4 KING STREET WEST Once in a Lifetime Retail for Lease

Total Page:16

File Type:pdf, Size:1020Kb

4 KING STREET WEST Once in a Lifetime Retail for Lease 4once KING in a lifetime STREET retail forWEST lease CBRE Limited, Real Estate Brokerage | 145 King Street West | Suite 1100 | Toronto, ON M5H 1J8 | 416 362 2244 | www.cbre.ca 4 King Street West | Retail for Lease AT THE CORNER OF KING & YONGE PATH & SUBWAY CONNECTED Pedestrian Traffic Count 51,486 Vehicular Traffic Count 33,606 *24 hour traffic count 4 King Street West | Retail for Lease Floor Plan Unit 1 UNIT 3 Size: 7,821 sq. ft. Net Rent: Please contact agents TMI: $21.00 per sq. ft. UNIT 2 Available: Flexible • Over 50 ft. of frontage onto STREET YONGE King Street West UNIT 1 Office • Multiple options to divide Lobby • Abuts building loading bay • Food uses are welcome • Over 4,000 sq. ft. of additional space available in the lower KING STREET WEST level Entrance to the King Subway Station + PATH network 4 King Street West | Retail for Lease Floor Plan Unit 2 UNIT 3 Size: 1,133 sq. ft. Net Rent: $100.00 per sq. ft. TMI: $21.00 per sq. ft. UNIT 2 Available: February 2019 • Rare opportunity to secure STREET YONGE small space on Yonge Street UNIT 1 Office • Approximately 30 ft of frontage Lobby onto Yonge Street • Access to service corridor that leads to building lobby and loading area KING STREET WEST Entrance to the King Subway Station + PATH network 4 King Street West | Retail for Lease Floor Plan Unit 3 UNIT 3 Size: 2,343 sq. ft. Net Rent: $100.00 per sq. ft. UNIT 2 TMI: $21.00 per sq. ft. Available: Immediate • Even rarer opportunity to STREET YONGE secure double frontage space UNIT 1 Office onto Yonge Street Lobby • Unit can be combined with Unit 2 • Space has contiguous storage and a potential PATH KING STREET WEST connection Entrance to the King Subway • Food uses are welcome Station + PATH network 4 King Street West | Retail for Lease CONNECTIVITY 4 King Street West benefits from exceptional 100 access to public transportation. It has a direct + Density WALK SCORE entrance to the King subway station, one of Toronto’s busiest stations, with a daily ridership of over 60,000 people. Additionally, Office the King streetcar stop is at the property’s doorstep. It is also directly connected to 72.7 million sf Toronto’s PATH, a 30 km underground path Inventory network connecting more than 75 buildings, six subway stations, nine hotels and Toronto’s 100 busiest transit hub- Union Station. 1,893,273 sf TRANSIT SCORE Availability 2.6% Vacancy Rate 4,284,120 sf of Incoming Office Density Residential 5,000 + Condominium Units in the Surrounding Area 4 King Street West | Retail for Lease TORONTO MARRIOT EATON CITY CENTRE HALL Enclosed Walkway 2 QUEEN STATION QUEEN Subway EAST QUEEN STREET Subject Property OSGOODE STATION FOUR SEASONS THE SHERATON THE BAY 1 QUEEN CENTRE CENTRE EAST RICHMOND STREET HILTON 111 85 RICHMOND RICHMOND YONGE WEST WEST RICHMOND CENTRE 3.7 Million sf 130 120 100 UNIVERSITY AVE ADELAIDE ADELAIDE ADELAIDE BAY ADELAIDE CENTRE of Retail Space WEST WEST WEST ADELAIDE STREET EXCHANGE 105 11 ADELAIDE 100-110 1 ADELAIDE TOWER ADELAIDE WEST YONGE WEST EAST Over 12,000 BAY STREET Shops & Services YORK STREET SCOTIA PLAZA SUN LIFE SUN LIFE FIRST CENTRE CENTRE 130 ROYAL BANK 4 KING KING WEST CANADIAN BANK OF BUILDING WEST ST. ANDREW STATION PLACE NOVA SCOTIA KING STREET Over 75 buildings STANDARD TD LIFE TD NORTH WEST NORTH 1 KING are Connected to the PATH 145 KING WEST BANK WEST CENTRE PAVILION KING STATION METRO ROY THOMPSON TD CENTRE COMMERCE COURT CENTRE HALL 55 HSBC TD TD ERNST & SIMCOE STREET UNIVERSITY BUILDING WEST BANK YOUNG Six Subway Stations TOWER TOWER SOUTH EAST are Connected to the PATH WELLINGTON STREET BAY RBC 95 TD SOUTH WELLINGTON CENTRE WELLINGTON TOWER WEST TOWER ROYAL 1 UNIVERSITY BANK CBC AVENUE PLAZA BROOKFIELD PLACE BROADCAST CENTRE FAIRMONT ROYAL TD CANADA HOCKEY YORK HOTEL TRUST 22 FRONT HALL OF SIMCOE TOWER ST W FAME PLACE 156 FRONT WEST UNION STATION FRONT STREET METRO TORONTO 151 FRONT ST W CITIGROUP PLACE CONVENTION CENTRE UNION STATION YONGE STREET SCOTIABANK ARENA CONTACT Arlin Markowitz* Senior Vice President 416 815 2374 [email protected] Alex Edmison* Vice President 416 874 7266 [email protected] Jackson Turner** Sales Associate 416 815 2394 [email protected] Teddy Taggart Sales Represenative 416 847 3254 [email protected] *Sales Representative, **Broker This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”). The information set out herein, including, without limitation, any pro- jections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verified by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE. CBRE and the CBRE logo are the service marks of CBRE Limited and/or its affiliated or related companies in other countries. All other marks displayed on this document are the property of their respective owners. All Rights Reserved..
Recommended publications
  • GARDINER EXPRESSWAY and LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014
    GARDINER EXPRESSWAY AND LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014 1 Gardiner Expressway and Lake Shore Blvd East Reconfiguration Environmental Assessment Infrastructure Baseline Conditions Report 2014 TABLE OF CONTENTS Page 1.0 INTRODUCTION ............................................................................................................................... 1 1.1 Study Area ........................................................................................................................... 1 2.0 STUDY METHODOLOGY ................................................................................................................... 4 3.0 DESCRIPTION OF EXISTING BASELINE CONDITIONS ........................................................................ 5 3.1 Introduction ........................................................................................................................ 5 3.2 Road Infrastructure ............................................................................................................. 6 3.2.1 Gardiner Expressway Corridor ............................................................................... 6 3.2.2 Don Valley Parkway ............................................................................................. 15 3.2.3 Lake Shore Boulevard East Corridor .................................................................... 16 3.2.4 Roads and Streets ...............................................................................................
    [Show full text]
  • PATH Underground Walkway
    PATH Marker Signs ranging from Index T V free-standing outdoor A I The Fairmont Royal York Hotel VIA Rail Canada H-19 pylons to door decals Adelaide Place G-12 InterContinental Toronto Centre H-18 Victory Building (80 Richmond 1 Adelaide East N-12 Hotel D-19 The Hudson’s Bay Company L-10 St. West) I-10 identify entrances 11 Adelaide West L-12 The Lanes I-11 W to the walkway. 105 Adelaide West I-13 K The Ritz-Carlton Hotel C-16 WaterPark Place J-22 130 Adelaide West H-12 1 King West M-15 Thomson Building J-10 95 Wellington West H-16 Air Canada Centre J-20 4 King West M-14 Toronto Coach Terminal J-5 100 Wellington West (Canadian In many elevators there is Allen Lambert Galleria 11 King West M-15 Toronto-Dominion Bank Pavilion Pacific Tower) H-16 a small PATH logo (Brookfield Place) L-17 130 King West H-14 J-14 200 Wellington West C-16 Atrium on Bay L-5 145 King West F-14 Toronto-Dominion Bank Tower mounted beside the Aura M-2 200 King West E-14 I-16 Y button for the floor 225 King West C-14 Toronto-Dominion Centre J-15 Yonge-Dundas Square N-6 B King Subway Station N-14 TD Canada Trust Tower K-18 Yonge Richmond Centre N-10 leading to the walkway. Bank of Nova Scotia K-13 TD North Tower I-14 100 Yonge M-13 Bay Adelaide Centre K-12 L TD South Tower I-16 104 Yonge M-13 Bay East Teamway K-19 25 Lower Simcoe E-20 TD West Tower (100 Wellington 110 Yonge M-12 Next Destination 10-20 Bay J-22 West) H-16 444 Yonge M-2 PATH directional signs tell 220 Bay J-16 M 25 York H-19 390 Bay (Munich Re Centre) Maple Leaf Square H-20 U 150 York G-12 you which building you’re You are in: J-10 MetroCentre B-14 Union Station J-18 York Centre (16 York St.) G-20 in and the next building Hudson’s Bay Company 777 Bay K-1 Metro Hall B-15 Union Subway Station J-18 York East Teamway H-19 Bay Wellington Tower K-16 Metro Toronto Convention Centre you’ll be entering.
    [Show full text]
  • 370 King Street West
    370 KING STREET WEST CBRE Limited, Real Estate Brokerage | 145 King Street West | Suite 1100 | Toronto, ON M5H 1J8 | 416 362 2244 | www.cbre.ca CORNER OF KING & PETER RETAIL FOR LEASE SIZE: 4,940 sq.Ō . AVAILABLE: Immediately NET RENT: TBN TMI: $19.77 per sq.Ō . (approx) • Unparalleled brand opportunity on one of the most prominent downtown corners- King & Peter Street • Interior entrance from hotel and street level access • Across the street from an entrance to the PATH network • Located directly on the King streetcar line and seconds from St. Andrew subway sta on THE LOCATION St. Andrews Condominium Under Construction Playground 370 KING ST WEST ADELAIDE STREET WEST Condo PORTLAND STREET PETER STREET BRANT STREET SPADINA AVENUE SPADINA WIDMER STREET JOHN STREET KING STREET WEST Future Condo BLUE JAYS WAY JAYS BLUE King Street West is Toronto’s most dynamic retail environment known for the city’s largest concentra on of restaurants, theatres and nightlife. King West has seen increasing WELLINGTON STREET WEST diversifi ca on of retail uses, leveraging one of the largest residen al development cycles in Canadian history. 370 King Street West is ideally located at the busy intersec on of King West and Peter Street, adjacent to the ff Bell Lightbox and nestled between two new condo developments which will bring 1,460 new units to the already densely populated area. Condo Developments In the Area Pre-Construction/Under Construction 370 King Street West 16 17 1 355 King Street West 2 357 King Street West 10 14 15 9 11 King Blue Condos Tux Condos
    [Show full text]
  • Kanada Osten
    ADAC Reiseführer JETZT mit Maxi Klappkarten- Kanada Osten Nationalparks • Fischerdörfer • Outdoor Activities Museen • Shopping Malls • Hotels • Restaurants ADAC Reiseführer Kanada Osten 1DWLRQDOSDUNVʬ)LVFKHUG¸UIHUʬ2XWGRRU$FWLYLWLHV 0XVHHQʬ6KRSSLQJ0DOOVʬ+RWHOVʬ5HVWDXUDQWV Die Top Tipps I¾KUHQ6LH]XGHQ+LJKOLJKWV von Andreas Srenk Intro Kanada Impressionen 6 Grandiose Natur und verlockende Metropolen Geschichte, Kunst, Kultur im Überblick 12 Natives und Inuit, Franzosen und Engländer, Architektur, Film und Literatur in und aus Kanada Unterwegs Ontario – das kraftvolle Herz Kanadas 18 1 Toronto 19 Downtown 21 Chinatown und Kensington Market 26 Rund um Yorkville 26 Toronto Islands 29 Vaughan Mills 29 Kleinburg 29 2 Niagara Falls 30 3 Niagara-on-the-Lake 34 4 Kitchener/Waterloo 34 5 Windsor 35 Point Pelee National Park 36 6 Kingston 36 7 Upper Canada Village 39 8 Ottawa 40 Parliament Hill und Wellington Street 40 Vom Canal Rideau zum Sussex Drive 43 Am Ufer des Ottawa River und rund ums Zentrum 46 Gatineau Park 47 9 Algonquin Provincial Park 49 10 Georgian Bay 50 Fathom Five National Marine Park 51 Manitoulin Island 51 Georgian Bay Islands National Park 51 Killarney Provincial Park 51 11 Sudbury 52 12 Thunder Bay 52 13 Cochrane 53 Moosonee 53 Québec – die launische Diva 54 14 Montréal 55 Vieux Montréal 57 Centre Ville 61 Quartier Latin und Mont Royal 64 Olympiagelände 67 Île Sainte-Hélène und Île Notre-Dame 67 Laurentides 68 15 Trois-Rivières 69 16 Québec City 70 Vieux Québec – Haute-Ville 73 Vieux Québec – Basse-Ville 74 Außerhalb der Stadtmauern 76 Île d’Orléans 76 Montmorency Falls 77 17 Tadoussac 79 18 Gaspésie 79 New Brunswick – die unbe kannte Provinz mit grandioser Natur 82 19 Fredericton 83 Kings Landing 84 Miramichi River 84 20 Saint John 85 21 St.
    [Show full text]
  • PATH Network
    A B C D E F G Ryerson TORONTO University 1 1 PATH Toronto Atrium 10 Dundas Coach Terminal on Bay East DUNDAS ST W St Patrick DUNDAS ST W NETWORK Dundas Ted Rogers School One Dundas Art Gallery of Ontario of Management West Yonge-Dundas About the PATH Square 2 2 Welcome to the PATH — Toronto’s Downtown Underground Pedestrian Walkway UNIVERSITY AVE linking 30 kilometres of underground shopping, services and entertainment ST PATRICK ST BEVERLEY ST BEVERLEY ST M M c c CAUL ST CAUL ST Toronto Marriott Downtown Eaton VICTORIA ST Centre YONGE ST BAY ST Map directory BAY ST A 11 Adelaide West F6 One King West G7 130 Adelaide West D5 One Queen Street East G4 Eaton Tower Adelaide Place C5 One York D11 150 York St P PwC Tower D10 3 Toronto 3 Atrium on Bay F1 City Hall 483 Bay Street Q 2 Queen Street East G4 B 222 Bay E7 R RBC Centre B8 DOWNTOWN Bay Adelaide Centre F5 155 Wellington St W YONGE Bay Wellington Tower F8 RBC WaterPark Place E11 Osgoode UNIVERSITY AVE 483 Bay Richmond-Adelaide Centre D5 UNIVERSITY AVE Hall F3 BAY ST 120 Adelaide St W BAY ST CF Toronto Bremner Tower / C10 Nathan Eaton Centre Southcore Financial Centre (SFC) 85 Richmond West E5 Phillips Canada Life Square Brookfield Place F8 111 Richmond West D5 Building 4 Old City Hall 4 2 Queen Street East C Cadillac Fairview Tower F4 Roy Thomson Hall B7 Cadillac Fairview Royal Bank Building F6 Tower CBC Broadcast Centre A8 QUEEN ST W Osgoode QUEEN ST W Thomson Queen Building Simpson Tower CF Toronto Eaton Centre F4 Royal Bank Plaza North Tower E8 QUEEN STREET One Queen 200 Bay St Four
    [Show full text]
  • 144-146 Front Street W Fabulous Boutique Office Building
    For Sublease: Office 144-146 Front Street W Fabulous Boutique Office Building 200-55 University Avenue, Toronto 416.649.5920 lennard.com 144-146 Front Street W 2,300 SF of office space located at the northwest corner of Front Street and University Avenue. Beautiful brick-and-beam building in Toronto’s Financial Core. Suite Net Rent 655A Discuss with agent Available Space Additional Rent 2,300 SF $22.88 PSF (2019 est.) Commission Leasing Agent $1.00 PSF* Richard Turner** Partner, Broker Sublease Expiry 416.649.5910 [email protected] Short Term TBA **Broker *Subject to our exclusive listing agreement Property Highlights • Beautiful brick-and-beam with high ceilings • Prime location at Front and University, steps away from Union Station, GO Transit, TTC bus & subway, PATH Suite Highlights • Suite includes private reception, kitchen, 2 spacious offices (could be further divided), and large boardroom • Open Space • Partially furnished • Seperate entrance to suite • As-is but move-in condition lennard.com 144-146 Front Street W Suite 655A - 2,300 SF Richard Turner**, Partner 416.649.5910 • [email protected] lennard.com 144-146 Front Street W Area Highlights & Amenities • A hub of activity • Walking distance to numerous restaurants and shops • Across the street from Union Station • On-site parking available • Close to Gardiner Expressway and a 10 minute drive to Don Valley Parkway Statements and information contained are based on the information furnished by principals and sources which we deem reliable but for which we can assume no responsibility. Lennard Commercial Realty, Brokerage 2019. Richard Turner**, Partner 416.649.5910 • [email protected] lennard.com 144-146 Front Street W Richard Turner**, Partner 416.649.5910 • [email protected] lennard.com.
    [Show full text]
  • 184 Front Street East Toronto, Ontario
    184 Front Street East Toronto, Ontario LEASING CONTACT With 147 properties across Canada, comprising more than 11 million square feet, Allied Jennifer Tait Properties has earned a reputation for contributing to the vitality of Canada’s most vibrant D 416 646 1778 T 416 977 9002 urban neighbourhoods, and for developing workplaces distinguished by thoughtful, human- [email protected] scale design, responsive property management, and an unsurpassed tenant experience. 184 Front Street East Office | 5,449 sf PROPERTYHIGHLIGHTS SUITE INFORMATION Located in the heart of King West, on the northwest corner of King Street West and Portland Street. A prime office opportunity in restored, four-storey SUITE SF TYPE AVAILABILITY Class I brick-and-beam mixed use building on Portland Street. 200 5,449 Office Immediately ELEVATORS & ACCESS — 2 Passenger elevators — 1 Freight elevator with over 13’ foot ceiling NetRent Call Leasing Contact — Shipping and receiving access laneway to rear of building — Building is wheelchair accessible AdditionalRent Includes Utilities and In- Suite Janitorial $23.72 AMENITIES — Nearby Public Transit — Subway — Streetcar PARKING — Bike storage available TELECOM PROVIDERS — Beanfield — Bell — Cogeco — Rogers 2 184 Front Street East Second Floor Floorplan Suite 200 5,449 sf 200 3 184 Front Street East Amenities Carte LOCATION RESTAURANTS HEALTH & WELLNESS SERVICES Walk Score® | 99 Walker’s Paradise Nami Japanese Restaurant Body + Soul Fitness Distillery District Transit Score® | 100 Rider’s Paradise ARDO Restaurant Fitness Bound RBC Royal Bank Bike Score® | 100 George Restaurant Fuel Training Club King East CIBC Less than a one minute walk to Woods Restaurant & Bar Area Fitness National Bank streetcars B.GOOD TD Canada Trust 4 ALLIED PROPERTIES 134 Peter St, Suite 1700 Toronto, On M5v 2H2 T 416 977 9002 F 416 306 8704 alliedreit.com.
    [Show full text]
  • Path Network
    PATH NETWORK Also available as North and Central posters South Sheraton Centre 3min Yonge-Dundas Square 10min ADELAIDE ST W ADELAIDE ST W Northbridge 100 – 110 VICTORIA ST Place Yonge 11 Dynamic ENTERTAINMENT FINANCIAL Adelaide Funds Tower DISTRICT DISTRICT Scotia Plaza West PEARL ST 200 King 150 King West West Exchange Tower First Canadian Place The Bank Princess Royal of Nova of Wales Alexandra Scotia TIFF Bell Theatre Theatre Royal Bank 4 King Lightbox Building West St Andrew KING ST W KING ST W King 225 King Commerce Commerce West 145 King 121 King TD North Court Court North West West Tower TD Bank West Collins Pavilion Barrow Place EMILY ST EMILY ST One King West Metro Toronto-Dominion Centre Roy Thomson YORK ST COLBORNE ST Metro Hall Centre Design Commerce Court Hall 55 Exchange SCOTTSCOTT STST University TD West Toronto-Dominion 200 Tower Bank Tower Accessible Wellington route through 222 Bay Commerce Level -1 West 70 York Court South WELLINGTON ST W WELLINGTON ST W Bay WELLINGTON ST E Wellington UNIVERSITY AVE Tower CBC North Brookfield The 95 Wellington SIMCOESIMCOE STST Broadcast RBC Tower BAY ST Place JOHN ST JOHN ST Centre Ritz-Carlton Centre West TD South Toronto Tower Royal Bank Plaza 160 Front Fairmont Royal York Street West TD Canada Hockey Hall FRONT ST E under construction Trust Tower South of Fame Simcoe Tower Place Metro Toronto FRONT ST W Meridian Convention Centre YONGE ST Hall North Citigroup Union Place InterContinental Toronto Centre Great Hotel Hall UP Express Visitor THE ESPLANADE SKYWALK Information Centre York
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • Alterations to a Designated Heritage Property in the Union Station
    REPORT FOR ACTION Alterations to a Designated Heritage Property in the Union Station Heritage Conservation District Under Parts IV and V of the Ontario Heritage Act and Authority to Enter into a Heritage Easement Agreement - 1 Front Street West Date: August 7, 2020 To: Toronto Preservation Board Toronto and East York Community Council From: Senior Manager, Heritage Planning, Urban Design, City Planning Wards: Ward 10 - Spadina-Fort York SUMMARY This report recommends that City Council approve the alterations proposed for the heritage property located at 1 Front Street West, the Dominion Public Building, in connection with a proposed redevelopment of the subject property and that Council grant authority to enter into a Heritage Easement Agreement for the subject property. RECOMMENDATIONS The Senior Manager, Heritage Planning, Urban Design, City Planning recommends that: 1. City Council approve the alterations to the heritage property at 1 Front Street West, in accordance with Sections 33 and 42 of the Ontario Heritage Act, to allow for the construction of a new mixed used development incorporating the heritage building on the lands known municipally in the year 2020 as 1 Front Street West, with such alterations substantially in accordance with plans and drawings dated July 19, 2018 and revised April 13, 2020, prepared by Architects Alliance, and on file with the Senior Manager, Heritage Planning; and the Heritage Impact Assessment (HIA), prepared by ERA Architects Inc., dated July 23, 2018 and revised July 15, 2020, and on file with the Senior Manager, Heritage Planning, all subject to and in accordance with a Conservation Plan satisfactory to the Senior Manager, Heritage Planning and subject to the following additional conditions: Alterations and HEA - 1 Front Street West Page 1 of 49 a.
    [Show full text]
  • Public Consultation Strategy Report
    R E V I S I O N R E C O R D I S S U E R E C O R D Public Consultation Strategy Report 53-55 Yonge Street Quadrangle Architects Limited 901 King Street West, Suite 701 Toronto, ON M5V 3H5 CITY OF TORONTO t 416 598 1240 www.bdpquadrangle.com 55 YONGE STREET PREPARED FOR Toronto, ON 53 Yonge Portfolio Inc. and for 55 Yonge Portfolio Inc. H&R REIT www.55yonge.ca 18060 N/A N/A March 2021 P R O J E C T S C A L E D R A W N R E V I E W E D [email protected] Renderings A472.S 1 A472.S - View of Lobby from Yonge Street & Melinda Street A472.S Note: This drawing is the property of the Architect and may not be reproduced or used without the expressed consent of the Architect. The Contractor is responsible for checking and verifying all levels and dimensions and shall report all discrepancies to the Architect and obtain clarification prior to commencing work. 2021-01-21 10:38:09 AM C:\Users\DGawel\Documents\QAL_AR_18060_55 Yonge_R2020_dgawel.rvt BOUSFIELDS INC. Job Number 18239 WWW.BOUSFIELDS.CA TORONTO OFFICE HAMILTON OFFICE URBAN PLANNING 3 CHURCH STREET, SUITE 200 1 MAIN STREET EAST, SUITE 200 URBAN DESIGN TORONTO, ON HAMILTON, ON COMMUNITY ENGAGEMENT M5E 1M2 L8N 1E7 T. 416.947.9744 T. 905.549.3005 F. 416.947.0781 TABLE OF CONTENTS 1 Introduction 1 2 What are the goals and outcomes? 2 3 What is the project? 4 4 Where are we engaging? 7 5 Who are you engaging? 9 6 What have we heard? 12 7 What will we be discussing? 13 8 How are we engaging? 16 9 How will we share feedback? 17 10 Conclusion 21 Appendix A: Full Demographic Chart 22 1 Introduction This Public Consultation Strategy Report has been prepared to describe the proposed consultation approach for the rezoning application by 53 Yonge Portfolio Inc.
    [Show full text]
  • Bus Bridging Decision-Support Toolkit: Optimization Framework and Policy Analysis
    Bus Bridging Decision-Support Toolkit: Optimization Framework and Policy Analysis by Alaa Itani A thesis submitted in conformity with the requirements for the degree of Master of Applied Science Department of Civil and Mineral Engineering University of Toronto © Copyright by Alaa Itani 2019 Bus Bridging Decision-Support Toolkit: Optimization Framework and Policy Analysis Alaa Itani Master of Applied Science Department of Civil and Mineral Engineering University of Toronto 2019 Abstract Bus Bridging is the strategy most commonly applied in responding to rail service interruptions in North America and Europe. In determining the required number of buses and source routes, most transit agencies rely on ad-hoc approaches based on operational experience and constraints, which can lead to extensive delays and queue build-ups at affected stations. This thesis developed an optimization model, to determine the optimal number of shuttle buses and route allocation which minimize the overall subway and bus riders delay. The generated optimal solutions are sensitive to bus bay capacity constraints along the shuttle service corridor. The optimization model is integrated with a previously developed simulation tool that tracks the evolution of system queues and delays throughout the bus bridging process. A set of bus bridging policy guidelines were developed based on further analysis of the optimization model outputs using a Classification and Regression Tree (CART) model. ii Acknowledgments First, I would like to thank my parents and for their continuous support and trust in my abilities. Although they were thousands of miles away, they were always supportive, I couldn’t have made it here without their presence.
    [Show full text]