infrastructure needs of all the NEC users – intercity, commuter and freight. This foundational document identifies an initial baseline of infrastructure improve ments needed to maintain the current NEC system in a state of good repair; integrate intercity, commuter and freight service plans; and move the NEC forward to meet the expanded service, reliability, frequency, and trip time improvements that are envisioned by the northeast states and the District. Therefore, we are pleased to endorse the collaborative planning process and Amtrak’s Infrastructure Master Plan Final Report. The Master Plan is the first in a series of planning activities that must be undertaken if an expanded NEC – as part of an integrated, intermodal regional transportation system – is to support future economic growth and environmental and energy goals.