Summary of Accidents Investigated by the Federal Railroad Administration (FRA) Includes 256 Railroad Accidents

Total Page:16

File Type:pdf, Size:1020Kb

Summary of Accidents Investigated by the Federal Railroad Administration (FRA) Includes 256 Railroad Accidents a® ;*,#i, -S' v ys»£ :»v &* i" if# T 2 S - A X Summary of Accidents June 1988 Investigated by the Federal Railroad Administration Calendar Year 1986 © U.S. D epartm ent of Transportation Federal Railroad Administration INTRODUCTION The 1986 Summary of Accidents Investigated by the Federal Railroad Administration (FRA) includes 256 railroad accidents. This summary provides the following information: o the railroad(s) involved o the location and the time of the accident o the type of railroad accident o the method of operation and movements involved o the speed involved o the type and class of track o the number of casualties o the estimated cost of railroad damages o the probable cause and any contributing factors(s). The railroad codes used in this summary can be found in the FRA Guide for Preparing Accident/Incident Reports Appendix A. Estimated railroad damage includes labor cost, and all other costs to repair or replace damaged on-track equipment, signals, track, track structures, or roadbed. The cost of lading and clearing the wreck, as well as the cost to society, is not included. The data were edited and summarized by FRA personnel. The United States Government assumes no liability for its contents or use. Federal Railroad Administration Office of Safety, RRS-22 400 Seventh Street, S.W. Washington, D.C. 20590 i ACCIDENT SUMMARY 1. Accidents Investigated During Calendar Year 1986/ the Federal Railroad Administration investigated and determined the probable cause of 256 railroad accidents. Type of Accident No. Percent (a) Derailment 108 42.2 (b) Head-End Collision 8 3.0 (c) Rear-End Collision 12 4.7 (d) Side Collision 3 1.2 <e) Raking 2 .8 (f) Broken Train Collision 2 .8 (g) Rail-Highway Crossing 109 ■■■■■> i 42.6 (h) Obstruction 1 A (i) Other 3 1.2 ( j) Fire or Violent Rupture 1 .4 (k) RR Grade Crossings 2 - - ; .8 (1) Other Collisions 5 1.9 Total 256 100.0- Accident Cause ' V ” (a) Track Roadbed and Structure 37 : 14.5 (b) Mechanical and Electrical Failure " . 35 • '--v 13.7 (c) Train Operation-Human Factor 58 22.7 • (d) Miscellaneous 17 6.6 (e) Rail-Highway Crossing , 109 42.5 Total 256 . 100.0 Casualties N o \ -' ^ ^ (a) Killed ^ 230 (b) Injured 1,448 Total 1,678 i i i := ACCIDENT SUMMARY BY TRACK CLASS, DAMAGES ,. TYPE AND CAUSE TRACK ACCID . TOTAL EQUIPMENT TRACK COLLI DERAIL OTHER TRACK EQUIPMENT HUMAN OTHER CLASS ENTS DAMAGE DAMAGE DAMAGE SIONS- MENTS ACCIDENTS CAUSED FAILURE FACTORS CAUSES 1 $28,000 $25,000 $3,000 1 1 14 $664,046 $393,846 $270,200 2 8 4 3 2 6 3 32 $4,053,528 $3,760,369 8 6 r o X $293,159 .10 14 1 17 8 cm 60 $13,852,206 $12,209,306 $1,642,900 7 32 21 13 8 . 1 5 24 125 $24,666,261 $22,209,805 $2,456,456 7 ' 47 - 71 14 22 14 75 — ut .p* .p* ut 24 $5,884,763 $5,466,623 $418,140 3 6 15 2 6 16 TOTAL 256 $49,148,804 $44,064,949 $5,083,855 29 108 119 37 35 58 126 f ■ i v . 9 INVOLVEMENT OF TRAIN ACCIDENTS BY RAILROAD, TYPE, AND CAUSE COLLISIONS. ........... .DERAILMENTS... ....... .OTHER ..DEFECTS...... ........ DEFECTS................. ....DEFECTS......... TOTAL HUMAN - HUMAN HUMAN ACCID FACTORS EQUIP TRACK OTHER FACTORS EQUIP TRACK OTHER FACTORS EQUIP TRACK OTHER ENTS * AMTRAK (NATIONAL RAILROAD PASSENGER CORPORAT 24 37 ATCHISON, TOPEKA AND SANTA FE RAILWAY COMPAN 11 26 BOSTON AND MAINE CORPORATION 1 3 BURLINGTON NORTHERN RAILROAD COMPANY . 15 34 BOONE SCENIC VALLEY 1 CENTRAL OF GEORGIA RAILROAD COMPANY, . 2 2 CHICAGO AND NORTH WESTERN TRANSPORTATION COM 1 6 CONSOLIDATED RAIL CORPORATION 4 17 CAROLINA AND NORTHWESTERN RAILWAY COMPANY 1 1 CHESSIE SYSTEM RAILROADS 5 17 CHICAGO SOUTH SHORE AND SOUTH BEND RAILROAD 1 1 CSX TRANSPORTATION 14 31 DENVER AND RIO GRANDE WESTERN RAILROAD COMPA 1 FLORIDA EAST COAST RAILWAY COMPANY 1 1 GRAND TRUNK WESTERN RAILROAD COMPANY 1 2 ILLINOIS CENTRAL GULF RAILROAD COMPANY 3 7 KANSAS CITY SOUTHERN RAILWAY COMPANY 1 4 KYLE RAILROAD COMPANY 2 LOUISIANA & ARKANSAS RAILWAY COMPANY 2 - ■ 3 LONG ISLAND RAIL ROAD 1 1 LAKE SUPERIOR TERMINAL & TRANSFER RAILWAY CO- 1 1 MAINE CENTRAL RAILROAD COMPANY .1 1 MISSOURI-KANSAS-TEXAS RAILROAD COMPANY 2 i — — 1 4 METRO NORTH COMMUTER RAILROAD COMPANY 1 2 NORTHEAST ILLINOIS REGIONAL COMMUTER RAIL CO 1 1 NEW JERSEY TRANSIT RAIL OPERATIONS 2 NEW ORLEANS TERMINAL COMPANY 1 NORFOLK AND WESTERN RAILWAY COMPANY 4 8 NEW YORK, SUSQUEHANNA AND WESTERN RAILROAD C 2 PORT AUTHORITY TRANS HUDSON 1 ROCHESTER SOUTHERN RAILROAD, INC. 1 SOUTH BRANCH VALLEY RAILROAD • 1 SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUT 1 2 SOO LINE RAILROAD COMPANY 1 4 SOUTHERN RAILWAY COMPANY 4 4 SOUTHERN PACIFIC TRANSPORTATION COMPANY 12 25 ST. LOUIS SOUTHWESTERN RAILWAY COMPANY 4 6 UNION PACIFIC RAILROAD COMPANY 18 39 WISCONSIN CALUMET RAILROAD 1 1 137 303 : V REPORT RAILROAD NUMBER CODE ....ACCIDENT LOCATION. • ♦ • DATE PAGE 1 ATSF ST F R A N C I S TX 01/ 0 1 / 8 6 1 2 CSX/ PARR IN 01/04/86 1 ATK 3 SSW BERNIE MO 0 1 /07/86 2 4 CSRR PEMBERTON VA 0 1 /08/86 2 5 SP . \ ' . OAK GROVE , -C.A- 01/ 1 1 / 8 6 2 6 SP/ MOORPARK CA 0 1/13/86 3 ATK ■ 7 SP/ DEL RIO TX 0 1 /17/86 3 ATK ' 8 KCS FORBING LA 0 1/17/86 3 , 9 . , CSX LIVE OAK FL 0 1/18/86 . 1 4 10 UP POPLAR BLUFF MO 01/ 1 9 / 8 6 4 11 BN/ NISQUALLY - WA 01/ 1 9 / 8 6 4 ATK 12, UP/ LAMAR. : M.O 0 1 /20/86 5 BN ' 1 3 KYLE . , . STUTTGART ‘KS 01/ 2 1 / 8 6 5 1 4 CR/ WASHINGTON • MA 0 1/24/86 6 15 CR/ PORTER IN 0 1 /24/86 6 ATK \ , 16 BM- .CHELSEA MA 0 1 /25/86 6 17 SP , S P A R K S NV 01/25/86 ' 7 ' 1 8 PATH . JERSEY CITY NJ 0 1/27/86 - . 7 19 CSRR A U B U R N 1 IN 01/ 2 7 / 8 6 7 . 20 ATSF LEVY NM . 0 1 /28/86 8 21 BN ALICEVILLE ‘ AL 01/ 2 9 / 8 6 8 . 22 CR SO U T H FORK PA - -01/29/86 9 23 , u p / ; KANSAS CITY KS 0 1 /30/86 9 SSW ' \ ■' ' • ■’ 24 . UP BIGGS OR , 0 1 / 3 1 / 8 6 9 25 CSRR NORTH BALTIMORE OH 0 1 / 3 1 / 8 6 , 10 26 ' SOO WINONA MN 0 2 /01/86 10 27 SEPA WESTTOWN PA 0 2 /05/86 1 i 28 DRGW CANON CITY, CO 02 / 1 3 / 8 6 : 11 29 CR C A N N O N * ; PA 0 2 /17/86 ■ 12 30 CSX DELRAY BEACH FL 0 2 / 1 8 / 8 6 12 31 BN HARTLEY TX 02 / 1 9 / 8 6 • 12 32 ICG/ . BRIDGEPORT IL 02 / 2 1 / 8 6 1 3 ATK . 33 SP GREGORY TX -■ 02 / 2 4 / 8 6 13 34 CSRR GRAND.LEDGE MI :02 / 2 5 / 8 6 13 35 UP MENO OR 02/ 2 6 / 8 6 14 36 UP . k u n a ID 02/ 2 7 / 8 6 14 37 UP • C O L U M B I A • LA 0 2 /28/86 14 . 38 UP JASPER MO,. 02 / 2 8 / 8 6 15 39 SSW RANDLES MO 02 / 2 8 / 8 6 15 40 CR VERSAILLES OH .03/01/86 15 VI - REPORT RAILROAD NUMBER CODE ....ACCIDENT LOCATION. DATE PAGE 41 CSX/ OGEECHEE GA 03/ 0 2 / 8 6 1 6 ATK 42 CSX SONORA KY 03 / 0 2 / 8 6 1 6 43 CSX SCREVEN- GA 03 / 0 3 / 8 6 16 44 NJTR NEWARK NJ 0 3 /03/86 1 7 45 BN : : ' CLAUDE TX 03/ 0 4 / 8 6 1 7 ■ 46 ATSF COLTON CA 03/ 0 6 / 8 6 1 7 47 UP BALD KNOB AR 03/ 0 7 / 8 6 18 48 UP/ BROWNSVILLE TX 03 / 0 7 / 8 6 1 8 SP 49 r CGA TRAMMELS AL 0 3 /07/86 - 18 50 : ss w / INDEPENDENCE MO . 03/08/86 ■ 19 UP 5 1 - SP/ BERWICK LA . 03/ 0 9 / 8 6 1 9 ATK 52 CSX/ INDIANTOWN FL 03/ 1 8 / 8 6 20 ATK 53 CR/ DEARBORN MI . 0 3 / 1 8 / 8 6 20 ATK 54 CNW ■ WAXDALE , : WI 03/ 1 8 / 8 6 20 55 . BN BOYER ID 03/ 2 1 / 8 6 21 56 ; . BN COLCHESTER IL - 0 3/23/86 21 57 CSRR - NORTH MOUNTAIL ; WV 03/ 2 3 / 8 6 -• ; 21 58 SSW DEXTER MO 03/ 2 7 / 8 6 22 ■ 59 BN VILLISCA IA : 03/ 2 8 / 8 6 , 22 6 0 CSX ROCKMART GA 03/ 2 9 / 8 6 ; 22 61 ATK/ BOWIE MD , . 0 4 / 0 9 / 8 6 23 CR 62 CSX SUMTER SC 04/ 1 0 / 8 6 23 , 63 ' SP t GALENA PARK ' TX- 0 4 / 1 1 / 8 6 . 2 3 64 ATSF TEXAS CITY JUNCTION TX 04/ 1 1 / 8 6 . 24 65 LA -HOPE AR ’ 0 4/11/86 24 66 ATSF LAMBERT' CA . 0 4 / 1 2 / 8 6 24 . 67 SP/ ;WAELDER TX 04/ 1 3 / 8 6 25 ATK t 68 .? SP IRVING OR 0 4/1.9/86 25 ;69 UP , HIG AR 04/ 2 0 / 8 6 25 70 . ATK " . GWYNN MD - 04/ 2 1 / 8 6 26 .71 NW’ .
Recommended publications
  • Union Depot Tower Interlocking Plant
    Union Depot Tower Union Depot Tower (U.D. Tower) was completed in 1914 as part of a municipal project to improve rail transportation through Joliet, which included track elevation of all four railroad lines that went through downtown Joliet and the construction of a new passenger station to consolidate the four existing passenger stations into one. A result of this overall project was the above-grade intersection of 4 north-south lines with 4 east-west lines. The crossing of these rail lines required sixteen track diamonds. A diamond is a fixed intersection between two tracks. The purpose of UD Tower was to ensure and coordinate the safe and timely movement of trains through this critical intersection of east-west and north-south rail travel. UD Tower housed the mechanisms for controlling the various rail switches at the intersection, also known as an interlocking plant. Interlocking Plant Interlocking plants consisted of the signaling appliances and tracks at the intersections of major rail lines that required a method of control to prevent collisions and provide for the efficient movement of trains. Most interlocking plants had elevated structures that housed mechanisms for controlling the various rail switches at the intersection. Union Depot Tower is such an elevated structure. Source: Museum of the American Railroad Frisco Texas CSX Train 1513 moves east through the interlocking. July 25, 1997. Photo courtesy of Tim Frey Ownership of Union Depot Tower Upon the completion of Union Depot Tower in 1914, U.D. Tower was owned and operated by the four rail companies with lines that came through downtown Joliet.
    [Show full text]
  • Derailment of Freight Train 9204V, Sims Street Junction, West Melbourne
    DerailmentInsert document of freight title train 9204V LocationSims Street | Date Junction, West Melbourne, Victoria | 4 December 2013 ATSB Transport Safety Report Investigation [InsertRail Occurrence Mode] Occurrence Investigation Investigation XX-YYYY-####RO-2013-027 Final – 13 January 2015 Cover photo source: Chief Investigator, Transport Safety (Vic) This investigation was conducted under the Transport Safety Investigation Act 2003 (Cth) by the Chief Investigator Transport Safety (Victoria) on behalf of the Australian Transport Safety Bureau in accordance with the Collaboration Agreement entered into on 18 January 2013. Released in accordance with section 25 of the Transport Safety Investigation Act 2003 Publishing information Published by: Australian Transport Safety Bureau Postal address: PO Box 967, Civic Square ACT 2608 Office: 62 Northbourne Avenue Canberra, Australian Capital Territory 2601 Telephone: 1800 020 616, from overseas +61 2 6257 4150 (24 hours) Accident and incident notification: 1800 011 034 (24 hours) Facsimile: 02 6247 3117, from overseas +61 2 6247 3117 Email: [email protected] Internet: www.atsb.gov.au © Commonwealth of Australia 2015 Ownership of intellectual property rights in this publication Unless otherwise noted, copyright (and any other intellectual property rights, if any) in this publication is owned by the Commonwealth of Australia. Creative Commons licence With the exception of the Coat of Arms, ATSB logo, and photos and graphics in which a third party holds copyright, this publication is licensed under a Creative Commons Attribution 3.0 Australia licence. Creative Commons Attribution 3.0 Australia Licence is a standard form license agreement that allows you to copy, distribute, transmit and adapt this publication provided that you attribute the work.
    [Show full text]
  • Transportation Planning for the Richmond–Charlotte Railroad Corridor
    VOLUME I Executive Summary and Main Report Technical Monograph: Transportation Planning for the Richmond–Charlotte Railroad Corridor Federal Railroad Administration United States Department of Transportation January 2004 Disclaimer: This document is disseminated under the sponsorship of the Department of Transportation solely in the interest of information exchange. The United States Government assumes no liability for the contents or use thereof, nor does it express any opinion whatsoever on the merit or desirability of the project(s) described herein. The United States Government does not endorse products or manufacturers. Any trade or manufacturers' names appear herein solely because they are considered essential to the object of this report. Note: In an effort to better inform the public, this document contains references to a number of Internet web sites. Web site locations change rapidly and, while every effort has been made to verify the accuracy of these references as of the date of publication, the references may prove to be invalid in the future. Should an FRA document prove difficult to find, readers should access the FRA web site (www.fra.dot.gov) and search by the document’s title or subject. 1. Report No. 2. Government Accession No. 3. Recipient's Catalog No. FRA/RDV-04/02 4. Title and Subtitle 5. Report Date January 2004 Technical Monograph: Transportation Planning for the Richmond–Charlotte Railroad Corridor⎯Volume I 6. Performing Organization Code 7. Authors: 8. Performing Organization Report No. For the engineering contractor: Michael C. Holowaty, Project Manager For the sponsoring agency: Richard U. Cogswell and Neil E. Moyer 9. Performing Organization Name and Address 10.
    [Show full text]
  • Rawie 16ZEB/28A Friction Arresting Buffer Stop at Freight Link Headshunt in Melbourne Only
    Engineering Procedure- Form New Equipment & System Approval Proforma Form number: EGP2101F-01 NEW EQUIPMENT & SYSTEM APPROVAL PROFORMA Ref: 14/19018 Note: the prompts given below are only a guide to the information required for approval. Dependent on the type of equipment or system that requires approval delete any section that is not applicable or include additional information if necessary. Mandatory fields are marked with an asterisk (*). 1 Equipment or System to be approved * Rawie 16ZEB/28a Friction Arresting Buffer Stop at Freight Link Headshunt in Melbourne only 2 Originator * Name: Patrick Gray Company: ARTC/RRL 3 Introduction * A new dual gauge freight headshunt was proposed by the Victorian Regional Rail Link Project to replace the previous freight headshunt over the North Melbourne Flyover in order to make way for the new Regional Rail Link Track use of the Flyover to access Southern Cross Station. The new headshunt is comprised of a Section of the new Freight Link Track and the Freight Link Headshunt which branches off the Freight Link Track. To control the risk of rolling stock overrun at the end of the headshunt it was determined through a risk assessment process that a friction buffer stop would be provided with capacity to safely bring a maximum freight train of 4500t to a stand from 15 km/h. The Rawie 16ZEB/28a Friction Arresting Buffer Stop is a non-insulated device capable of arresting centre coupled freight vehicles through a friction shoe braking mechanism that allows impact energy to be dissipated over the nominated length of track. This type of equipment provides enhanced rail safety over traditional fixed buffer stops by providing controlled speed reduction and reduces likelihood of destructive impact and the potential for rolling stock to override the buffer.
    [Show full text]
  • Track Report 2006-03.Qxd
    DIRECT FIXATION ASSEMBLIES The Journal of Pandrol Rail Fastenings 2006/2007 1 DIRECT FIXATION ASSEMBLIES DIRECT FIXATION ASSEMBLIES PANDROL VANGUARD Baseplate Installed on Guangzhou Metro ..........................................pages 3, 4, 5, 6, 7 PANDROL VANGUARD Baseplate By L. Liu, Director, Track Construction, Guangzhou Metro, Guangzhou, P.R. of China Installed on Guangzhou Metro Extension of the Docklands Light Railway to London City Airport (CARE project) ..............pages 8, 9, 10 PANDROL DOUBLE FASTCLIP installation on the Arad Bridge ................................................pages 11, 12 By L. Liu, Director, Track Construction, Guangzhou Metro, Guangzhou, P.R. of China PANDROL VIPA SP installation on Nidelv Bridge in Trondheim, Norway ..............................pages 13,14,15 by Stein Lundgreen, Senior Engineer, Jernbanverket Head Office The city of Guangzhou is the third largest track form has to be used to control railway VANGUARD vibration control rail fastening The Port Authority Transit Corporation (PATCO) goes High Tech with Rail Fastener............pages 16, 17, 18 in China, has more than 10 million vibration transmission in environmentally baseplates on Line 1 of the Guangzhou Metro by Edward Montgomery, Senior Engineer, Delaware River Port Authority / PACTO inhabitants and is situated in the south of sensitive areas. Pandrol VANGUARD system has system (Figure 1) in China was carried out in the country near Hong Kong. Construction been selected for these requirements on Line 3 January 2005. The baseplates were installed in of a subway network was approved in and Line 4 which are under construction. place of the existing fastenings in a tunnel on PANDROL FASTCLIP 1989 and construction started in 1993. Five the southbound track between Changshoulu years later, the city, in the south of one of PANDROL VANGUARD TRIAL ON and Huangsha stations.
    [Show full text]
  • Railroad Building in Virginia (1827 to 1860)
    Railroad Building in Virginia (1827 to 1860) Virginia History Series #10-08 © 2008 Major Railroads in Virginia (from 1827-1860) • Baltimore and Ohio (1827) – Winchester & Potomac (at Harpers Ferry) – Winchester & Strasburg • South Side or “Petersburg & -- North Western to Lynchburg RR” (1849-54) Parkersburg, WV • Richmond & Danville (1847-1856) • Manassas Gap (1850-54) • Petersburg & Roanoke (river in NC) • Orange & Alexandria (1848) (1833) -- Richmond & Petersburg (1838) • Virginia Central (1836) -- Blue Ridge (1858) • Norfolk and Petersburg (1853) • Virginia & Tennessee (1850s) • Seaboard & Roanoke (river in NC) or “Portsmouth and Weldon RR” (1835) • Richmond, Fredericksburg, and Potomac to Alexandria (1834) & Fredericksburg & Charlottesville RR Major RR Routes in Virginia by 1860 Wheeling●, Ohio River Parkersburg ● ● Grafton Maryland & York RR+ + ++++++/ + Norfolk Stn + Petersburg & + Norfolk RR + + + + Suffolk Stn + + Bristol ● + + + + Norfolk & + Roanoke RR Weldon ■ On March 8, 1827, the Commonwealth of Virginia joined Maryland in giving the Baltimore and Ohio Rail Road (B&O RR) the task of building a railroad from the port of Baltimore, MD West to a suitable point on the Ohio River. The railroad was intended to provide a faster route for Midwestern goods to reach the East Coast than the successful Erie Canal across upstate NY. Construction began on July 4th, 1828. It was decided to follow the Patapsco River to a point near where the railroad would cross the “fall line” and descend into the valley of the Monocacy and Potomac Rivers. Thomas Viaduct (on the B&O RR) spans the Patapsco River and Patapsco Valley between Relay and Elkridge, MD (1833-35) It was the largest bridge in the nation and today its still the world's oldest multiple arched stone railroad bridge Further extensions of the B&O RR soon opened to Frederick and Point of Rocks on the Potomac river.
    [Show full text]
  • 2014 Maine State Rail Plan
    Maine State Rail Plan TABLE OF CONTENTSview Chapter 1 Framework of the Maine State Rail Plan 1.1 Purpose of the State Rail Plan 1.1 1.2 Visions, Goals, Objectives of the Maine State Rail Plan 1.3 1.3 Transportation and Rail Planning in Maine 1.6 . Figure 1-1: MaineDOT Organizational Chart 1.7 . Figure 1-2: Maine’s MPO Areas 1.10 . Figure 1-3: Regional Planning and Development Councils 1.11 1.4 Public and Stakeholder Involvement 1.12 1.5 Review of Freight and Passenger Rail Planning Studies 1.17 1.6 Evaluation Criteria 1.18 Chapter 2 Freight Rail System 2.1 Overview 2.1 . Figure 2-1: North American Class I Rail Connections 2.2 . Figure 2-2: Map of MM&A Abandonment 2.6 . Figure 2-3: State of Maine Owned Rail Status 2.10 2.2 Freight Rail Industry Development 2.10 2.3 Maine’s Freight Railroad Facilities 2.12 2.4 International, National and Regional Context 2.21 . Figure 2-4: Canadian Class I Connections to Maine System 2.21 . Figure 2-5: Northeast U.S. Rail Freight System 2.22 . Figure 2-6: NS, CP, PAS and PAR Corridors 2.23 . Figure 2-7: Railroad Return on Investment and Cost of Capital 2.24 2.5 Freight Rail Issues and System Constraints 2.24 . Figure 2-8: Estimated National Highway System Peak-Period Congestion 2.25 . Figure 2-9: Estimated Rail Freight Service Levels, 2035 2.25 . Figure 2-10: Rail Clearance and Weight Constraints 2.28 .
    [Show full text]
  • Inner Circumferential Commuter Rail Feasibility Study
    INNER CIRCUMFERENTIAL COMMUTER RAIL FEASIBILITY STUDY FINAL REPORT and STV Inc. April 1999 Inner Circumferential Commuter Rail Feasibility Study TABLE OF CONTENTS PAGE FOREWORD ............................................................. iii EXECUTIVE SUMMARY ................................................ ES-1 1.0 INTRODUCTION .................................................. 1 2.0 EXISTING CONDITIONS ......................................... 5 2.1 Alignment Options .................................................. 5 2.2 Description of Alignments ............................................ 8 2.3 Land Use and Zoning ................................................ 12 2.4 Potential Station Locations ............................................ 12 2.5 Environmental Issues ................................................ 19 3.0 FUTURE PLANS .................................................. 24 3.1 Demographic and Socioeconomic Characteristics .......................... 24 3.2 Municipal Development Plans. ........................................ 27 3.3 Railroads and Other Agencies .......................................... 34 4.0 POTENTIAL OPERATIONS ...................................... 39 4.1 Option 1: IHB-BRC ................................................. 40 4.2 Option 2 :MDW-BRC. .............................................. 41 4.3 Option 3: WCL-CSX-BRC ........................................... 42 4.4 Option 4: IHB-CCP-BRC ............................................ 43 5.0 CAPITAL IMPROVEMENTS ....................................
    [Show full text]
  • Remote Control Switch Expedites Trains at a Junction on the Union Pacific
    565 Remote Control Switch Expedites Trains at a Junction on the Union Pacific The power switch machine at loca­ t i on ''C"-N o t e plates and rail braces AT MENOKEN) Kan., five miles west of Topeka, the Union Pacific has installed a remotely-controlled power switch and signals to facili- tate train movements at a junction of two main lines. On the daily, and the traffic on the Denver over layout at Menoken, marked A ) Kansas City-Denver route, the main line includes 8 passenger and 4 freight and the single switch location marked line is double track from Kansas City trains daily, thus totaling about 34 C. Under the previous method of to Topeka and single track from To­ train movements through the Meno­ operation, the single switch at C peka westward to Denver. At Meno­ ken junction daily. The difficulty of served as the junction switch, an ken, five miles west of Topeka, a handling trains through this junction operator being located here to handle single-track main line branches off to is increased by reason of the move­ train orders and to operate the hand­ the northwest, extending through ments being bunched during certain throw stand of the junction switch. Marysville, Kan., to Grand Island periods. For example, between 8 p.m. With this arrangement, the section of Neb., and Gibbon, · where connections and midnight there are two freight track between points X and Y could are ·made with the Omaha-Ogden trains northward to the Marysville be used as a passing siding for trains main line of the Union Pacific.
    [Show full text]
  • Washington, DC to Richmond Third Track Feasibility Study HOUSE
    REPORT OF THE VIRGINIA DEPARTMENT OF RAIL AND PUBLIC TRANSPORTATION Washington, DC to Richmond Third Track Feasibility Study TO THE GOVERNOR AND THE GENERAL ASSEMBLY OF VIRGINIA HOUSE DOCUMENT NO. 78 COMMONWEALTH OF VIRGINIA RICHMOND 2006 Third Track Feasibility Study December 2006 WASHINGTON, D.C. TO RICHMOND THIRD TRACK FEASIBILITY STUDY PREFACE This study was requested by the 2006 General Assembly session in HB 5012. In addition to an analysis of the feasibility of constructing a third track, this study responds to the General Assembly’s direction to expand the scope to: (i) Identify needed right-of-way parallel to existing tracks, including right-of-way owned by CSX or by other parties; (ii) Identify major environmental issues; (iii) Develop an implementation plan based on the most optimal options, including the schedules for each phase of the project as well as financing for the project; (iv) Review legal and regulatory issues; and (v) Estimate the cost of powering passenger trains by electricity for a Third Track from Washington, D.C. to Richmond. The Department of Rail and Public Transportation (DRPT) is charged with ensuring that the Commonwealth of Virginia achieves the highest public benefit for the dollars invested in our rail programs. There is no doubt that this is a high priority freight and passenger rail corridor that will require significant investment in order to maintain and improve mobility for people and goods. DRPT is taking a strategic approach in studying this high priority corridor. Our new approach is based on establishing public benefits, identifying public/private partnership opportunities, and providing realistic cost estimates based on a comprehensive plan that identifies all of the improvements and issues that need to be addressed in the provision of reliable, sustainable, expandable, and efficient freight and passenger rail operations.
    [Show full text]
  • South Dakota's Railroads
    South Dakota’s Railroads South Dakota State Historic Preservation Office South Dakota’s Railroads: An Historic Context Prepared for: South Dakota State Historic Preservation Office 900 Governors Drive Pierre, South Dakota 57501 Prepared by: Mark Hufstetler and Michael Bedeau Renewable Technologies, Inc. 511 Metals Bank Bldg. Butte, Montana 59701 July 1998 Revised, December 2007 TABLE OF CONTENTS 1. Introduction.................................................................................................................................2 A. Purpose of this Document..............................................................................................2 B. Methodology ..................................................................................................................3 2. The Importance of Railroads to South Dakota ...........................................................................4 3. The History of Railroading in South Dakota..............................................................................5 A. Geographical Background .............................................................................................5 B. Establishment and Expansion: South Dakota Railroads in the Nineteenth Century......6 1. Beginnings (1851-1868) .....................................................................................6 2. The Little Dakota Boom and the First Railroads (1868-1873)...........................8 3. Railway Expansion During the Great Dakota Boom (1878-1887).....................9 4. The Impact and
    [Show full text]
  • Crn Cs 220 Rail and Rail Joints
    Engineering Standard Track CRN CS 220 RAIL AND RAIL JOINTS Version 1.7 Issued September, 2019 Owner: Manager Engineering Services Approved by: M Wright, Principal Track and Civil Engineer Authorised by: J Zeaiter, Manager Engineering Services Disclaimer. This document was prepared for use on the CRN Network only. John Holland Rail Pty Ltd makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems or work or operation. It is the document user’s sole responsibility to ensure that the copy of the document it is viewing is the current version of the document as in use by JHR. JHR accepts no liability whatsoever in relation to the use of this document by any party, and JHR excludes any liability which arises in any manner by the use of this document. Copyright. The information in this document is protected by Copyright and no part of this document may be reproduced, altered, stored or transmitted by any person without the prior consent of JHR. UNCONTROLLED WHEN PRINTED Page 1 of 47 CRN Engineering Standard - Track CRN CS 220 Rail and Rail Joints Document control Revision Date of Approval Summary of change 1.0 August, 2011 First Issue. Includes content from the following former RIC standards: C 2405, C 2447, C 2501, C 3200, C 3201, C 3361, C 5200, TS 3101, TS 3104, TS 3111, TS 3341, TS 3362, TS 3371, TS 3394, TS 3396, TS 3397, TS 3601, TS 3602, TS 3603, TS 3604, TS 3606, TS 3642, TS 3645, TS 3646, TS 3648, TS 3650, TS 3654, TS 3655, RC.2410, RC.2411, RTS.3602, RTS.3640,
    [Show full text]