Southwest Area Integrated Water Resources Planning and Management Project in Bangladesh
Total Page:16
File Type:pdf, Size:1020Kb
SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT SOUTHWEST AREA INTEGRATED WATER RESOURCES PLANNING AND MANAGEMENT PROJECT IN BANGLADESH July 2005 ABBREVIATIONS AD line – alluvial and dilluvial line ADB – Asian Development Bank BWDB – Bangladesh Water Development Board CBSP – Chenchuri beel subroject DAE – Department of Agricultural Extension DC – district commissioner DOE – Department of Environment DOF – Department of Fisheries DPHE – Department of Public Health Engineering DTW – deep tube well EA – Executing Agency EAP – environmental action plan EIA – environmental impact assessment EIRR – economic internal rate of return EMP – environmental management plan FCD/I – flood control and drainage/irrigation FGD – focus group discussion IEE – initial environmental examination IPM – integrated pest management IWRM – integrated water resources management IWMP – integrated water management plan JMC – joint management committee JVT – joint verification team KJDRP – Khulna Jessore Drainage Rehabilitation Project LGED – Local Government Engineering Department LGI – local government institution LLP – low lift pump MED – monitoring and evaluation division MOEF – Ministry of Environment and Forest MOWR – Ministry of Water Resources NGO – nongovernment organization NSP – Narail subproject O&M – operation and maintenance PCO – project coordination office PMO – project management office PPTA – project preparatory technical assistance PRRA – participatory rapid rural appraisal PSC – project steering committee PWD – public works datum RAC – resettlement advisory committee RP – resettlement plan SEIA – summary environmental impact assessment SIP – subunit implementation plan SMO – subproject management office STW – shallow tubewell TA – technical assistance WMO – water management organization Weights and Measures ha – hectare m – meter mm – milli meter m3 – cubic meter µg – micro gram ppt – parts per thousand GLOSSARY Aman Wet season rice, either transplanted (in July-August) or broadcast (in March-April in low-lying areas) and harvested in November-January Aus Early summer rice, usually grown in broadcast conditions from April-May to July-August Baroj Farms Baor An oxbow lake or wetland formed in an abandoned arm of a river Beel A saucer-like natural depression, which generally retains water througout the year Boro Winter season rice, usually transplanted in November- December and harvested in April-May Char land Accelerated land by deposition of sand or silt in rivers Dwarf embankment Low-height embankment required to protect against floods, when bank level is comparatively at a higher elevation. Generally the embankment height is less than 1.5 meters FCD/I schemes Flood control and drainage with or without irrigation schemes. An FCD/I scheme is a system of water management infrastructure comprising flood embankments and networks of internal drainage/irrigation canals that are mostly for drainage purposes but can also be used for irrigation, in particular in the tidal impact areas in the southeast and southwest regions Flood land/ Floodplains Areas of relatively low-lying lands, seasonally inundated by overspill from adjacent rivers, lakes, reclaimed from a body of water and natural depressions Gher Low land used for culture fisheries, especially for shrimp culture in coastal areas Integrated pest management (IPM) In the integrated pest management approach, each crop and its measured pests are considered as an ecological system, and a control program that integrates a variety of biological, chemical, and cultural methods in proper sequence and timing, is developed Khal Natural channel Kharif I Early summer (March through June) Kharif II Late summer (July through October) Kachcha Toilet A temporary, unhygienic, indigenous latrine made of bamboo Khas land Unoccupied land that is legally owned by the Government, including accredited land from rivers Pukkha toilet A permanent hygienic sanitary latrine with concrete ring slab, covered with permanent shades PWD A survey datum being used by the public works department for all topographic survey works Regulators The regulating structures required to control the flow of water into and outside the project area Resectioning With reference to an embankment, rebuilding the damaged embankment to its design section Temporary desilting basin A small low-lying area to accumulate runoff silt from a construction site Thana/Upazila Subdistrict Union Subdivision of a subdistrict CONTENTS MAPS ii I. INTRODUCTION 1 II. DESCRIPTION OF THE PROJECT 1 III. DESCRIPTION OF THE ENVIRONMENT 3 A. Physical Environment 3 B. Ecological Environment 5 C. Human and Economic Development 5 IV. ALTERNATIVES 7 V. ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 9 A. Physical Environment 9 B. Ecological Environment 12 C. Human and Economic Development 12 D. Impact Identification and Assessment Matrix 16 VI. ECONOMIC ASSESSMENT 16 VII. ENVIRONMENTAL MANAGEMENT PLAN 16 VIII. PUBLIC INVOLVEMENT AND DISCLOSURE 19 IX. CONCLUSIONS 20 APPENDIXES 1. Subproject Area Topographical Maps 21 2. Multicriteria Analysis of Options 23 3. Dry Season Peak Salinity After Ganges Water Treaty Signing 24 4. Summary Resettlement Plans 26 5. Environmental Management Plan 32 6. Organizational Setup for Implementation of Project and Environmental Management Plan 41 7. Summary Environmental Impacts and Mitigation Measures 42 8. Project Investment in Environmental and Social Measures 45 ii o 89 o 10’E 89 55’E BANGLADESH SOUTHWEST AREA INTEGRATED WATER RESOURCES PLANNING AND MANAGEMENT PROJECT M G a a th n ab g e ha KUSHTIA s River ng a PABNA R . G K o u r m a a i MEHERPUR r R R . MANIKGANJ R Pad C b a h ma r a i n Riv a d h RAJBARI a er B n . R . K umar N R. ab K CHUADANGA ag u anga R. m a r R . Ch . R C itr N t o a R a h o a 23 50’N b a 23 50’N b a . g n a an d g ga M a FARIDPUR e R. a n B d a h R K Fa u . u lki MAGURA m m JHENAIDAH a a R r . t i R R . Bhairab R. hitra R C . N ab B ag h A a an ir f ga r R a a . b R R . NARAIL INDIA Chenchuri B Beel a t Subproject n JESSORE Narail a . R R Subproject . k a . d R a ga b n a a GOPALGANJ g K a B b h a a M N ad ir h N a u . b m R a t R i i . k R n . a b ra 0 5 10 15 20 25 Atha Kilometers B a tn a o R o 22 40’N . 22 40’N KHULNA SATKHIRA BAGERHAT P River a s s u District Boundary r R International Boundary . R i l a Boundaries are not necessarily authoritative. k . r a R a Jamun p u S 89 o 10’E 89o 55’E 05-3453a RM iii Nawapara 89o 35’E 89o 40’E Chenchuri Beel Kalaohandpur Irrigation Sub-Scheme Ch. 30.00 Km BANGLADESH CHENCHURI BEEL SUBPROJECT N Chanalbarpur ab r a e ga v n i g R a R a i r v Proposed Bhomordia Regulator t e Khali i Chota Beel r h Kanchanpur C 1 Ch. 35.00 Km Sibnaldapur Bara Beel Proposed Sarulia Khal Regulator Sarutia Proposed Arenda Regulator S Nala Beel Shalgari Beel ar H ul a i l a w K a a h h Palakhari al k K Rampur 217A Lohagora h a a l r Baraul i a K p h a Laksmipasha Ch. 20.00 Km t a t l D Narail Baupati Zia Khal 23 o 10’N 23 o 10’N l. Hawaikhali a G h Mangalhata D H il K a a a o t i o h CK-1 w b la s a o NARAIL a Khal i r ip k i h K m a s Ch. 15.00 Km l h i k K a a h l To Jessore 2 a L Naopara Auria l R-46.1 Narail Bhadrabila NARAIL UPAZILLA s Tabra Charabari Khal Regulator F Fulshar Vi u Amada ls llage Khal h Kamalpratab o r R aik CK-2 Hagladanga Ch. 45.00 Km ha Kamaral l i CK-5 3 K CK-3 Bh h aba a nip l u l r a Ch. 10.00 Km K h K CK-4 Amada h r Tartala a u l ip Palaldanga n a Dhumdi b Noagram a h B Baringram LOHAGORA UPAZILLA l a h Gobra l a K l) r h e ha K K Aterhat in t L h a Mirar nc h r Khal ra Ch. 50.00 Km e t (B a A Ramshidal CK-6 o Ch. 05.00 Km ad o 23 05’N J Am 23 05’N Dakshin al 4 ish Bagdagha a B Suktagram ak Komadanga l und Mahajian a ia Hazla Khal h K K Ch. 55.00 Km ga h Khal n al Moulichal a b Kumira al a h Bardia t nga Kh a 6 Upazila Headquarters M Baghda Mallabangh s Home Stead Bagdonga CK-7 Bangram Kha Beel Khal Reg. - 1 Bongram Suktagram CK-9 5 l r River e Kadamtala v Bagdonga l i a Compartment Number Chanchori R 1 Puruno h Khal Reg. - 2 K a National Highway a g h KALIA UPAZILLA s n Ch. 00.00 Km li Regional Highway Kada a a B g l mtalo l a i l Upazila Road (Metalled) a b Kha B h K a Ch. 95.00 Km l Bobra ashi Union Road (Metalled) CK Ur N -8 Chenchuri Puru Union Road (Earthern) r lia K F Darighat e u Narail FCD l l v hal d a s s s s i o Existing Embankment Kh h Scheme K R a 7 l Kanchanpur Mata s s s s r Proposed Embankment a a r lir Kh l Noagram n t i i a al h d Retired Embankment h l o K a C h r Chachuri M e Resectioning K M Maheskhala n ur o i C h h Ch.