Federal Register/Vol. 75, No. 117/Friday, June 18
Total Page:16
File Type:pdf, Size:1020Kb
34714 Federal Register / Vol. 75, No. 117 / Friday, June 18, 2010 / Notices applications because of increased public Environmental Documentation • One IBCT has been established as involvement, such as the opportunity to The decision document for the the 43rd BCT at Fort Carson, CO; • The 44th BCT has been activated at comment on public notices for suspension of NWP 21 is available at the individual surface coal mining activities Fort Bliss, TX; and Corps Headquarters ‘‘National Notices in Appalachia. This additional • The 45th BCT was established at and Program Initiatives’’ page at: information could help improve not Fort Stewart, GA, as an IBCT. http://www.usace.army.mil/CECW/ only the Corps analysis of potential • The Army will not stand up new Pages/nnpi.aspx and the regulations.gov individual and cumulative adverse growth IBCTs at Fort Bliss, TX; Fort Web site under docket number COE– effects of the proposed activity on the Stewart, GA; or Fort Carson, CO in 2011 2009–0032. It is also available by aquatic environment, but also on the as was originally announced in the 2007 contacting Headquarters, U.S. Army potential adverse effects on other public ROD. In place of these BCTs, the Army Corps of Engineers, Operations and interest review factors listed at 33 CFR will establish additional combat support Regulatory Community of Practice, 441 320.4(a)(1), such as conservation, units at locations across the Army to aesthetics, economics, land use, G Street, NW, Washington, DC 20314– better meet mission requirements and recreation, fish and wildlife values, 1000. man units for upcoming deployments. energy needs, and general Authority • The Army will convert a Heavy considerations of property ownership, Brigade Combat Team (HBCT) (the 1st We are suspending NWP 21 under the to the extent that those public interest Brigade of the 1st Armored Division (1⁄1 authority of Section 404(e) of the Clean factors are relevant to waters of the AD)) to a Stryker Brigade Combat Team Water Act (33 U.S.C. 1344) and Section United States subject to CWA (SBCT) beginning in 2011 at Fort Bliss, jurisdiction and within the Corps 10 of the Rivers and Harbors Act of 1899 TX. This conversion involves the Federal control and responsibility. (33 U.S.C. 401 et seq.). stationing of approximately 450 Concurrent with this Federal Register Dated: June 8, 2010. additional Soldiers and their equipment notice, all Corps districts will issue Approved by: at Fort Bliss. local public notices announcing the R.L. Van Antwerp, • An HBCT will no longer be suspension of NWP 21 as of the effective Lieutenant General, U.S. Army, Commanding. returning from Germany to White Sands date identified above. [FR Doc. 2010–14778 Filed 6–17–10; 8:45 am] Missile Range in fiscal year 2013. The stationing of HBCTs currently assigned Grandfathering of Existing NWP 21 BILLING CODE 3720–58–P Authorizations to Germany will be reassessed in light of the Army’s global mission Today’s action prohibits District DEPARTMENT OF DEFENSE requirements. Engineers from issuing NWP 21 These modifications to the original verifications in response to PCNs for Department of the Army Grow the Army decision will better surface coal mining activities in the allow the Army to respond to security Appalachian counties listed above Updated Record of Decision (ROD) for threats in an unpredictable global during the period of suspension. In Revised Army Growth and Force; security environment. other words, District Engineers cannot Structure Realignment Decisions ADDRESSES: A request for copy of the continue to process NWP 21 PCNs that ROD can be sent to the Public Affairs are pending as of June 18, 2010 or AGENCY: Department of the Army, DoD. Office, U.S. Army Environmental accept new or revised NWP 21 PCNs for ACTION: Notice of availability (NOA). Command, Building E4460, Attention: surface coal mining activities in the IMAE–PA, 5179 Hoadley Road, Appalachian region of those six states SUMMARY: The Department of the Army Aberdeen Proving Ground, MD 21010– unless the suspension is lifted and NWP announces the availability of an 5401. 21 is reinstated in this region. updated ROD for Army Growth and Proponents of proposed surface coal Force Structure Realignment. This ROD FOR FURTHER INFORMATION CONTACT: LTC mining activities in the Appalachian explains that the Army has modified David Patterson, Media Relations region of these six states will have to previous decisions made in December Division, Office of the Chief of Public submit applications for individual 2007 to support Army growth and force Affairs, at (703) 697–7592. permits instead of NWP 21 PCNs. structure realignment. The Army’s SUPPLEMENTARY INFORMATION: In January NWP 21 activities that have been decision at the time grew the Army by 2007, the President asked Congress for verified by District Engineers prior to six Infantry Brigade Combat Teams authority to increase the overall strength June 18, 2010 in the Appalachian region (IBCTs), eight active component support of the Army by 74,200 Soldiers over the of Kentucky, Ohio, Pennsylvania, brigades, and associated growth in next five years. This growth was Tennessee, Virginia, and West Virginia, smaller combat support and combat intended to mitigate shortages in units, continue to be authorized by that NWP service support units required to Soldiers, and time to train that would until it expires on March 18, 2012, complement the U.S. Army’s overall otherwise inhibit the Army from unless the District Engineer takes action force structure growth. The decision meeting readiness goals and supporting to modify, suspend or revoke a also relocated two Heavy Brigade strategic requirements. The Department particular NWP authorization on a case- Combat Teams (HBCTs) from Europe to of the Army prepared a Programmatic by-case basis in accordance with the the continental United States. This Environmental Impact Statement (PEIS) procedures at 33 CFR § 330.5(d). District updated ROD details how the Army has that evaluated the potential engineers may not modify previously modified growth and realignment environmental and socioeconomic issued NWP 21 verifications to decisions to better meet operational effects associated with alternatives for authorize additional discharges of mission requirements. Specifically, the Army growth and realignment. In the dredged or fill material into waters of original decision is being modified by Final PEIS (published on October 26, the United States in the affected this updated ROD in the following 2007), the Army identified Alternative 3 Appalachian counties; such discharges ways: as the preferred alternative. Alternative must be applied for and evaluated under • Army growth is stopped at 45 active 3 (adds combat support and combat the individual permit process. component BCTs instead of 48; service support units, as well as Army VerDate Mar<15>2010 16:17 Jun 17, 2010 Jkt 220001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\18JNN1.SGM 18JNN1 srobinson on DSKHWCL6B1PROD with NOTICES Federal Register / Vol. 75, No. 117 / Friday, June 18, 2010 / Notices 34715 BCTs to the Army’s force structure) Regulatory Information Management Frequency: Semi-Annually. remains the Army’s preferred alternative Services, Office of Management, invites Affected Public: with the modification to the Army’s comments on the proposed information Not-for-profit institutions. ROD. collection requests as required by the State, Local, or Tribal Government The Final PEIS examined major Army Paperwork Reduction Act of 1995. (Gov’t), State Education Associations installations within the continental DATES: Interested persons are invited to (SEAs) or Local Education United States and their ability to submit comments on or before August Associations (LEAs). support new unit stationing actions in 17, 2010. Reporting and Recordkeeping Hour connection with growth and SUPPLEMENTARY INFORMATION: Section Burden: realignment. The Final PEIS provided 3506 of the Paperwork Reduction Act of Responses: 138. the Army senior leader-ship with an 1995 (44 U.S.C. Chapter 35) requires Burden Hours: 6,900. assessment of environmental and that the Office of Management and Abstract: The purpose is to socioeconomic impacts that would be Budget (OMB) provide interested implement a data collection process for associated with these actions in Federal agencies and the public an early a new semi-annual reporting for addition to the feedback and concerns of opportunity to comment on information Government Performance Results Act the public. This information was collection requests. OMB may amend or (GPRA) purposes for the National considered as part of the decision- waive the requirement for public Professional Development Program. making process for decisions contained consultation to the extent that public These data are necessary to assess the in the updated ROD (2010). participation in the approval process performance of the National The conversion of an HBCT to an would defeat the purpose of the Professional Development in meeting its SBCT at Fort Bliss, TX will create the information collection, violate State or stated goals and objectives and report to Army’s 7th active component SBCT. Federal law, or substantially interfere Department of Education’s (ED) Budget The Army’s needs are best met by with any agency’s ability to perform its Service. The National Professional transforming an HBCT at Fort Bliss as statutory obligations. The Director, Development (NPD) program provides this unit will have maximum time to Information Collection Clearance professional development activities implement conversion to an SBCT and Division, Regulatory Information intended to improve instruction for train with new equipment prior to the Management Services, Office of students with Limited English need to redeploy. In addition, Fort Bliss Management, publishes that notice proficiency (LEP) and assists education is capable of providing the SBCT with containing proposed information personnel working with such children fully modernized training and garrison collection requests prior to submission to meet high professional standards. The infrastructure; and the installation has of these requests to OMB.