Fact Sheet: Penang

Total Page:16

File Type:pdf, Size:1020Kb

Fact Sheet: Penang Penang Quality Solutions Across the Entire Product Lifecycle Incorporated in 1995, Jabil Penang is located in the Bayan Lepas Free Trade Zone, close to major air and seaports, and road and railway links to Peninsular Malaysia. Occupying over a million sq. ft., Jabil Penang's strategic location, superior capabilities in any-mix, any-volume manufacturing, and supply chain management offer companies in search of cost-effective, quality solutions an unparalleled advantage. Jabil Penang offers end-to-end solutions in manufacturing, testing, and distribution including printed circuit board assembly, new product introduction, surface-mount technology processes, box-build with build-to-order and configure-to-order models, and root-cause failure analysis. The facility's implementation of Lean Six Sigma, automated process lines, and smart factory capabilities, particularly in the areas of predictive analytics and big data, revolutionize manufacturing efficiency, offering even greater productivity and efficiency than before. Operating 24/7, Jabil Penang serves global customers across a diverse range of industries including capital equipment, computing and storage, defense and aerospace, healthcare, industrial and energy, networking, and telecommunications. Jabil Penang offers end-to-end solutions in manufacturing, testing, and distribution including printed circuit board assembly and new product introduction. With highly innovative and responsive teams that are committed to delivering the highest quality products, services, and supply chain management processes in the industry, Jabil Penang is the proud recipient of numerous industry awards and is consistently rated by customers as “Best in Class” in the areas of technology, quality, responsiveness, delivery, cost, environmental awareness, and business management. ©2017 Jabil Circuit, Inc. Penang Shared Services Capabilities • High complexity electro-mechanical assembly • Machine-to-machine (M2M) communications GBC IT Center of Excellence — ERP and SCM • Medical equipment applications, quality and shop floor • Optics applications, service desk and IT • Supply chain control infrastructure, B2B and EDI • Wireless backhaul GBC FINANCE Asia: accounts payable, inter-company, Commitment to Quality corporate cost management; principal: REGISTRATIONS accounts receivable and management • TL 9000 accounting • ISO 9001 GBC SCM • ISO 13485 Material quotation services, supply chain • ISO 14001 management, full supplier compliance • AC7120 services, centralized procurement • AS9100 • ESD S20.20 Manufacturing Capabilities • OHSAS 18001 • Advanced manufacturing technology lab REGULATORY CERTIFICATES • Advanced mechanical assemblies • CCC • Any-mix, any-volume • CE • Automation engineering lab • CSA • Build-to-order/configure-to-order • Curtis-Straus • Cleanroom assembly • MET • Direct fulfillment • TUV • E-dashboards and control towers • TUV-R • Failure analysis lab • UL • Fluidics • ETL About Jabil Jabil’s unique combination of global expertise, ingenuity, analytics, and financial performance has contributed to the success of the world’s most well-known brands. We help companies design, build, and take their products to market quickly, affordably, and efficiently. But more than that, Jabil helps customers intelligently design their supply chains to be agile, economical, and effective even in uncertain times. We provide supply chain services for some of the world’s most respected and trusted brands in a broad range of industries including defense, aerospace, automotive, clean technology, computing, consumer, industrial, instrumentation, healthcare, networking, peripherals, storage, and telecommunications. Plant 1: 56, Hilir Sungai Keluang 1, Bayan Lepas Industrial Park Phase 4, Penang 11900, Malaysia Jabil Penang Plant 2: Plot 1242, Lebuh Kampung Jawa, FIZ Phase 3, Bayan Lepas, Penang 11900, Malaysia Plant 3: Plot 88(B) Jalan Lintang Bayan Lepas, Kawasan Perindustrian Bayan Lepas, Penang 11900, Malaysia For more information on Jabil locations or all other inquiries, please visit us at www.Jabil.com/contact..
Recommended publications
  • Chapter 2: Penang's Macroeconomic Performance
    Penang Economic and Development Report 2017/2018 22 Penang’s Macroeconomic 22 Performance 2.1 Output performance down from 8.7% in 2016 to 6.2% in 2017, it still exceeded the national average (1%) (Figure 2.2). The Penang’s economy has been growing at an average manufacturing and services sectors have been the rate of 5.6% over the past seven years (Figure main contributors to Penang’s GDP over the past 2.1). The state’s GDP growth slowed down by 0.3 seven years. In fact, Penang’s economic structure percentage point to 5.3% in 2017, mainly due to is mainly manufacturing- and services-oriented. In the negative 10.1% growth rate in the construction 2017, the services sector accounted for 49.3% of sector. Agricultural and manufacturing sectors GDP, while 44.8% was from the manufacturing sector registered the higher growth rates at 2.2% and 5.7%, (Table 2.1). However, the agricultural (2%), mining respectively, in 2017 compared to 2016, while the and quarrying (0.1%), and construction (2.6%) services sector remained at 5.6%. Although growth sectors were less significant, altogether accounting in Penang’s mining and quarrying sector had slowed for only 4.7% of Penang’s GDP. Figure 2.1 GDP growth in Malaysia and Penang, 2011–17 (at constant 2010 prices) 9.0 8.0 8.0 7.0 6.0 5.9 6.0 5.4 5.6 5.5 5.4 5.3 5.3 5.1 5.0 5.0 4.5 4.7 4.2 4.0 Percentage 3.0 2.0 1.0 0.0 2011 2012 2013 2014 2015 2016 2017 Malaysia Penang Source: Department of Statistics, Malaysia.
    [Show full text]
  • Seberang Perai(PDF)
    31 October 2014 (Friday) Pacifico, Yokohama, Japan DATO’ MAIMUNAH MOHD SHARIF MUNICIPAL PRESIDENT MUNICIPAL COUNCIL OF SEBERANG PERAI (MPSP) PENANG, MALAYSIA To cut emissions 3 categories; energy efficiency, low carbon technologies and halt deforestation Malaysia is adopting an indicator of a voluntary reduction up to 40 percent in terms of emissions intensity of GDP by the year 2020 compared to 2005 levels National Green Technology Council chaired by Malaysia Prime Minister, Penang Green Council, MPSP Level- Green Office Vision is for energy, economy, environment & society 2 To assists local authorities, townships developers, designers and individuals in accessing whether developments carried out within the city contribute towards the reduction or decrease in Green House Gases (GHG) 3 Incentives Carbon trading & regulation Increase technology support Ecological footprint Engagement with the public or residents 4 Less pollution Better Health GOOD Cleaner transport QUALITY OF LIFE Protects water supply Controls Flooding Provide bio-diversity 5 THINK GLOBAL ACT LOCAL 6 SEGREGATION AT SOURCE WASTE GENERATORS PAY: To reduce cost at landfill To reduce wastage and as a source for other beneficial output/ activities To involve industries in recycling to reduce waste To encourage innovation and productions of new item base on industrial and commercial waste To increase the life- span of existing sanitary landfill To encourage zero waste, waste minimization and low carbon initiative. 7 MOU with Kawasaki, Japan- Waste to
    [Show full text]
  • Design Conditions for PENANG/BAYAN LEPAS, Malaysia
    2005 ASHRAE Handbook - Fundamentals (SI) © 2005 ASHRAE, Inc. Design conditions for PENANG/BAYAN LEPAS, Malaysia Station Information Hours +/- Time zone Station name WMO# Lat Long Elev StdP Period UTC code 1a 1b 1c 1d 1e 1f 1g 1h 1i PENANG/BAYAN LEPAS 486010 5.30N 100.27E 4 101.28 8.00 MLY 8201 Annual Heating and Humidification Design Conditions Humidification DP/MCDB and HR Coldest month WS/MCDB MCWS/PCWD Coldest Heating DB 99.6% 99% 0.4% 1% to 99.6% DB month 99.6% 99% DP HR MCDB DP HR MCDB WS MCDB WS MCDB MCWS PCWD 2 3a3b4a4b4c4d4e4f5a5b5c5d6a6b 10 22.8 23.1 18.5 13.4 27.0 19.3 14.0 27.1 7.4 26.3 6.1 27.6 1.1 350 Annual Cooling, Dehumidification, and Enthalpy Design Conditions Hottest Cooling DB/MCWB Evaporation WB/MCDB MCWS/PCWD Hottest month 0.4% 1% 2% 0.4% 1% 2% to 0.4% DB month DB range DB MCWB DB MCWB DB MCWB WB MCDB WB MCDB WB MCDB MCWS PCWD 7 8 9a 9b 9c 9d 9e 9f 10a 10b 10c 10d 10e 10f 11a 11b 4 6.5 32.9 26.2 32.3 26.0 32.0 26.0 27.6 31.2 27.2 30.7 27.0 30.5 3.7 270 Dehumidification DP/MCDB and HR Enthalpy/MCDB 0.4% 1% 2% 0.4% 1% 2% DP HR MCDB DP HR MCDB DP HR MCDB Enth MCDB Enth MCDB Enth MCDB 12a 12b 12c 12d 12e 12f 12g 12h 12i 13a 13b 13c 13d 13e 13f 26.7 22.2 29.5 26.2 21.7 29.1 26.1 21.5 29.0 87.7 31.5 86.3 31.0 85.2 30.6 Extreme Annual Design Conditions Extreme Extreme Annual DB n-Year Return Period Values of Extreme DB Extreme Annual WS Max Mean Standard deviation n=5 years n=10 years n=20 years n=50 years 1% 2.5% 5%WB Max Min Max Min Max Min Max Min Max Min Max Min 14a 14b 14c 15 16a 16b 16c 16d 17a 17b 17c 17d 17e 17f
    [Show full text]
  • High-Level Roundtable Discussion on Smart Sustainable Cities World Smart Sustainable Cities Organization
    High-level Roundtable Discussion on Smart Sustainable Cities World Smart Sustainable Cities Organization Mr. Kyong-yul Lee Secretary General WeGO | World Smart Sustainable Cities Organization WHAT IS WeGO? INTERNATIONAL ORGANIZATION OF 131 CITIES + 5 NATIONAL ICT INSTITUTIONS + 7 CORPORATE MEMBERS • President City: Seoul • Executive Vice President City: Makati • Vice President Cities: Addis Ababa, Beyoğlu, Ha Noi, Jakarta, Mexico City, Moscow, Ulyanovsk Region • Executive Committee Member Cities: Bucharest, Chengdu, Goyang, Hebron, Khartoum State, Kigali, Nairobi, Pittsburgh, Seberang Perai, Ulaanbaatar • Regional Offices: Asia, Europe, Latin America, Mediterranean • Secretariat: Seoul Global Center 7F, South Korea WeGO | World Smart Sustainable Cities Organization WeGO MEMBERS 20 5 44 65 143 MEMBERS WORLDWIDE VISION: Smart Sustainable Cities for All • Innovative cities that leverage digital technology and connectivity to improve quality of life, efficiency of urban operation and services, and economic prosperity for all citizens, while ensuring long-term economic, social and environmental sustainability MISSION • To promote and facilitate the transformation of cities to Smart Sustainable Cities worldwide; • To be a global platform for cities to enhance their digital capabilities and leverage their innovation potentials in order to develop transformative solutions; and • To foster international exchange, cooperation, and learning among cities. WeGO | World Smart Sustainable Cities Organization WeGO ACTIVITIES 1. Capacity Building 3. Knowledge
    [Show full text]
  • Aspen Group Together with Oxley Holdings Aim to Bring Mixed-Use Integrated Development with Modern Conveniences to Air Itam
    PRESS RELEASE - FOR IMMEDIATE RELEASE Aspen Group together with Oxley Holdings aim to bring mixed-use integrated development with modern conveniences to Air Itam ▪ The Group together with Oxley Holdings Limited are investing RM165 mil to acquire a total of 7 pieces of freehold land measuring 29.05 acres (1.27 million sq ft) in Paya Terubong via a conditional sale and purchase agreement with Geo Valley Sdn Bhd ▪ The proposed development is a mixed-use development comprising residential towers, service apartments, retail lots and a community centre ▪ The land is strategically located within a matured suburban township serving a community as many as 400,000 people. ▪ The development will benefit from existing daily lifestyle amenities and well- connected excellent infrastructure in a matured residential township, including the ongoing Jalan Bukit Kukus Highway Project which will eventually link the Air Itam township to the FTZ area of Bayan Lepas, Penang International Airport and two Penang Bridges via the future Pan Island Link Singapore, 22 June 2019 – Aspen (Group) Holdings Limited (“Aspen” and together with its subsidiaries, the “Group”), today announced that its subsidiary company, Aspen Park Hills Sdn Bhd signed a conditional sales and purchase agreement with Geo Valley Sdn. Bhd., to acquire a total of seven pieces of freehold land measuring 29.05 acres in Paya Terubong for RM165mil. Geo Valley Sdn. Bhd. will also invest 25% equity in Aspen Park Hills Sdn Bhd. Parts of the land are currently approved by the local council for mixed development and for the construction of part of the Jalan Bukit Kukus paired road linking Thean Teik Highway from Air Itam to Jalan Paya Terubong.
    [Show full text]
  • ISO 14001 Certification
    CERTIFICATE Certificate Number: 141099.01 With One Page Addendum The Environmental Management System and implementation of: Western Digital Technologies, Inc. With central functions at: 5601 Great Oaks Parkway San Jose, CA 95119-1003 United States meets the requirements of the standard: ISO 14001:2015 Scope: Manufacturing of Storage Solutions and Components Certificate Expires: April 17, 2024 Certificate Reissued: April 25, 2021 Certificate Issued: April 18, 2021 Certified Since: June 25,1995 Dr. Cem O. Onus Managing Director DEKRA Certification, Inc. 1120 Welsh Road, Suite 210 North Wales, PA 19454 USA (215) 997-4519 www.dekra.us/en/audits CERTIFICATE ADDENDUM Certificate Number: 141099.01 Addendum Page: 1 of 1 Certificate Expires: April 17, 2024 Certificate Reissued: April 25, 2021 The Environmental Management System and implementation of: Western Digital Technologies, Inc. meets the requirements of the standard: ISO 14001:2015 Site Address Scope per Site: Western Digital Technologies, Inc. (Central Function) Central management of the EMS 5601 Great Oaks Parkway, San Jose, CA 95119-1003, United States HGST, Inc. Manufacturing of Storage Solutions Wafer Fab Manufacturing and Components 5601 Great Oaks Parkway, San Jose, CA 95119-1003 United States HGST Malaysia Sdn. Bhd. Manufacturing of Storage Solutions Sama Jaya Free Industrial Zone, Muara Tabuan, Kuching, and Components Sarawak, Malaysia 93450 Western Digital Storage Technologies (Philippines) Corp. Manufacturing of Storage Solutions 109 Technology Avenue, Special Export Processing Zone, and Components Laguna Technopark, Binan City, Laguna, Philippines 4024 HGST (Shenzhen) Co., Ltd. Manufacturing of Storage Solutions #7 Lanhua Road, Futian Free Trade Zone, and Components Shenzhen, P.R. China 518038 Manufacturing of Storage Solutions HGST Japan, Ltd.
    [Show full text]
  • Club Health Assessment MBR0087
    Club Health Assessment for District 308 B2 through May 2018 Status Membership Reports Finance LCIF Current YTD YTD YTD YTD Member Avg. length Months Yrs. Since Months Donations Member Members Members Net Net Count 12 of service Since Last President Vice Since Last for current Club Club Charter Count Added Dropped Growth Growth% Months for dropped Last Officer Rotation President Activity Account Fiscal Number Name Date Ago members MMR *** Report Reported Report *** Balance Year **** Number of times If below If net loss If no report When Number Notes the If no report on status quo 15 is greater in 3 more than of officers that in 12 within last members than 20% months one year repeat do not have months two years appears appears appears in appears in terms an active appears in in brackets in red in red red red indicated Email red Clubs less than two years old 133833 Cyberjaya Blue Ocean Royale 03/08/2018 Newly 20 20 0 20 100.00% 0 3 M,VP,MC,SC N/R Chartered 129840 Damansara Centennial 02/22/2017 Active(2) 26 3 24 -21 -44.68% 22 1 0 2 MC,SC N/R $1000.00 129178 Ipoh Centennial 11/11/2016 Active 54 9 1 8 17.39% 45 1 0 2 MC 0 $1100.00 Exc Award (,06/30/17) 130221 Ipoh Tin Valley 03/21/2017 Active(1) 24 10 26 -16 -40.00% 25 1 0 2 M,MC,SC 0 129895 Kajang 01/28/2017 Active 30 3 2 1 3.45% 29 1 1 2 VP,MC,SC 0 $1000.00 132629 Kedah 10/12/2017 Active 22 22 0 22 100.00% 0 0 MC,SC 3 $1000.00 132318 Kulim Central 10/25/2017 Active 47 48 1 47 100.00% 0 0 1 M,VP,MC,SC N/R 132374 Penang Harmony 08/17/2017 Active 20 20 0 20 100.00% 0 0 MC,SC 2 $20.00 130146
    [Show full text]
  • (Emeer 2008) State: Pulau Pinang
    LIST OF INSTALLATIONS AFFECTED UNDER EFFICIENT MANAGEMENT OF ELECTRICAL ENERGY REGULATIONS 2008 (EMEER 2008) STATE: PULAU PINANG No. Installation Name Address BADAN PENGURUSAN BERSAMA PRANGIN MALL, PEJABAT 1 PRANGIN MALL PENGURUSAN, TINGKAT 5, PRANGIN MALL, NO.33, JALAN DR. LIM CHWEE LEONG, 10100 PULAU PINANG 161,KAWASAN INDUSTRI,11900 BAYAN LEPAS FTZ,BAYAN LEPAS, PULAU 2 RAPID PRECISION PINANG 3 TECO INDUSTRY (MALAYSIA) 535/539,LRG PERUSAHAAN BARU,13600 PERAI,PULAU PINANG 4 MEGAMALL PENANG 2828, JALAN BARU, BANDAR PERAI JAYA, 13600 PERAI, PULAU PINANG PLOT 17A,JLN PERUSAHAAN,13600 KAWASAN PERINDUSTRIAN PRAI 5 METECH ALUMINIUM SDN BHD IV,PRAI, PULAU PINANG ALLIANCE RUBBER PRODUCTS SDN 2714, LRG INDUSTRI 15, KAWASAN PERINDUSTRIAN BKT PANCHOR, 6 BHD NIBONG TEBAL, 14300, PULAU PINANG BENCHMARK ELECTRONICS (M) SDN PLOT 17A & B, TECHNOPLEX, MEDAN BAYAN LEPAS, BAYAN LEPAS 7 BHD - PRECISION TECHNOLOGIES INDUSTRIAL PARK, PHASE 4, 11900 BAYAN LEPAS, PULAU PINANG NO. 2515, TINGKAT PERUSAHAAN 4A, PERAI FREE TRADE ZONE, 13600 8 TONG HEER FASTENERS CO. SDN BHD PERAI, PULAU PINANG 9 NI MALAYSIA SDN BHD NO. 8, LEBUH BATU MAUNG 1, 11960 BAYAN LEPAS, PULAU PINANG 10 EPPOR-PACK SDN BHD 2263, PERMATANG KLING, 14300 NIBONG TEBAL, PULAU PINANG FLEXTRONICS SYSTEMS (PENANG) PMT 719, LINGKARAN CASSIA SELATAN, 14100 SIMPANG AMPAT, PULAU 11 SDN BHD PINANG 12 GURNEY PARAGON MALL 163-D, PERSIARAN GURNEY, 10250, PULAU PINANG BENCHMARK ELECTRONICS (M) SDN BAYAN LEPAS FREE INDUSTRIAL ZONE PHASE 1, 11900 BAYAN LEPAS, 13 BHD - ELECTRONIC MANUFACTURING PULAU PINANG SERVICES
    [Show full text]
  • Non-Related Party Transaction Greatech
    ANNOUNCEMENT SUBJECT: TRANSACTION (CHAPTER 10 OF LISTING REQUIREMENTS) - NON-RELATED PARTY TRANSACTION GREATECH TECHNOLOGY BERHAD (“GREATECH” OR “THE COMPANY”) ACQUISITION BY GREATECH INTEGRATION (M) SDN BHD (COMPANY NO. 447240-X) (“GIM”), A WHOLLY OWNED SUBSIDIARY OF GREATECH, OF A PIECE OF VACANT LEASEHOLD LAND EXPIRING ON 17 AUGUST 2074 HELD UNDER NO. H.S.(D) 47093, PT5822, MUKIM 13, DAERAH SEBERANG PERAI SELATAN, NEGERI PULAU PINANG WITH LAND AREA MEASURING APPROXIMATELY 4.2067 ACRES OR 183,243.85 SQUARE FEET (“LAND”) FROM PENANG DEVELOPMENT CORPORATION (“VENDOR”) FOR A PURCHASE CONSIDERATION OF APPROXIMATELY RM8,245,973.25 (“PURCHASE CONSIDERATION”) TO BE SATISFIED IN CASH (“ACQUISITION OF LAND”) 1. INTRODUCTION Reference is made to the Company’s Prospectus dated 13 May 2019 in relation to its initial public offering in conjunction with the listing of and quotation for the Company’s entire issued share capital on the ACE Market of Bursa Malaysia Securities Berhad. GIM has on 22 April 2019 received a letter of offer from the Vendor in respect of the Acquisition of Land. The offer has been accepted by GIM on 17 May 2019, subject to the terms and conditions under the Sale and Purchase Agreement (“ SPA ”) to be entered between the Vendor and GIM. The Board of Directors of the Company (“ Board ”) wishes to announce that on 20 June 2019, GIM entered into an SPA with the Vendor for the Acquisition of Land on an “as is where is basis” free from all encumbrances of whatsoever and with legal and vacant possession but subject to the Category, the Express Conditions and restrictions implied by the National Land Code, 1965 and upon the terms and conditions of the SPA.
    [Show full text]
  • Sungai Dua Water Treatment Plant Seberang Perai, Malaysia
    Sungai Dua Water Treatment Plant Seberang Perai, Malaysia 1. Background Information Sungai Dua Water Treatment Plant (SDWTP) is located at Seberang Perai and occupies about 13 hectares of land. SDWTP is the most important WTP in the Penang as it supplies 80% of the total volume of treated water to Penang. SDWTP was first commissioned in the year 1973 and after series of upgrading in 1994, 1999, 2004, 2011 and 2013, it now has the design capacity of 1,113,792 m3/day . SDWTP usually draws water from Muda River as a primary source and Mengkuang Dam as the secondary source which is the largest dam in the Penang. Currently, the Mengkuang Dam is temporarily decommissioned since February 2014 to facilitate its expansion project. SDWTP is owned and operated by Perbadanan Bekalan Air Pulau Pinang (PBAPP). SDWTP also serves as the control center for PBAPP’s “on-line” supervisory control and data acquisition (SCADA) system to facilitate remote operation. SCADA gathers real-time data from remote location and empowers the operator to remotely control equipment and conditions. The plant operates at 3 shifts per day. The general information of SDWTP is shown in Table 1. Table 1: Overall Information of Sungai Dua Water Treatment Plant Location Seberang Perai, Penang Constructed Year 1973 (1994, 1999, 2004, 2011 & 2013 upgrading) Raw Water Source Muda River (primary) & Mengkuang Dam Maximum Design Capacity (m3/d) 1,113,792 Operating Capacity (m3/d) 1,002,412 Number of employees 120 Topography Tropical Automation Yes Water Quality Exceeds Standards for Drinking Water set by Ministry of Health, Malaysia Supply Areas Seberang Perai, Penang Island Reference Perbadanan Bekalan Air Pulau Pinang (PBAPP) Source: Making Sure Penang’s Taps Keep Flowing.
    [Show full text]
  • 08 Seberang Perai MY Climate and Energy
    7TH UCLG ASPAC CONGRESS “INNOVATION-DRIVEN DEVELOPMENT FOR SUSTAINABLE CITIES” 13th September 2018 City Energy and Climate Action : Seberang Perai’s Experience on Climate Change Speaker: Ahmad Zabri Mohamed Sarajudin Director of Crisis Management Department, Seberang Perai SEBERANG PERAI EXPERIENCE ON CLIMATE CHANGE EXPERIENCESEBERANG ON PERAICLIMATE CHANGE 3,256 171,428 houses 162 cars people affected trapped affected 9,636 358 1 Person 15 cars people Died houses affected relocated affected 362mm 15,942 tonnes rainfall within 12 days Solid Waste 6 consecutive for collected hours recovery RM11.3M 11,323 1,194 trees Economic Warriors uprooted Loss SEBERANG PERAI Aspiring City Of Tomorrow Citizen Cashless Public Participation Payment Reporting System System System Smart Industry Data 4.0 Exchange Smart Street Platform Light Flood Management Digital System Signage Smart & Smart Sustainable Parking Building Smart & Smart Smart Solid Smart Integrated Sustainable Traffic Waste Learning Command Hawkers Complex Light Management Center Center Vision Seberang Perai Resilient, Inclusive, Green, Competitive and Technology Driven Smart City Mision To provide urban service, development planning and infrastructure efficiently, effectively and responsive to the needs of the community in Seberang Perai Corporate Value We work collaboratively across organization and communities to improve outcome, value for money and services 7Ps INCLUSIVE PARTNERSHIP Guiding Principles MODEL “City for all” •Improve governance and inclusiveness •Accessibility and mobility
    [Show full text]
  • The State of Penang, Malaysia
    Please cite this paper as: National Higher Education Research Institute (2010), “The State of Penang, Malaysia: Self-Evaluation Report”, OECD Reviews of Higher Education in Regional and City Development, IMHE, http://www.oecd.org/edu/imhe/regionaldevelopment OECD Reviews of Higher Education in Regional and City Development The State of Penang, Malaysia SELF-EVALUATION REPORT Morshidi SIRAT, Clarene TAN and Thanam SUBRAMANIAM (eds.) Directorate for Education Programme on Institutional Management in Higher Education (IMHE) This report was prepared by the National Higher Education Research Institute (IPPTN), Penang, Malaysia in collaboration with a number of institutions in the State of Penang as an input to the OECD Review of Higher Education in Regional and City Development. It was prepared in response to guidelines provided by the OECD to all participating regions. The guidelines encouraged constructive and critical evaluation of the policies, practices and strategies in HEIs’ regional engagement. The opinions expressed are not necessarily those of the National Higher Education Research Institute, the OECD or its Member countries. Penang, Malaysia Self-Evaluation Report Reviews of Higher Education Institutions in Regional and City Development Date: 16 June 2010 Editors Morshidi Sirat, Clarene Tan & Thanam Subramaniam PREPARED BY Universiti Sains Malaysia, Penang Regional Coordinator Morshidi Sirat Ph.D., National Higher Education Research Institute, Universiti Sains Malaysia Working Group Members Ahmad Imran Kamis, Research Centre and
    [Show full text]