Avonmouth Docks, Bristol

Total Page:16

File Type:pdf, Size:1020Kb

Avonmouth Docks, Bristol Avonmouth Docks, Bristol Flood Risk Sequential Test For Clayewater Group Project Number: 13556 December 2020 Campbell Reith Hill LLP No. 1 Marsden House Manchester M2 1HW T: +44(0)1161 819 3060 E: [email protected] W: www.campbellreith.com Avonmouth Docks, Bristol Flood Risk Sequential Test Document History and Status Revision Date Purpose/Status File Ref Author Check Review P1 16/12/20 For Planning 13556 MB EH RBG This document has been prepared in accordance with the scope of Campbell Reith Hill LLP’s (CampbellReith) appointment with its client and is subject to the terms of the appointment. It is addressed to and for the sole use and reliance of CampbellReith’s client. CampbellReith accepts no liability for any use of this document other than by its client and only for the purposes, stated in the document, for which it was prepared and provided. No person other than the client may copy (in whole or in part) use or rely on the contents of this document, without the prior written permission of Campbell Reith Hill LLP. Any advice, opinions, or recommendations within this document should be read and relied upon only in the context of the document as a whole. The contents of this document are not to be construed as providing legal, business or tax advice or opinion. © Campbell Reith Hill LLP 2020 Document Details Last saved 16/12/2020 11:24 Path 13556-CRH-ZZ-XX-RP-C-0001-P1_Sequential Test.docx Author Matthew Bailey Project Partner Chris Brady Project Number 13556 Project Name Avonmouth Docks, Bristol Structural Civil Environmental Geotechnical Transportation 13556-CRH-ZZ-XX-RP-C-0001_P1 i Avonmouth Docks, Bristol Flood Risk Sequential Test Contents 1.0 EXECUTIVE SUMMARY .......................................................................................................... 1 2.0 INTRODUCTION ................................................................................................................... 2 3.0 SITE CONTEXT .................................................................................................................... 3 Site Location ................................................................................................................... 3 Site Characterisation ........................................................................................................ 4 Site Topography .............................................................................................................. 4 Existing Flood Zone Classification ...................................................................................... 4 4.0 PLANNING POLICY ............................................................................................................... 6 National Planning Policy Framework ................................................................................... 6 Local Planning Policy ........................................................................................................ 6 5.0 METHODOLOGY .................................................................................................................. 11 Overview of Study Area ................................................................................................... 11 Proposed Development Site ............................................................................................. 11 Comparable Site Selection Methodology ............................................................................ 11 Sequential Assessment .................................................................................................... 12 6.0 SUMMARY & RESULTS ......................................................................................................... 13 Appendices Appendix 1: Site Location Plan (Drawing no. 13556-CRH-XX-XX-FG-G-7000-P1) and Proposed Site Plan (Drawing no. 5592-1) Appendix 2: Topographic Survey (Drawing no. 661/5592/1) Appendix 3: Correspondence with Bristol City Council Appendix 4: Rightmove and Zoopla Property Search Results Figures Figure 3.1: Site Location Plan (not to scale) ..................................................................................... 3 Figure 3.2: EA Flood Map for Planning (not to scale) ......................................................................... 5 Figure 4.1: Avonmouth Village Regeneration Area extent (not to scale). Bristol Ward Map taken from Bristol City Council’s ‘Avonmouth & Lawrence Weston Statistical Ward Profile 2020’. ....................................... 9 13556-CRH-ZZ-XX-RP-C-0001_P1 ii Avonmouth Docks, Bristol Flood Risk Sequential Test 1.0 EXECUTIVE SUMMARY 1.1.1. The Site located off Gloucester Road, Avonmouth, Bristol, extends to approximately 0.3ha in area and is proposed to be redeveloped for residential end use for up to 28 units. 1.1.2. A review of Environment Agency Flood Map for Planning showed the Site to lie entirely within Flood Zone 2 with a medium risk of fluvial flooding. In accordance with the NPPF, new developments should be steered towards areas with the lowest risk of flooding (preferably Flood Zone 1), unless there are no reasonable available sites. Therefore, a Sequential Test was required to confirm if there were any potential sites with a lesser risk of flooding than the proposed development Site. 1.1.3. As such CampbellReith, consulted with the Local Planning Authority, Bristol City Council, to agree a methodology for the search criteria for locating potential sites within the Council’s region of authority. 1.1.4. Following consultation with Bristol City Council and from a review of their Flood Risk Sequential Test Practice Note, the search for comparable sites was limited to the Avonmouth Village regeneration area. The Council’s Strategic Housing Land Availability Assessment document and two online property agents were used to identify available comparable sites within the defined search area. 1.1.5. Using the methodology informed by consultation with Bristol City Council, at the time of writing this report, no available sites were identified in the SHLAA within the Avonmouth Village regeneration area. 1.1.6. An online property search was also conducted within the search area, returning a total of 12 available sites to purchase. All of the available sites within the search area were considered not to be comparable, on the basis that they are too small to accommodate the requirements of the proposed development (28 residential units). 1.1.7. It is therefore considered that the proposed residential development, located at the Site off Gloucester Road, passes the Sequential Test as defined in the National Planning Policy Framework. 13556-CRH-ZZ-XX-RP-C-0001_P1 1 Avonmouth Docks, Bristol Flood Risk Sequential Test 2.0 INTRODUCTION 2.1.1. CampbellReith was appointed by Dewar Planning Associates, on behalf of their client Clayewater Group, to produce a Flood Risk Sequential Test in support of a forthcoming full Planning Application. 2.1.2. The proposed development is located Off Gloucester Road, Avonmouth, Bristol, BS11 9AQ. The Site proposed for development is approximately 0.3 hectares (ha) in area and is currently utilised as a depot for truck part supplier, comprising of a hardstanding service yard and office building. 2.1.3. The proposed development is to consist of the construction of three residential apartment buildings, totalling 28 units, with associated car parking and landscaping. 2.1.4. The entire Site is located within Flood Zone 2. It is anticipated that the risk of flooding is associated with the Swash Channel and Mouth of the Severn, located approximately 450m to the southwest and 1.5km to the west, respectively. 2.1.5. As the proposed development is to be residential, located entirely within Flood Zone 2, a Sequential Test is required in line with the National Planning Policy Framework. The aim of the sequential test is to determine if there are any comparable sites in the immediate area that could be considered to be a more suitable location for development, outside of an area at risk of flooding. 2.1.6. A Site location plan (Drawing no. 13556-CRH-XX-XX-FG-G-7000) and proposed Site layout (Drawing no. 5592-1), provided by the Client, have been presented within Appendix 1. 2.1.7. Bristol City Council has been consulted throughout the production of this assessment. 13556-CRH-ZZ-XX-RP-C-0001_P1 2 Avonmouth Docks, Bristol Flood Risk Sequential Test 3.0 SITE CONTEXT Site Location 3.1.1. The Site is located of Gloucester Road, Avonmouth, Bristol, BS11 9AQ at National Grid Reference X: 351447 Y: 178082, which is approximately 9km to the northwest of Bristol City. Figure 3.1: Site Location Plan (not to scale) 13556-CRH-ZZ-XX-RP-C-0001_P1 3 Avonmouth Docks, Bristol Flood Risk Sequential Test Site Characterisation 3.2.1. The Site extends to approximately 0.3ha. It is currently utilised as a depot for truck part supplier, comprising of a hardstanding service yard and office building. The Site is bound by Gloucester Road to the north, commercial development to the east and west, and green open space to the south. 3.2.2. The Site can be accessed at the north Site boundary, from Gloucester Road. 3.2.3. There is a number of watercourses or waterbodies located in the surrounding area. Avonmouth Dock is located approximately 150m to the southwest of the Site, the Swash Channel approximately 500m to the southwest, Royal Edward Dock approximately 550m to the northwest, and the Mouth of the Severn approximately 1.5km to the west of the Site. Site Topography 3.3.1. A topographic survey for the Site,
Recommended publications
  • Avonmouth Severnside Development Strategy Report April 2012
    Avonmouth Severnside Outline Development Strategy April 2012 - Final Report AMION Consulting Limited Customs House, 7 Union Street, Liverpool L3 9QX Avonmouth Severnside - Outline Development Strategy April 2012 - Final Report Avonmouth Severnside Outline Development Strategy April 2012 - Final Report Reviewed and approved by: Signature(s): Name(s): Graham Russell Job Title(s): Partner Director Date: April 2012 AMION Consulting is the trading name of AMION Consulting Limited Registered Office: Langtons, The Plaza, 100 Old Hall Street, Liverpool L3 9QJ Company No: 3909897 Tel: 0151 227 5563 This document including appendices contains 98 pages Ref: K:\CLIENTS\White Young Green\Avonmouth Severnside\Deliverables\Avonmouth Severnside Development Strategy Report - Final 14 Feb.12.docx Avonmouth Severnside - Outline Development Strategy April 2012 - Final Report Contents Executive summary ............................................................................................................................ i Introduction ............................................................................................................................................................... i Avonmouth Severnside ............................................................................................................................................. ii Realising the Opportunity – an Integrated Strategy ................................................................................................ iv Costs, Benefits and Value for Money .......................................................................................................................
    [Show full text]
  • From Sea Mills to Avonmouth to Bristol Temple Meads
    Train times From Sea Mills 4 April until 21 October 2018 Severn17–22 mins Beach St Andrews10 mins Road Avonmouth7 mins Shirehampton3 mins Sea Mills Clifton4 mins Down Redland7 mins Montpelier9 mins Stapleton13 mins Road Lawrence15 mins Hill Bristol18–26 mins Temple Meads To Avonmouth To Bristol Temple Meads Mondays to Mondays to Fridays Saturdays Sundays Fridays Saturdays Sundays 0532sb 0619 0915sb e 0620 0641 1000f 0605 0651 1040sb 0637 0723 1130 0649sb 0733sb 1140sb 0735 0811 1230 0821 0821 1240sb 0810 0842 1330 0855 0852 1340sb 0844 0923 1430 0933sb 0933sb 1440sb 0923 1011 1530 1022 1021 1540sb 1011 1042 1630 1053 1052 1640sb 1042 1123 1730 1133sb 1133sb 1710sb 1123 1211 1800 1222 1221 1810sb 1211 1242 1900 1253 1254 1910sb 1242 1323 1959 1333sb 1333sb 2010 1323 1411 2029 1422 1421 • 1411 1442 • 1453 1452 • 1442 1523 • 1533sb 1533sb • 1523 1611 • 1622 1621 • 1611 1642 • 1653 1652 • 1642 1723 • 1733sb 1733sb • 1722 1811 • 1822sb 1821sb • 1811 1911 • 1914 1921sb • 1904 2004 • 1951 2052sb • 1940 2149 • 2054sb 2158 • 2011 2223 • 2156 2233sb • 2147 2311 • 2238sb • • 2228 • • 2326 • • Notes: sb Train continues to Severn Beach Cam & Dursley e Departs 3 minutes later from 20 May Severn Tunnel f Departs 3 minutes later until 13 May Newport Junction Pilning Severn Beach Yate Patchway Filtonn Abbey Wood Avonmouth Bristol Parkway Shirehampton Sea Mills Redland Montpelier Stapleton Road Cardiff Clifton Down Chippenham Bristol Temple Meads LawreLawrence Hill Central Map shown for illustrative purposes only and is not to scale. Please note Nailsea & Backwell Bedminster Parson Keynsham that not all trains necessarily call at all stations shown on the map.
    [Show full text]
  • Shirehampton Remount Depot
    Shirehampton Remount Depot During World War I the main form of transport for troops, munitions and supplies was the horse or mule. The military effort on the Western Front from August 1914 to November 1918 required a continual supply of these animals. Several Remount Depots were set up across the UK to help maintain this supply. Shirehampton was one of the largest and over 300,000 horses passed through Shirehapmton and Avonmouth between 1914 and 1918. There are no surviving physical remains and very few very few These images are used courtesy of the Shirehampton Book of images of the Remount Depot. Remembrance At the beginning of the war most of these http://shirehamptonbookofremembrance.webs.com/ horses came from British farms, but this supply was quickly exhausted. By 1915 most of the animals were shipped over from Canada or the US to be stabled at Shirehampton before they were sent to the front as required. Through the Heritage Lottery funded Shirehampton and Avonmouth All Our Stories project Myers-Insole Local Learning (MILL) aim to uncover stories of the men, their families and their experiences of the remount depot. These stories will There are a few drawings of the remount depot made by These two show buildings of the vetinary hospital that was part be presented on a World War I layer on Samuel Loxton immediately after the war in 1919. of the site and appears to have continued in use for a time. bristol.gov.uk/knowyourplace and will also be accessible at www.locallearning.org.uk. www.locallearning.org.uk Shirehampton Remount Depot A plan of the Shirehampton Remount Depot made in 1914 with later amendments held in the Building Plan books at Bristol Record Office (BRO BP Vol64a f56).
    [Show full text]
  • STUDENT VILLAGE ACCOMMODATION SITE INFORMATION 1932 Students/Single Study Bedrooms, 326 Flats
    STUDENT VILLAGE ACCOMMODATION SITE INFORMATION 1932 students/single study bedrooms, 326 flats uwe.ac.uk/accommodation Your accommodation The Courtyards The Student Village consists of four separate courtyards: Brecon Court, BS16 1ZG 564 students Cotswold Court, BS16 1ZH 500 students Mendip Court, BS16 1ZL 400 students Quantock Court, BS16 1ZP 468 students Each courtyard has the following communal facilities: • Post boxes (one per flat) • Secure bicycle storage Heating • Common room (situated at Cotswold) You can control the temperature in your bedroom • Laundry facilities (situated at Brecon, Mendip and by adjusting the thermostat control on the radiator. Quantock) Time-controlled devices are fitted to the radiators to save energy. • Waste and recycling areas. All accommodation can be accessed using a lift. Typical room layout Your flat and study bedroom can be summarised as follows: • Flats are organised in single rooms for groups of five or six students. • Residents share an open kitchen and lounge area. • All accommodation is provided on a self catering basis. • All study bedrooms are single occupancy. • All study bedrooms are provided with Glide internet service. • Gas, electricity and water bills are included as part Under desk of the rent. chest of drawers Kitchen and lounge area Kitchen facilities comprise of two electric cookers, two fridge/freezers, kettle and a microwave. Residents will need to bring their own crockery, cutlery and cooking utensils. The lounge area has a breakfast bar, stools, easy chairs, a sofa and two coffee tables. There is a TV aerial socket within this area. You are also provided with a hoover, ironing board, floor brush, mop and mop bucket.
    [Show full text]
  • Download Bristol Walking
    W H II T RR EE E D L H LL A A A N M D D II PP E TT G O S R N O V R RR EE O O W AA OO A D H RR U D BB G RR II B A LL S CC R E M ONO R E H N LL H A E H T H CC H R Y A CHERCH R TT EE RR A S O O O Y EE 4 M AD H LL E N C D II SS TT 1 RTSEY PP E L CC D R K N L 0 T TT A EE S EE O R HA S O G E CC NN 8 K A N C E N N AA E P M IIN A TT Y RD LEY RO B F H D W L II R F S P R PP M R R L RD W Y CC Y II K D A E O EE N R A A D A U R DD O O E U LLLL A AA D RD RR WAVE A H M EN A B P S P RR N O TT D M LL KK V TT A ININ T C D H H H R BB BB DD LA E O N T AD E R NN K S A A A EE A SS S N C A G RO B E AA D T VI M A L S OO A T RR D TT A OA ST RONA U M L B TT NER A OO O O C NN DD R E RR TT AAN TT M R E O B RR JJ CK T H Y EE NN OOH RONA O II N II R G R L O PP T R EE N OO H N O L AA RR A A RR II RR D T LL CH A A A A NSN C A O T RR O OO V T A R D N C SS V KK DD S D E C VV W D O R NSN H EE R R F EE L R O UU A L S IIE L N AD R A L L II N TT R IAL D K R H U OADO A O O ER A D R EE P VE OD RO O TT N AD O A T T IMPERIIM W D CC NE E D S N II A E OA N E L A D V E R F PP A S R E FR N R EY KK V D O O O TL A E UG T R R T HA RR R E ADA G R S W M N S IIN Y D G A A O P LL E AL PP R R S L L D N V Y WE H YN T II IIN DE WE S R L A LLE C A Y N O E T G N K R O F M N RORO II HA D TO R E D P A T E Y II L R L E P L Y E A A M L R E DD D U E E A R D U F MPTOM H N M R AA M AD A V A W R R R W T W L OA OA M OA S O M OO A IIL T HA R A C L O D L E L RR D A D P K D D II E E N O E AM Y D T HAM VA R R R O T T AD CO D N VE OR N O O M Y BBI D ST F COTHAMC R THA I ST A A FORD AA C T R ITIT G D T M O
    [Show full text]
  • Local Organisation Submissions to the Bristol City Council Electoral Review
    Local organisation submissions to the Bristol City Council electoral review This PDF document contains all local organisation submissions. Some versions of Adobe allow the viewer to move quickly between bookmarks. Submission to the Local Government Boundaries Commission by the Bishopston, Cotham and Redland Neighbourhood Partnership 15 February 2015 Nick Clark (Chair) Neighbourhood Partnership status This submission on the proposed City of Bristol ward boundary changes is made by the Bishopston, Cotham and Redland Neighbourhood Partnership. We are one of 14 Neighbourhood Partnerships within the City of Bristol, and cover the three current electoral wards of Bishopston, Cotham and Redland. The membership of the Partnership includes all Bristol City Councillors from these wards as well as representatives of local community groups and advocates for local topics of concern. This submission is made independently from that of any political party. As part of the devolution of local authority powers to a local level, we have responsibility for a small devolved budget from Bristol City Council but also for decisions on matters such as minor road schemes, management of parks and street scene, including local services, amenities, appearance and accessibility. We were not made aware of the current boundary consultation until shortly before the initial submission deadline. We have also not been given access to computer software to allow us to measure the effects of different boundary choices on electoral representation. We wish more had been done at an earlier stage to involve Neighbourhood Partnerships in providing their contributions to the current boundary changes. We therefore make the following submission, in reaction to the new boundary proposals, primarily on matters of principle.
    [Show full text]
  • Bristol One City Climate Strategy a Strategy for a Carbon Neutral, Climate Resilient Bristol by 2030 1 Foreword from the One City Environmental Sustainability Board
    One City Climate Strategy A strategy for a carbon neutral, climate resilient Bristol by 2030 Bristol One City Climate Strategy A strategy for a carbon neutral, climate resilient Bristol by 2030 1 Foreword From the One City Environmental Sustainability Board We are facing a climate In the One City Plan, Bristol This strategy sets the vision for where This strategy is a call to action. committed to becoming carbon we need to be in 2030 based on We call on you, as people who live, emergency. As a city neutral and climate resilient by 2030. sound science. We would like to thank work, visit and invest in Bristol, to join we need to act now to To achieve this, over the next decade, our colleagues on Bristol’s Advisory with us on this exciting decade of we need to radically rethink how we Committee on Climate Change for transformation. reduce direct and indirect live, work and invest in the city. their review and challenge of the We will engage widely to understand evidence for Bristol. carbon emissions to net We also need action regionally, how we can work together to achieve nationally and internationally. We recognise that achieving our vision the ambitions set out in this strategy. zero. We need to prepare will not be easy. There are entrenched However, this does not mean that any This provides an opportunity to take market and wider forces that will organisation or individual should wait and adapt to deal with a collaborative, inclusive and citywide support existing fossil-fuel dependent, for a plan to be shared.
    [Show full text]
  • Urban Issues and Challenges
    PAPER 2: HUMAN GEOGRAPHY Section A: Urban Issues and Challenges (Parts 1-5) Case study of a major city in a LIC or NEE: Rio de Janeiro An example of how urban planning improves the quality of life for the urban poor: Favela Bairro Project Case study of a major city in the UK: Bristol An example of an urban regeneration project: Temple Quarter Section B: The Changing Economic World (Parts 1-6) An example of how tourism can reduce the development gap: Jamaica A case study of an LIC or NEE: Nigeria A case study of an HIC: the UK An example of how modern industries can be environmentally sustainable: Torr Quarry Section C: The Challenge of Resource Management (27-29) Example of a large scale water management scheme: Lesotho Example of a local scheme in an LIC to increase water sustainability: The Wakel river basin project Section A: Urban Issues and Challenges (Parts 1-5) Case study of a major city in a LIC or NEE: Rio de Janeiro An example of how urban planning improves the quality of life for the urban poor: Favela Bairro Project Case study of a major city in the UK: Bristol An example of an urban regeneration project: Temple Quarter 2 Y10 – The Geography Knowledge – URBAN ISSUES AND CHALLENGES (part 1) 17 Urbanisation is….. The increase in people living in towns and cities More specifically….. In 1950 33% of the world’s population lived in urban areas, whereas in 2015 55% of the world’s population lived in urban areas. By 2050….
    [Show full text]
  • Green Space in Ashley, Easton and Lawrence Hill
    Ashley Easton Lawrence Hill AGSP_new_Covers 09/06/2010 11:24 Page 1 Ideas and Options Paper Ashley, Easton and Lawrence Hill Area Green Space Plan Ideas and Options Paper Ashley, Easton and Lawrence Hill Area Green Space Plan A spatial and investment plan for the next 20 years • raising quality • setting standards • providing variety • encouraging use • 1 Ashley Easton Lawrence Hill AGSP_new_Covers 09/06/2010 11:24 Page 2 Ideas and Options Paper Ashley, Easton and Lawrence Hill Area Green Space Plan If you would like this Vision for Green Space in informationBristol in a different format, for example, Braille, audio CD, large print, electronic disc, BSL Henbury & Southmead DVD or community Avonmouth & Kingsweston languages, please contact Horfield & Lockleaze us on 0117 922 3719 Henleaze, Westbury-on-Trym & Stoke Bishop Redland, Frome Vale, Cotham & Hillfields & Eastville Bishopston Ashley, Easton & Lawrence Hill St George East & West Cabot, Clifton & Clifton East Bedminster & Brislington Southville East & West Knowle, Filwood & Windmill Hill Hartcliffe, Hengrove & Stockwood Bishopsworth & Whitchurch Park N © Crown Copyright. All rights reserved. Bristol City Council. Licence No. 100023406 2008. 0 1km • raising quality • setting standards • providing variety • encouraging use • Ashley Easton Lawrence Hill AGSP_new_text 09/06/2010 11:18 Page 1 Ideas and Options Paper Ashley, Easton and Lawrence Hill Area Green Space Plan Contents Vision for Green Space in Bristol Section Page Park Page A city with good quality, 1. Introduction 2 Riverside Park and Peel Street Green Space 9 Rawnsley Park 10-12 attractive, enjoyable and 2. Background 3 Mina Road Park 13 accessible green spaces which Hassell Drive Open Space 14-15 meet the diverse needs of all 3.
    [Show full text]
  • The Severn Beach Line
    el at * v a Standard network charges apply. Calls from mobiles may behigher. Callsfrommobilesmay apply. Standard networkcharges More information and news.Registerat specialdeals missoutonourlatest offers, Don’t Buy yourtrainticketsonlineat Earn Nectarpoints train times.Search Download ourapp to purchaseticketsandcheck 03457 000125* [email protected] GWR.com/contact Like us: us: Follow r T quieter times times facebook.com/GWRUK @GWRHelp (open 0600-2300daily) ace f GWR rain ering GWR.com/signup ear a T 16 May to 11 December 2021 ov GWR.com/Safety B8S W c in your App store inyour GWR.com our y ash W hands Redland Montpelier Sea Mills Down Clifton Shirehampton Avonmouth Severn Beach Severn Road Andrews St Bristol Temple Meads Temple Bristol Lawrence Hill Lawrence Stapleton Road Check before you travel, visit Travel with Confidence. Passenger Assist Large print timetables are available for our partially sighted customers. You can arrange help, check station accessibility, buy a ticket and reserve a seat by calling us on Call 03457 000 125* or email [email protected] Freephone 0800 197 1329 or by text relay * Standard network charges apply. Calls from mobiles may be higher. 18001 0800 197 1329 (open 0600 to 2300, 7 days a week, except Christmas Day). You may book assistance by completing the Access Ticket offi ce hours Ticket Bike online booking form available on our website. Station CRS Operator Category Weekdays Saturdays Sundays machine Toilets Car Park Rack Station accessibility Avonmouth AVN GW B Unstaffed Unstaffed Unstaffed D D All
    [Show full text]
  • Prime Unique Connected
    PRIME UNIQUE CONNECTED DESIGN AND BUILD OPPORTUNITIES UP TO 1,300,000 SQ FT MOUNTPARK BRISTOL XL SEVERN ROAD / CENTRAL AVENUE, BRISTOL, BS10 7ZE MOUNTPARK.COM/BRISTOLXL CHEPSTOW M48 SEVERN BRIDGE THORNBURY Mountpark BristolXL is a new industrial / logistics development situated at the gateway to the south J1 west, Avonmouth in Bristol. M48 A4O3 J23 The scheme has three fundamental benefits: M4 SEC OND SEV ERN A38 CRO M4 J21 SSING J22 M5 NEW J15 / J2O JUNCTION PRIME SEVERN ESTUARY JO1 The site is situated in a prime distribution M4 location, adjacent to the established Central A4O3 M5 A38 Park area of Avonmouth, 10 miles to the M49 A432 north west of Bristol City Centre. A4O3 AVONMOUTH DOCKS FILTON J19 RIVER AVON J18 A4O18 M4 UNIQUE ROYAL A41744 HRS SHEFFIELD PORTBURY J18a DOCKS M32 M1 A38 M6 The proposed scheme can accommodate A4162 NOTTINGHAM a single unit of over 1,000,000 sq ft, which A4 is unique for the area. 3 HRS M42 A4176 A432 A4174 BIRMINGHAM M5 2 HRS M5 M1 A369 M4O CONNECTED A42O A42O BRISTOL 1 HR OXFORD The scheme is strategically located for local and O.5 HRS national distribution via the M49, M4 and M5 A37O M4 M4 LONDON motorways. Accessibility will be further improved in CARDIFF BRISTOL SWINDON 2019 with the opening of a new junction on the M49 A38 A4174 A431 A4174 M3 motorway which is within 1 mile of the site. M4 A37 SOUTHAMPTON PORTSMOUTH A37O BRISTOL AIRPORT CONNECTED ABUNDANT Strategically located, offering Bristol is the economic hub of the south west both connectivity and accessibility, region with excellent labour availability, education resources, and connectivity.
    [Show full text]
  • Avonmouth and Severnside Integrated Development, Infrastructure, And
    Bristol City and South Gloucestershire Councils AVONMOUTH AND SEVERNSIDE INTEGRATED DEVELOPMENT, INFRASTRUCTURE AND FLOOD RISK MANAGEMENT STUDY February 2012 Address: Ropemaker Court, 12 Lower Park row, Bristol, BS1 5BN Tel: 01179 254 393 Email: [email protected] www.wyg.com creative minds safe hands Document Control Project: A066776 Client: SWRDA, Bristol City Council and South Gloucestershire Council Job Number: A066776 File Origin: X: \Projects \A0 60000 -\A066776 - Avonmouth Infrastructure Study \Final Report \April 2012 \A066776 wyg report final feb 2012.doc Document Checking: Prepared by: AS Signed: AS Checked by: ND Signed: ND Verified by: ND Signed: ND Issue Date Status 1 3rd October 2011 Draft 2 22 nd December 2011 Revised Draft 3 10 th February 2011 Final Draft 4 24 th April 2012 Final Issue www.wyg.com creative minds safe hands Contents Page Executive Summary…………………………………………………………………………………………………………………1 1.0 Introduction .......................................................................................................................4 1.1 The Opportunity.........................................................................................................................4 1.2 WYG .........................................................................................................................................4 1.3 Location ....................................................................................................................................5 1.4 Infrastructure ............................................................................................................................5
    [Show full text]