1St Semester of 2016
Total Page:16
File Type:pdf, Size:1020Kb
Highlights Of Accomplishment Report 1st Semester of 2016 Prepared by: Corporate Planning and Management Staff Table of Contents TRAFFIC DISCIPLINE OFFICE ……………….. 1 TRAFFIC ENFORCEMENT Income from Traffic Fines Traffic Direction & Control; Metro Manila Traffic Ticketing System 60-Kph Speed Limit Enforcement Bus Management and Dispatch System South West Integrated Provincial Transport System (SWIPTS) EDSA Bicycle-Sharing Scheme Anti-Jaywalking Operations Anti-Illegal Parking Operations Towing and Impounding Enforcement of the Yellow Lane and Closed-Door Policy Anti-Colorum and Out-of-Line Operations Operation of the TVR Redemption Facility Personnel Inspection and Monitoring Road Emergency Operations (Emergency Response and Roadside Clearing) Unified Vehicular Volume Reduction Program (UVVRP) TRAFFIC ENGINEERING Upgrading of Traffic Signal System Design and Construction of Pedestrian Footbridges Application of Thermoplastic Pavement Markings Traffic Signal Operation and Maintenance Fabrication and Manufacturing/ Maintenance/ Installation of Traffic Road Signs/ Facilities Other Special Projects TRAFFIC EDUCATION Institute of Traffic Management OTHER TRAFFIC IMPROVEMENT-RELATED SPECIAL PROJECTS/ MEASURES METROBASE FLOOD CONTROL & SEWERAGE MANAGEMENT OFFICE (FCSMO) ……………….. 19 SOLID WASTE MANAGEMENT OFFICE ……………….. 23 HEALTH, PUBLIC SAFETY & ENVIRONMENTAL PROTECTION OFFICE (HPSEPO) ……………….. 26 Enforcement of MMDA Regulation No. 96-009 or Anti-littering Law Enforcement of RA 9211 or the Tobacco Regulation Act/ No Smoking in Public Places/ MMDA-Bloomberg Project Public Safety Programs Anti-Smoke Belching Operations Metro Parkway Clearing Group OFFICE OF THE ASSISTANT GENERAL MANAGER FOR PLANNING (OAGMP) ……………….. 37 Regional Development Council (RDC) NCR Urban Renewal Program, Zoning and Land Use Planning and Shelter Service METROPOLITAN SOCIAL SERVICE OFFICE ……………….. 39 SIDEWALK CLEARING OPERATIONS ……………….. 41 GROUP (SCOG) COUNCIL SECRETARIAT ……………….. 43 MANAGEMENT AND INFORMATION ……………….. 45 SYSTEM STAFF PUBLIC AFFAIRS STAFF—PUBLIC ……………….. 46 INFORMATION CENTER PUBLIC CONCERNS AND RESPONSES ……………….. 47 MANAGEMENT UNIT Design and Layout SECURITY INTELLIGENCE AND ……………….. 51 INVESTIGATION OFFICE LEGAL AND LEGISLATIVE ……………….. 52 AFFAIRS STAFF Traffic Adjudication Division CORPORATE PLANNING AND ……………….. 54 MANAGEMENT STAFF TASK FORCE BAKLAS BILLBOARD ……………….. 56 FINANCE SERVICE ……………….. 57 Accounting Division Budget Division Internal Audit Unit ADMINISTRATIVE SERVICE ……………….. 61 Personnel Benefits Division Payroll Group Medical and Dental Clinics Personnel Transaction Division General Administrative Service Division Transport Division Staff Development Division Supply and Property Division Records Division MMDA SPECIAL PROJECTS ……………….. 73 Pasig River Ferry System MMDA Workers’ Inn Children’s Road Safety Park TRAFFIC DISCIPLINE OFFICE Traffic Discipline Office (TDO) is the MMDA unit tasked with traffic management and enforcement in Metro Manila. It has a total manpower complement of 3,496 as of June, 2016, of which 2,392 are assigned in traffic enforcement and 410 in traffic engineering. INCOME FROM TRAFFIC FINES Total income from traffic fines for 1st Semester 2016, with comparative data for 1st Semester 2015, is as follows: st st PROGRAM/PROJECT/ACTIVITY 1 Semester 2016 1 Semester 2015 INCOME FROM TRAFFIC FINES P51.160M P48.352M The 2016 first semester figure posted an increase of P2.808 million, or 5.8%, from that of 1st Semester 2015. TRAFFIC ENFORCEMENT TRAFFIC DIRECTION AND CONTROL; METRO MANILA TRAFFIC TICKETING SYSTEM As of June, 2016, a total of 2,312 traffic constables were deployed to manage traffic, of which 795 were active holders of Unified Ordinance Violation Receipts (UOVRs), who made a total of 126,426 apprehensions, or 158% more than the 80,000 target for the semester. Hereunder is a comparative chart of 2015 and 2016 first semester data on deployment and apprehensions: Target Output 1st Semester 1st Semester PROGRAM/PROJECT/ACTIVITY 2016 2016 2015 No. of Traffic Constables (TCs) - 2,312 2,281 deployed No. of active UOVR holders - 795 822 Total no. of apprehensions 40,000/ qtr. 126,426 114,546 80,000/sem ( 158%) Total number of apprehensions increased by 11,880, or 10.37%, and exceeded target output by 158%. 1| P a g e 60-KPH SPEED LIMIT ENFORCEMENT A 60-km./ hour speed limit is being enforced along the above -mentioned roads since 2011 due to the high incidence of road accidents on Commonwealth Ave. and illegal drag racing/ reckless driving on Macapagal Ave. Macapagal Ave. Commonwealth Ave. Target Output 1st Semester 1st Semester PROGRAM/ PROJECT/ ACTIVITY 2016 2016 2015 Commonwealth Ave. Speed Limit 2,100/ qtr. 3,242 4,723 Enforcement 4,200/ sem. Macapagal Ave. Speed Limit 2,684 1,960 Enforcement Total 5,926 6,683 (141.09%) Bus Management & Dispatch System (BMDS) This scheme was completed during 1st Quarter 2012 as an improvement to the former Organized Bus Route (OBR) project. BMDS controls bus dispatch in the 4 major BMDS terminals in Baclaran, Alabang, Fairview and Malabon and in 10 satellite stations to improve city bus operation particularly along EDSA. Bus drivers were registered in the system thru fingerprint scanners. PROGRAM/ PROJECT/ ACTIVITY Target Output 1st Semester 1st Semester 2016 2016 2015 Total Bus Dispatch recorded for the 946,400 bus 1,223,822 1,150,018 semester trips/ sem. (129.31%) Average Bus Dispatch recorded per day 5,200 ave. daily 6,725 6,350 bus trips/ qtr ( 120.67%) Drivers registered thru fingerprint 150/ qtr. 658 588 scanners 300/ sem. (219.33%) No. of BMDS-related apprehensions 25/ qtr. 2,340 345 50/ sem. ( 4,680%) 2| P a g e SOUTHWEST INTEGRATED PROVINCIAL TRANSPORT SYSTEM (SWIPTS) The SWIPTS Terminal at Coastal Mall was launched on August 6, 2013 to serve as a temporary terminal for provincial buses coming from and going to Cavite and Batangas until a permanent South-West ITS (Integrated Transport System) Terminal is built. 1st Semester 1st Semester PROGRAM/ PROJECT/ ACTIVITY Target Output 2016 2016 2015 Total no. of bus trips recorded/ 54,600/ sem 56,298 98,362 dispatched (103.11%) Decline in number of bus trips is attributed to the bypassing of the Terminal by provincial buses even as LTFRB Memo Circular No. 2013-004 directs public utility buses coming from provinces south of Metro Manila to end their route at the SWIPTS Terminal. EDSA BICYCLE-SHARING SCHEME The MMDA started operating its EDSA-Magallanes to Ayala bike lane on January 17, 2013 but its operation was suspended as of 1st Quarter 2016 due to lack of personnel. The Ortigas bike lane from Santolan to White Plains/ Temple Drive was opened on March 26, 2014 and the Roxas Blvd. bike lane on February 9, 2015. The Ortigas bike lane has one bike shelter while the Roxas Blvd. bike lane has three – at T.M. Kalaw, Gwapotel-Port Area and Rajah Sulayman. Target Output 1st Semester 1st Semester PROGRAM/ PROJECT/ ACTIVITY 2016 2016 2015 Comparative No. of Bike Borrowings 400/ qtr. 1,593 1,126 800/ sem. (199%) The TDO-Bike Lane Program Office also facilitated seven (7) bicycle-awareness and promotion events on the following occasions during 1st Semester 2016: February 7 Roxas Blvd. Road Sharing Carless Day, Feb. 25 30th EDSA People Power Anniversary, March 6 Commonwealth QC Bayanihan sa Daan, March 20 PNP Camp Crame Bisikleta Kontra Droga, April 24 Makati City Hall Earth Day, May 29 2nd QC Bike Day, and June 22 MM Shake Drill-Guadalupe Super Ferry. 3| P a g e ANTI-JAYWALKING OPERATIONS Four (4) Anti-Jaywalking Unit (AJU) groups conducted operations along EDSA/ Quezon Ave., EDSA-Taft Ave. (Pasay City), EDSA-Ortigas and EDSA-Ayala during 1st Semester 2016 and apprehended a total of 16,533 violators. Target Output 1st Semester 1st Semester PROGRAM/ PROJECT/ ACTIVITY 2016 2016 2015 Settled/ Paid fine 2,800/ sem. 2,069 1,525 Unsettled 14,464 19,865 Total 16,533 (590%) 21,486 ANTI-ILLEGAL PARKING OPERATIONS Twelve (12) personnel of the Parking Enforcement Team made the rounds of major metr o streets and issued citation tickets to violators whose vehicles were parked beyond the designated sidewalk boundary marker. Target Output 1st Semester PROGRAM/ PROJECT/ ACTIVITY 1st Semester 2016 2016 2015 Total no. of apprehension 600/ qtr. 1,385 2,283 1,200/ sem. (115.41%) Towing and Impounding The MMDA maintains two (2) impounding areas for Metro Manila – one at the Ultra in Pasig City and another at Tumana in Marikina City. Illegally parked, out-of-line and colorum vehicles are subject to towing and impounding. Target Output 2016 1st Semester 2016 Impounded 100% of stalled vehicles 9,485 Released - 8,417 4| P a g e ENFORCEMENT OF THE YELLOW LANE RULE & CLOSED-DOOR POLICY The Yellow Lane (designated bus and PUJ lanes) Rule and Closed Door Policy are strictly implemented along EDSA to help improve traffic flow and promote passenger safety. PROGRAM/ PROJECT/ Target Output 2016 1st Semester 2016 1st Semester 2015 ACTIVITY Yellow Lane Rule 1,000/ qtr 3,663 2,769 2,000/ sem. (183.15%) Closed-Door Policy 350/ qtr. 1,082 753 700/ sem. (154.57%) ANTI-COLORUM & OUT-OF-LINE OPERATIONS Public utility vehicles without LTFRB franchise and those op- erating outside their authorized routes contribute to traffic congestion and unduly compete with legal transport opera- tors. PROGRAM/ PROJECT/ Target Output 2016 1st Semester 2016 1st Semester 2015 ACTIVITY Anti-Colorum 100% apprehension 199 260 Out-of-Line of such vehicles 171 314 5| P a g e OPERATION OF THE TVR REDEMPTION FACILITY he Traffic Ticket Redemption Facility along Orense St. operates from 8 a.m. to 5 p.m. Mondays thru Saturdays. Traffic ticket redemption, applications for traffic clearances, release of impounded vehicles and redemption of confiscated items are transacted/ received/ processed here. Target Output 1st Semester 1st Semester PROGRAM/ PROJECT/ ACTIVITY 2016 2016 2015 Traffic clearance applications 10,890/ qtr. 37,280 34,591 processed 21,780/ sem (171.16%) Traffic clearances released - 36,020 33,976 (96.62% of processed) Applications received/ processed for 150/ qtr. 336 534 release of impounded vehicles 300/ sem. (112%) Impounded vehicles released after - 318 405 penalty payment/ with resolution (94.64% of from the Traffic Adjudication Div.