Federal Register / Vol. 85, No. 39 / Thursday, February 27, 2020 / Notices 11361

DEPARTMENT OF ENERGY Applicants: GridLiance West LLC. The filings are accessible in the Description: Compliance filing: Commission’s eLibrary system by Federal Energy Regulatory GridLiance West 02/19/2020 clicking on the links or querying the Commission Compliance Filing to be effective 2/19/ docket number. 2020. Any person desiring to intervene or Combined Notice of Filings #1 Filed Date: 2/19/20. protest in any of the above proceedings Take notice that the Commission Accession Number: 20200219–5131. must file in accordance with Rules 211 received the following electric corporate Comments Due: 5 p.m. ET 3/11/20. and 214 of the Commission’s filings: Docket Numbers: ER20–1041–000. Regulations (18 CFR 385.211 and Applicants: Wabash Valley Power 385.214) on or before 5:00 p.m. Eastern Docket Numbers: EC20–36–000. Association, Inc. time on the specified comment date. Applicants: Tropico, LLC, Nicolis, Description: § 205(d) Rate Filing: Protests may be considered, but LLC, Gulf Coast Solar Center I, LLC, Agreement for Early Termination of intervention is necessary to become a Gulf Coast Solar Center II, LLC, Gulf Wholesale Power Supply Contracts to be party to the proceeding. Coast Solar Center III, LLC, Avalon effective 4/20/2020. eFiling is encouraged. More detailed Solar Partners, LLC. Filed Date: 2/20/20. information relating to filing Description: Supplement to February Accession Number: 20200220–5001. requirements, interventions, protests, 11, 2020 Application for Authorization Comments Due: 5 p.m. ET 3/12/20. service, and qualifying facilities filings Under Section 203 of the Federal Power Docket Numbers: ER20–1042–000. can be found at: http://www.ferc.gov/ Act (Exhibit B documents in .XLS docs-filing/efiling/filing-req.pdf. For format) of Tropico, LLC, et al. Applicants: Nevada Gold Energy LLC. Description: Compliance filing: other information, call (866) 208–3676 Filed Date: 2/20/20. (toll free). For TTY, call (202) 502–8659. Accession Number: 20200220–5078. Baseline Filing to be effective 1/1/2020. Comments Due: 5 p.m. ET 3/12/20. Filed Date: 2/20/20. Dated: February 20, 2020. Take notice that the Commission Accession Number: 20200220–5026. Nathaniel J. Davis, Sr., Comments Due: 5 p.m. ET 3/12/20. received the following electric rate Deputy Secretary. filings: Docket Numbers: ER20–1043–000. [FR Doc. 2020–03930 Filed 2–26–20; 8:45 am] Applicants: Union Electric Company, Docket Numbers: ER19–1864–003. BILLING CODE 6717–01–P Applicants: Public Service Company TG High Prairie, LLC. of Colorado. Description: Baseline eTariff Filing: Description: Compliance filing: Test Power and Station Service DEPARTMENT OF ENERGY Errata_OATT-Att N–LGIP–Order 845 Agreement to be effective 4/21/2020. Federal Energy Regulatory Compliance_ER19–1864–Test to be Filed Date: 2/20/20. Commission effective N/A. Accession Number: 20200220–5064. Comments Due: 5 p.m. ET 3/12/20. Filed Date: 2/20/20. [Docket No. CP20–50–000; Docket No. Accession Number: 20200220–5019. Docket Numbers: ER20–1044–000. CP20–51–000] Comments Due: 5 p.m. ET 3/12/20. Applicants: PJM Interconnection, Docket Numbers: ER20–270–003. L.L.C. Gas Pipeline Company, Applicants: Dynegy Oakland, LLC. Description: § 205(d) Rate Filing: First L.L.C.; Southern Natural Gas Description: Tariff Amendment: Revised ISA No. 5227; Queue No. AE1– Company, L.L.C.; Notice of Application Amended Filing—Request for 154 to be effective 1/22/2020. Filed Date: 2/20/20. Take notice that on February 7, 2020, Commission Action to be effective 1/1/ Tennessee Gas Pipeline Company, 2020. Accession Number: 20200220–5066. Comments Due: 5 p.m. ET 3/12/20. L.L.C. (Tennessee), 1001 Filed Date: 2/19/20. Street, Suite 1000, Houston, Accession Number: 20200219–5132. Docket Numbers: ER20–1045–000. 77002, filed in the above referenced Comments Due: 5 p.m. ET 3/11/20. Applicants: Tri-State Generation and docket an application pursuant to Docket Numbers: ER20–519–000; Transmission Association, Inc. section 7(c) of the Natural Gas Act, TS20–2–000. Description: § 205(d) Rate Filing: requesting authorization to construct, Applicants: Wilderness Line Unexecuted Service Agreement No. 608 install, modify, operate, and maintain Holdings, LLC. between Tri-State and Leeward to be the Evangeline Pass Expansion Project Description: Supplement to December effective 2/20/2020. located in Louisiana. Specifically, 4, 2019 Request for Waivers of the Filed Date: 2/20/20. Tennessee proposes to: (i) Construct, Standards of Conduct and Order Nos. Accession Number: 20200220–5096. operate and maintain approximately 9.1 889 and 1000 Requirements of Comments Due: 5 p.m. ET 3/12/20. miles of 36-inch-loop pipeline, along Wilderness Line Holdings, LLC. Take notice that the Commission Tennessee’s existing 24-inch Toca Filed Date: 2/19/20. received the following electric securities 529D–100 Yscloskey Lateral located in Accession Number: 20200219–5151. filings: St. Bernard Parish, Louisiana; (ii) Comments Due: 5 p.m. ET 3/11/20. Docket Numbers: ES20–16–000. construct, operate and maintain Docket Numbers: ER20–1039–000. Applicants: Horizon West approximately 4.0 miles of 36-inch-loop Applicants: GridLiance Heartland Transmission, LLC. pipeline, along Tennessee’s existing 36- LLC. Description: Application for inch 500–2 Pipeline in Plaquemines Description: Compliance filing: GLH Authorization of Issuance of Long-Term Parish, Louisiana; and (iii) construct, Compliance Filing—2/19/2020 to be Debt Securities Under Section 204 of the operate and maintain a new 23,470 effective 12/31/9998. Federal Power Act, et al. of Horizon horsepower compressor station, CS 529, Filed Date: 2/19/20. West Transmission, LLC. along Tennessee’s existing 500 line Accession Number: 20200219–5130. Filed Date: 2/19/20. system at mainline valve 529 in St. Comments Due: 5 p.m. ET 3/11/20. Accession Number: 20200219–5165. Bernard Parish, Louisiana. In addition, Docket Numbers: ER20–1040–000. Comments Due: 5 p.m. ET 3/11/20. and in conjunction with the Project,

VerDate Sep<11>2014 17:26 Feb 26, 2020 Jkt 250001 PO 00000 Frm 00032 Fmt 4703 Sfmt 4703 E:\FR\FM\27FEN1.SGM 27FEN1 lotter on DSKBCFDHB2PROD with NOTICES 11362 Federal Register / Vol. 85, No. 39 / Thursday, February 27, 2020 / Notices

Tennessee will replace certain facilities Company, L.L.C., 1001 Louisiana Street, comments in support of or in opposition including a like-for-like replacement of Suite 1000, Houston, Texas 77002, by to this project. The Commission will two 10,410 hp units at its existing telephone at (713) 420–3292 or by email consider these comments in Compressor Station 527 located in at [email protected]. determining the appropriate action to be Plaquemines Parish, Louisiana. Any questions regarding this taken, but the filing of a comment alone Tennessee also seeks to acquire lease application should be directed to Tim will not serve to make the filer a party capacity from Southern Natural Gas Hardy, Manager, Rate & Regulatory to the proceeding. The Commission’s Company, L.L.C. pursuant to a lease Affairs, Southern Natural Gas Company, rules require that persons filing agreement between the parties. L.L.C., 569 Brookwood Village, Suite comments in opposition to the project Tennessee estimates the cost of the 749, Birmingham, 35209, by provide copies of their protests only to project to be $261 million, all as more telephone at (205) 325–3668 or by email the party or parties directly involved in fully described in the application which at [email protected]. the protest. is on file with the Commission and open Pursuant to section 157.9 of the Persons who wish to comment only to public inspection. Commission’s rules, 18 CFR 157.9, on the environmental review of this Take notice that on February 7, 2020, within 90 days of this Notice the project should submit an original and Southern Natural Gas Company, L.L.C. Commission staff will either: Complete two copies of their comments to the (SNG), 569 Brookwood Village, Suite its environmental assessment (EA) and Secretary of the Commission. 749, Birmingham, Alabama 35209, filed place it into the Commission’s public Environmental commenters will be in the above referenced docket an record (eLibrary) for this proceeding; or placed on the Commission’s application pursuant to section 7(b) and issue a Notice of Schedule for environmental mailing list and will be 7(c) of the Natural Gas Act, requesting Environmental Review. If a Notice of notified of any meetings associated with authorization to construct, install, own, Schedule for Environmental Review is the Commission’s environmental review lease, operate, and maintain the SNG issued, it will indicate, among other process. Environmental commenters Evangeline Pass Expansion Project milestones, the anticipated date for the will not be required to serve copies of located in and Louisiana. Commission staff’s issuance of the final filed documents on all other parties. Specifically, SNG proposes to: (i) Install environmental impact statement (FEIS) However, the non-party commenters 22,220 hp of compression at a new or EA for this proposal. The filing of the will not receive copies of all documents compressor station in Clark County EA in the Commission’s public record filed by other parties or issued by the Mississippi; (ii) construct three new for this proceeding or the issuance of a Commission and will not have the right meter stations in Clark and Smith Notice of Schedule for Environmental to seek court review of the Counties, Mississippi and in St. Bernard Review will serve to notify federal and Commission’s final order. Parish, Louisiana; and (iii) construct state agencies of the timing for the As of the February 27, 2018 date of and/or modify certain system auxiliary completion of all necessary reviews, and the Commission’s order in Docket No. and appurtenant facilities under Section the subsequent need to complete all CP16–4–001, the Commission will 2.55(a) at existing compressor stations federal authorizations within 90 days of apply its revised practice concerning and along the pipeline corridor in the date of issuance of the Commission out-of-time motions to intervene in any Mississippi and Louisiana. SNG staff’s FEIS or EA. new Natural Gas Act section 3 or section There are two ways to become estimates the cost of the project to be 7 proceeding.1 Persons desiring to involved in the Commission’s review of $171 million. The SNG Evangeline Pass become a party to a certificate Expansion Project will add 1,100 this project. First, any person wishing to proceeding are to intervene in a timely mmcf/d of southbound capacity to the obtain legal status by becoming a party manner. If seeking to intervene out-of- existing SNG system, which SNG will to the proceedings for this project time, the movant is required to show lease to Tennessee Gas Pipeline should, on or before the comment date good cause why the time limitation Company, L.L.C., all as more fully stated below file with the Federal should be waived, and should provide described in the application which is on Energy Regulatory Commission, 888 justification by reference to factors set file with the Commission and open to First Street NE, Washington, DC 20426, forth in Rule 214(d)(1) of the public inspection. a motion to intervene in accordance 2 These filings are available for review with the requirements of the Commission’s Rules and Regulations. at the Commission in the Public Commission’s Rules of Practice and The Commission strongly encourages Reference Room or may be viewed on Procedure (18 CFR 385.214 or 385.211) electronic filings of comments, protests the Commission’s website web at http:// and the Regulations under the NGA (18 and interventions in lieu of paper using www.ferc.gov using the ‘‘eLibrary’’ link. CFR 157.10). A person obtaining party the eFiling link at http://www.ferc.gov. Enter the docket number excluding the status will be placed on the service list Persons unable to file electronically last three digits in the docket number maintained by the Secretary of the should submit an original and 3 copies field to access the document. For Commission and will receive copies of of the protest or intervention to the assistance, contact FERC at all documents filed by the applicant and Federal Energy Regulatory Commission, [email protected] or call by all other parties. A party must submit 888 First Street NE, Washington, DC toll-free, (866) 208–3676 or TTY, (202) 3 copies of filings made in the 20426. 502–8659. proceeding with the Commission and Comment Date: 5:00 p.m. Eastern Any questions regarding this must provide a copy to the applicant Time on March 13, 2020. application should be directed to Ben and to every other party. Only parties to Dated: February 21, 2020. Carranza, Director, Regulatory, the proceeding can ask for court review Kimberly D. Bose, Tennessee Gas Pipeline Company, of Commission orders in the proceeding. Secretary. L.L.C., 1001 Louisiana Street, Suite However, a person does not have to [FR Doc. 2020–04023 Filed 2–26–20; 8:45 am] 1000, Houston, Texas 77002, by intervene in order to have comments BILLING CODE 6717–01–P telephone at (713) 420–5535 or by email considered. The second way to _ at ben [email protected], or participate is by filing with the 1 Tennessee Gas Pipeline Company, L.L.C., 162 Debbie Kalisek, Senior Regulatory Secretary of the Commission, as soon as FERC 61,167 at 50 (2018). Analyst II, Tennessee Gas Pipeline possible, an original and two copies of 2 18 CFR 385.214(d)(1).

VerDate Sep<11>2014 17:26 Feb 26, 2020 Jkt 250001 PO 00000 Frm 00033 Fmt 4703 Sfmt 9990 E:\FR\FM\27FEN1.SGM 27FEN1 lotter on DSKBCFDHB2PROD with NOTICES