HINDUSTAN ZINC LIMITED Mining Customer Profile - India

Total Page:16

File Type:pdf, Size:1020Kb

HINDUSTAN ZINC LIMITED Mining Customer Profile - India HINDUSTAN ZINC LIMITED Mining Customer Profile - India June 2017 COMPANY BACKGROUND Hindustan Zinc Limited (HZL) is a Vedanta Group Company. HZL is an integrated mining and resources producer of zinc, lead, silver and cadmium and is the world’s second largest zinc producer and is among the leading global lead and silver producers. HZL is a subsidiary of the BSE and NSE listed Vedanta Limited (ADRs listed on the NYSE; earlier known as Sesa Sterlite Limited), a part of London listed diversified metals and mining major, Vedanta Resources plc. HZL posted total revenue of US$221 billion in 2015 and PBDIT of US$1.4 billion. The HZL head office is located in Udaipur with the majority of its mines in Rajasthan, northern India, and employs a total of 6742 staff across all operations. Website Hindustan Zinc Hindustan Zinc Limited - Investor Relations MAJOR OPERATING DIVISIONS HZL’s core business comprises of mining and smelting zinc and lead along with captive power generation. They have a metal production capacity of over one million tonnes per annum with the key lead-zinc mines being Rampura Agucha and Sindesar Khurd. Modern smelting complexes are located in Chanderiya and Dariba, and all mines and smelting operations are located in the state of Rajasthan and Zawar in India. HZL owns 474 mega-watt of coal based thermal captive power plants in Rajasthan to support its metallurgical operations. In addition, their environmently friendly power generation includes 274 mega-watt of wind energy, 16 mega-watt of solar and 35.4 mega-watt from waste heat generation. Active zinc mines include the Rampura Agucha Mine, Zawar Mining Complex, Rajpur Dariba Mine, Sindesar Khurd Mine and Kayad Mine. ACTIVE PROJECTS Rampura Agucha Zawar Group Rajpura Dariba Sindesar Khurd Kayad Mature - world’s Mature – lead zinc Mature – lead zinc Mature – lead zinc Mature - lead zinc largest zinc mine Comprises a cluster Stratiform, sediment- of 4 underground hosted, high grade mines: Mochia, zinc and lead Balaria, Zawarmala deposits and Baroi. The mines are connected by Ore grade is both rail and road. consistent throughout with no deterioration Reserves : 51.1mt Reserves : 9.5mt Reserves : 9.3mt Reserves : 33.2mt Reserves : 3.9mt Resources : 82.3mt Resources : 49.4 mt Resources : 52.7mt Resources : 76.3mt Resources : 2mt Res. Grade Zn: 3.4% Res. Grade Zn: Res. Grade Zn: 14% Res. Grade Zn: 4.7% Res. Grade Zn: 6.3% Res.Grade Pb: Res. Grade Pb: 1.7% 13.4% Res. Grade Pb : 1.8% 1.6% Res. Grade Pb: Ore production 3.2% Res. Grade Pb: 1.8% Ore production Ore production capacity : 1.2mtpa capacity : 6.15mtpa capacity : 0.90mtpa Ore production Ore production CPP : 80MW capacity : 3.0mtpa capacity : 1mtpa Simultaneous Underground Underground Underground open cast and Open stoping with Blast hole open stoping in upper block Sublevel stoping underground some shrinkage operations LHS with paste filling in lower block Small to medium stoping (Sindesar Khurd) sized drifts Mining in the open pit up to a depth of Mining is carried out using the vertical 372 m - underground crater tetreat method and blast hole mining is carried out stoping method with mined out stopes below this level backfilled with cemented tailings. (Rajpura Dariba) The plant process includes: • crushing and screening • grinding • lead and zinc floatation • lead and zinc concentrate thickening and filtration • tailing dewatering and disposal • paste and high density hydro fill plant. Hindustan Zinc Limited 2 PROCUREMENT PRIORITIES Key operational drivers across all mines operator (MDO) for the Rampura Agucha Mine of Hindustan Zinc Limited. In the context of maintaining HZL’s current position of Hindustan Zinc- has two Peruvian and one Chinese being one of the lowest cost producers globally, key mining contractor involved as MDOs. operational drivers focus on safety; increased production; increased utilisation of current assets and life of mine Recent mine upgrades and automation extension. Computerisation has been identified as suppliers offering a two-fold solution; to improve safety within the Across the group of mines: mines operations and delivering increased productivity. International consultants were engaged in February • slope stability radar systems (Groundprobe) 2016 to undertake an assessment of the Sindesar Khurd • weighment solutions (Trakblaze) Mines operational, safety and technical standards. • tailings management (Golder Associates) HZL is currently establishing an underground Wi-Fi • safety training–behaviour based safety network across all mines to improve safety and production. • contract mining (Barminco) The network will facilitate: • dust suppression solutions (COOEE Dust Bloc) • asset (men/machine/material) tracking using Wi-Fi • mine planning systems (Modular Mining). tags and real time visibility of operations • tele-remote operations of loaders • automation of auxiliaries – pumping station, PROCUREMENT ventilation, sub-stations etc OPPORTUNITIES • VoIP based communication HZL is currently seeking solutions in the broad areas More information can be found in the 2017 HZL Presentation of safety improvements and innovation, production and productivity improvements, IT-based monitoring Key development activities of equipment, contract mining, exploration, metal HZL executives maintain a strong focus on recoveries, precious metal separation and techno technology to deliver improved underground economical solutions in metal recoveries from tailings. operations and safety across all mines. HZL are moving up the value chain and desire a In HZL’s February 2017 presentation on Mining Technology, ‘single point responsibility’ from the supplier. As the way forward for all HZL mines requires: an example Atlas Copco was asked to take full ownership of underground mining equipment for its • refrigerated ventilation in deep mining economic life time and provide a guaranteed cost • new mining methods for geo technically of operation (parts and labor) for the entire period. challenging ground conditions Establishing a local presence through partnering with • top down mining method at Rampura Agucha established Indian companies or engaging dedicated underground for better ground management and representation directly has been highly regarded in stability the procurement decision process. A local presence • centralised control and command centre for delivers the ability for regular engagement and integrated mining operations ongoing follow-up at a minimum. Where service and • use of slag and fly ash as binder in paste design or training are critical aspects of the supply, local presence would be considered essential. Service, Current Tier 1 suppliers and OEM’s repair and maintenance capability is mandatory for non-standard and sophisticated plant and equipment. OEM’s - Normet and CAT supply all underground related mining equipment. NB: for most underground equipment, HZL require DGMS regulatory clearance which Contract Mining Companies - as of November 2016, can be a lengthy and complex process. Barminco has been appointed as the mining developer Please see the Directorate General of Mines Saftey website for more information. Hindustan Zinc Limited 3 AUSTRALIAN AUSTRADE SUPPLIER The Australian Trade and Investment Commission – ENGAGEMENT Austrade – contributes to Australia’s economic prosperity by helping Australian businesses, education institutions, Austrade has worked with a range of Australian tourism operators, governments and citizens as they: suppliers and facilitated regular client engagement • develop international markets in various areas related to safety, training, weighment • win productive foreign direct investment solutions, waste management and contract mining. • promote international education Australian METS suppliers with proven solutions • strengthen Australia’s tourism industry have established high value relationships with HZL providing products and services across HZL’s group • seek consular and passport services. of mines. See the ‘Recent mine upgrades/automation • international business opportunities. suppliers’ section above for companies and solutions. w austrade.gov.au Trakblaze - commercial sale of in-motion weighment e [email protected] solutions. t 13 28 78 (within Australia) RESEARCH AND Austrade Contact TRAINING LINKS TO Renee Barton, Team Leader AUSTRALIA Mining Equipment, Technology and Services t +61 8 8202 7853 HZL are actively involved in research and development e [email protected] activities related to waste management, contract mining, mining innovation, fly ash management and spent port lining removal at aluminium smelters. Hindustan Zinc’s Central Research and Development Laboratory (CRDL) was established in 1976 with an objective to enhance metal recoveries, to recover values from the waste and optimise waste management. The CRDL has developed various processes that includes the recovery of lead and silver from low grade lead concentrate and hot gas precipitator dust. Hindustan Zinc’s CRDL has been recognised by the Department of Scientific and Industrial Research and is listed in the American Society for Testing and Materials, online directory for testing laboratories. CRDL representatives have participated in R&D roundtables organised by Austrade, and have engaged with Australian companies such as Zeobond (fly ash management), Regain (spent port lining) and Golder Associates (waste management). Disclaimer While care has been taken to ensure the information in this document is accurate, the Commonwealth of Australia represented by the Australian Trade and Investment Commission does not provide warranty or accept liability for any loss arising from reliance on such information. ©Commonwealth of Australia 2017 Hindustan Zinc Limited 4.
Recommended publications
  • Hindustan Zinc Limited
    Hindustan Zinc Limited INVESTOR PRESENTATION AUGUST 2019 Cautionary Statement and Disclaimer The views expressed here may contain information derived from publicly available sources that have not been independently verified. No representation or warranty is made as to the accuracy, completeness, reasonableness or reliability of this information. Any forward looking information in this presentation including, without limitation, any tables, charts and/or graphs, has been prepared on the basis of a number of assumptions which may prove to be incorrect. This presentation should not be relied upon as a recommendation or forecast by Hindustan Zinc Limited. Past performance of Hindustan Zinc cannot be relied upon as a guide to future performance. This presentation contains 'forward-looking statements' – that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as 'expects,' 'anticipates,' 'intends,' 'plans,' 'believes,' 'seeks,' or 'will.' Forward–looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets including the London Metal Exchange, fluctuations in interest and or exchange rates and metal prices; from future integration of acquired businesses; and from numerous other matters of national, regional and global scale, including those of a environmental, climatic, natural, political, economic,
    [Show full text]
  • Iot Opportunities for Industry 4.0
    EMPOWER YOUR ANALYTICS WITH OPERATIONAL DATA 2019 OSISOFT MUMBAI SEMINAR IoT opportunities for industry 4.0 Neelesh Chawda 14th October, 2019 Head Milling Excellence, HZL one vision . one vedanta . Industry opportunities and challenges one vision . one vedanta . Opportunity to scale up Mining Autonomous Vehicles Estimated worldwide 88,000 110Mn uber users across the mining equipment in use world Data volume are up 500 folds Handles 3Mn drivers around over past 10 years different parts and timelines of world Only 20% of network capacity With 110Mn uber users, only industry need in 2020 exist today caters 69% of US market 62% of workforce think having Completely mobile access to application helps App and IoT to do better job based operations Working mine or cluster might be Operates in 80 countries and next door or halfway across 400 cities across globe world one vision . one vedanta . Industry challenges We are mature and proactive org, but We want to be data-driven, but… We need to cut costs, but… UNNECESSARY EXCESSIVE Loss time are of the UNPLANNED MAINTENANCE don’t know which cuts DOWNTIME COST 89% not time based 85% effort push us over our risk tolerance is in gathering and aggregating the data Operational Silos Average in a week Less Innovation and working investment as compared to other 40% hours are lost Reactive or Break / Fix due to inefficient communication sectors Maintenance Culture Organizational Working hazards and Care for Environment and Knowledge Loss mitigation of safety risks natural resources Data Not Accessible or Proactively Analyzed We know asset failure is often IT & OT data sources are diverse We don’t know where to cut random; however, we don’t have a and siloed, resulting in limited or where the point of diminishing better set of diagnostic tools visibility across an enterprise returns resides LOST LOWER REVENUE PROFITABILITY PEOPLE PROCESS TECHNOLOGY one vision .
    [Show full text]
  • Cr-V OXIDES from the RAMPURA AGUCHA Pb-Zn
    745 The Canadian M inc ralo g ist Vol. 33, pp. 745-752 (1995) Cr-V OXIDESFROM THE RAMPURA AGUCHA Pb-Zn-(Ag) DEPoSll RAJASTHAN,INDIA WOLFRAM HOLLER ANDEUGEN F. STIIMPFL Institute of Geological Sciences, Mining University Leoben, Peter-Twmer-Strasse 5, 8700 Leobea Austria Arsrrasr Two new compositionalvarieties of rme oxide minerals have been studiedby ore microscopyand electron-microprobe analysis in samplesfrom the high-grademetamorphic, stratiform RampuraAgucha Pb--Zn{Ag) deposit, Rajasthan,India- We haveestablished the presenceof a Cr-V-Fe spineland a Cr-V rhombohedraloxide. The compositionsof the two minerals, Vs.s-1.15Cr9.6a_1.15Fej.6_n.67Mn6.12+.y.Mgo.A4zrzno.os-o.ozOaand V1.111.6Crs.36_4.sFe6.62_n.17O3, respectively, differ from known end-membersbecause of considerablesubstitution of Cr for V. Similar solid-solution seriesof spinels in the system FeCrrO. - FeVrOo- MnCrrOa- MnV2O4,such as manganochromite,worelainenite and coulsonite,as well as relatively pure karelianite and eskolaite, have been reported from several high-grademetamorphic deposis and areas.The rare V-oxide schreyerite,V2Ti3O9, also occursas exsolution lamellae in rutile at RampuraAgucha. These unusual compositions are arcributed to locally high concentrationsof V in the precursorsediments; they further underscorethe isochemicalnature of regional metamorphismof the orebody. Keryord*: coulsonite, ma:rganochromite,vuorelainenite, rutile, eskolaite, karelianite, schreyerite,Cr-V spinel, Rampura Agucha,Rajasthan, India. SoMraans Deux groupesd'oxydes rares ont 6t6mis en 6videnceau coursde notre dtudep6trographique et nos analysespar microsonde 6lectroniqued'6chantillons de rochesfortement m6urnorphisdes du gisementstrattforme n Pb--Zn-(Ag) de RampuraAguch4 au Rajasthan,en Inde. tr s'agit d'un spinelle I Cr-V-Fe et d'un oxyde rhombo€driquede Cr-V.
    [Show full text]
  • The Working Group on Mineral Exploration and Development (Other Than Coal & Lignite)
    REPORT OF THE WORKING GROUP ON MINERAL EXPLORATION AND DEVELOPMENT (other than Coal and Lignite) FOR THE ELEVENTH FIVE YEAR PLAN OVER VIEW VOL - I GOVERNMENT OF INDIA PLANNING COMMISSION January, 2007 1.0 REVIEW OF THE ACTIVITIES OF THE Xth PLAN 1.1 Geological studies carried out in past half-century have delineated vast area suitable for hosting mineral deposits. However, most of the exploration activity in the country even in the post-independence era remained confined to the stretches traditionally known to be locales of mining activities. Industrialization has led to manifold growth of mineral sector and fast depletion of known and near surface deposits would be the unavoidable result. During the Xth Plan, the need to adopt modern exploration techniques and beneficiation technologies was felt, mainly to locate the concealed mineral deposits and utilize the low-grade ores, which were hitherto being discarded as waste. 1.2 The Indian landmass measures 3.28 million sq.km., of which 2.42 million sq.km is constituted of hard rock. Out of the total hard rock area, approximately 7,00,000 sq km (5,71,000 sq.km. for Schedule Minerals) has been identified to contain geological associations and surface shows indicative of possible mineral occurrences. 1.3 During the Xth Plan (2002-2007) major thrust has been accorded to exploration for high value minerals like gold, diamond and platinum group of elements (PGE). Efforts for augmenting resource base for those mineral commodities having key role in sustaining industrial growth were also continued. Application of state-of-the-art technology for exploration and integrated multi-disciplinary approach were introduced during this period.
    [Show full text]
  • Corporate Presentation February 2015
    Corporate Presentation February 2015 HINDUSTAN ZINC Agenda Corporate Overview Journey over last decade Financial Performance Way Forward Corporate Responsibility Key Take Away HINDUSTAN ZINC Agenda 2 About Us 1st Rampura Agucha Largest zinc mine globally 2nd Largest zinc-lead miner globally with: 9 million+ MT of ore production capacity 4th Largest zinc-lead smelter globally: 1 million+ MT of production capacity (Rankings calculated from Wood Mackenzie, March 2014 Long Term Outlook) A Journey towards Excellence - 15 million T Ore Production Capacity; & 1.2 million T MIC production capacity from Underground Mines HINDUSTAN ZINC Corporate Overview 3 Vision, Mission & Values We want our employees to be ambassadors of our core values To be the world’s largest and most admired zinc-lead and silver company Enhance stakeholder value through exploration, innovation, operational excellence and sustainability Be the lowest cost producer Maintain market leadership & enhance customer Entrepreneurship Trust delight Growth Sustainability Excellence HINDUSTAN ZINC Corporate Overview 4 Creating Injury Free Environment Zero harm to people, host communities and Declining lost time injuries per million man-hours worked environment (LTIFR ) — Promoting behavioural safety 62% 2.29 2.15 1.95 — Safety cultural transformation journey from Reactive to Interdependent; Engagement with “Dupont” 1.01 0.88 — Focus on hazard identification and near misses FY10 FY11 FY12 FY13 FY14 — Zero water discharge Operations + Projects Benchmarking with peers INITIATIVES
    [Show full text]
  • At Rampura Agucha Mines
    TENDER DOCUMENT FOR Potential Purchasers of running condition Mining equipment at Rampura Agucha Mines Contact Details: 8003994956 HZL Contact Mr. Sunil Dixit ([email protected]) Person Mr. Ashish Agarwal 9799903005 ([email protected]) 1. EQUIPMENT DETAILS: - Attached separately Taxes and duties will be charged at the rates prevailing at the time of invoicing. Terms & Conditions 1. EMD: EMD of 10 % of bid value to be submitted in form of BG from scheduled Bank / L/C as per prescribed format which shall be deposited immediately within 15 days of winning the bidding process / Intimation from HZL . Which shall be adjusted in final payment. 2. Price Basis: “As is where is” Basis Ex-site RA Mines HZL. All taxes / duties / freight etc shall be in your account. 3. Payment toward sale value shall be deposited through wire transfer / irrevocable Letter of credit to HZL account in advance as below. 4. Total Value of Sale order to be deposited within 30 days of release of Sale Order and before start of dismantling activity. 5. Net Charges: The offered price shall be Net payable to HZL. 6. Segregation, dismantling, cutting, loading & dispatches shall be in the scope of buyer. 7. Dismantling sequence will be as per HZl’s instructions. 8. Dismantling and dispatch hours would be from 08 am to 06 pm only. 9. Safety and security of men & material is the sole responsibility of buyer. Job specific PPEs for gas cutting, arc cutting, grinding, and height work should be ensured as per HZL instruction, safety standards like LOTO, Work at Height, Confined Space, and Scaffolding to be followed by the buyer on his own cost.
    [Show full text]
  • “Progress of Mineral Resource Evaluation System at Hindustan Zinc Ltd – a Journey Towards JORC”
    “Progress of Mineral Resource Evaluation system at Hindustan Zinc Ltd – A journey towards JORC” Presented by: Kuldeep Singh Solanki AGM (Geology) Hindustan Zinc Ltd Core Strengths Leading the way with fully integrated operations 1 Sustainable Enterprise Among the lowest cost producers of zinc Zero harm to People, Positively Impacting 2500 5 lakh people in nearby communities 2250 2 R&R base 389.9 Mt 2000 Nyrstar Ensuring mine life of +25 years 1750 Boliden MMG Limited 1500 Glencore Xstrata 3 High Scale of Operation 1250 11 million+ MT Ore Production Capacity 1000 Teck Hindustan Zinc C1 Cash Cost ($/t Zn) 750 4 Fully Integrated Operation 500 Raw Material & Power – Self sufficiency 250 0 5 High Domestic Market Share 0 10 20 30 40 50 60 70 80 90 100 Cumulative Production (Percentile) Large Customer Portfolio in India Source: Wood Mackenzie Research A world class mining portfolio Rampura Agucha Mine Reserves : 51.1mt Chanderiya Smelting Complex Resources : 52.7mt Reserve Grade : Zn 14.0%, Pb 1.8% Pyrometallurgical Lead Zinc Smelter: Current Ore Capacity : 4.63 mtpa 105,000 tpa Zinc and 85,000 tpa Lead Kayad Mine Hydrometallurgical Zinc Smelter: 420,000 tpa Zinc Reserves : 3.9mt Captive Power Plant: 234MW Resources : 2.0mt Reserve Grade : Zn 13.4%, Pb 1.8% Current Ore Capacity : 1.0 mtpa Sindesar Khurd Mine Dariba Smelting Complex Reserves : 33.2mt Hydrometallurgical Zinc Smelter: Resources : 76.3mt 210,000 tpa Zinc Reserve Grade : Zn 4.7%, Pb 3.2% Current Ore Capacity :4.0 mtpa Lead Smelter: 100,000 tpa Lead Captive Power Plant: 160MW Rajpura Dariba Mine Reserves : 9.3mt : Zinc Smelter Debari Resources : 49.4mt Reserve Grade : Zn 6.3%, Pb 1.6% Hydrometallurgical Zinc Current Ore Capacity : 0.84 mtpa Smelter: 88,000 tpa Zinc Zawar Mining Complex Reserves : 9.5mt Resources : 82.3mt Pantnagar & Haridwar Reserve Grade : Zn 3.4%, Pb 1.7% Processing & Refining of Zinc, Current Ore Capacity : 1.8 mtpa Lead & Silver Exploration Success Strong track record of delivering organic R&R growth.
    [Show full text]
  • Microwave Energy Aided Mineral Comminution
    Proceedings of the International Seminar on Mineral Processing Technology - 2006, Chennai, India. pp.398 - 404. Microwave Energy Aided Mineral Comminution Ashish Kumar, Bala P. Kamath*, V.V. Ramarao* and D.B. Mohanty Central Research & Development Laboratory, Hindustan Zinc limited, Zinc Smelter, Debari — 313024, Udaipur (Rajasthan), India * Corresponding authors Email : [email protected] Abstract Mineral liberation during beneficiation is essentially through comminution. However, the fact that the major slice (up to 50 percent) in the pie for total energy requirements during beneficiation is occupied by comminution, dictates us to look into various possibilities to render comminution more energy-efficient. In the early 1900s, efforts for reduction in the crushing and grinding energies based on the concept, 'thermally assisted liberation' (T A L) were made but could not be commercially exploited. With the advent of microwave energy and applications in different commercial operations based on its property of heat generation in materials encouraged it in utilizing as an aid during comminution. Microwave energy heats individual phases in an ore matrix to different heat levels as per individual microwave absorption characteristics. Exposure to microwave energy over discrete time intervals prior to comminution results in development of micro fractures due to differential heating. Weakening of interspatial bonding in the ore matrix helps in lesser energy requirements. Numerous studies on microwave energy applications in the field of mineral processing and extractive metallurgy are undertaken in many parts of the world in recent years. With an ambition for implementing microwave technology at the production level in the beneficiation plant operations of Hindusthan Zinc Limited (HZL) as a platform change technology, Central Research and Development Laboratory has included in its road map a project to work on the concept.
    [Show full text]
  • The Scope of Work Will Be Operation and Maintenance of SKM Shaft. on the Job Training Will Be Given by NFC To
    Scope of Work: The scope of work will be operation and maintenance of SKM shaft. On the job training will be given by NFC to the contractor for the below mentioned scope of work for the said period of time. 1. Operation and maintenance of skip and cage hoisting system, daily normal maintenance and monthly centralized maintenance. Cage hoisting system includes winder, crane, hoisting signal, operation equipment’s at top & bottom opening, shaft equipment, etc. Skip hoisting system includes winder, hoisting signal, shaft equipment, etc. 2. Equipment operation and maintenance of Surface Unloading System (e.g.- Head Gear, Ore Bin, Winder, Winch, etc.) 3. Underground production system: Equipment operation and maintenance for -395mRL Substation, Main Pump, Breaking Hammer, -450mRL Crushing Station, -490mRL Loading equipment, Belt Conveyor, Feeder, etc. 4. For the spillage recover at -540mrl, and the cleaning of pump station, HZL will provide the LHD/ equipment which will be lowered by NFC. Operator for LHD/equipment will be provided by contractor. NFC is responsible for management, to inform manpower carry out spillage recover and cleaning of pump station. 5. Responsible for O&M of total electrical system related to hoisting system of all levels in Underground & Surface winder control room. 6. Arrest all leakage/spillage within hoisting system. In case of leakage/spillage will ensure cleaning of the same. 7. All statutory daily/scheduled checks related to skip, winder, cage, etc. HZL will provide competent party to inspect the rope condition twice in a year, will provide necessary support for the same and prepare necessary statutory documents. 8. Operation and maintenance of skip & cage hoisting system shall be periodical and timing, three shift patrolling.
    [Show full text]
  • Sedimentary Exhalative (Sedex) Zinc-Lead-Silver Deposit Model
    Sedimentary Exhalative (Sedex) Zinc-Lead-Silver Deposit Model Chapter N of Mineral Deposit Models for Resource Assessment Scientific Investigations Report 2010–5070–N U.S. Department of the Interior U.S. Geological Survey Zn Pb Fe 7 MILLIMETERS Cover. Polymictic sedimentary conglomerate overlying rhythmically laminated high-grade sphalerite and galena ore from the I 3/4 horizon in McArthur River (HYC) deposit, Australia. Inset shows scanning micro x-ray fluorescence (XRF) map of zinc (Zn), lead (Pb), and iron (Fe) concentrations. Deformation and partial truncation of fine, chemically graded laminae at contact with conglomeratic base of the overlying turbidite and intralaminar deformation together indicate deposition and modification through sea-floor processes, suggesting ore was deposited syndepositionally as a chemical sediment on the sea floor. Sedimentary Exhalative (Sedex) Zinc-Lead-Silver Deposit Model By Poul Emsbo, Robert R. Seal, George N. Breit, Sharon F. Diehl, and Anjana K. Shah Chapter N of Mineral Deposit Models for Resource Assessment Scientific Investigations Report 2010–5070–N U.S. Department of the Interior U.S. Geological Survey U.S. Department of the Interior SALLY JEWELL, Secretary U.S. Geological Survey Suzette M. Kimball, Director U.S. Geological Survey, Reston, Virginia: 2016 For more information on the USGS—the Federal source for science about the Earth, its natural and living resources, natural hazards, and the environment—visit http://www.usgs.gov or call 1–888–ASK–USGS. For an overview of USGS information products, including maps, imagery, and publications, visit http://store.usgs.gov. Any use of trade, firm, or product names is for descriptive purposes only and does not imply endorsement by the U.S.
    [Show full text]
  • Rampura Agucha Mine MAKING MINING SAFER
    CASE STUDY: Rampura Agucha Mine MAKING MINING SAFER HOW HINDUSTAN ZINC LTD IS LEADING THE WAY WITH THE Sustainable development and safety management is an HIGHEST SAFETY STANDARDS FOR MINING IN INDIA integral part of Hindustan Zinc’s business philosophy and is committed to continue to improve its performance in line GroundProbe’s Slope Stability Radar goes with their HSE & social policy. After comparing the different hand-in-hand with Rampura Agucha’s slope monitoring instruments, RAM opted for the Slope Stability Radar (SSR) as a commitment by management to policy of minimisation of slope hazards. safety of its people and the mine. This also supports the company’s high profitability by Rampura Agucha is the first mine in India to use Slope allowing better recovery, decreasing cost of production and Stability Radar for improvement in its productivity and closely managing risk. Rampura Agucha is the first mine in safety “RAM is proud to be the first mine in India to have an India to adopt SSR. SSR on site, especially because the SSR goes hand-inhand with RAM’s policy of minimisation of slope hazards. of always The Rampura Agucha Mine (RAM) is situated 220 kilometres being one step ahead in safety and production”, says Mr. R. south-west of Jaipur, in the district of Bhilwara, Rajasthan, R. Kumar, General Manager, Rampura Agucha Mine. India. It is a world class zinc-lead deposit, owned by Hindustan Zinc Ltd, Vedanta Resources Plc, with an estimated geological reserve of 87.35 million metric tonnes. Hindustan Zinc Ltd is the only integrated zinc producer in India.
    [Show full text]
  • INDIAN BUREAU of MINES Ajmer Regional Office MINERALS
    INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Ajmer regional office Mine file No : RAJ/BLW- 56 /PB,ZN-1/6/12/2001 Mine code : 34RAJ06001 (i) Name of the Inspecting : K018( ) Dr A Z Khan Officer and ID No. (ii) Designation : Senior Mining Geologist (iii) Accompaning mine : Sh. Ashok Paliwal, Head Geology, Sh. Kishore Kumar, M Official with Designation (iv) Date of Inspection : 19-MAY-17 (v) Prev.inspection date : 18-FEB-15 PART-I : GENERAL INFORMATION 1. (a) Mine Name : RAMPURA AGUCHA (b) Registration NO. : IBM/421/2011 (c) Category : A Mechanised (d) Type of Working : Opencast (e) Postal address State : RAJASTHAN District : BHILWARA Village : AGUCHA Taluka : HURDA Post office : AGUCHA Pin Code : 311029 FAX No. : 01483-23073 E-mail : [email protected] Phone : 01483-23331, 23332 (f) Police Station : Gulabpura (g) First opening date : 05-FEB-81 (h) Weekly day of rest : MON 2. Address for : HINDUSTAN ZINC LTD. correspondance RAMPURA AGUCHA MINE, PO AGUCHA, BHILWARA 3. (a) Lease Number : RAJ0652 (b) Lease area : 1200 (c) Period of lease : 50 (d) Date of Expiry : 12-MAR-30 4. Mineral worked : LEAD & ZINC ORE Main PAGE : 2 5. Name and Address of the Lessee : HINDUSTAN ZINC LTD. HINDUSTAN ZINC LTD. YASHAD BHAWAN YASHADGARH, UDAIPUR UDAIPUR RAJASTHAN Phone:01483-23331, 23332 FAX :01483-23073 Owner : Sunil Duggal Hindustan Zinc Limited Yashad Bhawan, Swaroop Sagar Udaipur BHILWARA RAJASTHAN Phone: 0294-2529182 FAX : 0294-2525765 Agent : Rajendra Dashora Rampura-Agucha Lead-Zinc Mine Agucha, Bhilwara, Rajasthan BHILWARA RAJASTHAN Phone: 01483-229012 FAX : 01483-229011 6.
    [Show full text]