Federal Register/Vol. 85, No. 170/Tuesday, September 1, 2020
Total Page:16
File Type:pdf, Size:1020Kb
Federal Register / Vol. 85, No. 170 / Tuesday, September 1, 2020 / Notices 54371 last three digits in the docket number 90-day Federal Authorization Decision ferc-online/overview to register for field to access the document. At this Deadline May 9, 2021 eSubscription. time, the Commission has suspended If a schedule change becomes Additional information about the access to the Commission’s Public necessary, additional notice will be Project is available from the Reference Room, due to the provided so that the relevant agencies Commission’s Office of External Affairs proclamation declaring a National are kept informed of the Project’s at (866) 208–FERC or on the FERC Emergency concerning the Novel progress. website (www.ferc.gov). Using the Coronavirus Disease (COVID–19), issued eLibrary link, select General Search by the President on March 13, 2020. For Project Description from the eLibrary menu, enter the assistance, contact the Federal Energy On its existing 300 Line, Tennessee selected date range and Docket Number Regulatory Commission at proposes to construct: One 11,107 excluding the last three digits (i.e., [email protected] or call horsepower turbine and compressor CP20–493), and follow the instructions. toll-free, (886) 208–3676 or TYY, (202) building at its existing Compressor For assistance with access to eLibrary, 502–8659. Station 321 in Susquehanna County, the helpline can be reached at (866) Comment Date: 5 p.m. Eastern Time Pennsylvania; one 20,500 horsepower 208–3676, TTY (202) 502–8659, or at on September 11, 2020. turbine and compressor building at its [email protected]. The Dated: August 26, 2020. existing Compressor Station 325 in eLibrary link on the FERC website also Kimberly D. Bose, Sussex County, New Jersey; one new provides access to the texts of formal compressor station (‘‘Compressor Secretary. documents issued by the Commission, Station 327’’) equipped with one 19,000 [FR Doc. 2020–19255 Filed 8–31–20; 8:45 am] such as orders, notices, and rule horsepower electric motor-driven makings. BILLING CODE 6717–01–P compressor unit in the Township of Dated: August 26, 2020. West Milford in Passaic County, New Kimberly D. Bose, DEPARTMENT OF ENERGY Jersey; and associated auxiliary facilities and appurtenances. Secretary. [FR Doc. 2020–19250 Filed 8–31–20; 8:45 am] Federal Energy Regulatory Background Commission BILLING CODE 6717–01–P On August 13, 2020, the Commission [Docket No. CP20–493–000] issued a Notice of Intent to Prepare an Environmental Assessment for the DEPARTMENT OF ENERGY Tennessee Gas Pipeline Company, Proposed East 300 Upgrade Project and L.L.C.; Notice of Schedule for Request for Comments on Federal Energy Regulatory Environmental Review of the East 300 Environmental Issues (NOI). The NOI Commission Upgrade Project was sent to affected landowners; federal, Combined Notice of Filings #1 On June 30, 2020, Tennessee Gas state, and local government agencies; Pipeline Company, L.L.C. (Tennessee) elected officials; environmental and Take notice that the Commission filed an application in Docket No. public interest groups; Native American received the following exempt CP20–493–000 requesting a Certificate tribes; other interested parties; and local wholesale generator filings: of Public Convenience and Necessity libraries and newspapers. The Docket Numbers: EG20–237–000. pursuant to Section 7(c) of the Natural Commission received comments from Applicants: Riverstart Solar Park LLC. Gas Act to construct and operate certain Consolidated Edison Company of New Description: Notice of Self- natural gas pipeline facilities in York, Inc., the Township of West Certification of Exempt Wholesale Pennsylvania and New Jersey. The Milford, Food and Water Watch, and Generator Status of Riverstart Solar Park proposed project is known as the East Sustainable West Milford. The primary LLC. 300 Upgrade Project (Project), and issues raised by the commentors relate Filed Date: 8/26/20. consists of modifying two existing to: Water quality impacts on Accession Number: 20200826–5030. compressor stations and constructing groundwater, streams, and the Comments Due: 5 p.m. ET 9/16/20. one new compressor station to create Monksville and Wanaque Reservoirs; air Docket Numbers: EG20–238–000. 115 million cubic feet per day of firm quality and noise; hydraulic fracturing Applicants: Alta Oak Realty, LLC. transportation capacity on Tennessee’s impacts; climate change impacts from Description: Notice of Self- existing 300 Line. upstream, downstream, and indirect Certification of Exempt Wholesale On July 15, 2020, the Federal Energy greenhouse gas emissions; safety; the Generator Status of Alta Oak Realty, Regulatory Commission (Commission or need for clean energy alternatives; and LLC. FERC) issued its Notice of Application general ‘‘impact upon the residents of Filed Date: 8/26/20. for the Project. Among other things, that West Milford.’’ All substantive Accession Number: 20200826–5109. notice alerted agencies issuing federal comments will be addressed in the EA. Comments Due: 5 p.m. ET 9/16/20. authorizations of the requirement to Take notice that the Commission Additional Information complete all necessary reviews and to received the following electric rate reach a final decision on a request for In order to receive notification of the filings: a federal authorization within 90 days of issuance of the EA and to keep track of Docket Numbers: ER17–2059–004; the date of issuance of the Commission all formal issuances and submittals in ER10–3097–009. staff’s Environmental Assessment (EA) specific dockets, the Commission offers Applicants: Puget Sound Energy, Inc., for the Project. This instant notice a free service called eSubscription. This Bruce Power Inc. identifies the FERC staff’s planned can reduce the amount of time you Description: Amendment to July 1, schedule for the completion of the EA spend researching proceedings by 2019 Updated Market Power Analysis in for the Project. automatically providing you with the Northwest Region for Puget Sound notification of these filings, document Energy, Inc., et al. Schedule for Environmental Review summaries, and direct links to the Filed Date: 8/24/20. Issuance of EA February 8, 2021 documents. Go to https://www.ferc.gov/ Accession Number: 20200824–5250. VerDate Sep<11>2014 19:00 Aug 31, 2020 Jkt 250001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\01SEN1.SGM 01SEN1 jbell on DSKJLSW7X2PROD with NOTICES 54372 Federal Register / Vol. 85, No. 170 / Tuesday, September 1, 2020 / Notices Comments Due: 5 p.m. ET 9/14/20 Comments Due: 5 p.m. ET 9/16/20. The filings are accessible in the Docket Numbers: ER19–697–001. Docket Numbers: ER20–2744–000. Commission’s eLibrary system (https:// Applicants: Cheyenne Light, Fuel and Applicants: Southwest Power Pool, elibrary.ferc.gov/idmws/search/ Power Company. Inc. fercgensearch.asp) by querying the Description: Report Filing: Refund Description: § 205(d) Rate Filing: 2626 docket number. Report under EL19–41, ER19–697 to be KCP&L, KCP&L GMO & Transource MO Any person desiring to intervene or effective N/A. Novation Cancellation to be effective 8/ protest in any of the above proceedings Filed Date: 8/26/20. 26/2020. must file in accordance with Rules 211 Accession Number: 20200826–5037. Filed Date: 8/26/20. and 214 of the Commission’s Comments Due: 5 p.m. ET 9/16/20. Accession Number: 20200826–5004. Regulations (18 CFR 385.211 and Docket Numbers: ER20–1616–001. Comments Due: 5 p.m. ET 9/16/20. 385.214) on or before 5:00 p.m. Eastern Applicants: Western Spirit Docket Numbers: ER20–2745–000. time on the specified comment date. Transmission LLC. Applicants: Midcontinent Protests may be considered, but Description: Compliance filing: Independent System Operator, Inc. intervention is necessary to become a Facilities Use Agreement—Compliance Description: § 205(d) Rate Filing: party to the proceeding. Filing per 6/19/2020 Order to be 2020–08–26_SA 2807 Entergy Arkansas- eFiling is encouraged. More detailed effective 6/19/2020. Entergy Arkansas 1st Rev GIA (J376) to information relating to filing Filed Date: 8/26/20. be effective 8/12/2020. requirements, interventions, protests, Accession Number: 20200826–5081. Filed Date: 8/26/20. service, and qualifying facilities filings Comments Due: 5 p.m. ET 9/16/20. Accession Number: 20200826–5029. can be found at: http://www.ferc.gov/ Comments Due: 5 p.m. ET 9/16/20. docs-filing/efiling/filing-req.pdf. For Docket Numbers: ER20–2148–001. other information, call (866) 208–3676 Applicants: Lexington Chenoa Wind Docket Numbers: ER20–2746–000. (toll free). For TTY, call (202) 502–8659. Farm LLC. Applicants: Riverstart Solar Park LLC. Description: Tariff Amendment: Description: Baseline eTariff Filing: Dated: August 26, 2020. Deficiency Filing Lexington Chenoa Market-Based Rate Application to be Kimberly D. Bose, Reactive Rate Schedule to be effective effective 10/26/2020. Secretary. 8/23/2020. Filed Date: 8/26/20. [FR Doc. 2020–19248 Filed 8–31–20; 8:45 am] Filed Date: 8/26/20. Accession Number: 20200826–5099. BILLING CODE 6717–01–P Accession Number: 20200826–5066. Comments Due: 5 p.m. ET 9/16/20. Comments Due: 5 p.m. ET 9/16/20. Docket Numbers: ER20–2747–000. Docket Numbers: ER20–2249–000. Applicants: Southern California DEPARTMENT OF ENERGY Applicants: Priogen Power LLC. Edison Company. Description: Amendment to June 30, Description: § 205(d) Rate Filing: DSA Federal Energy Regulatory 2020 Priogen Power LLC tariff filing. Silverstrand Grid, LLC & Cancel Letter Commission Filed Date: 8/24/20. Agreement to be effective 10/26/2020. Combined Notice of Filings Accession Number: 20200824–5131. Filed Date: 8/26/20. Comments Due: 5 p.m. ET 9/3/20. Accession Number: 20200826–5043. Take notice that the Commission has Docket Numbers: ER20–2741–000. Comments Due: 5 p.m. ET 9/16/20. received the following Natural Gas Applicants: Public Service Company Docket Numbers: ER20–2748–000.