A.R. Nagaraju
Total Page:16
File Type:pdf, Size:1020Kb
FORM –I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY A.R. NAGARAJU (QUARRY LEASE AREA – 11.50 HA.) SY. NO: 155 ( BLOCK SPLIT NUMBER OF OLD SY.NO. 94) OF DAYYALAGUDEM VILLAGE, ADONI MANDAL, KURNOOL DISTRICT. Prepared by ISO 9001: 2008 Certified Accredited by 6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | Hyderabad- 82 | E mail: [email protected]|www.pioneerenvirolabs.com | PEOPLE WHO CARE FOR ENVIRONMENT | SAVE ENVIRONMENT | APPENDIX I (See paragraph – 6) FORM - 1 (I) Basic Information Sr. No (I) Basic Information 1 Name of the project A.R. Nagaraju 2 S. No. in the schedule 1 (a) 3 Proposed capacity/area/length/tonnage to be handled/command area/lease S.No Mineral Production area/number of wells to be drilled 1. Colour Granite 8338 M3/annum Total land – 11.50 Ha. 4 New/Expansion/Modernization New 5 Existing capacity/Area etc. No 6 Category of project i.e. ‘A’ or ‘B’. B 7 Does it attract the general condition? If yes, No please specify. 8 Does it attract the specific condition? If yes, No please specify. 9 Location Plot/Survey/Khasra No. 155 ( Block Split Number of Old Sy.No. 94) Village Dayyalagudem Tehsil/Mandal Adoni District Kurnool State Andhra Pradesh 10 Nearest railway station/airport along with Nearest Railway station: Adoni – 10.9 Kms. distance in kms. Bellary Air port – 76.0 Kms. 11 Nearest Town, city, District Headquarters Adoni – 8.2 Kms along with distance in kms District Head quarter: Kurnool- 74 Kms 12 Village Panchayats,Zilla Parishad, Municipal Village Panchayat: Dayyalagudem corporation, Local body(complete postal addresses with telephone no.s to be given) 13 Name of the applicant A.R. Nagaraju 14 Registered Address S/o. Sri A. Ramakrishnam Raju, H. No: 1-541-18 -B3, Adoni (V) & (M), Kurnool District 15 Address for correspondence: Name A.R. Nagaraju Designation(owner/partner/CEO) Lessee Address S/o. Sri A. Ramakrishnam Raju, H. No: 1-541-18 -B3, Adoni (V) & (M), Kurnool District 1 | P a g e Pin code 518301 E-Mail [email protected] Telephone No. 9741414181 Fax No. -- Details of Alternative sites examined, if any. No alternative sites have been considered as the 16. Location these sites should be shown on a letter of intent for grant of Quarry lease area is topo sheet issued by Department of Mines & Geology, Hyderabad. 17. Interlinked Projects No 18. Whether separate application of interlinked No project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves Not Applicable approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, 1980 (b) The Wildlife (protection) Act, 1972 (c) The C.R.Z Notification,1991? Whether there is any a government Not Applicable 22. order/policy relevant/relating to the site? 23. Forest land involved(hectares) Not Applicable 24. Whether there is any litigation pending Not Applicable against the project and/or land in which the project is propose to be set up? (a)Name of the court (b)Case No. (c) Orders/directions of the court, if any and its relevance with the proposed project. (II) Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, wherever possible) with source of S.No. Information/Checklist confirmation Yes/No information data 1.1 Permanent or temporary change in land Yes Topography of the Quarry will change due to use, land cover or topography including mining. increase in intensity of land use (with respect to local land use plan. 1.2 Clearance of existing land, vegetation and No There are no permanent structures like buildings? buildings roads in and around surrounding area. 1.3 Creation of new land uses? Yes The waste generated will be dumped in the quarry lease area 1.4 Pre-construction investigations e.g. bore Yes Investigations have been carried out to detect houses, soil testing? the quantum of Colour Granite deposits in Quarry lease area. 2 | P a g e 1.5 Construction works? Yes Rest rooms, First Aid Room, Shelters and Lavatory, will be constructed after obtaining the necessary permissions from SEIAA / APPCB. 1.6 Demolition works? No Not applicable. 1.7 Temporary sites used for construction No Not applicable works or housing of construction workers? 1.8 Above ground buildings, structures or No Not applicable earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining or No Not applicable tunneling? 1.10 Reclamation works? No Not applicable 1.11 Dredging? No Not applicable 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing Yes Colour Granite will be quarried using Opencast processes? Semi Mechanized. 1.14 Facilities for storage of goods or Yes Store room will be provided for storage of materials? Quarry materials / machinery. 1.15 Facilities for treatment or disposal of No The waste generated will be dumped in the solid waste or liquid effluents? quarry lease area. The wastewater generated during washing of Granite Blocks to identify defects and cracks will be collected in collection pit & reused further. The Sanitary wastewater generated will be treated in septic tank followed by soak pit. 1.16 Facilities for long term housing of No Not applicable operational workers? 1.17 New road, rail or sea traffic during Yes Internal roads will be laid in the Quarry area construction or operation? for the transportation of Quarried granite through trucks and tippers. 1.18 New road, rail, air waterborne or other No Not applicable transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport No Not applicable routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No Not applicable pipelines? 1.21 Impoundment, damming, culverting, No Not applicable. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable 1.23 Abstraction or transfers of water form Yes Not applicable ground or surface waters? 3 | P a g e 1.24 Changes in water bodies or the land No Not applicable surface affecting drainage or run-off? 1.25 Transport of personnel or materials for Yes As construction activity will be minimum, construction, operation or transportation of construction materials & decommissioning? personnel will have negligible impact on environment. 1.26 Long-term dismantling or No Not applicable decommissioning or restoration works? 1.27 Ongoing activity during decommissioning No Not applicable which could have an impact on the environment? 1.28 Influx of people to the area either Yes Most of the employees & workers will be from temporarily or permanently? local area only. Hence influx of people will not be there to the site. 1.29 Introduction of alien species? No Not applicable 1.30 Loss of native species or genetic No Not applicable diversity? 1.31 Any other actions? No Nil 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with approximate Information/checklist confirmation quantities /rates, wherever possible) with S.No. Yes/No source of information data 2.1 Land especially undeveloped or Yes The proposed QL area is govt. land. agricultural land (ha) 2.2 Water (expected source & competing Yes The water requirement will be met from users) unit: KLD the Borewells of nearby Village and supplied by Tankers. 2.3 Minerals (MT) No Not applicable 2.4 Construction material – stone, Yes All construction materials are locally aggregates, sand / soil (expected source – available. MT) 2.5 Forests and timber (source – MT) No Not applicable 2.6 Energy including electricity and fuels No Not applicable (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use No Not applicable appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate quantities/rates, wherever possible) with S.No. Information/Checklist confirmation Yes/No source of information data 3.1 Use of substances or materials, which are Yes The storages of all hazardous materials in hazardous (as per MSIHC rules) to human the Quarry are much less and will be stored health or the environment (flora, fauna, as per the Mines Rules & Regulation. and water supplies) 4 | P a g e 3.2 Changes in occurrence of disease or affect No Not applicable disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No Not applicable changing living conditions? 3.4 Vulnerable groups of people who could be No Not applicable affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not applicable 4. Production of solid wastes during construction or operation or decommissioning (MT/month) Details thereof (with approximate quantities/rates, wherever possible) with S.No. Information/Checklist confirmation Yes/No source of information data 4.1 Spoil, overburden or mine wastes Yes The waste generated during the Quarrying will also be dumped in the quarry lease area. 4.2 Municipal waste (domestic and or Yes MSW will be disposed off as per norms. commercial wastes) 4.3 Hazardous wastes (as per Hazardous No Not applicable Waste Management Rules) 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge from No Not applicable effluent treatment 4.7 Construction or demolition wastes Yes Construction wastes will be disposed of as per norms.