pn x172 County Council (Various Roads, Braintree) (Temporary Prohibition of Traffic & Temporary (Rectory Lane, Rivenhall) (Temporary Prohibition of Traffic) Order 2019 Introduction of 30mph Speed Limit) & (Temporary Introduction Notice is hereby given that the Essex County Council has made the above Order under of Clearway) (Streetworks No.5) Order 2020 section 14(1) of the Road Traffic Regulation Act 1984. Notice is hereby given that the Essex County Council intends, not less than seven days Effect of the order: To temporarily close that length of Rectory Lane, Rivenhall in the from the date of this notice, to make the above Order under Section 14(1) of the Road District of Braintree, from its junction with Rickstones Road for a distance of approximately Traffic Regulation Act 1984. 60m in a southeasterly direction. The closure is scheduled to commence on 07/01/20 Effect of the order: for 7 days, or where stated on a valid permit (EC30034827968 – UK Power Networks). 1. To temporarily close those various lengths of roads in the District of Braintree, The scheduled dates may vary for these works with appropriate signs showing and/ as detailed in the Schedule. or displayed on one.network. The closure is required for the safety of the public and workforce while small connection works are undertaken by UK Power Networks. 2. To temporarily introduce a 30mph speed limit in the various lengths of road as detailed in the Schedule. An alternative route is available via Rickstones Road, Forest Road and vice versa. 3. A temporary ‘No Waiting’ restriction will be introduced on both sides of carriageway The Order came into effect on 12/12/19 and may continue in force for 18 months or until on the various lengths of roads as specified in the schedule for the duration of the the works have been completed, whichever is the earlier. restrictions in order to facilitate the works. Signs will be installed indicating when (Beazley End, Wethersfield) (Temporary Prohibition of Traffic) Order 2019 the No Waiting restriction will be in force. Notice is hereby given that the Essex County Council has made the above Order under 4. “The Essex County Council () (Prohibition of Waiting, Loading and Section 14(1) of the Road Traffic Regulation Act 1984. Stopping) and (On Street Parking Places) (Civil Enforcement Area) Consolidation Order 2019” will be temporarily amended to include the temporary ‘No Waiting at Any Time’ Effect of the order: To temporarily close that length of Beazley End, Wethersfield in the restriction and suspend any existing parking and waiting restrictions on the above District of Braintree, from its junction with Codham Little Park Drive for a distance of lengths of roads only. All other restrictions and exemptions contained in the approximately 310m in a northerly direction. The closure is scheduled to commence on aforementioned Order and Amendments to that Order shall remain in force. 02/01/20 for 2 days, or where stated on a valid permit (BC005CC1W00EA4LHM2902JAN The works are scheduled to commence after 02/01/20, as stated on a valid permit. – BT). The scheduled dates may vary for these works with appropriate signs showing and/ The scheduled dates may vary for these works with appropriate signs showing and/or or displayed on one.network. The closure is required for the safety of the public and displayed on www.roadworks.org. The roads will be closed to facilitate each phase and workforce while structure repair works are undertaken by BT. then re-opened to the public. Access will be maintained for emergency services. Diversion An alternative route is available via Beazley End, Bovingdon Road, Church Street, Church routes will be signed at each location and residents will be informed of the dates of each Lane, Church Lane Roundabout, Broad Road, Convent Hill, Broad Road Roundabout, High phase via letter/leaflet drop and advanced warning signs on the road. Garrett, Gosfield Road, Braintree Road, The Street, Church Road, Parkhall Road and vice versa. The restrictions are required for the safety of the public and workforce while superfast The Order came into effect on 12/12/19 and may continue in force for 18 months or until installation cabling works are undertaken by County Broadband. the works have been completed, whichever is the earlier. The Order will come into effect on 02/01/20 and may continue in force for 18 months (Nounsley Road, Hatfield Peverel) or until the works have been completed, whichever is the earlier. (Temporary Prohibition of Traffic) Order 2019 Schedule Notice is hereby given that the Essex County Council has made the above Order under Road Description Alternative Route section 14(1) of the Road Traffic Regulation Act 1984. Great Yeldham From its junction with Dyers Church Road, Wesley End Road, Effect of the order: To temporarily close that length of Nounsley Road, Hatfield Peverel Road, Road for a distance of Stambourne Road, Birdbrook Road, in the District of Braintree, from a point approximately 20m east of its junction with Stambourne approximately 735m in Drury Lane, Mill Road, Ridgewell Road, Sportsmans Lane for a distance of approximately 80m in an easterly direction. The closure an easterly direction Great Yeldham Road and vice versa is scheduled to commence on 14/01/20 for 3 days, or where stated on a valid permit Gainsford End, From its junction with Gainsford End Road, The Causeway, The (AD03010570500 – Anglian Water). The scheduled dates may vary for these works Toppesfield Gainsford Hall Road to its Street, Church Lane, Stambourne Road, with appropriate signs showing and/or displayed on one.network. The closure is required junction with Carters Hill, Great Yeldham Road, Dyers End, for the safety of the public and workforce while new connection works are undertaken a distance of approximately Finchingfield Road, Robinhood End, by Anglian Water. 2255m Finchingfield Road, Colemans Farm Lane, An alternative route is available via London Road, Hatfield Peverel Bypass, The Street, Toppesfield Road, Gainsford End and Road, Ulting Road and vice versa. vice versa The Order came into effect on 12/12/19 and may continue in force for 18 months or until Gainsford End From its junction with Gainsford End Road, Gainsford End, the works have been completed, whichever is the earlier. Road, Harrow Hill to its junction Gainsford Hall Road, Toppesfield Road, Toppesfield with Great Yeldham Road, Colemans Farm Lane, Finchingfield Road, (Maldon Road/Newland Street/Collingwood Road, ) a distance of approximately Robinhood End, Finchingfield Road, Dyers (Temporary Prohibition of Traffic) & (The Avenue, Witham) 345m End, Great Yeldham Road, Stambourne (Temporary Introduction of 20mph Speed Limit) Order 2019 Road, Church Lane, The Street, Notice is hereby given that the Essex County Council has made the above Order under The Causeway and vice versa Section 14(1) of the Road Traffic Regulation Act 1984. Stambourne From its junction with Great Yeldham Road, Dyers End, Effect of the order: Road, Stambourne Road for a Finchingfield Road, Robinhood End, 1. To temporarily close that length of Maldon Road, Witham in the District of Braintree, Toppesfield distance of approximately Finchingfield Road, Howe Street – Dyers from its junction with Newland Street for a distance of approximately 40m in 1725m in a southerly End, Colemans Farm Lane, Toppesfield a southeasterly direction. direction Road, Gainsford End, Gainsford Hall End 2. To temporarily close that length of Newland Street, Witham in the District of Braintree, Road, The Causeway, The Street, Church from its junction with Maldon Road to its junction with Collingwood Road, a distance Lane, Stambourne Road and vice versa of approximately 60m. Stambourne From its junction with Stambourne Road, Ridgewell Road, Mill 3. To temporarily close that length of Collingwood Road, Witham in the District of Road, Stambourne Road for a Road, Drury Lane, Wesley End Road, Braintree, from its junction with Newland Street for a distance of approximately 45m Toppesfield distance of approximately Church Road, Great Yeldham Road and in a northwesterly direction. 705m in an easterly vice versa 4. To temporarily introduce a 20mph speed limit in that length of The Avenue, Witham direction in the District of Braintree, from its junction with Newland Street to its junction with Carters Hill, From its junction with Carters Hill, Gainford End Road, Great Collingwood Road, a distance of approximately 415m. Toppesfield Gainsford End Road for a Yeldham Road, Toppesfield Road, High The closures are scheduled to commence on 13/01/20 for 10 days (please note Newland distance of approximately Street, Poole Street, Hedingham Road, Street will only be closed at night), or where stated on a valid permit (EP201EH2287335A 700m in a southerly Yeldham Road, Crouch Green, Graves Hall – Essex County Council). The scheduled dates may vary for these works with appropriate direction Road, Delvin End, Blois Hall Road and signs showing and/or displayed on one.network. The closures are required for the vice versa safety of the public and workforce while junction renewal works are undertaken Gainsford End From its junction with Gainsford End Road, Gainsford End, by Essex County Council. Road, Harrow Hill to its junction Gainsford Hall Road, Toppesfield Road, Alternative routes are available via Toppesfield with Carters Hill, a distance Colemans Farm Lane, Finchingfield Road, 1. Newland Street, The Grove, Maldon Road and vice versa. of approximately 280m Robinhood End, Finchingfield Road, Dyers End, Great Yeldham Road, Stambourne 2. Newland Street, The Avenue, Collingwood Road and vice versa. Road, Church Lane, The Street, 3. Collingwood Road, The Avenue, Newland Street and vice versa. The Causeway and vice versa The Order came into effect on 12/12/19 and may continue in force for 18 months or until the works have been completed, whichever is the earlier. (Bakers Lane, Black Notley) (Temporary Prohibition of Traffic) Order 2020 (Hedingham Road, Wethersfield) (Temporary Prohibition of Traffic) Notice is hereby given that the Essex County Council intends, not less than seven days Order 2019 from the date of this notice, to make the above Order under Section 14(1) of the Road Traffic Regulation Act 1984. Notice is hereby given that the Essex County Council has made the above Order under section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order: To temporarily close that length of Bakers Lane, Black Notley in the District of Braintree, from its junction with London Road to its junction with Church Road, Effect of the order: To temporarily close that length of Hedingham Road, Wethersfield a distance of approximately 1735m. The closure is scheduled to commence on 13/01/20 in the District of Braintree, from its junction with Blackmore End to its junction with for 3 days, or where stated on a valid permit (EP201EH2287201 – Essex County Council). Prayors Hill, a distance of approximately 5810m. The closure is scheduled to commence The scheduled dates may vary for these works with appropriate signs showing and/ on 14/01/20 for 3 days, or where stated on a valid permit (EP201EH2288172 – Essex or displayed on one.network. The closure is required for the safety of the public and County Council). The scheduled dates may vary for these works with appropriate signs workforce while gully replacement works are undertaken by Essex County Council. showing and/or displayed on one.network. The closure is required for the safety of the An alternative route is available via Bakers Lane, Buck Hill, Buck Farm Road, Notley Road, public and workforce while gully repair works are undertaken by Essex County Council. Godlings Way, London Road, Roseval Roundabout, Link Under Braintree Bypass, King An alternative route is available via Prayors Hill, Rectory Road, Swan Street, Potter Street, William Roundabout and vice versa. Queen Street, Braintree Road, Hedingham Road, Church Road, Parkhall Road, Beazley End, The Order will come into effect on 02/01/20 and may continue in force for 18 months Blackmore End, Pattens Farm Road and vice versa. or until the works have been completed, whichever is the earlier. The Order came into effect on 12/12/19 and may continue in force for 18 months or until the works have been completed, whichever is the earlier. (Fairstead Hall Road, Fairstead) (Temporary Prohibition of Traffic) Order 2019 (Rose Hill, Braintree) (Temporary Prohibition of Traffic) Order 2019 Notice is hereby given that the Essex County Council has made the above Order under Notice is hereby given that the Essex County Council has made the above Order under Section 14(1) of the Road Traffic Regulation Act 1984. section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order: To temporarily close that length of Fairstead Hall Road, Fairstead Effect of the order: To temporarily close that length of Rose Hill, Braintree in the District in the District of Braintree, from its junction with Fairstead Road for a distance of of Braintree, from its junction with The Yard for a distance of approximately 95m in a approximately 110m in a southwesterly direction. The closure is scheduled to commence northwesterly direction. The closure is scheduled to commence on 07/01/20 for 1 day, on 06/01/20 for 5 days, or where stated on a valid permit (EC30034827588 – UK Power or where stated on a valid permit (AD037RO56564257 – Anglian Water). The scheduled Networks). The scheduled dates may vary for these works with appropriate signs showing dates may vary for these works with appropriate signs showing and/or displayed on one. and/or displayed on one.network. The closure is required for the safety of the public and network. The closure is required for the safety of the public and workforce while manhole workforce while small connection works are undertaken by UK Power Networks. replacement works are undertaken by Anglian Water. An alternative route is available via Braintree Road, Owls Hill, New Road, Fairstead Road, An alternative route is available via South Street, Notley Road, Masefield Road, Challis Peg Millars Lane and vice versa. Lane, Skitts Hill, Mill Hill, Rose Hill and vice versa. The Order came into effect on 12/12/19 and may continue in force for 18 months or until The Order came into effect on 12/12/19 and may continue in force for 18 months or until the works have been completed, whichever is the earlier. the works have been completed, whichever is the earlier.