Manual 15 Emergency Operations Manual Manual 15 Emergency Operations Manual Issued: July 2021 Version: 8.0 Effective Date: 07/07/2021 Committee Acceptance: 08/13/2020 OC Prepared By: NYISO Grid Operations New York Independent System Operator 10 Krey Boulevard Rensselaer, NY 12144 (518) 356-6060 www.nyiso.com Disclaimer: The information contained within this manual, along with other NYISO manuals, is intended to be used for information purposes only, and is subject to change. The NYISO is not responsible for the user’s reliance on these publications, or for any erroneous or misleading material. ©Copyright 1999-2021 New York Independent System Operator Emergency Operations Manual | ii Table of Contents REVISION HISTORY ........................................................................................................................................................... VII 1. OVERVIEW0B .................................................................................................................................................................... 1 1.1.9BOperating Policy ................................................................................................................................... 1 1.2.10BOperating States ................................................................................................................................. 2 1.2.1. Determining54B the Operating State ...................................................................................................... 2 1.2.2. Operating55B Objectives ......................................................................................................................... 3 1.2.3. Generator56B Response During Reserve Activation ................................................................................ 4 1.3.110B11BGovernmental and Public Relations Notification Procedures .......................................................... 4 1.3.1. NYISO57B – Transmission Owner Emergency Notifications ..................................................................... 5 1.3.2. NYS58B Public Service Commission (PSC) Notification ............................................................................. 5 1.3.3. NYISO60B Public Relations Notification ................................................................................................... 6 1.4.13BCommunications ................................................................................................................................. 6 1.4.1. Emergency61B Notification ..................................................................................................................... 6 1.4.2. Non62B -Emergency Communications ...................................................................................................... 7 1.4.3. Emergency63B Status Updates ................................................................................................................ 7 1.4.4. Dissemination64B of Emergency Communications .................................................................................. 7 1.5.14BEmergency Communication Systems................................................................................................. 7 1.5.1. Emergency65B Hot Line System ............................................................................................................... 8 1.5.2. Load66B Shed Alarm System .................................................................................................................... 9 1.5.3. Alternate67B Emergency Hot Line ........................................................................................................... 9 1.5.4. NERC68B Reliability Coordinator Information System ............................................................................. 9 2. ALERT1B STATE ............................................................................................................................................................... 10 2.1.15BDefinition of the Alert State .............................................................................................................. 10 2.2.16BAlert State Criteria ............................................................................................................................. 10 2.3.17BResponses to the Alert State ............................................................................................................ 11 3. MAJOR2B EMERGENCY STATE ........................................................................................................................................ 15 3.1.18BDefinition of the Major Emergency State ......................................................................................... 15 3.2.19BMajor Emergency Criteria ................................................................................................................. 15 3.3.20BResponses to Major Emergency ....................................................................................................... 17 3.3.1. Major69B Emergency Declared by NYISO .............................................................................................. 17 3.3.2. Emergency70B Declared by Transmission Owner .................................................................................. 20 4. MONITORED3B CONDITIONS .......................................................................................................................................... 22 4.1.21BTransmission Rating Exceedance .................................................................................................... 22 Emergency Operations Manual | iii 4.1.1. Actual71B LTE and STE Rating Exceedance ............................................................................................ 22 4.1.2. Post72B -Contingency STE Rating Exceedance ....................................................................................... 23 4.2.High or Low Voltage .......................................................................................................................... 23 4.3.23BPost-Contingency Voltage IROL Exceedance ................................................................................... 24 4.4.24BOperating Reserve Deficiency .......................................................................................................... 25 4.4.1. Shortage74B Operating Reserve New York City – Day-Ahead Forecast ................................................. 26 4.4.2. Shortage Operating Reserve – In Day .............................................................................................. 27 4.4.3. Shortage76B Operating Reserve – Real Time ........................................................................................ 29 4.4.4. Shortage77B of Meeting Load (Including the Inability to Reach a “0" ACE) – Real Time ....................... 31 4.5.25BIROL Stability Limit Exceedance ....................................................................................................... 31 4.6.26BHigh/Low Frequency ......................................................................................................................... 32 4.7.27BOvergeneration .................................................................................................................................. 33 4.8.Procedure for overloads caused by NYISO Controlled Facility Common Tower, Bus or Stuck Circuit Breaker (SCB) contingencies ............................................................................................................... 34 5. RESERVED4B FOR FUTURE USE ....................................................................................................................................... 36 6. RESTORATION5B STATE .................................................................................................................................................. 37 6.1.32BDefinition of the Restoration State .................................................................................................. 37 6.2.33BRestoration Criteria ........................................................................................................................... 37 6.2.1. Scope78B ................................................................................................................................................ 37 6.2.2. Strategy79B ............................................................................................................................................ 37 6.2.3. Priorities80B ........................................................................................................................................... 38 6.2.4. Re81B sponsibilities ................................................................................................................................ 38 6.3.34BResponses to the Restoration State ................................................................................................ 39 6.4.Criteria and Conditions for Reestablishing Interconnections ......................................................... 41 6.4.1. Assessment82B of System Conditions Prior to Interconnecting ............................................................. 41 6.4.2. Assessment82B of Tie Line Conditions and Coordination of Tie Line Operating Parameters ................. 41 6.4.3. Assessment and Coordination of Frequency Control for the Operation after Synchronization ....... 42 6.5.35BCommunications during Restoration ..............................................................................................
Recommended publications
  • Operating Reserves
    TECHNICAL AND MARKET ISSUES FOR OPERATING RESERVES Eric Hirst and Brendan Kirby Consulting in Electric-Industry Restructuring Oak Ridge, Tennessee October 19, 1998 INTRODUCTION Ancillary services matter! That’s the key lesson to learn from the problems faced by the California Independent System Operator (ISO) during the summer of 1998. And California will not be alone. Unless ISO New England changes its market rules, it, too, will face serious problems in the acquisition, pricing, and costs of ancillary services. These problems arose (and will continue to occur) because the electricity industry as a whole does not yet recognize the technical and market importance of ancillary services. These services are, like transmission, essential for both reliability and commercial functions. Because most of these services are provided by the same pieces of equipment (generators) that produce energy, the energy and ancillary services markets are tightly coupled. Problems in one market will, unavoidably, cause problems in other markets. Poorly designed rules can amplify the problems from one market to the next. This paper uses operating reserves as an example to illustrate these issues, problems, and possible solutions. Electricity is the ultimate “real-time” product, with its production, transportation, and consumption occurring within a fraction of a second. Because electricity moves at nearly the speed of light and cannot be readily stored, bulk-power systems must maintain a continuous and near-instantaneous balance between production and consumption. Operating reserves are the ancillary services that maintain this balance when a major generator or transmission line unexpectedly fails. DEFINITION The utility industry understands well the technical requirements for operating reserves because the service has been an important part of operating power systems for decades (Hirst and Kirby 1997 and 1998).
    [Show full text]
  • Long Term Evaluation of Operating Reserve with High Penetration of Renewable Energy Sources
    1 Long Term Evaluation of Operating Reserve with High Penetration of Renewable Energy Sources Armando M. Leite da Silva, Fellow, IEEE, Mauro A. Rosa, Warlley S. Sales, and Manuel Matos, Member, IEEE Abstract − Due to the high penetration of renewable energy into quate to assess short-term risks for time intervals up to a few the energy matrix of today’s power networks, the design of gene- hours. In this case, the system risk obtained is conditioned to a rating systems based only on static reserve assessment does not short period, assuming that the operator knows a priori the seem to be enough to guarantee the security of power system op- generating units available to take up load. Conversely, in the eration. From the wind power integration perspective, this ener- medium- and long-term running, the operator does not know gy source imposes additional requirements, mainly due to the in- exactly the set of generating units that will be available for herent unpredictable characteristic of the wind. Besides the un- certainties in load and generating unit availabilities, the operat- each period of time and, therefore, the risk assessment must ing reserve needs also to deal with the fluctuation characteristic account for the chronological evaluation of the generating ca- of the wind power. Therefore, more flexibility of the conventional pacity system. generators (hydro and thermal) is required to provide system Due to the growing penetration of renewable energy into support services. This paper discusses a new methodology based the energy matrix of today’s power networks, the design of on chronological Monte Carlo simulation to evaluate the operat- generating system based only on static reserve assessment ing reserve requirements of generating systems with large does not seem to be enough to ensure the security of power amounts of renewable energy sources, in particular, wind power.
    [Show full text]
  • ID #2013 005R, Operating Reserve
    Information Document Operating Reserve ID #2013-005R Information Documents are not authoritative. Information Documents are for information purposes only and are intended to provide guidance. In the event of any discrepancy between an information document and any authoritative document1 in effect, the authoritative document governs. 1 Purpose This information document relates to the following authoritative documents: • Section 205.1 of the ISO rules, Offers for Operating Reserve; • Section 205.2 of the ISO rules, Issuing Dispatches for Operating Reserve; • Section 205.3 of the ISO rules, Restatements for Operating Reserve (“Section 205.3”); • Section 205.4 of the ISO rules, Regulating Reserve Technical Requirements and Performance Standards (“Section 205.4”); • Section 205.5 of the ISO rules, Spinning Reserve Technical Requirements and Performance Standards (“Section 205.5”); • Section 205.6 of the ISO rules, Supplemental Reserve Technical Requirements and Performance Standards (“Section 205.6”); and • Section 302.1 of the ISO rules, ISO Directives (“Section 302.1”). The purpose of this information document is to assist market participants in understanding the operating reserve market. This information document is likely of most interest to market participants who currently provide or may in the future provide operating reserve. 2 Operating Reserve Operating reserve acts as a safety net, making extra power available to help balance the supply of, and demand for, electricity in real time and stabilizing and protecting the interconnected electric system in the event of unforeseen problems. There are two types of operating reserve: regulating reserve and contingency reserve. Each type of operating reserve performs a unique function and has unique technical requirements.
    [Show full text]
  • C-4 Confined Space Rescue
    CENTRAL ZONE OPERATIONS MANUAL Number: Title: Page 1 of 6 C-4 CONFINED SPACE PROCEDURES PURPOSE The purpose of this policy is to establish the minimum standards and requirements needed for Central Zone Fire Departments to comply with all applicable regulations including Title 8, General industry safety orders (GISO), Article 108, Confined Spaces – 5156, 5157, and 5158 and OSHA 29 CFR 1910.146. The intent is to provide minimum procedures and guidelines for responding personnel at confined space incidents in order to protect employees from life-threatening or other serious hazards posed by entry and work in confined spaces. Nothing in this policy shall prevent a department from exceeding these guidelines. DEFINITIONS: A confined space shall be defined as: Large enough and so configured that an employee can enter and perform assigned work; and Has limited or restricted means of entry or exit i.e., tanks, vessels, silos, storage bins, hoppers, vaults, and pits are types of spaces that may have limited means of entry; and Is not designed for continuous employee occupancy. A Permit-Required Confined Space is defined as a confined space that has one or more of the following: Contains or has a known potential to contain, a hazardous atmosphere; or Contains material with the potential for engulfment; or Has an internal configuration such that an entrant could be trapped or asphyxiated by inwardly converging walls, or a floor which slopes and tapers to a smaller cross section; or Contains any other recognized serious safety or health hazard. POLICY/PROCEDURES It is the responsibility of all personnel to follow the guidelines in this policy at all times.
    [Show full text]
  • Safe Operations Manual, March 15, 2015
    AFRICA OIL CORPORATION SAFE OPERATIONS MANUAL HEALTH SAFETY AND ENVIRONMENT Issued 2014 This manual contains confidential and proprietary information of Africa Oil Corporation. Any use of this manual without authorization from Africa Oil Corporation and/or its affiliates is prohibited. Proprietary - Safe Operations Manual HSE AFRICA OIL CORPORATION HSE SAFE OPERATIONS MANUAL Document Revision Data Rev No Revision Data Revised by (name) Date Comment 1.1 Document Issue and Distribution Document Title Issue Date Distribution Sign Signature Safe Operations Manual 2014 15 Mar 14 AOK Ops Team HSE Mgr Safe Operations Manual 2014 15 Mar 14 AOE Ops Team HSE Mgr 1.2 How to revise this document Suggestions for revision to this document can be sent to the AOC HSE Manager directly. Revisions shall be recorded in the table at section 1. Document revision Data. Full revision data is required and must be recorded along with the revision location (section and paragraph number) and date. This document shall be reviewed annually to ensure it remains current. 1.3 Distribution of this document This document provides the standards by which Africa oil Corporation shall conduct safe operations. This document is issued primarily to support field operations, is complimented by HSE Procedures and other standards are incorporated for office use. The Operations Team Management is responsible for further distribution to applicable contractors. Applicable contractors are those with direct contracts with Africa Oil Corporation in support of company activities. Page 2 of 133 Proprietary –AOC Safe Operations Manual AFRICA OIL CORPORATION HSE SAFE OPERATIONS MANUAL Intentionally left blank Page 3 of 133 Proprietary –AOC Safe Operations Manual AFRICA OIL CORPORATION HSE SAFE OPERATIONS MANUAL Manual Contents 1.
    [Show full text]
  • POLICIES and PROCEDURES HANDBOOK UNCW Center For
    POLICIES AND PROCEDURES HANDBOOK UNCW Center for Marine Science Updated Fall 2016 1 The Center for Marine Science at UNCW supports faculty, students and staff from various departments and centers who carry out research, education, and outreach activities related to coastal and marine science. These include both residents at the Center for Marine Science Myrtle Grove facility as well as faculty and students based at the College Road campus and at Wrightsville Beach. This handbook is designed to acquaint faculty, staff and students with CMS and provide information about the center and relevant policies. Please comply with all provisions of the handbook as they have been developed by faculty and staff to ensure that they are in accordance with university and state policies and guidelines, reduce multi-user conflicts over Center resources and services, provide for faculty governance, and aid in the operation of key facilities. No set of policies and procedures can anticipate every circumstance or question, and there will be situations where the need arises for us to revise, add, or cancel policies. Normally, the Handbook will be reviewed and updated on an annual basis. However, through consultation with CMS advisory committees, these policies and procedures may sometimes need to be altered more frequently to meet changing needs and be in compliance with university or state regulations. This handbook is in no way intended to replace or modify policies and procedures set in place by UNCW or the North Carolina University system. In any case of a difference in policy between this handbook and the University authorities, the University policy supersedes any CMS policy.
    [Show full text]
  • Operating Reserve Training
    JULY 12, 2013|MARLBOROUGH, MA Operating Reserve Training Welcome and Introductions Peter Brunette INSTRUCTIONAL DESIGNER CUSTOMER SERVICE & TRAINING Disclaimer for Customer Training ISO New England (ISO) provides training to enhance participant and stakeholder understanding. Because not all issues and requirements are addressed by the training, participants and other stakeholders should not rely solely on this training for information but should consult the effective Transmission, Markets and Services Tariff (“Tariff”) and the relevant Market Manuals, Operating Procedures and Planning Procedures (“Procedures”). In case of a discrepancy between training provided by ISO and the Tariff or Procedures, the meaning of the Tariff and Procedures shall govern. 2 Objectives • Explain Reserves in New England Markets • Understand Reserve Requirements • Understand how Markets meet those requirements 3 Agenda 8:30 a.m. – 8:40 a.m. Welcome and Introductions Peter Brunette, Instructional Designer, Customer Service and Training 8:40 a.m. – 10:00 a.m. Overview of Reserves Ronald Coutu, Manager, Business & Technology Solutions, Business Architecture and Technology 10:00 a.m. – 10:15 a.m. Break 10:15 a.m. – 12:00 p.m. Real-Time Reserve Market and Day-Ahead Energy Market Ronald Coutu, Manager, Business & Technology Solutions, Business Architecture and Technology 12:00 p.m. – 1:00 p.m. Lunch 1:00 p.m. – 2:45 p.m. Forward Reserve Market Ronald Coutu, Manager, Business & Technology Solutions, Business Architecture and Technology 2:45 p.m. - 3:00 p. m. Break 3:00 p.m. – 3:30 p.m. Wrap up Ronald Coutu, Manager, Business & Technology Solutions, Business Architecture and Technology 3:30 p.m.
    [Show full text]
  • Annual Report 2000 Higher Transport Performance We Were Able to Increase Our Transport Performance in Passenger and Freight Transport Significantly in 2000
    Annual Report 2000 Higher Transport Performance We were able to increase our transport performance in passenger and freight transport significantly in 2000. Positive Income Development Our operating income after interest improved by € 286 million. Modernization of Deutsche Bahn AG A comprehensive fitness program and the expansion of our capital expenditures will pave the way to our becoming an even more effective railway. Key figures Change in € million 2000 1999 in % Revenues 15,465 15,630 – 1.1 Revenues (comparable) 15,465 14,725 + 5.0 Income before taxes 37 91 – 59.3 Income after taxes 85 87 – 2.3 EBITDA 2,502 2,036 + 22.9 EBIT 450 71 + 533.8 Operating income after net interest 199 – 87 + 328.7 Return on capital employed in % 1.6 0.3 – Fixed assets 34,671 33,495 + 3.5 Total assets 39,467 37,198 + 6.1 Equity 8,788 8,701 + 1.0 Cash flow (before taxes) 2,113 2,107 + 0.3 Gross capital expenditures 6,892 8,372 – 17.7 Net capital expenditures 1) 3,250 3,229 + 0.7 Employees (as of Dec 31) 222,656 241,638 – 7.9 Performance figures Change Passenger Transport 2000 1999 in % Passengers DB Reise&Touristik million 144.8 146.5 – 1.2 DB Regio million 1,567.7 1,533.6 + 2.2 Total million 1,712.5 1,680.1 + 1.9 Passenger kilometers DB Reise&Touristik million pkm 2) 36,226 34,897 + 3.8 DB Regio million pkm 2) 38,162 37,949 + 0.6 Total million pkm 2) 74,388 72,846 + 2.1 Train kilometers DB Reise&Touristik million train-path km 175.9 177.5 – 0.9 DB Regio million train-path km 563.9 552.4 + 2.1 Total million train-path km 739.8 729.9 + 1.4 Freight Transport
    [Show full text]
  • Personal Protective Equipment (PPE) Program
    Personal Protective Equipment (PPE) Program The University Of Iowa Environmental Health & Safety 122 Grand Avenue Court Iowa City, IA 52242-1000 Phone: 319-335-8501 Date Revised/Reviewed: 6/1/2018 Table of Contents 1. Summary ................................................................................................................................ 2 2. Scope ...................................................................................................................................... 2 3. Policy and Regulation........................................................................................................... 2 4. Roles and Responsibilities .................................................................................................. 2 5. Procedures ............................................................................................................................. 3 6. Resources and Assistance .................................................................................................. 5 APPENDIX A - Forms .................................................................................................................. 6 APPENDIX B - PPE Information and Training Guides ........................................................... 7 Eye and Face Protection ................................................................................................................. 8 Protective Clothing ........................................................................................................................
    [Show full text]
  • WOCE (World Ocean Circulation Experiment)
    National Oceanographic Library – Archive WOCE Archive Archive location Archive A - PROJECT COLLECTIONS Part 1 Administrative Documents a= media/articles p= projects c= countries s= woce committees d= dpc t= satellites f= finance w= workshops i= international organisations j= jsc l= whp lines/moorings WOCE NOL file Subject Archive no. subject dates category. Box No. 3.3.2 First National Bank File 4/93-7/94 001-1f 1 3.3.2 First National Bank File 9/94-8/95 001-1f 1 3.3.2 First National Bank File 8/95-11/96 001-1f 2 3.3.2 First National Bank File 12/96-3/99 001-1f 2 3.3.2 First National Bank File 4/99-2/01 001-1f 3 3.1 WOCE Finances 5/86 - 01 002-2f 4 3.1.1 WOCE IPO Budget 88-96 002-2f 4 3.2.1 SOC Funding/Project 1/96 - 5/03 002-2f 4 3.2.2 Funding WCRP 6/92-10/99 002-2f 4 Funding Sources Countries, France, Japan, 3.2.3 Australia, Canada 89-02 002-2f 5 3.2.3 Funding Sources Countries Argentina, Germany, 90/95 002-2f 5 3.2.3 Funding Sources Countries Japan 90/95 002-2f 5 3.3.1 Russian Contract 92-96 002-2f 5 3.3.1 OMNET mailbox - finance 91-96 002-2f 5 3.3.1 WOCE IPO Staff Funding (2 Folders) 87-93 002-2f 6 3.2 IOSDL/NERC A/C's 89-95 003-3f 6 3.3.2 Signet/First Union Bank File 5/93-8/98 003-3f 7 3.3.2 Signet/First Union Bank File 10/98-7/03 003-3f 7 3.3.2 First National Bank/Allfirst File 3/01-12/02 003-3f 8 3.3.2 Cheque stubs Signet Bank 9/94-12/02 003-3f 8 4.6 Data Products Committee DPC 1/95-12/95 004-1d 9 4.6 Data Products Committee DPC 1/96-7/97 004-1d 9 4.6 Data Products Committee DPC 5/00-5/01 004-1d 10 4.6 Data Products Committee DPC
    [Show full text]
  • Field Operations Manual for Marine Water-Column Benthic, and Trawl
    FIELD OPERATIONS MANUAL FOR MARINE WATER-COLUMN, BENTHIC, AND TRAWL MONITORING IN SOUTHERN CALIFORNIA Southern California Bight Field Methods Committee March 2002 TABLE OF CONTENTS SECTION Acknowledgements ........................................................................................................................................................ 2 INTRODUCTION ................................................................................................................................................ 3 GENERAL CONSIDERATIONS........................................................................................................................ 5 Safety ........................................................................................................................................................ 5 Navigation................................................................................................................................................ 5 Cruise and Site Data................................................................................................................................ 6 Chain of Custody .................................................................................................................................... 7 WATER-COLUMN PROFILING....................................................................................................................... 9 Purpose....................................................................................................................................................
    [Show full text]
  • Strategies for Provision of Secondary Reserve Capacity to Balance Short-Term Fluctuations of Variable Renewable Energy
    Strategies for Provision of Secondary Reserve Capacity to Balance Short-Term Fluctuations of Variable Renewable Energy David-Constantin Radu Master of Science Thesis KTH School of Industrial Engineering and Management Energy Technology EGI_2017-0073-MSC EKV1199 Division of Heat & Power SE-100 44, STOCKHOLM Master of Science Thesis EGI_2017-0073-MSC EKV1199 Strategies for Provision of Secondary Reserve Capacity to Balance Short-Term Fluctuations of Variable Renewable Energy David-Constantin Radu Approved Examiner Supervisor 2017-09-18 Miroslav Petrov -KTH/ITM/EGI Miroslav Petrov Commissioner Contact person Energynautics GmbH Eckehard Tröster Peter-Philipp Schierhorn Abstract Recent trends and projections show a massive shift in power generation towards variable renewable energy (VRE), especially wind and solar PV. Renewable energy technologies are expected, in the upcoming decades, to become the primary source of electricity production and this will attract inherent design and operational challenges of power systems. One such challenge is posed by the ability of power systems to cope with short-term fluctuations, or intermittency, of variable renewable energy technologies. Strategies linked to this issue are related to the use of one specific subset of power system ancillary services, namely the active power control mechanism, responsible for the activation of primary, secondary and tertiary or reserves. The scope of this thesis is to develop and present a methodology that comes as solution to sizing and allocation of secondary reserves. The first part of the thesis (i.e. dimensioning of system-wide secondary reserve requirement) is based on high-resolution load and VRE generation time series. Input data is processed to represent more accurately the challenges secondary control has to cope with; and statistically analyzed according to predefined security-of-supply levels.
    [Show full text]