Hambleton District Council Local Plan Habitats Regulations Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Hambleton District Council Local Plan Habitats Regulations Assessment Hambleton District Council Local Plan Habitats Regulations Assessment Screening Report November 2016 Summary The Habitats Directive1 seeks to protect the integrity of Natura 2000 sites and requires a Habitats Regulations Assessment to be undertaken to assess the implications of the plan or project on Natura 2000 sites, which includes Special Areas of Conservation (SAC), Special Protection Areas (SPA) and RAMSAR sites. The key principle is to adopt the precautionary approach and to preserve the integrity of sites. The sites identified for inclusion in the assessment are: SAC North York Moors Strensall Common River Derwent North Pennine Moors North Pennine Dales Meadows SPA North York Moors North Pennine Moors Teesmouth and Cleveland Coast Ramsar Teesmouth and Cleveland Coast The Hambleton Local Plan will allocate land for housing and commercial development to meet the growth of the District up to 2035. 1 The Conservation of Natural Habitats and of Wild Fauna and Flora (Habitats Directive) (Directive 92/34/EEC) Introduction Requirement to carry out an assessment under the Habitats Regulations Articles 6 (3) and 6 (4) of the Conservation of Natural Habitats and of Wild Fauna and Flora (Habitats Directive) (Directive 92/43/EEC) require an assessment to be undertaken for plans and projects that are likely to have a significant effect, alone or in combination with other plans and projects, on one or more European sites (Special Protection Areas and Special Areas of Conservation). Article 6(3) states: ‘Any plan or project not directly connected with or necessary to the management of the site but likely to have a significant effect thereon, either individually or in combination with other plans and projects, shall be subject to appropriate assessment of its implications for the site in view of the site’s conservation objectives. In light of the conclusions of the assessment of the implications for the site and subject to the provisions of paragraph 4, the competent national authorities shall agree to the plan or project only after ascertained that it will not adversely affect the integrity of the site concerned and, if appropriate, after having obtained the opinion of the general public’ The Habitats Directive was transposed into UK law through the Conservation (Natural Habitats & C) Regulations 1994. However the Regulations were amended on a number of occasions and in 2010 the changes were consolidated through the Conservation of Habitats and Species Regulations 2010. Paragraph 61 sets out requirements for undertaking an appropriate assessment where a plan ‘is likely to have a significant effect on a European Site or a European Offshore Marine Site (along or in combination with other plans or projects). The Regulations clarify that European sites include both terrestrial and marine Special Protection Areas (SPAs), Special Areas of Conservation (SACs), Sites of Community Importance (SCIs), potential SACs (pSACs) and potential SPAs (pSPAs). Ramsar sites (which support internationally important wetland habitats listed under the Ramsar Convention) are also included in the sites protected through these regulations. The Birds Directive 2009/147/EC places great emphasis on the protection of habitats for endangered and migratory species. It establishes a network of Special Protection Areas (SPAs) including all the most suitable territories for these species. Since 1994, all SPAs are included in the Natura 2000 ecological network, set up under the Habitats Directive 92/43/EEC. For the purposes of this assessment the sites will be collectively referred to as Natura 2000 sites. The 2010 Regulations have subsequently been updated by the Conservation of Habitats and Species (Amendment) Regulations 2012, however the protocols for carrying appropriate assessment remains the same. Stages of the Habitats Regulations Assessment As shown below the HRA involves three stages; the screening, appropriate assessment and assessment where no alternatives exist. The stages of the Habitat Regulations Assessment are sequential and it is only necessary to proceed to the next stage if likely significant effects cannot be ruled out. STAGES of HRA Table 1.1: Stages in HRA Stage Task Stage 1: This stage aims to identify the likely impacts of the plan on Natura 2000 sites, either alone or in combination with other projects and Screening /or plans. The impacts are examined to establish whether they are likely to be significant. If it can be demonstrated that significant effects are unlikely then no further assessment is required. Stage 2: If likely significant effects cannot satisfactorily be ruled out, then a full appropriate assessment is required. This aims to examine the Appropriate conservation objectives of the site and to assess whether or not Assessment the plan, alone or in combination with other projects and/or plans will result in adverse effects on the integrity of the site, as defined by the conservation objectives and status of the site. Where it cannot be demonstrated that there will be no adverse effects on the site, it is necessary to devise mitigation measures to avoid, where possible, any adverse effects. Stage 3: If impacts remain after stage 2, alternative solutions must be proposed. These may be alternatives such as considering Assessment of alternative locations, proposing different scales of development, alternative or even doing nothing! If there are no suitable alternative solutions solutions that would maintain site integrity it will be necessary to proceed to an additional stage. Additional In rare cases, if no suitable alternatives exist and the plan must Stage to be still go ahead with a negative impact on a Natura 2000 site, undertaken ‘imperative reasons of overriding public interest’ (IROPI) and / or only where no grounds of human health, public safety or primary benefits for the alternatives environment must be demonstrated. These reasons can include exist and certain social or economic reasons consistent with European adverse Commission guidance. impacts remain If the need to progress the plan is demonstrated through an IROPI test, compensatory measures must be demonstrated to maintain and enhance the Natura 2000 network and offset the impact of the plan, Hambleton Local Plan Hambleton District Council are preparing a new Local Plan which will set out how much land should be provided to accommodate new homes and jobs that are needed within Hambleton up to 2035 and where this should be located. The Issues and Options consultation was the first stage in the development of the Local Plan, which will be prepared under the provisions of the Town and Country Planning (Local Planning) Regulations 2012. A scoping report was prepared to accompany the Issues and Options document which gave an indication of the scope of the plan in terms of the issues it will address and to obtain views about where growth should take place. The comments received in the relation to the scoping assessment are summarised below: Natural England note that the section titled ‘Requirement to carry out an assessment under the Habitats Regulations’ refers to the Habitats Directive (92/34/EEC) and Ramsar Convention but advise thatyou also refer to the Birds Directive 2009/147/EC with regards to Special Protection Areas (SPA). Natural England advises that the report should set out a clear rationale for utilising a 10km screening distance for sites, we note that this distance is shorter than that applied by neighbouring local planning authorities in the assessment of their spatial plans. Where there is any doubt as to whether a European site may be affected, a precautionary approach should be adopted and the information for the site should be obtained. Natural Englansd advise that the assessment of Likely Significant Effects (LSE) should be considered a ‘course filter’ judgement where likely should be considered more in terms of possible effects rather than whether they are probable. In addition the precautionary principle should be applied where there are uncertainties. Natural England advises that you use the most up to date conservation objectives and citations for European Sites. These were updated as part of the Improvement Programme for Natura 2000 sites exercise after 2010. The timescale for the preparation of the Local Plan is illustrated below 2016 • developing the evidence base DEVELOPING THE • issues & options consultation PLAN • preferred options consultation 2017 • submission Local Plan PROPOSED consultation PLAN • formal submission 2018 • Examination TESTING in Public THE PLAN • final adoption The Preferred Options consultation document has been drafted in response to the comments received in relation to the Issues and Options Consultation. The Preferred Options document sets out the Council’s preferred spatial approach to new development, preferred policies against which decisions will be taken and the preferred sites which will accommodate the growth of the District up to 2035. This report comprises Stage 1 of the HRA process and will screen for the likely significant effects on Natura 2000 sites. If effects are noted an Appropriate Assessment will be undertaken. Strategic Environmental Assessment and Sustainability Appraisal Strategic Environmental Assessment and Sustainability Appraisal is required to be carried out as part of a plan preparation under separate legislation and is used to inform decision making throughout the production of the plan. Habitats Regulations Assessment differs from this process in that it requires certain standards
Recommended publications
  • Parish: Thormanby Committee Date: 5 May 2018 Ward: Raskelf & White
    Parish: Thormanby Committee date: 5 May 2018 Ward: Raskelf & White Officer dealing: Miss R Hindmarch Horse 14 Target date: 10 May 2018 18/00239/FUL Change of use of annexe to dual use as a holiday cottage and ancillary residential use At: Annexe Two At, The Old Black Bull, Thormanby, North Yorkshire, YO61 4NN For Applicant This application is referred to Planning Committee because the applicant is a member of the Council 1.0 SITE, CONTEXT AND PROPOSAL 1.1 The Old Black Bull, formerly a public house but now a private dwelling, lies on the eastern side of the A19 within the main village street in Thormanby. The dwelling is a three storey property, with the second floor accommodation within the roof space, attached to its neighbour at The Old Rectory. 1.2 Access to the property is via a driveway at the north western edge of the plot, which gains access into a courtyard area at the side of the house. A detached annexe lies within the courtyard. 1.3 It is proposed to change the use of this ancillary residential annexe to a dual use as a holiday cottage and ancillary residential use. 1.4 No physical alterations are required to the building, this application purely relates to its use. 2.0 RELEVANT PLANNING AND ENFORCEMENT HISTORY 2.1 2/99/154/0007F - Change of use of public house to private dwelling; Granted 23 September 1999. 2.2 2/02/154/0007G - Alterations and extensions to existing dwelling and construction of a domestic treble garage with store; Granted 10 May 2002.
    [Show full text]
  • Thormanby Committee Date: 22 June 2017 Ward: Raskelf and White Horse Officer Dealing: Caroline Strudwick 14 Target Date: 30 June 2017
    Parish: Thormanby Committee date: 22 June 2017 Ward: Raskelf and White Horse Officer dealing: Caroline Strudwick 14 Target date: 30 June 2017 16/02262/FUL Demolition of two houses and construction of five detached dwellings with associated highway improvements and revised site access At Hillside, Wentworth Avenue, Thormanby For Mr and Mrs A Hogarth This application is referred to Planning Committee as the proposed development is considered to be a departure from the Development Plan 1.0 SITE, CONTEXT AND PROPOSAL 1.1 The 0.43 hectare site is located between Wentworth Avenue and The Old Black Bull on the north eastern side of the A19 in Thormanby. Thormanby is a predominantly linear settlement, developed along the A19 with the Old Black Bull and the Old Rectory at the top of the hill. There are lanes to the east and west of the main road. Back Lane runs along the rear, eastern, boundary of the application site. There is a pair of derelict semi-detached cottages on the site, with some agricultural outbuildings in a state of repair. The site is currently accessed directly off the A19, adjacent to the Old Black Bull. 1.2 The proposal site is elevated above the A19 with a brick wall forming the front boundary on the road. There is a large amount of over grown vegetation on site. There is a large paddock to the rear of the site, with large mature tree to the north east. The Old Rectory, to the southeast of the site is Grade II listed and St Mary’s Church, 160m to the east of the site, is Grade II* Listed.
    [Show full text]
  • Download 2015 Minutes
    1246 MINUTES OF THE MONTHLY MEETING OF RUDBY PARISH COUNCIL HELD ON MONDAY, 12 JANUARY 2015 AT 7.15 PM IN THE CHAPEL SCHOOLROOM Present: Councillor M Jones (Chairman) Councillors Mrs D Medlock, Messrs. N Bennington, M Fenwick, J Nelson, A Parry, R Readman and N Thompson District Councillor Mrs B Fortune 1 member of the public 1. Apologies for absence were received from Councillors Mrs R Danjoux, Messrs. J Cooper and S Cosgrove. 2. The minutes of last month’s meeting had been circulated and were signed by the Chairman after being agreed as a correct record. 3. Police Report and Neighbourhood Watch The Police report for December was received. Information gathered at the meeting on one of the items in the report will be e mailed to the Police. An e mail was circulated consulting on views on the proposed Police precept for the next financial year. Ringmaster messages included reports on damage to the King’s Head and a blackmail scam. 4. Meeting open to the Public Mr Autherson attended the meeting to bring the Council up to date with changes which are going to happen to the Chapel. They have decided not to go for planning permission but will be having an open consultation evening on 5 February. Leaflets will be distributed throughout the village. The project is going well and it is hoped to open in May. There will be a book exchange but there may be a chance of a branch library. Another suggestion is a CAB session once a week. Linking everything together is the coffee shop.
    [Show full text]
  • Kilburn House, Husthwaite, York, Yo61 4Qa Guide Price
    KILBURN HOUSE, HUSTHWAITE, YORK, YO61 4QA GUIDE PRICE £565,000 KILBURN HOUSE, LOW STREET HUSTHWAITE, YORK, YO61 4QA Mileages: Easingwold – 4 miles, Thirsk – 9 miles, York – 18 miles (Distances Approximate). With outstanding views towards the White Horse and Hambleton Hills. An individually designed double fronted 4 bedroomed family home revealing well-appointed accommodation with well- proportioned rooms and set amidst delightful landscaped mature gardens extending to 0.21 acres. With UPVC Double-Glazing, a Purpose-Built Conservatory and Oil-Fired Central Heating. Reception Lobby, Reception Hall, Cloakroom/WC, Study, Lounge, Purpose-built Conservatory, Separate Dining Room, Fitted Breakfast Kitchen and Utility Room. First floor landing, Principal Bedroom, En-suite Fully Tiled Shower Room, 3 Further Double-Sized Bedrooms, House Bathroom. Outside: Detached Double Garage, Driveway with plenty of Off-Road Parking, generous Landscaped Gardens with uninterrupted farmland views. Internal viewing highly recommended to fully appreciate the quality of accommodation. A composite panelled and leaded double-glazed balustrade and handrail lead up to the FIRST FLOOR entrance door opens to a RECEPTION LOBBY, with LANDING. Loft access, airing cupboard with pressurized black and white tiled floor. hot water cylinder. An inner door opens to the STAIRCASE RECEPTION PRINCIPAL BEDROOM enjoying a dual aspect with HALL, with useful understairs storage cupboard. elevated panoramic views. Wardrobe cupboard with hanging rail and shelf, luxury and refitted ENSUITE CLOAKROOM, having white suite with wall hung wash SHOWER ROOM having fully tiled walls, with walk-in handbasin, tiled splash, low suite WC. double shower cubicle with overhead shower rose and hand-held shower, wall hung wash handbasin, bidet and To one side is a STUDY, with front garden outlook.
    [Show full text]
  • Class 3 Info Autumn (1) 2018
    HUSTHWAITE and SESSAY CE PRIMARY FEDERATION and Husthwaite Apple Tree Nursery Headteacher: Miss Fiona Bennett Low Street, Husthwaite, Sessay, Thirsk York, YO61 4QA North Yorkshire, YO7 3NA Tel: 01347 868371 Tel: 01845 501239 [email protected] [email protected] ____________________________________________________________________________________________ Class 3 Information – Autumn 1 2018 I hope you are all ready for the new term. A few reminders to start off with: School doors open at 8.40 and the register will be taken promptly at 8.50. If you need to speak to me before school starts please come before 8.50, otherwise the class will be learning. Please remember you can always leave messages in person at the office, by phone or by email and I will get back to you as soon as possible. P.E. will be taught on Monday and Friday. It is advisable to bring it in on a Monday and leave it at school through the week in case it is needed. As we enter the winter months, trainers are needed due to the wetter weather. Children need to plan ahead by bringing in coats, jumpers and water bottles, should they be required. Please ensure ALL your clothing is labelled. Planners - In Class 3 the children will have planners to remind them of upcoming events as well as to record guided reading or other interventions they are taking part in. You can write communications in these, although they will not be checked every day by staff. If you need a message passing on, please make your child aware of the message that needs to be seen.
    [Show full text]
  • Hambleton Local Plan Local Plan Publication Draft July 2019
    Hambleton Local Plan Local Plan Publication Draft July 2019 Hambleton...a place to grow Foreword iv 1 Introduction and Background 5 The Role of the Local Plan 5 Part 1: Spatial Strategy and Development Policies 9 2 Issues shaping the Local Plan 10 Spatial Portrait of Hambleton 10 Key Issues 20 3 Vision and Spatial Development Strategy 32 Spatial Vision 32 Spatial Development Strategy 35 S 1: Sustainable Development Principles 35 S 2: Strategic Priorities and Requirements 37 S 3: Spatial Distribution 41 S 4: Neighbourhood Planning 47 S 5: Development in the Countryside 49 S 6: York Green Belt 54 S 7: The Historic Environment 55 The Key Diagram 58 4 Supporting Economic Growth 61 Meeting Hambleton's Employment Requirements 61 EG 1: Meeting Hambleton's Employment Requirement 62 EG 2: Protection and Enhancement of Employment Land 65 EG 3: Town Centre Retail and Leisure Provision 71 EG 4: Management of Town Centres 75 EG 5: Vibrant Market Towns 79 EG 6: Commercial Buildings, Signs and Advertisements 83 EG 7: Rural Businesses 85 EG 8: The Visitor Economy 89 5 Supporting Housing Growth 91 Meeting Hambleton's Housing Need 91 HG 1: Housing Delivery 93 HG 2: Delivering the Right Type of Homes 96 HG 3: Affordable Housing Requirements 100 HG 4: Housing Exception Schemes 103 HG 5: Windfall Housing Development 107 HG 6: Gypsies, Travellers and Travelling Showpeople 109 Hambleton Local Plan: Publication Draft - Hambleton District Council 1 6 Supporting a High Quality Environment 111 E 1: Design 111 E 2: Amenity 118 E 3: The Natural Environment 121 E
    [Show full text]
  • Thirsk Market Place
    RELIANCE 30SE 30 30X 40 THIRSK MARKET PLACE SOWERBY Commencing BAGBY LANE END 30/04/2018 BIRDFORTH THORMANBY RASKELF EASINGWOLD EASINGWOLD CRAYKE ALNE STILLINGTON 30X TOLLERTON HUBY SHIPTON SUTTON SKELTON EASTMOOR RAWCLIFFE MITRE WIGGINTON L.E. CLIFTON PARK BUMPER CASTLE CLIFTON GREEN YORK HOSPITAL YORK EXH. SQ. YORK EXH. SQ. YORK STATION AV. YORK STATION YORK STATION YORK COLLEGE YORK COLLEGE ASKHAM BRYAN COLL ASKHAM BRYAN COLL Y R 80 EA E R V S O RELIANCE O F E L IC O V CAL SER Easingwold departures for York Mon to Fri 40 30 40 30 40 30SE 30 40 30X 40 30X 40 30 40 30X 40 30 40 30 40 30 30XS 40 30X 40 30 40 30 40 30 40 0635 0655 0725 0735 0800 0800 0840 0910 0930 1010 1030 1035 1045 1110 1130 1210 1240 1310 1340 1405 1445 1500 1505 1540 1605 1640 1705 1740 1805 1825 1910 SD SD FO Saturday 40 30 30 40 30X 40 30X 40 30 40 40 30 40 30 40 30 40 30X 40 30 30 40 30 40 40 0730 0745 0840 0910 0930 1010 1030 1040 1045 1110 1210 1240 1310 1340 1410 1440 1510 1540 1610 1640 1705 1710 1808 1810 1910 Sunday 40 30 40 30 40 30 40 30 40 30 0830 0900 1000 1100 1200 1300 1400 1500 1600 1700 York Exhibition Square departures for Easingwold Mon to Fri 40 30XS 40 30 40 30X 40 30 40 30X 40 30 40 30X 40 30 40 30 40 30 40 40 30 40 30 40 0740 0740 0905 0930 1005 1030 1105 1130 1205 1230 1305 1330 1405 1430 1505 1540 1605 1610 1630 1705 1705 1730 1745 1805 1830 1905 SD Saturday 40 30 40 40 30X 40 30 40 30X 40 30 40 30X 40 30 40 30 40 30 40 40 0810 0900 0925 1005 1030 1105 1130 1205 1230 1305 1330 1405 1430 1505 1530 1605 1630 1705 1705 1805 1905 Sunday 40 30
    [Show full text]
  • CHAPTER 1 Arrowheads
    THE MILLENNIUM BOOK OF TOPCLIFFE John M. Graham The MILLENNIUM BOOK OF TOPCLIFFE John M. Graham This book was sponsored by Topcliffe Parish Council who provided the official village focus group around which the various contributors worked and from which an application was made for a lottery grant. It has been printed and collated with the assistance of a grant from the Millennium Festival Awards for All Committee to Topcliffe Parish Council from the Heritage Lottery Fund. First published 2000 Reprinted May 2000 Reprinted September 2000 Reprinted February 2001 Reprinted September 2001 Copyright John M. Graham 2000 Published by John M. Graham Poppleton House, Front Street Topcliffe, Thirsk, North Yorkshire YQ7 3NZ ISBN 0-9538045-0-X Printed by Kall Kwik, Kall Kwik Centre 1235 134 Marton Road Middlesbrough TS1 2ED Other Books by the same Author: Voice from Earth, Published by Robert Hale 1972 History of Thornton Le Moor, Self Published 1983 Inside the Cortex, Published by Minerva 1996 Introduction The inspiration for writing "The Millennium Book of Topcliffe" came out of many discussions, which I had with Malcolm Morley about Topcliffe's past. The original idea was to pull together lots of old photographs and postcards and publish a Topcliffe scrapbook. However, it seemed to me to be also an opportunity to have another look at the history of Topcliffe and try to dig a little further into the knowledge than had been written in other histories. This then is the latest in a line of Topcliffe's histories produced by such people as J. B. Jefferson in his history of Thirsk in 1821, Edmund Bogg in his various histories of the Vale of Mowbray and Mary Watson in her Topcliffe Book in the late 1970s.
    [Show full text]
  • Highthorne Lane, Husthwaite
    Highthorne Lane, Husthwaite Highway Statement June 2020 Project No. 1824 Paragon Highways Unit 6 The Office Campus Paragon Business Park, Red Hall Court Wakefield WF1 2UY ☏ 01924 291536 ✉ [email protected] paragonhighways.com Highthorne Lane, Husthwaite Highway Statement Quality Management First Issue Revision 1 Revision 2 Revision 3 Client Remarks amendments Date June 2020 25/6/20 Prepared by CH PAH Checked by PAH CH This document is issued for the party which commissioned it and for specific purposes connected with the above- captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. This document should not be shown to other parties without consent from us and from the party which commissioned it. 2 Highthorne Lane, Husthwaite Highway Statement Contents 1.0 Introduction .............................................................................................................................. 4 2.0 Existing Conditions .................................................................................................................... 5 3.0 Development Proposals ............................................................................................................ 9 4.0 Traffic Impact .........................................................................................................................
    [Show full text]
  • 75186 Sav Green, Raskelf.Indd
    RESIDENTIAL DEVELOPMENT SITE the green, raskelf, york, yo61 3ld A WELL LOCATED RESIDENTIAL DEVELOPMENT SITE WITH OUTLINE PLANNING CONSENT FOR UP TO FOUR DWELLINGS IN THE ATTRACTIVE RURAL VILLAGE OF RASKELF, ONLY 13 MILES FROM YORK. residential development site, the green, raskelf, york, yo61 3ld Situation The 0.33ha (0.81 acre) plot lies to the south of the village of Raskelf, at the junction of Raskelf Road and Hag Lane. The site is bordered by mature hedges, trees and an existing residential property to the south. This Plan is based upon the Ordnance Survey Map with the sanction of the Raskelf is a picturesque rural village with good local road networks. Controller of H.M. Stationery Office. Crown Copyright reserved. (100024244). This Plan is published for the convenience of Purchasers only. Its accuracy is The A19 is approximately one mile to the west providing excellent not guaranteed and it is expressly excluded from any contract. NOT TO SCALE. GP accessibility to York, Thirsk and Teeside, as well as linking to the A1. The village provides a range of amenities including a pub, restaurant, cricket club and regular bus service. A large range of shops and services 23.8m including dentist, doctors, primary and secondary school are available in the nearby market town of Easingwold (approximately two miles). Planning consent Dovecote Outline planning consent (17/02240/OUT) was granted on 15th January 2018 for a residential development of up to four dwellings, to include associated parking and amenity space. The planning Cla permission is subject to the approval of all the reserved matters, with yto nvi an application to be made within three years from the date of consent.
    [Show full text]
  • Yorkshire & the Humber
    Yorkshire & The Humber Woodfuel Directory 2011 www.forestry.gov.uk/yhwoodfuel Atmospheric carbon dioxide, water and sunlight Woodfuel CO2 Lean Fuel Carbon released back into the atmosphere Converted into new plant material through photosynthesis Which is harvested and burnt 2 Yorkshire & The Humber Woodfuel Directory 2011 www.forestry.gov.uk/yhwoodfuel Introduction Yorkshire and The Humber is a diverse and varied “region with a long history of power generation and solid fuel installations, previously based on the region’s coal resource. This, when combined with the potential to secure a signifi cant increase in biomass from the region’s under-managed woodlands, gives us a unique opportunity to help continue our move to a low U Rudie Humphrey carbon economy through the use of renewable energy. The development of the Woodfuel Strategy (launched in 2005) was seen as a key step in taking forwards the opportunities that woodfuel across the region presents. This fi rst regional directory is a manifestation of this. Its aim is to reinforce the links in the woodfuel supply chain in order to ensure consistent and effective delivery on the ground. The priorities are drawn from the already agreed regional ‘Vision for Biomass’ – connecting suppliers with producers was one of its key objectives. The Forestry Commission now seeks to build on the work of the South Yorkshire Woodfuel cluster and the supply chain development programme; the Wood Energy Co-ordinator recruitment in the White Rose Forest; and Yorkshire Woodfuels co-ordinated by Yorwoods. We are grateful to all of these partners and the Biomass Energy Centre who have proved vital in the development of this directory.
    [Show full text]
  • HUTTON RUDBY NORTH YORKSHIRE Northside, Hutton Rudby HUTTON RUDBY
    HUTTON RUDBY NORTH YORKSHIRE Northside, Hutton Rudby HUTTON RUDBY Exquisite new village homes fusing past and future Northside, Hutton Rudby ith the introduction of The Huttons to the And yet the picturesque and much sought after village of Wquintessentially English village of Hutton Rudby, Hutton Rudby, whilst peaceful and steeped in history, lives in the heart of glorious North Yorkshire, there is a sense very much in the present and has a vibrant and gregarious of continuity and belonging. Just fi ve new thoughtfully social interaction. So, life here is far from dull and with designed and beautifully detailed four bedroom family excellent travel options close to hand, the quality of life for homes join this charming community and blend seamlessly those living at The Huttons is sure to be second to none. into the established and mature environment. Quite simply, The Huttons is the perfect place to live, relax Each new home at The Huttons is named after a tree to and play! refl ect the natural backdrop and peaceful leafy location. Lime Tree House and Sycamore House nestle happily on gently rising grassy land overlooking North End with its mature trees and quaint houses, while Rowan House, Magnolia House and Mulberry House are discreetly located in a quiet close in Deepdale. 1 18432 Hutton Rudby folder insert v4.indd 1 22/09/2011 14:59 Northside, Hutton Rudby The Green College Square, Stokesley All About Hutton Rudby A QUALITY OF LIFE THAT IS SECOND TO NONE The village of Hutton Rudby lies just four miles south west of the bustling market town of Stokesley in the Hambleton district of North Yorkshire.
    [Show full text]