Penang Transport Master Plan
8 April 2016 1 PDP for Penang TMP
• In Aug 2014, Penang State Government requested proposals for the implementation of the Penang TMP through a PDP concept.
• Process was carried out via Open Tender: 6no. tenderers submitted bids 2no. tenderers were shortlisted
• KPMG was part of the tender evaluation team.
• SRS Consortium Sdn. Bhd. was awarded the PDP role in Aug 2015.
• SRS Consortium proposed an Alternative TMP.
2 Proposed Alternative TMP
• Public Transport Network • Highways and Roads • PSR Master Plan • Implementation Programme
3 Kepala Batas TgTokong North Coast Monorail PT Network Pair Road Raja Uda – BM Monorail Sungai Dua
Sea Tunnel
Tram Raja Uda Ayer Itam Catamaran Monorail KOMTAR
Sunway Carnival Penanti Penang Mall Sentral
KTM Komuter Skycab Tmn Supreme UiTM Pulau Pinang George Town – Bkt Butterworth Bdr Mertajam LRT Perda
Prai Bkt Tengah Taman Jln Indah Maju Kulim
Alma
Bayan Bkt Minyak Baru
Bayan Lepas LRT P/Tinggi – Batu Pmtg Tinggi Kawan BRT Airport Simpang Ampat
Stadium Batu Kawan
Island C Island A Island B Note: Transit alignment & system are subject to review prior to implementation 4 North Coast Highways Pair Road
Gurney IC and Roads
Sea Tunnel Utama IC
Pmtg Pan Island KOMTAR Pasir Link 1 BKE IC
Tmn Pauh Paya Indah Terubong IC Perda
Balik Jln Tun Sardon Pulau Tmn Kota Relau IC Juru IC Permai Tmn Bkt Relau Tmn Bkt Minyak Utama Minyak Tmn IKS Bkt Awang IC Minyak PIL 2
LCE IC Airport
PIL 2A
Island C Island B Island A 5 PSR Master Plan
Note: Based on version 9e Master Plan 6 7 8 9 http://pgmasterplan.penang.gov.my
THANK YOU
10