Multi-Story Wood Construction
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
ABSTRACT the Main Feature of a Conventional Terraced Housing Development Is Rows of Rectangular Shaped Houses with the Narrow Fa
MAKING A RETURN ON INVESTMENT IN PASSIVE ARCHITECTURE TERRACED HOUSES DEVELOPMENT Wan Rahmah Mohd Zaki Universiti Teknologi Malaysia(UiTM) Malaysia E-mail: [email protected] Abdul Hadi Nawawi Universiti Teknologi MalaysiaQJiTM) Malaysia E-mail: [email protected] Sabarinah Sh Ahmad Universiti Teknologi MalaysiaQJiTM) Malaysia E-mail: [email protected] ABSTRACT The main feature of a conventional terraced housing development is rows of rectangular shaped houses with the narrow facade as the frontage. Consequently, this limits natural cross ventilation and daylight penetration into the middle of the houses; and cause for unnecessary energy consumption on mechanical cooling and artijicial lighting to make the living spaces comfortable for occupants. Such inconsideration is mainly attributed to the optimum configuration of houses which offers the most economic return desired by the developer. Passive Architecture (PA) design strategies can make terraced houses more conducive for occupants as well as gives reasonable returns to the developer. The idea is demonstrated on a hypothetical double storeys terraced scheme in a 2.5 acre site whereby it is transformed intofour types of PA terraced houses development. The Return on Invesfment of the PA terraced houses is ascertained for two situations, ie., (i) fwed sales price for all types of house; and (ii) added premium to PA terraced houses due to the positive unintended effects such as low density housing, etc. If critical criteria for demand and supply in housing remain constant, it is found that PA terraced housing development offers competitive returns to the developer relative to the returns for conventional terraced housing scheme. Keyworh: Orientation, Indoor Comfort and Operational Energy 1.0 INTRODUCTION 1.1 Housing and Energy The recent public awareness on sustainability calls for housing to not only serves as a basic shelter but also to be energy efficient, i.e., designed to make occupants need low operational energy. -
The Construction of a High-Rise Development Using Volumetric Modular Methodology
ctbuh.org/papers Title: The Construction of a High-Rise Development Using Volumetric Modular Methodology Author: Phillip Gardiner, Managing Director, Irwinconsult Subjects: Architectural/Design Building Case Study Construction Economics/Financial Keywords: Design Process Economics Modular Construction Sustainability Publication Date: 2015 Original Publication: The Future of Tall: A Selection of Written Works on Current Skyscraper Innovations Paper Type: 1. Book chapter/Part chapter 2. Journal paper 3. Conference proceeding 4. Unpublished conference paper 5. Magazine article 6. Unpublished © Council on Tall Buildings and Urban Habitat / Phillip Gardiner The Construction of a High-Rise Development Using Volumetric Modular Methodology Phillip Gardiner, Managing Director, Irwinconsult The SOHO Tower is a 29-level modular building the cost and shortage of a skilled construction Another driver was the foundation in Darwin, in the far north of Australia, a workforce led to a decision to investigate a conditions. Darwin is underlain cyclonic region. The building was designed to volumetric modular alternative, with modules predominantly by a crust of soft Porcellanite incorporate a basement and eight floors built delivered complete with all finishes, joinery rock overlying softer Cretaceous sedimentary with conventional reinforced concrete followed and fittings. It was essential however that deposits of Phyllite to a very significant by 21 levels of volumetric modular apartments. the building layout and appearance not be depth. Buildings have been typically founded The modules were constructed and fully finished changed in any substantial way. This was a on pads or rafts founded in the soft rocks in Ningbo, China and shipped to Darwin. Unlike significant challenge. at bearing pressures that would not cause most modular systems, a concrete floor was unacceptable levels of settlement. -
Approved Microenterprise Home Kitchen Operations As of 9/4/2021
Approved Microenterprise Home Kitchen Operations as of 9/30/2021 Permit Exp. City Facility Address Owner Permit # Date Beaumont Slangin Plates 34936 Hagen Hts Kipp Funderburk PR0081203 3/31/2022 Blythe Davis Down Home 409 San Luis Wy Stacy Davis PR0080525 12/31/2021 Dining La Cocina de Monica 18211 Maple Dr Monica Ferrer PR0082034 6/30/2022 Quesa Virria Tacos 461 Seville Ln Gustavo Valdez PR0080222 11/30/2021 Ruelas Tosti House 380 S 5th St Nora Patricia Ruelas PR0080112 10/31/2021 Canyon Lake The Wicked Spoon Cafe 29748 Redwood Dr Samantha Gorrell PR0078967 2/28/2022 Cathedral City Carnitas Valdez 33531 Pueblo Trail Julia E Valdez PR0078655 1/31/2022 Pupusas Claudia 33609 Sky Blue Water Trail Claudia Moreno PR0080245 11/30/2021 Shep's Kitchen 30260 Travis Ave Robert Shephard PR0081048 3/31/2022 Smokey Lips BBQ 31265 Sky Blue Water Trl CAE LLC PR0081854 5/31/2022 Coachella El Reaper 84017 Manhattan Ave Omar Francisco Leon PR0081963 6/30/2022 Corona Amy's CaliPinoy Kitchen 5750 Red Haven St Amelia Victorio PR0082262 7/31/2022 B's Rollin BBQ 2620 Hawk Cir Eric Burnell PR0080792 2/28/2022 Barra De Pan 1104 Fullerton Ave Lucina Silva PR0078814 1/31/2022 BNL BBQ 1100 Newfield Cir Lupe Aguilar PR0079624 7/31/2022 Boonies Pit & Q LLC 823 S Howard St Christopher McCoy PR0081858 5/31/2022 Cazonci Mexican Kitchen 1599 Border Ave Unit F Robert Oliveros PR0080900 2/28/2022 Chef J's Table 11468 Alton Dr James Cameron PR0079569 7/31/2022 Convertible Kitchen 8911 Carnation Dr Talisha Seraj PR0080521 12/31/2021 El Jefe Cuisine 1028 E Francis St Che Galvan PR0080153 10/31/2021 Enchilame y Mas 1567 Del Norte Dr Olivia Cordova PR0080623 1/31/2022 Jerky Jerk 7581 Stonegate Dr Evon McMurry PR0078974 3/31/2022 Approved Microenterprise Home Kitchen Operations as of 9/30/2021 Permit Exp. -
GUIDE to RESIDENCE LIVING 2021-2022 Florida State University
GUIDE TO RESIDENCE LIVING 2021-2022 Florida State University (850) 644-2860 [email protected] 1 2 Table of Contents Table of Contents .............................................................................................. 2 Residential Student Experience ......................................................................... 3 Learning Goals .................................................................................................. 4 Florida State University Civility Statement ......................................................... 4 Residence Hall Staff ........................................................................................... 5 COVID-19 & Public Health ................................................................................. 6 Residence Hall Information ................................................................................ 7 Moving In........................................................................................................... 9 Moving Out ...................................................................................................... 10 Personalize Your Room .................................................................................... 11 Getting Involved in the Halls ............................................................................ 12 Roommate Relationships ................................................................................ 14 Safety in the Halls ........................................................................................... -
Elevator Design Book. Synergy ® and Evolution ® Design Contents
Elevator Technology Elevator design book. synergy ® and evolution ® Design Contents synergy and evolution 04 Philosophy. Design line architecture 05 How to define your personal cabin 06 F design line 07 E design line 15 D design line 29 C design line 43 B design line 55 A design line 71 Cabin and landing fixtures 85 Planning tools 92 About us 93 We have turned our elevators into an architectural design element, providing users with a great thyssenkrupp ambiance they can see and feel. New design collection for synergy and evolution elevators offers a wide range of attractive styles and moods. Perfect, down to the detail. Every single element reflects our commitment to creating the optimum ride experience. From functional, robust cabin interiors to a luxurious look and feel: all design elements speak a clear language and provide exceptional quality. Our many combination possibilities allow you to select a design that perfectly meets your individual taste and needs. 4 synergy and evolution. Design line architecture. 5 synergy and evolution. Design line architecture. Our synergy and evolution elevators combine state-of-the-art technology with flexible Our synergy and evolution elevators feature new design lines, which are named with design. Immerse yourself in the design world of these two elevator families and choose letters from “F” to “A”. “F” indicates a more functional, robust design line, whereas “A” the design that suits your taste and requirements. portrays the premium designs. Our designers have developed predesigned cabins in various ambiances for each design line. In addition, the design lines A, B, E and D offer synergy evolution the opportunity to configure cabins according to your individual taste - truly custom fit. -
Detached Garage / Pool House Application Requirements *
TOWN OF EAST FISHKILL BUILDING AND ZONING DEPARTMENT 330 Route 376, Hopewell Junction, NY 12533 (845) 221-2427 Fax (845) 227-4018 http://www.eastfishkillny.org DETACHED GARAGE / POOL HOUSE APPLICATION REQUIREMENTS * ALONG WITH THE COMPLETED APPLICATION, PLEASE PROVIDE THE FOLLOWING ITEMS: IF DETACHED GARAGE/POOL HOUSE IS A PRE-FAB, A COPY OF BROCHURE NOTING MAKE, MODEL AND SIZE. IF DETACHED GARAGE/POOL HOUSE IS BEING CONSTRUCTED, 2 COPIES OF PLANS/DRAWINGS SHOWING SPECIFICATIONS OF STRUCTURE. (PLANS MUST BE STAMPED IF 500 SQ. FT. AND OVER.) A COPY OF SURVEY SHOWING LOCATION OF STRUCTURE WITH SETBACKS NOTED. ANY DETACHED GARAGE/POOL HOUSE 500 SQ. FT. AND OVER REQUIRES 3 COPIES OF STAMPED PLOT PLAN (SURVEY) SHOWING LOCATION OF ADDITION WITH FRONT, SIDE AND REAR SETBACKS NOTED (TO BE APPROVED BY ENGINEERING: REVIEW FEE/$250). PLOT PLAN REQUIREMENTS CAN BE OBTAINED AT THE BUILDING DEPARTMENT. (** AN AS-BUILT AND FINAL SURVEY MAY BE REQUIRED.) INSURANCE FORMS FOR CONTRACTORS OR “SELF” (See insurance info in permit application packet. Forms must be submitted with application. No faxing/emailing.) IF APPLICANT IS NOT THE HOME OWNER/PROPERTY OWNER, AN ORIGINAL, SIGNED, NOTARIZED LETTER FROM THE OWNER WILL BE REQUIRED GRANTING PERMISSION TO APPLY FOR PERMIT. (Applicant may obtain signature on application from owner, thus notarized letter not required.) FEE: PLEASE SEE FEE SHEET ATTACHED TO THE BUILDING PERMIT CASH OR CHECK MADE OUT TO: TOWN OF EAST FISHKILL Note: Construction without a permit is double the fee: As-Built Fee (* Not to exceed 750 sq. ft. or 60% of the square footage of the footprint of the principal structure, whichever is greater in size and 1 ½ stories or 25 ft/height without ZBA approval. -
Clear Wall Planning Guide
Clear Wall Planning Guide December 2020 Clear Wall Planning Guide 1 Contents Five steps to specs ...................................................................................... 3 Design and Installation Planning .....................................................4 - 11 Space Planning, Site Survey and Measurement...........6 - 10 Planning Checklist ...........................................................................11 Components .........................................................................................12 - 25 Framing Elements ...................................................................13 -15 Transition Connectors ...........................................................15 - 16 Glass Inserts................................................................................ 17-18 Copolymer Strips ........................................................................... 19 Doors ..................................................................................................20 Door Sections ......................................................................... 21 - 23 Door Hardware ......................................................................24 - 25 Power/Data .................................................................................................. 26 Installation ...........................................................................................27 - 40 Clear Wall Planning Guide 2 5 Steps Five steps to specs: 1. Pre-qualify the project 2. Select Framing Elements 3. Select -
Townhouse Or Two-Family Dwelling?
TWO-FAMILY DWELLING, TWO-UNIT TOWNHOUSE and TOWNHOUSE BUILDINGS and the 2020 MINNESOTA RESIDENTIAL CODE Minnesota Department of Labor and Industry DEFINITIONS A two-family dwelling (IRC-2 occupancy) is: • A building containing two separate dwelling units. • The separation between units is either horizontal or vertical. • Both units are on one lot. • Sometimes referred to as “duplexes.” A townhouse (IRC-3 occupancy) is: • A single-family dwelling unit constructed in a group of two or more attached dwelling units. • Each unit is a separate building and extends from the foundation to the roof with open space on at least two sides of each unit. • Each unit is provided with separate building service utilities required by other chapters of the State Building Code. • A two-unit townhouse is sometimes referred to as a “twin-home.” DISTINCTION The primary differences between a two-family dwelling and a two-unit townhouse or twin-home: • Property – A two-unit townhouse or twin-home is typically located on two separate individual lots with a property line running between them whereas both units of a two-family dwelling, or “duplex,” are located on the same single lot. • Separation – A two-unit townhouse must be separated from the foundation to the roof by a double wall (two one-hour walls, see exceptions below). The separation between units in a two-family dwelling can be provided by single one-hour fire-resistance-rated assembly that is horizontal or vertical. • Services – Since each townhouse unit is a separate building, each townhouse unit must be supplied with separate utilities. Units classified as townhouses must be supplied by separate electrical services. -
Evaluating Skyscraper Design and Construction Technologies on an International Basis
EVALUATING SKYSCRAPER DESIGN AND CONSTRUCTION TECHNOLOGIES ON AN INTERNATIONAL BASIS by Saad Allah Fathy Abo Moslim B.Sc., Mansoura University, Egypt, 1984 M.Eng., The University of British Columbia, Canada, 2000 A THESIS SUBMITTED IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY in THE FACULTY OF GRADUATE AND POSTDOCTORAL STUDIES (Civil Engineering) THE UNIVERSITY OF BRITISH COLUMBIA (Vancouver) November 2017 © Saad Allah Fathy Abo Moslim, 2017 Abstract Design and construction functions of skyscrapers tend to draw from the best practices and technologies available worldwide in order to meet their development, design, construction, and performance challenges. Given the availability of many alternative solutions for different facets of a building’s design and construction systems, the need exists for an evaluation framework that is comprehensive in scope, transparent as to the basis for decisions made, reliable in result, and practical in application. Findings from the literature reviewed combined with a deep understanding of the evaluation process of skyscraper systems were used to identify the components and their properties of such a framework, with emphasis on selection of categories, perspectives, criteria, and sub-criteria, completeness of these categories and perspectives, and clarity in the language, expression and level of detail used. The developed framework divided the evaluation process for candidate solutions into the application of three integrated filters. The first filter screens alternative solutions using two-comprehensive checklists of stakeholder acceptance and local feasibility criteria/sub-criteria on a pass-fail basis to eliminate the solutions that do not fit with local cultural norms, delivery capabilities, etc. The second filter treats criteria related to design, quality, production, logistics, installation, and in-use perspectives for assessing the technical performance of the first filter survivors in order to rank them. -
Residential Bathroom Remodel Based on the 2016 California Residential, Electrical, Plumbing and Mechanical Code
BUILDING & SAFETY DIVISION │ PLANS AND PERMITS DIVISION DEVELOPMENT SERVICES CENTER 39550 LIBERTY STREET, FREMONT, CA 94538 P: 510.494.4460 │ EMAIL: [email protected] WWW.FREMONT.GOV SUBMITTAL AND CODE REQUIREMENTS FOR AN RESIDENTIAL BATHROOM REMODEL BASED ON THE 2016 CALIFORNIA RESIDENTIAL, ELECTRICAL, PLUMBING AND MECHANICAL CODE PERMIT INFORMATION: A permit is required for bathroom remodels that include the replacement of the tub/shower enclosure, relocation of plumbing fixtures or cabinets, or if additional plumbing fixtures will be installed. A permit is not required for replacement of plumbing fixtures (sink or toilet) in the same location. Plans shall be required if walls are removed, added, altered, and/or if any fixtures are removed, added or relocated. All requirements shall in conformance to the currently adopted codes. THINGS TO KNOW: □ A Building Permit may be issued only to a State of California Licensed Contractor or the Homeowner. If the Homeowner hires workers, State Law requires the Homeowner to obtain Worker’s Compensation Insurance. □ When a permit is required for an alteration, repair or addition exceeding one thousand dollars ($1,000.00) to an existing dwelling unit that has an attached garage or fuel-burning appliance, the dwelling unit shall be provided with a Smoke Alarm and Carbon Monoxide Alarm in accordance with the currently adopted code. □ WATER EFFICIENT PLUMBING FIXTURES (CALIFORNIA CIVIL CODE 1101.4(A)): The California Civil Code requires that all existing non-compliant plumbing fixtures (based on water efficiency) throughout the house be upgraded whenever a building permit is issued for remodeling of a residence. Residential building constructed after January 1, 1994 are exempt from this requirement. -
For Sale Large 4 Bedroom TERRACED HOUSE
For Sale Large 4 Bedroom TERRACED HOUSE & Interconnecting 6 Car Garage With Country Views General Information Description Status: For Sale Located on the outskirts of Mqabba, is this 4 bedroomed TERRACED HOUSE enjoying unobstructed country views. Offered At: €310,000 Price(LM): (Lm133,083) The spacious accommodation comprises of a formal sitting room, guest shower, Location: Mqabba kitchen/dining/living room with access to a back yard, 4 bedrooms, bathroom, a large terrace and a washroom. Type: Terraced House Category: Residential Complimenting this property is an interconnecting 6 car garage with shower room, 2 storage rooms and a back yard. Finish: Highly Code: SS Property is being sold freehold and will make a beautiful family home. Ref Number: 3303 Contact Information Mobile: +356 79708350 E-Mail: [email protected] Ref: 3303 €310,000 These details are intended as a guide and do not form part of a contract. Buyers should satisfy themselves as to any information contained therein. For Sale Large 4 Bedroom TERRACED HOUSE & Interconnecting 6 Car Garage With Country Views Summary Room Dimensions Bedrooms – 4 Entrance Hall – 2.48x4.17 – (10.35sqm) Yard – Yes Formal Sitting Room – 4.02x4.24 – (17.06sqm) Hall – 8.52x2.47 – (21.10sqm) Garage – Yes Bedroom – 4.04x3.98 – (16.14sqm) Freehold – Yes Shower – 2.32x2.96 – (6.88sqm) Water Well – Yes Kitchen/dining/living – 4.72x6.67 – (31.57sqm) Unobstructed Country Views - Yes Yard – 2.03x3.13 – (6.37sqm) Bathroom – 2.32x2.98 – (6.93sqm) Bedroom – 4.03x3.96 – (16.01sqm) Bedroom – 3.98x4.28 – (17.07sqm) Features Terrace – (13.85sqm) Bedrooms 4 Bedroom – 3.57x5.70 – (20.41sqm) Washroom – 4.72x4.67 – (22.07sqm) Bathrooms 3 Roof – 9.12x6.69 – (61.11sqm) Kitchen W/Appliances Garage – 6.38x12.78 – (81.58sqm) Shower in Garage – 5.14x2.42 – (12.49sqm) Living Room in Garage – 4.80x3.32 – (15.98sqm) Garage 6 Room in Garage – 2.85x3.58 – (10.22sqm) Yard in Garage – 4.27x3.11 – (13.30sqm) Roof Plot 23ftx83ft No. -
Schindler 3300 MRL Traction Elevator Entrance Details
Schindler 3300 MRL Traction Elevator Entrance details Single-speed center opening (SSCO) side jamb Single-speed center opening (SSCO) top jamb 2 x 5/8” Gypsum board Wall 2HR fire rating thickness Door space (4.875”) 2 x 5/8” Gypsum board (Ref.) Wall thickness (Ref.) Wall rhickness (Ref.) Clear opening width 1” Gypsum board Rough opening width J-Runner See note A See note A 6.75” 6.75” Rough 4.25” opening 4.25” Wall thickness height Clear Wall thickness 4.75” Wall 4.75” opening thickness height See note B minus 4.25” Wall thickness minus 4.25” See note B 4 3/8”– 5 7/8” Two-speed side opening (2SSO) side jamb Two-speed side opening (2SSO) top jamb Door space (4.875”) Wall thickness (Ref.) Wall thickness (Ref.) Clear opening width Rough opening width See note A 6.75” See note A 2.5” 5.5” Rough 2.5” opening Wall thickness height 4.75” Clear Wall thickness Wall thickness Wall thickness minus 2.5” minus 2.5” opening 4.75” height See note B See note B Strike side Return side 4 3/8”– 5 7/8” Note A: Fire rating is maintained by the interface at this area only. Note B: Finished wall by others. No fire rating at this point. Wall thickness can vary, as jamb thickness remains constant. Dimensions Capacity lbs (kg) Door Type Clear Opening Width x Height ft (mm) Rough Opening Width x Height ft (mm) 2100 (950) 2SSO 3’- 0” x 7’- 0” (915 x 2134) 4’- 4” x 7’- 8” (1321 x 2337) 2SSO 3’- 6” x 7’- 0” (1067 x 2134) 4’- 10” x 7’- 8” (1473 x 2337) 2500 (1135) SSCO 3’- 6” x 7’- 0” (1067 x 2134) 4’- 10” x 7’- 8” (1473 x 2337) General Purpose 2SSO 3’- 6” x 7’- 0” (1067 x 2134) 4’- 10” x 7’- 8” (1473 x 2337) 3000 (1360) SSCO 3’- 6” x 7’- 0” (1067 x 2134) 4’- 10” x 7’- 8” (1473 x 2337) 2SSO 3’- 6” x 7’- 0” (1067 x 2134) 4’- 10” x 7’- 8” (1473 x 2337) 3500 (1590) SSCO 3’- 6” x 7’- 0” (1067 x 2134) 4’- 10” x 7’- 8” (1473 x 2337) Schindler 3300 MRL Traction Elevator Entrance details Landing door mounting options General requirements Requirements for installation vary by type of equipment selected.