Details of Contracts Awarded on Usbrl Project
Total Page:16
File Type:pdf, Size:1020Kb
DETAILS OF CONTRACTS AWARDED ON USBRL PROJECT Nos. and names Type of Whether contract Last date of No. of of parties not Mode of Tender Bidding (Single Nos. and names of parties qualified awarded to Contract Nos Value of Scheduled date Tender Number Item / Nature of work Date of Publication receipt of tenders qualified after Name of Contractor Enquiry / Two Bid after technical evaluation lowest tenderer / & Date Contract (Rs.) of completion tender recd. technical System) evaluation L1 evaluation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 DETAILS OF CONTRACTS AWARDED IN THE MONTH OF JANUARY 2020 (USBRL PROJECT) 1. M/s K.S construction-Jagar Singh Construction of balance work at JV, Udhampur KR-PD-JK-Br-Sang-21-2019 Bridge No.81, 82, 85-A, 87-A (RCC Open Tender 2. M/s RK infracorp pvt ltd, Kadappa, KR/PD/JK/Br/Sang/21/201 M/s RK Infracorp Pvt 18.10.2019 Two Bid System 22.11.2019 3 NIL Yes 32.33 Cr 20 Months dated 18.10.2019 Box) and Slope Protection works in IREPS Website A.P 9 dated 13.01.2020 Ltd, Kadappa, A.P Sangaldan Yard 3. M/s SRM Contractors Private Limited, Jammu 1. M/s KEC International Limited, Design of broad gauge ballast Gurgaon less track including supply, 2. M/s Paras Railtech Private Limited, KR-PD-JK-BLT-17-2019 installation, testing and Open Tender KR/PD/JK/BLT/17/2019 M/s PARAS-PSOVL 25.09.2019 Two Bid System 31.10.2019 4 New Delhi NIL Yes 72.53 Cr 24 Months dated 25.09.2019 commissioning between km IREPS Website dated 23.01.2020 JV, New Delhi 3. M/s Rahee Pandrol JV, Kolkata 92.548 to km 101.632 (Approx. 4. M/s Texmaco Rail and Engineering 12.6 Km). Limited, Kolkata 1. M/s SRM Contractors Private Extension of wider section at Limited, Jammu M/s SRM Contractors KR-PD-JK-Tun-Sang-22-2019 T41P2, providing niches for tunnels Open Tender KR/PD/JK/Tun/Sang/22/20 19.10.2019 Two Bid System 25.11.2019 2 2. M/s Sai Engineering Foundation NIL Yes Private Limited, 39.93 Cr 12 Months dated 19.10.2019 T40-47 and stabilization of strata at IREPS Website 19 dated 29.01.2020 . Shimla Jammu tunnel T45P2 at Sangaldan DETAILS OF CONTRACTS AWARDED IN THE MONTH OF FEBRUARY 2020 (USBRL PROJECT) NIL DETAILS OF CONTRACTS AWARDED IN THE MONTH OF MARCH 2020 (USBRL PROJECT) Design of broad gauge ballast less 1. M/s Texmaco PRIL JV, Hyderabad track including supply, installation, 2. M/s Paras-PSOVL JV, Delhi KR-PD-JK-BLT-2-25-2019 testing and commissioning Open Tender KR/PD/JK/BLT/25/2019 M/s PARAS-PSOVL 15.11.2019 Two Bid System 16.01.2020 4 3. M/s Royal Vijay JV, Kolkata NIL Yes 133.74 Cr 24 Months dated 15.11.2019 between 42.210 to km 50.400 & IREPS Website dated 16.03.2020. JV, New Delhi . 4. M/s Rahee Infratech Limited, km 51.715 to km 61.687 (Approx. Kolkata 22 km) DETAILS OF CONTRACTS AWARDED ON USBRL PROJECT Nos. and names Type of Whether contract Last date of No. of of parties not Mode of Tender Bidding (Single Nos. and names of parties qualified awarded to Contract Nos Value of Scheduled date Tender Number Item / Nature of work Date of Publication receipt of tenders qualified after Name of Contractor Enquiry / Two Bid after technical evaluation lowest tenderer / & Date Contract (Rs.) of completion tender recd. technical System) evaluation L1 evaluation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 DETAILS OF CONTRACTS AWARDED IN THE MONTH OF APRIL 2020 (USBRL PROJECT) Construction of Wider Section of Tunnel for a length of 85m KR-PD-JK-T5-W-29-2019 Open Tender 1. M/s Max-Nara JV KR/PD/JK/T5/W/29/2019 M/s SRM Contractors (approx.) from km. 42/977.50 to 26.12.2019 Two Bid System 31.01.2020 2 NIL Yes 32.26 Cr 12 Months dated 26.12.2019 IREPS Website 2. M/s SRM Contractors PVt Ltd dated 20.04.2020 Pvt Ltd, Jammu 43/062.50 in Tunnel no. 5 (Portal- 1) and ancillary work Tunnel Design Consultancy, Site Service and 3D Monitoring for Construction of Wider Section of Tunnel for a length of 85m (approx.) from km. 42/977.50 to Special Limited M/s Amberg KR-PD-JK-DDC-02-2020 43/062.50 in Tunnel no. 5 (Portal- Single Bid 1. M/s Lombardi Engg Ltd KR/PD/JK/DDC/02/2020 Tender 04.02.2020 06.03.2020 2 NIL Yes Engineering AG, 2.46 Cr 12 Months dated 04.02.2020 1) at Reasi & Extension of wider System 2. M/s Amberg Engg. AG dated 20.04.2020 KRCL Website Switzerland section at T41P2 (approx. 90m), providing niches for tunnels T40-47 and stabilization of strata at tunnel T45P2 at Sangaldan and ancillary work 1. M/s AEPL-VCL (JV), Model Town, Provision of E&M system which New Delhi includes Supply, Erection, Testing 2. M/s KEI-CDCPL-VFCPL (JV), and Commissioning of 33KV AND Okhla Industrial Area, Phase-I, New 11KV HT Power Cable Network, M/s Polycab-ETA Delhi KR/PD/JK/EL/T-3/2019 M/s PISCESIA KR/PD/JK/EL/T-3/2019 GIS substation, DG sets, Tunnel Open Tender (JV), 21.12.2019 Two Bid System 29.01.2020 5 3. M/s PISCESIA SAVRONIK (JV), C- Yes dtd. 20/04/2020 SAVRONIK (JV), 288.08 Cr 18 Months Dated: 21/12/2019 Ventilation System, Tunnel IREPS Website Mumbai. 44, Vibhuti Khand, Gomti Nagar, Lucknow Lighting, SCADA system and Lucknow-226010 (U.P.) firefighting system etc. for tunnel T- 4. M/s TPL-Voltas Limited (JV), 6, T-9, T-10, T-11 & T-12 between Mumbai, Maharashtra KM 39 to 61 KR-PD-JK-Rail-13-2019-V- M/s ArcelorMittal, 73.77 Cr 18 Months 1 dated 27.04.2020 Spain (80% Quantity) Manufacture, supply, transportation and delivery of prime DETAILS OF CONTRACTS AWARDED ON USBRL PROJECT Nos. and names Type of Whether contract Last date of No. of of parties not Mode of Tender Bidding (Single Nos. and names of parties qualified awarded to Contract Nos Value of Scheduled date Tender Number Item / Nature of work Date of Publication receipt of tenders qualified after Name of Contractor Enquiry / Two Bid after technical evaluation lowest tenderer / & Date Contract (Rs.) of completion tender recd. technical System) evaluation L1 evaluation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 transportation and delivery of prime quality of UIC 60 Kg 1080 Grade Head Hardened Class A Rails as Open Tender 1. ArcelorMittal, Spain KR-PD-JK-Rail-13-2019 per Indian Railway Standard (GLOBAL) 22.05.2019 Two Bid System 18.07.2020 2 2. Jindal Steel & Power Limited, NIL Yes dated 22.05.2019 Specification for Flat Bottom Rails KRCL Website Gurgaon M/s Jindal Steel & KR-PD-JK-Rail-13-2019-V- Power Limited, IRS-T-12-2009 (with latest A & C 17.46 Cr 18 Months slips) at Katra, Reasi, Kauri, 2 dated 27.04.2020 Gurgaon (20% Dugga & Sangaldan site Quantity) DETAILS OF CONTRACTS AWARDED ON USBRL PROJECT Nos. and names Type of Whether contract Last date of No. of of parties not Mode of Tender Bidding (Single Nos. and names of parties qualified awarded to Contract Nos Value of Scheduled date Tender Number Item / Nature of work Date of Publication receipt of tenders qualified after Name of Contractor Enquiry / Two Bid after technical evaluation lowest tenderer / & Date Contract (Rs.) of completion tender recd. technical System) evaluation L1 evaluation 1 2 3 4 5 6 7 8 9 10 11 12 13 14 DETAILS OF CONTRACTS AWARDED IN THE MONTH OF MAY 2020 (USBRL PROJECT) NIL DETAILS OF CONTRACTS AWARDED IN THE MONTH OF JUNE 2020 (USBRL PROJECT) Provision of E&M system which includes Supply, Erection, Testing and Commissioning of 33KV AND 1. M/s AEPL-VCL (JV), New Delhi 11KV HT Power Cable Network, 2. M/s PISCESIA SAVRONIK (JV), M/s Polycab-ETA KR/PD/JK/EL/T-4/2019 M/s PISCESIA KR/PD/JK/EL/T-4/2019 GIS substation, DG sets, Tunnel Open Tender Lucknow (JV), 31.12.2019 Two Bid System 12.02.2020 4 Yes dtd. 05.06.2020 SAVRONIK (JV), 320.76 Cr 18 Months Dated: 31/12/2019 Ventilation System, Tunnel IREPS Website 3. M/s TPL-Voltas Limited (JV), Mumbai. Lucknow Lighting, SCADA system and Mumbai firefighting system etc. for tunnel T- 40/41, T-42/43, T-44/45, T-46 & T- 47 between KM 91 to 101 DETAILS OF CONTRACTS AWARDED IN THE MONTH OF JULY 2020 (USBRL PROJECT) Consultancy Services for Proof Checking of Designs & Drawings submitted by BLT Contractor/Consultant engaged by KR-PD-JK-BLT-PC-03-2020 KRCL and Technical Guidance for Open Tender 1. M/s Primerail Infralabs Pvt Ltd, KR/PD/JK/BLT/PC/03/202 M/s Primerail Infralabs 07.03.2020 Two Bid System 10.06.2020 1 NIL Yes 2.72 Cr 24 Months dated 07.03.2020 the Construction of Broad Gauge IREPS Website Bengaluru 0 dated 22.07.2020 Pvt. Ltd., Bangalore Ballast Less Track between Km 25.000 to KM 70.742 and Km 92.398 to Km 101.632 (Approx. 59.45 Km) DETAILS OF CONTRACTS AWARDED ON USBRL PROJECT Nos.