SUMMARY ELEMENTS 0' 30' 60'

LONG WHARF DRIVE AREA OF ROCK REVETMENT 0 1/2" 1" · SIGNIFICANT EROSION OF THE PARK EDGE HAS OCCURRED TO BE CONSTRUCTED IN 2016 IN THE LAST FEW YEARS · THE CITY PLANS TO CONSTRUCT A STONE REVETMENT ALONG THE ERODING EDGE OF THE PARK · AN OPPORTUNITY IS AVAILABLE TO PURSUE A PROJECT IN THE INTERTIDAL ZONE TO RETAIN SEDIMENT AND INCREASE THE AREA OF VEGETATION · THE “REEF BALL” PROJECT TESTED IN STRATFORD PROVIDES A LOCAL EXAMPLE OF A “LIVING SHORELINE” PROJECT · THE REEF BALL LINES ARE SET WITH THEIR BASES ABOVE THE MLW (-3.3 FEET) AT ELEVATIONS -1.0 TO -2.0 FEET · WITH SEA LEVEL RISE OF 1-2 FEET, THE REEF BALLS 1

SHOULD REMAIN EFFECTIVE Ò

SUPPLEMENTAL SPARTINA LINE OF REEF BALLS AT www.miloneandmacbroom.com PLANTINGS TO INCREASE 99 Realty Drive Cheshire, 06410 (203) 271-1773 Fax 272-9733 MARSH FUNCTION (TYP.) APPROXIMATE ELEVATION -2.0

LINE OF REEF BALLS AT APPROXIMATE ELEVATION -2.0 BY SUPPLEMENTAL SPARTINA PLANTINGS TO INCREASE MARSH FUNCTION (TYP.) LINE OF REEF BALLS AT APPROXIMATE ELEVATION -1.0 DATE

LINE OF REEF BALLS AT APPROXIMATE ELEVATION -1.0 DESCRIPTION LIVING SHORELINE RESTORATION AND REEF BALL PLACEMENT PLAN (SCALE: 1"=60')

A Framework for Coastal Resilience LONG WHARF LIVING SHORELINE/REEF BALL PROJECT REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT Reducing coastal vulnerability NEW HAVEN, CONNECTICUT

through local collaboration & DM SRS DM DESIGNED DRAWN CHECKED

1"=60' natural systems. Credit: Milone and MacBroom SCALE JUNE 6, 2016 DATE

Long Island Sound is a key contributor to quality of life in Connecticut and 2733-14 PROJECT NO. EXISTING VIEW This Regional Partnership PROPOSEDprovides ecological, social LIVING and economic benefitsSHORELINE to residents throughout AND the 1 1 1 OF 1 (NOT TO SCALE) is between: REEFstate. SomeBALL of the largestPLACEMENT population centers in Southern PERSPECTIVE Connecticut are in SHEET NO. The Towns of close proximity to the shoreline and vulnerable to extreme weather, sea level (NOT TO SCALE) Branford, Fairfield, rise, flooding and coastal erosion. Recent storms, such as Hurricane Irene and Super Storm Sandy have underscored this vulnerability. Less dramatic PR-1 Guilford, Madison & but equally devastating is the continual beach erosion and sea level rise that SHEET NAME Copyright Milone & MacBroom, Inc - 2016 Stratford. threaten the coastline. The Cities of Bridgeport, Extreme weather and other natural hazards are not controlled by political Milford, East Haven, boundaries. By approaching coastal resilience regionally, communities can New Haven & focus on projects which are complementary to and support the strategies of West Haven neighboring municipalities. Through the Regional Framework for Coastal Resilience in Southern Con- As well as: necticut, opportunities to naturally reduce risk and increase resilience will be identified. The opportunities will be comprehensively assessed and prioritized based on their benefits to the local community and their overall contribution to reducing vulnerabilities in Southern Connecticut. Over 590,000 residents live in the ten coastal municipalities that are partners in the Regional Framework for Coastal Resilience. Increasing the viability of natural ecosystems along this significant portion of Connecticut’s coastline (approximately 30%) will protect the integrity of and coast- al ecosystems. Concepts identified through this partnership can be found on the next two pages. TO MINIMIZE CHANNEL FLOW AT JOINT, ANGLE ENDS OF COIR ROLLS UPHILL SO THAT TOP OF ROLL MEETS RIPRAP AT SAME ELEVATION

PROVIDE ADDITIONAL STONE RIPRAP AND GEOGRID ON EAST SIDE OF 1 0' 30' 60' SWALE TO MATCH EXISTING PR-1 SWALE 0 1/2" 1" GRATED SCALE 1" = 60' SURFACE INLET CONTINUE FIBER ROLLS SHRUB MASSES (TYP.) Swale TO EXTENT OF CUT BANK INCLUDING HIGH BUSH BLUEBERRY, NORTHERN BAYBERRY AND GROUNDSEL BUSH

Conc. Headwall Grass

UICO 1845

15" RCP TO MINIMIZE CHANNEL FLOW AT JOINT, INV.=9.85 Benchmark Bench Tie in Utility Pole SUMMARY ELEMENTS ANGLE ENDS OF COIR ROLLS UPHILL Conc. Swale FAIRFIELD BEACH ROAD Elev.=20.42 SO THAT TOP OF ROLL MEETS RIPRAP · THIS SEGMENT OF THE SHORELINE IS A PATHWAY FOR STORM SURGES TO REACH THE COASTAL FLOODPLAINAT SAME ELEVATION Riprap GRATED · THE FAIRFIELD FLOOD AND EROSION CONTROL BOARD CONSIDERS

THIS IS A PRIORITY AREA FOR MITIGATION 0' 40' 80' INCORPORATE SURFACE INLET · PRIVATE SEAWALLS ARE AT ELEVATION 8 TO 10 FEET Riprap GEOTEXTILE EARTHERN BERM · THE FEMA BASE FLOOD ELEVATION IS 13 (VE) 0 1/2" 1"  GRATED ROWLAND ROAD · THE NACCS-CALCULATED STORM LEVELS ARE 10.5 TO 11.5 FEET IN BELOW ENDS THE 50 TO 100-YEAR RI RANGE SURFACE INLET · OF COIR ROLLS VEGETATE BACK OF DUNE WITH: BACK OF DUNE RIDGE TO MEET PRIVATE WALLS CREATION OF A DUNE RIDGE AT ELEVATION 12 FEET WOULD PROVIDE INCREASED PROTECTION AND UNDER · Bayberry (Myrica pennsylvanica) AT ELEVATION 8 TO 10 FEET(APPROX.) Grass · THE ELEVATION 12 FEET IS SUFFICIENTLY LOW TO AVOID NEW RIPRAP · Beach Plum (Prunus maritima) OBSTRUCTING VIEWS · Seaside Goldenrod (Solidago sempervirens) EARTHERN BERM · A DUNE RIDGE WOULD INTRODUCE VEGETATION TO THIS BEACH STONE · Switchgrass (Panicum virgatum) · THE BEACH WIDTH MUST BE INCREASED TO ACCOMMODATE THE DUNE RIDGE VEGETATE FRONT OF DUNE WITH: Wrack Line (Typ.) · WITH SEA LEVEL RISE OF ONE FOOT, THE DUNE RIDGE SHOULD TOP OF DUNE EL. · Beachgrass (Ammophila breviligulata) STILL PROVIDE SIGNIFICANT PROTECTION Conc. Headwall 12.0 (NAVD88) · Saltmeadow Cordgrass (Spartina patens) Long Island Sound Ò SEE INSET 1 TOP OF DUNE EL. 12.0 (NAVD88) TOP OF DUNE EL. 12.0 (NAVD88) www.miloneandmacbroom.com 99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733

EARTHERN BERM SUMMARY ELEMENTS SHOAL POINT INCORPORATE GEOTEXTILE BELOW ENDS · THIS SEGMENT OF THE SHORELINE IS A SHINING EXAMPLE OF OF COIR ROLLS TO STRENGTHEN JOINT COASTAL PUBLIC ACCESS · LOW DUNES AND PATCHES OF VEGETATION ARE FOUND AMONG VEGETATE BACK OF DUNE WITH: 0 BETWEEN EARTH, COIR, AND STONE WIDE SANDY EXPANSES 0' 50' 100' www.miloneandmacbroom.com · Bayberry (Myrica99 Realty Drive pennsylvanica)Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733 · THE CITY OF WEST HAVEN CONSIDERS THIS IS A PRIORITY AREA · FOR FLOOD PROTECTION 0 1/2" 1" 0 Beach Plum (Prunus maritima) · THE FEMA BASE FLOOD ELEVATION IS 12 (VE) 0 · Seaside Goldenrod (Solidago sempervirens) · NORTH END OF DUNE RIDGE TO TIE INTO · Switchgrass (Panicum virgatum) THE NACCS-CALCULATED STORM LEVELS ARE 10.3 TO 11.4 FEET IN SOUTH END OF DUNE RIDGE TO TIE INTO THE 50 TO 100-YEAR RI RANGE PROVIDE ANGLED PATHWAYS OVER DUNE TO SEEFUTURE INSET PROJECT 2 AT PENFIELD BEACH · CREATION OF A DUNE RIDGE AT ELEVATION 13 FEET WOULD FUTURE FLOOD PROTECTION SYSTEM OR END BEACH IN EXISTING LOCATIONS (TYP.) Project LocationsVEGETATE FRONT OF &DUNE WITH: InformationPROVIDE INCREASED PROTECTION IN FAVOR OF OTHER MITIGATION METHODS · Beachgrass BY (Ammophila breviligulata) · A DUNE RIDGE WOULD INCREASE THE DENSITY AND TYPES OF NORTH END OF BEACH TO TIE INTO FUTURE VEGETATION AT THIS BEACH

· Saltmeadow Cordgrass (Spartina patens) TIE GRADES INTOBY EXISTING EXTEND WALK THROUGH DUNE (TYP.) ENGINEERED BEACH AT PENFIELD · THE BEACH WIDTH MUST BE INCREASED IN SOME PLACES TO

Swale RETAINING WALL (TYP.) ACCOMMODATE THE DUNE RIDGE ALTSCHULER PLAZA ALTSCHULER

DATE · WITH SEA LEVEL RISE OF ONE FOOT, THE DUNE RIDGE SHOULD WOODLAND TO REMAIN STILL PROVIDE SIGNIFICANT PROTECTION

PROVIDE ADDITIONAL STONE WASHINGTON AVE. TOP OF DUNE TOP OF DUNE TOP OF DUNE Ò RIPRAP AND GEOGRID ON LONG ISLAND SOUND ELEVATION 13.0 ELEVATION 13.0 ELEVATION 13.0 EAST SIDE OF SWALE TO 1 DATE MATCH EXISTING SWALE TO MINIMIZE CHANNEL FLOW AT JOINT, ANGLE West Haven BEACH ST.

ENDS OF COIR ROLLS Stratford DESCRIPTION UPHILLCONCEPTUAL SO THAT TOP OF BEACH NOURISHMENT/ DUNE CREATION PLAN ROLL MEETS RIPRAP AT (SCALE: 1"=80') Beach Nourishment & SAME ELEVATION Conc. Headwall Conc. Headwall Russian Beach www.miloneandmacbroom.com Dune Creation 99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733 Bank Protection DESCRIPTION PROJECT END POINT - T.B.D.

TIE GRADES INTO EXISTING GRADES - PROJECT END POINT T.B.D.

CONSIDER INCORPORATING PAVILIONWest Haven’s 3+ miles of public beach BY TO MINIMIZE The coastal bank at Rus- WALL INTO FLOOD PROTECTION SYSTEM CHANNEL FLOW 1 AT JOINT, ANGLE DATE LONG ISLAND SOUND are a vital asset to the City. A dune ridge INCORPORATE ENDS OF COIR sian Beach is experienc- 15" RCP GEOTEXTILE ROLLS UPHILL SO INV.=9.85 BELOW THAT TOP OF ENDS OF ROLL MEETS would provide increased protection from COIR RIPRAP AT SAME ing severeCONCEPTUAL erosion BEACHand NOURISHMENT/ DUNE CREATION PLAN DESCRIPTION ROLLS AND ELEVATION (SCALE: 1"=100') UNDER INCORPORATE GEOTEXTILE flooding and increase the density and BELOW ENDS OF COIR ROLLS there is limited protection Conc. Swale NEW RIPRAP TO STRENGTHEN JOINT STONE BETWEEN EARTH, COIR, AND types of vegetation at the beach. STONE in place. A bioengineered bank design would miti- 1 PART PLAN 2 PART PLAN gate the ongoing erosion - WEST END 0 20 40 - EAST END 0 20 40 EXISTING PERSPECTIVE SCALE: 1" = 20' SCALE: 1" = 20' andNOT protect TO SCALE waterfront PENFIELD TO SHOAL POINT BEACH NOURISHMENT AND DUNE CREATION REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT FAIRFIELD, CONNECTICUT

homes. JCW SRS DM DESIGNED DRAWN CHECKED INSET A: EARTHERN BERM 1"=80' SUMMARY ELEMENTS: DUCKBILL ANCHORS W/ 10' SCALE SHRUBS CABLES INSTALLED OVER Milone & MacBroom JUNE 6, 2016 · THE EGAN CENTER IS AN IMPORTANT COMMUNITY ASSET DATE · A SMALL TIDAL CREEK WAS LONG AGO PLACED IN A CULVERT 0' 10' 20' AND UNDER AS SHOWN. BENEATH THE SITE 2733-14 · DAYLIGHTING THE STREAM WOULD PROVIDE OPPORTUNITIES TO 0 1/2" 1" PROJECT NO. RESTORE TIDAL AND NON-TIDAL WETLAND VEGETATION · EXIST. LAWN 1 OF 1 A RAIN GARDEN MAY BE INCORPORATED INTO THE PROJECT TO CUT AND RESURFACE SHEET NO. FILTER STORMWATER FROM THE EGAN CENTER 15' EXISTING VIEW PROPOSED BEACH NOURISHMENT/ DUNE CREATION PERSPECTIVE · WITH A RISE IN SEA LEVEL, TIDAL CONDITIONS WILL MIGRATE 12"Ø x12'L COIR ROLLS 1 1 UPSTREAM FROM THE ADJACENT MARSH INTO THE DAYLIGHTED (NOT TO SCALE) (NOT TO SCALE) 20 (TYP. 8 ROLLS) PART OF THE STREAM · TIDAL WETLANDS COULD ADVANCE INTO THE STREAMBANK AREAS - 18 PR-1 THIS IS NOT POSSIBLE UNDER CURRENT CONDITIONS FILL AND RESURFACE SHEET NAME 16 Fairfield Copyright Milone & MacBroom, Inc - 2016 20"Ø x12'L COIR FIBER ROLLS MARGARET EGAN 14 (TYP.) CENTER PARK CONCEPT - MAIN BEACH NOURISHMENT / DUNE PROJECT REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT WEST HAVEN, CONNECTICUT 12 EXISTING PATHWAY

STONE TOE Ò 10 BEACH FRONT TO REMAIN Beach Nourishment TO REMAIN JCW SRS DM UNDISTURBED AS IS DESIGNED DRAWN CHECKED 8 GRATED Milone & MacBroom 1"=100' 6 SCALE 6' SURFACE INLET 4 & Dune Creation JUNE 6, 2016 DATE 2 6'LG OAK STAKE 2733-14 PROJECT NO. RUSSIAN BEACH - CONCEPT 1 PROJ. #: 0304 REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT 0 @ 4'-0" O.C. TOWN #3 - STRATFORD, CONNECTICUT This sectionHEADWALL of coastline was EXISTING VIEW EAGAN PROPOSED BEACH NOURISHMENT/ DUNE CREATION PERSPECTIVE 1 OF 1 -2 1 1 SHEET NO.

(NOT TO SCALE) CENTER (NOT TO SCALE) 1 LS TL/AMH KB SUBSURFACE 5 10 15 20 25 30 35 40 45 50 55 60 65 70 120 130 140 150 160 170 180 severally impacted by Sandy DESIGNED DRAWN CHECKED PR-1 www.miloneandmacbroom.com 99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733 INFILTRATOR GALLERY DUCKBILL ANCHORS SHEET NAME TO SECURE COIR FIBER ROLLS AS NOTED Copyright Milone & MacBroom, Inc - 2016 SPACED 4'-0" (SEE INSET THIS SHEET) storm surge and inunda- SCALE Milone & MacBroom JUNE 2, 2016 tion. A 12’ dune ridge would DATE BY 2733-14

A CONCEPT #1 PROJECT NO. DATE PR-1 BANK STABILIZATION 0 10 20 provide some protection from 02 OF 03 PROPOSED PERSPECTIVE SHEET NO. SCALE: 1" = 10' storm surge without impact- NOT TO SCALE ing views. PR-1 DESCRIPTION SHEET NAME

Copyright Milone & MacBroom, Inc - 2016

EXISTING VIEW 1 EASTERN (NOT TO SCALE) PKWY

TO DAYLIGHTING OF STREAM AT EGAN CENTER MARGARET EGAN CENTER AREA PROJECT REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT RAIN GARDEN PLANT LIST TOWN #4 - MILFORD, CONNECTICUT

JCW SRS DM · SAMBUCUS CANADENSIS - DESIGNED DRAWN CHECKED ELDERBERRY 1"=20' · ILEX VERTICILLA - WINTERBERRY Milone & MacBroom SCALE · VACCINIUM CORYMBOSUM - JUNE 6, 2016 DATE HIGHBUSH BLUEBERRY 2733-14 PROJECT NO.

1 OF 1 Milford SHEET NO. CONCEPTUAL STREAM DAYLIGHTING PLAN PROPOSED STREAM DAYLIGHTING PERSPECTIVE 1 Bridgeport (SCALE: 1"=20') (NOT TO SCALE) PR-1 Egan Center Stream Daylighting SHEET NAME West Johnson Creek Copyright Milone & MacBroom, Inc - 2016 This small tidal creek was placed in a culvert Living Shoreline years ago. Restoration of wetland vegetation A raised boardwalk and trail system could occur if the stream was daylighted. A would provide public access to this coast- Milone & MacBroom rain garden could also be integrated into the al wetland. project. SURF CLUB ROAD SUMMARY ELEMENTS EXISTING PARKING · THIS SEGMENT OF THE SHORELINE IS MADISON'S PUBLIC BEACH · DUNES AND PATCHES OF VEGETATION ARE STILL PRESENT, BUT NOT 0' 15' 30' CONTINUOUS · THE TOWN OF MADISON CONSIDERS THIS IS A PRIORITY AREA FOR FLOOD 0 1/2" 1" SCALE 1" = 20' PROTECTION · THE FEMA BASE FLOOD ELEVATION IS 14 (VE) · THE NACCS-CALCULATED STORM LEVELS ARE 9.4 TO 10.5 FEET IN THE 50 TO 100-YEAR RI RANGE BOARDWALK CONTINUATION OVER DUNE · RESTORATION OF A DUNE RIDGE AT ELEVATION 11 FEET WOULD PROVIDE INCREASED PROTECTION · RESTORATION OF A DUNE RIDGE WILL ALLOW FOR INCREASED DENSITY AND VEGETATE BACK OF DUNE WITH: TYPES OF VEGETATION · Marsh elder (Iva frutescens) · THE BEACH WIDTH LIKELY DOES NOT NEED TO BE INCREASED TO · Seaside Goldenrod (Solidago sempervirens) ACCOMMODATE THE RESTORATION

EXISTING Ò Grass WETLANDS

VEGETATE FRONT OF DUNE WITH: · Beachgrass (Ammophila breviligulata) Sand 30 30 30 30 · Saltmeadow Cordgrass (Spartina patens)

Shower Head Wild Roses TIE GRADES INTO EXISTING RETAINING x 11.5 EXISTING GRADE EXISTING GRADE Phragmites WALL Sand 20 20 20 20 Sand Grass 'A' www.miloneandmacbroom.com 99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733 PROPOSED PROPOSED x 11.3 DUNE DUNE Wild Roses 'B'

10 10 10 10 x 11.2 Phragmites

Sand BY x 11.2 0 0 0 0 DATE

0 Benchmark Top of Conc. Retaining Wall -10 -10 -10 -10 1 Elev.=9.91' 'A' DESCRIPTION

0

SUMMARY ELEMENTS 0' 30' 60'

LONG WHARF DRIVE AREA OF ROCK REVETMENT 0 1/2" 1" · SIGNIFICANT EROSION OF THE PARK EDGE HAS OCCURRED TO BE CONSTRUCTED IN 2016 IN THE LAST FEW YEARS 'B' · THE CITY PLANS TO CONSTRUCT A STONE REVETMENT ALONG THE ERODING EDGE OF THE PARK · AN OPPORTUNITY IS AVAILABLE TO PURSUE A PROJECT IN THE INTERTIDAL ZONE TO RETAIN SEDIMENT AND INCREASE THE AREA OF VEGETATION · THE “REEF BALL” PROJECT TESTED IN STRATFORD PROVIDES CROSS SECTION 'A-A' CROSS SECTION 'B-B' A LOCAL EXAMPLE OF A “LIVING SHORELINE” PROJECT · THE REEF BALL LINES ARE SET WITH THEIR BASES ABOVE SCALE: 1"=40 H SCALE: 1"=40 H THE MLW (-3.3 FEET) AT ELEVATIONS -1.0 TO -2.0 FEET · WITH SEA LEVEL RISE OF 1-2 FEET, THE REEF BALLS 1

SHOULD REMAIN EFFECTIVE 1"=8 V Ò 1"=8 V

0 CONCEPTUAL DUNE RESTORATION PLAN (SCALE: 1"=30')

SUPPLEMENTAL SPARTINA LINE OF REEF BALLS AT www.miloneandmacbroom.com PLANTINGS TO INCREASE 99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733 MARSH FUNCTION (TYP.) APPROXIMATE ELEVATION -2.0

LINE OF REEF BALLS AT APPROXIMATE ELEVATION -2.0 BY SUPPLEMENTAL SPARTINA PLANTINGS TO INCREASE MARSH FUNCTION (TYP.) LINE OF REEF BALLS AT APPROXIMATE ELEVATION -1.0 DATE

LINE OF REEF BALLS AT APPROXIMATE ELEVATION -1.0 DESCRIPTION LIVING SHORELINE RESTORATION AND REEF BALL PLACEMENT PLAN SUMMARY ELEMENTS (SCALE: 1"=60')

· A PAIR OF ROADS EXTENDS TO THE EAST HAVEN BEACH THROUGH SILVER SANDS RD (ROUTE 337) A TIDAL MARSH New Haven 0' 30' 60' · A LONG-TERM OPPORTUNITY EXISTS FOR THE TOWN TO FOCUS RESOURCES ON ELEVATING ONE ROAD AND RETIRING THE OTHER REMOVE EXISTING UTILITY POLES REMOVE EXISTING CULVERT 0 1/2" 1" · RETIRING A ROAD WOULD PROVIDE SPACE FOR MARSH SCALE 1" = 60' AND OVERHEAD WIRES Long Wharf Living Shoreline ADVANCEMENT INTO THE FORMER ROADWAY ALIGNMENT AND WOULD REDUCE THE NUMBER OF CREEK CROSSINGS

· THE ELEVATED ROAD WILL BE AT ELEVATION 8 FEET, HIGHER THAN CONNECTICUT LESS-SEVERE FREQUENT FLOODS, AND APPROXIMATELY EQUAL TO REMOVE EXISTING CULVERT , THE NACCS-CALCULATED 10-YEAR FLOOD REMOVE FARVIEW ROAD AND EMBANKMENT 1 The park edge · THE FEMA BASE FLOOD ELEVATION IS 12 (AE) · THE ELEVATED ROAD WILL NOT BE HIGHER THAN THE BFE, BUT IT SHOULD PROVIDE A LONGER DURATION OF EMERGENCY ACCESS CAROLINE RD DEAD END FARVIEW ROAD has experienced DURING DEVELOPING FLOODING CONDITIONS · UNDER A THREE-FOOT RISE IN SEA LEVEL, THE MHW, MHHW, AND CJL WOULD REMAIN LOWER THAN THE ROAD SURFACE ELEVATION significant ero- OF 8 FEET sion. The goals of this project would Ò DUNE RESTORATION AT MADISON SURF CLUB PROJ. #: 1003 REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT TIDAL ESTUARY TOWN #10 - MADISON

(EBB / FLOW) be to protect the Milone & MacBroom JCM JCS DM intertidal zone, DESIGNED DRAWN CHECKED retain sediment Madison 1"=30' SCALE PROVIDE DEAD-END SIGNAGE LONG WHARF LIVING SHORELINE/REEF BALL PROJECT REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT NEW HAVEN, CONNECTICUT www.miloneandmacbroom.com EXISTING BEACH VIEW PROPOSED DUNE RESTORATION99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733 PERSPECTIVE 1 AT ROADWAY ENTRANCE 1 and increase Surf Club Dune JUNE 6, 2016 DM SRS DM DATE (NOT TO SCALE) Milone & MacBroom (NOTDESIGNED DRAWNTO CHECKEDSCALE) vegetation. 1"=60' SCALE Restoration 2733-14 JUNE 6, 2016 PROJECT NO. DATE

2733-14 EXISTING VIEW PROPOSED LIVING SHORELINE AND PROJECT NO. This segment of shore- 1 OF 1 1 1 1 OF 1 SHEET NO. (NOT TO SCALE) SHEET NO. REEF BALL PLACEMENT PERSPECTIVE BY line is the Town’s public (NOT TO SCALE) PR-1 SHEET NAME beach space. A restored MEET LINE AND GRADE OF Copyright Milone & DATE MacBroom, Inc - 2016 PR-1 EXISTING ROADWAY dune ridge would SHEET NAME BRAZOS RD increase protec- Copyright Milone & MacBroom, Inc - 2016

REMOVE SLUMPED MATERIAL FROM BRIDGE SUMMARY ELEMENTS: OPENING TO INCREASE HYDRAULIC CAPACITY tion from flooding, · THE OLD TROLLEY LINE PEDESTRIAN BRIDGE IS AN IMPORTANT OF BRIDGE AND REDUCE DAILY TIDAL DESCRIPTION 6'-0" COMMUNITY ASSET VELOCITIES BENEATH BRIDGE · SCOUR HAS EXPOSED THE BRIDGE ABUTMENTS 0' 5' 10' ELLIS RD · PROTECTION OF THE BRIDGE MAY BE POSSIBLE USING LIVING 10'-0" 0 1/2" 1" and increase SHORELINE TECHNIQUES COMBINED WITH HARD STRUCTURES SCALE 1" = 10' INSTALL REPLACEMENT BRIDGE TO · THE DESIGN ENVISIONS A WIDENING OF THE CHANNEL COUPLED INCREASE TIDAL CYCLE IN UPSTREAM 10'-0" WITH THE USES OF OYSTER CASTLES, ROCKY MATERIAL, AND ELEVATE BRAZOS ROAD TO ELEVATION 8.0 FT (NAVD 88). GRASSES IN THE INTERTIDAL ZONE TO STABILIZE THE BANKS MARSH · BOULDERS WOULD BE PLACED AGAINST THE ABUTMENTS vegetation PERFORM NECESSARY MODIFICATIONS AND RELOCATIONS · WITH SEA LEVEL RISE OF 1-2 FEET, THE ZONATION OF THE TO EXISTING UTILITIES (OVERHEAD WIRE, BURIED INTERTIDAL ZONE BENEATH THE BRIDGE MAY SHIFT UPLAND WATERMAIN, AND STORM DRAINAGE) REMOVE EXISTING CULVERT density.

COSEY BEACHAVENUE EXT

EXISTING RIP-RAP EDGE CONCEPTUAL PLAN - Ò FARVIEW ROAD ABANDONMENT PAIRED WITH BRAZOS ROAD ELEVATION (SCALE: 1"=60')

BOTTOM OF TROLLEY BRIDGE www.miloneandmacbroom.com Branford 99 Realty Drive Cheshire, Connecticut 06410 (203) 271-1773 Fax 272-9733 ELEVATED ROADWAY AND NEW BRIDGE Pine CreekFARVIEW ROAD REMOVED "OYSTER CASTLES" PRECAST CONCRETE OYSTER HABITAT UNITS (TYP.) BY

Pedestrian Bridge Existing Abutment TIDAL ESTUARY TIDAL

BOULDER CLUSTERS (EBB / FLOW) / (EBB REPLACE SOIL LOST IN VOIDS OF DATE EXISTING BRIDGE ABUTMENT This old trolley bridge serves REMOVE SLUMPED MATERIAL FROM BRIDGE OPENING TO INCREASE HYDRAULIC CAPACITY 1 OF BRIDGE AND REDUCE DAILY TIDAL as VELOCITIESa pedestrian BENEATH BRIDGE walkway 36" - 48" LARGE BOULDERS TO 36" - 48" LARGE BOULDERS TO CONNECTICUT PROTECT EXISTING BRIDGE PROTECT EXISTING BRIDGE , ABUTMENTS ABUTMENTS DESCRIPTION "OYSTER CASTLES" PRECAST along a localExisting Grade trail. Scour has CONCRETE OYSTER HABITAT UNITS BOULDERS INTERPLANTED WITH (TYP.) BOULDERS INTERPLANTED WITH MARSH ELDER (IVA FRUTESCENS) damaged the bridge abut- MARSH ELDER (IVA FRUTESCENS) BOULDER CLUSTERS TO LOCK IN OYSTER CASTLES SMALL COBBLE RIP-RAP INTERPLANTED WITH SALT SMALL ROCK INTPERPLANTED WATER CORDGRASS (SPARTINA ALTERNIFLORA) ments. Oyster castles, rocky WITH SPARTINA ALTERNIFLORA Milone & MacBroom CONCEPTUAL BRIDGE ABUTMENT EROSION MITIGATION material and grassesTYPICAL CROSSin the SECTION (SCALE: 1"=10') (SCALE: N.T.S.) CONCEPT 2 - REMOVE FAIRVIEW RD & ELEVATE BRAZOS PROJ. #: 0707 & 0708 REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT intertidal zone would TOWN #7 - EAST HAVEN Guilford JCM SRS DM stabilize the DESIGNED DRAWN CHECKED Chittenden Beach & Milone & MacBroom 1"=60' bank. SCALE JUNE 6, 2016 West River Living DATE

2733-14 PROJECT NO. Shoreline EXISTING VIEW PROPOSED PERSPECTIVE East Haven 2 OF 2 1 1 SHEET NO. CONNECTICUT

(NOT TO SCALE) (NOT TO SCALE) Located close to , a newly renovated Road Abandonment & PR-2 park and athletic field, this low-ly- Elevation SHEET NAME ing area experienced significant Copyright Milone & MacBroom, Inc - 2016 PEDESTRIAN BRIDGE ABUTMENT EROSION MITIGATION PROJ. #: 0810 REGIONAL FRAMEWORK FOR COASTAL RESILIENCE IN SOUTHERN CONNECTICUT A pair of roads provide access to damage from Sandy.TOWN #8 - BRANFORD Installation LS/ JCW SRS DM DESIGNED DRAWN CHECKED

1"=10' the East Haven beach through a of an offshoreSCALE breakwater would JUNE 6, 2016 tidal marsh. In the long term, one Milone & MacBroom attenuateDATE wave action. Replacing 2733-14 PROJECT NO.

1 OF 1 road (Brazos or Fairview) would sedimentSHEET behind NO. a rocky sill and EXISTING ABUTMENT VIEW PROPOSED ABUTMENT PERSPECTIVE 1 1 (NOT TO SCALE) be abandoned and the other (NOT TO SCALE) planting morePR-1 marsh grass would SHEET NAME elevated. nourish, restore,Copyright Milone & MacBroom, Inc - and2016 stabilize the tidal marsh. A Regional Project Benefits Approach to Resilience Resiliency • Minimize the consequences of large scale storms The Regional Framework for Coastal in some of coastal Connecticut’s largest popula- Resilience in Southern Connecticut is tion centers. being funded by a $700,000 Hurricane • Keep people & property safe from the impacts Sandy Coastal Resiliency Competitive of natural hazards. Grant through the U.S. Department of • Utilize green infrastructure, natural ecosystems & environmental the Interior and the National Fish and solutions to reduce risk & increase resiliency. Wildlife Foundation. The grant was awarded to the South Resource Protection Central Regional Council of Govern- ments (SCRCOG), in partnership with • Safeguard coastal resources: endangered species, critical the Connecticut Metropolitan Council habitats, cultural assets & recreational facilities. of Governments (MetroCOG) and The • Improve the resiliency of natural infrastructure such as salt Nature Conservancy (TNC). This is marshes, dunes & floodplains. the first time in Connecticut that two • Identify opportunities to reduce storm- Councils of Governments with this water runoff through existing & future many member municipalities have ad- natural systems. vanced a collaborative project focused on an environmental, economic, and Partnership social issue of this magnitude. • Synchronize local hazard mitigation planning The Regional Framework for Coastal efforts for complimentary project imple- Resilience in Southern Connecticut mentation. includes the following components: • Through regional consensus, identify • A comprehensive green infrastruc- projects which will have the most ture assessment of the coastline impact in reducing risks for people & nature. between Madison & Fairfield. • Increase awareness, recognition & integration of environmental • Cross municipal understanding of solutions & policies through municipal and regional planning. common themes for infrastructure and resilience needs. • Conceptual visualizations for the Economy highest priority project in each • Protect local businesses & criticial infrastructure, thus limiting the municipality. extent of economic impacts after a storm. • Develop a Regional Plan for • Proactively reduce risk to property Coastal Resiliency. & the need for financial assistance after extreme weather by prioritiz- ing investments to those with the greatest overall impact.. Graphics (this page): ShareAlike creative- $700,000 commons.org/licenses/; All-Silhouettes.com; • Avoid future costs associated with designed by Freepik the loss of critical coastal ecosys- tems through resource protection.