Route Map to Kindai University S Main Campus

Total Page:16

File Type:pdf, Size:1020Kb

Route Map to Kindai University S Main Campus How to Get to KINDAI University’s Main Campus Using Public Transportation Kansai Kintetsu Osaka Line International Airport Limousine Bus Kintetsu (Local Train) Airport Bus (54 min.) Uehonmachi (11 min.) Terminal Stop Number 7 JR Kyoto Line JR Shin-Osaka (Local Train) JR Osaka (Bullet Train Staition) Loop Line (4 min.) Bound for Kintetsu JR Kyoto Line JR Osaka Kyobashi, (Special Rapid Turuhashi Nagase KINDAI and Tennoji Service Train) Kintets University JR Kyoto Osaka Line On Foot (4 min.) (15 min.) (Local Train) (10 min.) Main Campus JR/Kintesu (10 min.) JR Osaka Loop Line JR Osaka Tsuruhashi Bound for Kyobashi, Turuhashi and Tennoji (15 min.) JR Osaka Loop Line JR Tennoji Bound for Tsuruhashi, Kyobashi and Osaka (6 min.) Kintetsu Nara Line (Any Train) On Foot (20 min.) Kintetsu (6 min.) Kintetsu Osaka-Namba or Kintetsu Nara Line (Local Train) Yaenosato By Taxi (5 min.) (16 min.) Route Map to Kindai University’s Main Campus JR Kyoto Line Hankyu Railways Osaka Subway Midosuji Line Shin-Kobe Shin-Osaka JR Shinkansen(Bullet Train) Kyoto Sannomiya Umeda Osaka Kintetsu JR Kobe Line Ishikiri Kyobashi Hanshin Rallways JR Tozai Line JR Gakkentoshi Line Osaka- JR Osaka Loop Line Namba Uehonmachi Tsuruhshi Fuse Ishikiri Kintetsu Nara Yaenosato Namba Kintetsu Nara Line Shuntokumichi KINDAI University JR Nara Tennoji Main Campus Shin-Imamiya Nagase JR Yamatoji Line Kansai International Airport Kintetsu Osaka Line Area Map From Nagase Station (Kintetsu Osaka Line) 10 min. Walk ←Osaka-Namba KINDAI SoftBank West Gate University Risona Bank Main 〒 Campus Post Post Office 〒 Office Cigaratte Shop Kintetsu Nagase Station Kintetsu OsakaLine Yao→ From Yaenosato Station (Kintetsu Nara Line) 20 min. Walk/5 min. Taxi Ride Kintetsu Yaenosato Station Kintetsu Nara Line ←Osaka-Namba Kintetsu Nara→ Hospital Taxi Terminal Hospital Gusto Restaurant KINDAI KINDAI University University E-Campus West Gate Main Campus East Main Gate.
Recommended publications
  • Odaigahara, Yoshino-Kumano National Park
    Odaigahara, Yoshino-Kumano National Park ▲ Moss colony in Nishi-Odai Seed of Ilex geniculata Autumn foliage in Nishi-Odai Masaki pass Daijagura What is the Nishi-Odai Regulated Utilization Area? Odaigahara Driveway Precious nature remains in Odaigahara. Among them is ▲ Nishi-Odai, one of the most beautiful natural beech forests in western Japan, where you can experience the calm and Nishi-Odai Regulated ▲ Odaigahara Parking Lot and Utilization Area Odaigahara Visitor Center pristine nature. (lecture location) In order to preserve this beautiful natural environment and Mt.Hidegatake take over it in the future, Nishi-Odai has been designated as Kaitaku junction ▲ Japan's first "Regulated Utilization Area". To maintain a favorable natural environment and provide a Sakasa Pass Higashi-Odai high-quality nature experience, the number of users is (Out of regulation) Regulated Utilization Area restricted in the “Regulated Utilization Area”. Trail Masakigahara Drive way Field In order to enter the Nishi-Odai Regulated Utilization Area, it Gate Daijagura is necessary to carry out procedures in advance and follow "Regulated Utilization Area" designated area This map is based on the Digital Topographic Map 25000 published by Geospatial Information Authority of Japan established rules. (About 450ha) * You can enter the Higashi-Odai, such as Mt. Hidegatake or Daijagura, without Kinki Regional Environment Office any procedures. Ministry of the Environment Natural environment of Nishi-Odai Nishi-Odai is surrounded by natural forests mainly composed of beech, and you can experience the calm and pristine nature. Beech forests are home to many wildlife, such as Japanese deer, Wrens, Japanese robins, and Odaigahara salamanders.
    [Show full text]
  • List of Literacy, Reading & Writing, and Japanese-Language Exchange
    List of literacy, reading & writing, and Japanese-language exchange classes held in Osaka City (Provisional) Ward Class Venue Class Schedule Nearest Station Inquiry Nakatsu Elementary School • 700 m north of Exit 5, Nakatsu Sta., Subway Nakatsu Elementary School Nakatsu Elementary School Lifelong Learning Room Fridays (evening) Midosuji Line 2F Multi-purpose Room TEL: 06–6371–2047 Nakatsu Japanese Literacy and 19:00–20:30 • Nakatsu Station, Hankyu Kobe Line, 3-34-18 Nakatsu, Kita-ku, Osaka (Vice-Principal) Language Exchange Class Takarazuka Line Wednesdays (evening) Kita 18:45–20:45 • Near East Ticket Gate, Kitashinchi Sta., JR Tozai Line General Lifelong Learning Center • JR Osaka Sta. General Lifelong Learning Yomikaki-Chaya 2nd Study Room, 6F, Osaka Ekimae Dai-2 Thursdays (morning) • Nishi-Umeda Sta., Subway Yotsubashi Line Center (Reading/writing) Bldg. 10:00–12:00 • Higashi-Umeda Sta., Subway Tanimachi Line TEL: 06–6345–5004 1-2-2-500 Umeda, Kita-ku, Osaka • Umeda Sta., Subway Midosuji Line / Hankyu Fridays (afternoon) Line / Hanshin Line 14:00–16:00 Minamioe Elementary School Minamioe Elementary School Minamioe Elementary School Lifelong Learning Room Tuesdays (morning) • 200 m south west of Exit 8, Tanimachi 4- Chuo 1F Conference Room TEL: 06–6942–0501 Minamioe Japanese Literacy 10:00–11:30 chome Sta., Subway Tanimachi Line / Chuo Line 1-3-3 Nonimbashi, Chuo-ku, Osaka (Vice-Principal) Class Tateba Elementary School Tateba Elementary School (Formerly) • 500 m south west of Sakuragawa Sta., Subway Osaka City Board of Education Lifelong
    [Show full text]
  • Transport Information Guide Tug of War Shinjo Kenmin Athletic Field 1
    Transport Information Guide Sport & Discipline Venue Nara Pref. Shinjo Kenmin Katsuragi City Athletic Field 1 292-3 Shinmachi, Katsuragi City, Nara www.city.katsuragi.nara.jp/index.cfm/17,2969,80,html ※There is an other venue. Please check each venue. Tug of War ・ Kashiba City General Gymnasium ■Recommended route to the venue From Osaka Station (Center Village) to the venue ( OP Original Kansai One Pass usable section WP Original JR Kansai Wide Area Pass usable section) Osaka Oji Yamato-Shinjo Venue Sta. Sta. Sta Traffic Mode Line Depart Arrive Route Time pass Osaka Loop Line / Yamatoji Line Train JR Osaka Sta. Oji Sta. OP WP 42min. for Kamo Wakayama Line Train JR Oji Sta. Yamato-Shinjo Sta. OP WP 24min. for Gojo Shuttle Yamato-Shinjo Sta. Venue 5min. bus Osaka Tennoji Osaka-Abenobashi Sta. Sta. Sta. Shakudo Kintetsu-Shinjo Venue Sta. Sta. Traffic Mode Line Depart Arrive Route Time pass Osaka Loop Line Train JR Osaka Sta. Tennoji Sta. OP WP for Tennoji 16min. ※5-minute walk to Kintetsu Line. Kintetsu Minami-Osaka Line Train Osaka-Abenobashi Sta. Shakudo Sta. OP 30min. Railway for Gose Kintetsu Gose Line Train Shakudo Sta. Kintetsu-Shinjo Sta. OP 5min. Railway for Kintetsu-Gose Shuttle Kintetsu-Shinjo Sta. Venue 5min. bus From Masters Village Nara to the venue Masters Village Nara: "Nara Visitor Center & Inn” ※ 16-minute walk from JR Nara Station, 8-minute walk from Kintetsu Nara Station Nara Visitor Nara Oji Yamato-Shinjo Venue Center & Inn Sta. Sta. Sta Traffic Mode Line Depart Arrive Route Time pass Walking Masters Village Nara Sta.
    [Show full text]
  • Osaka Train Route Map Lastupdate May.22.2021 Kanmaki Minase Takatsuki Tokaido(Kyoto) Line Y E
    Shimamoto X Osaka Train Route map LastUpdate May.22.2021 Kanmaki Minase Takatsuki Tokaido(Kyoto) Line Y e n Saitonishi i Z Hankyu Minoo Line L o Settsutonda Takatsukishi t i Minoo a Toyokawa Tonda Kuzuha S A l i Hankyu-Takarazuka Line a JRSojiji r o n O Makiochi o Handaibyoinmae Gotenyama m Ikeda Sakurai a Sojiji Makino k a IshibashiHandaimae Kitasenri s Koenhigashiguchi Ibaraki Ibarakishi Hirakatashi O ShibaharaHandaimae Shoji Unobe Hirakatakoen Miyanosaka OsakaMonorail Line Hotarugaike Senrichuo Yamada BanpakuKinenKoen Minamiibaraki Hoshigaoka B Momoyamadai Minamisenri Senrioka Kozenji e n i L Osakakuko Toyonaka Sawaragi Muranno Nagao o n e a t Ryokochikoen n i a L K i Okamachi r Senriyama Kishibe Shojaku Settsushi Settsu Korien Kozu Fujisaka n n a e e h i n S i e e L n u K i y o L Sone Kandaimae e Katanoshi Tsuda k e k n n o i e u t a L y r o k H r y n a Osaka International a K k e Toyotsu h Kawachinomori u a n i i u u s Airport(ITM) e Hankyu Takarazuka Line y L o t K k l a i t n t a i a r K c Suita H o Hoshida Kawachiiwafune c n Tokaido(Kyoto) Line o e Hattoritenjin Aikawa M Minamisettsu Neyagawashi Kisaichi e a f k f Suita Itakano a s e O e Esaka MinamiSuita Neyagawakoen r r Zuiko4 P P N Shonai Kamishinjo Sonoda Higashiyodogawa Shimoshinjo Kayashima o o Shinobugaoka Dainichi t g Tokaido-Shinkansen R Imazatosuji Line o o Higashimikuni Daidotoyosato Moriguchi Owada y y Mikuni Awaji Taishibashiimaichi K Kashima Kanzakigawa Moriguchishi H Kadomashi P JRAwaji Nishisanso Furukawabashi ShinOsaka JR Osakahigashi Line Q Sozenji Senbayashiomiya
    [Show full text]
  • Kyoto City Subway Route Map
    Kurama Iwakura Eizan Kurama Line North Kibuneguchi K Kokusaikaikan 01 (Kyoto International Conference Center) Kitayama K K 03 02 Matsugasaki K Kitaoji Yase-Hieizanguchi 04 Takaragaike Eizan Line Karasuma Line K 05 Kuramaguchi to Omi-Maiko Kitano-Hakubaicho K Randen Kitano Line Demachiyanagi Imadegawa K Saga Arashiyama Uzumasa 06 Hanazono Emmachi to Kameoka Sakamoto Jingu-marutamachi JR Kosei Line Sagano Scenic Railway Torokko Saga Marutamachi K 07 Lake Katabiranotsuji Biwa KamisakaemachiHamaotsu Arashiyama Sanjo Nijo-jo mae Karasuma Oike Uzumasa Tenjingawa Nisioji Oike Nijo Kyoto Shiyakusho-mae (Kyoto City Hall) Sanjo Keihan Higashiyama Keage (Nijo-jo Castle) K Randen-Saga 08 Otani T T T T T T T T T Misasagi 17 16 15 14 13 12 11 10 09 Matsuo- Omiya Karasuma T Keihan-Yamashina Shinomiya taisha Oiwake Randen Tenjingawa Sai-in Gion-shijo 08 Hankyu Arashiyama Line Sai Keihan Ishiyama-sakamoto Line K Kawaramachi Keihan Keishin Line Randen Arashiyama Line Shijo- Shijo to Maibara Omiya 09 T Nishikyogoku Yamashina Hankyu Kyoto Line 07 Tambaguchi Ishiyamadera K Gojo Kamogawa River Kiyomizu-gojo 10 JR Biwako Line Katsura T Higashino JR Sagano Line Kyoto Shichijo 06 K Nishioji to Umeda(Osaka) 11 Tokaido Shinkansen to Nagoya Tofukuji T Nagitsuji Toji K Kujo Fushimi-inari 05 Katsuragawa 12 Inari K Tozai Line T Ono (Kintetsu)Jujo Jujo JR Nara Line 04 Mukomachi 13 T K Keihan Main Line T Daigo Kamitobaguchi 14 Kuinabashi 03 T JR Kyoto Line K Takeda 02 Ishida 15 T Fushimi Momoyama 01 Rokujizo Chushojima Kintetsu-Tambabashi Rokujizo Tambabashi Momoyamagoryomae
    [Show full text]
  • Operating Results by Business Segment — —
    Introduction Business Strategy and Operating Results ESG Section Financial Section The President’s Message Medium-Term Management Plan Operating Results by Business Segment — — Operating Results by Business Segment Transportation Operations JR-West’s transportation operations segment consists of railway Railway Revenues operations and small-scale bus and ferry services. Its railway operations encompass 18 prefectures in the western half of Japan’s Sanyo Shinkansen main island of Honshu and the northern tip of Kyushu, covering a total service area of approximately 104,000 square kilometers. Other Conventional Lines The service area has a population of approximately 43 million people, equivalent to 34% of the population of Japan. The railway network comprises a total of 1,222 railway stations, with an operating route length of 5,015.7 kilometers, almost 20% of passenger railway kilometerage in Japan. This network includes the Sanyo Kansai Urban Area Shinkansen, a high-speed intercity railway line; the Kansai Urban (including the Urban Network) Area, serving the Kyoto–Osaka–Kobe metropolitan area; and other conventional railway lines (excluding the three JR-West branch offices in Kyoto, Osaka, and Kobe). The Sanyo Shinkansen is a high-speed intercity to the major stations of the Sanyo Shinkansen passenger service between Shin-Osaka Station in Line, such as Okayama, Hiroshima, and Hakata, Osaka and Hakata Station in Fukuoka in northern without changing trains. These services are Kyushu. The line runs through several major cities enabled by direct services with the services of Sanyo in western Japan, including Kobe, Okayama, the Tokaido Shinkansen Line, which Central Shinkansen Hiroshima, and Kitakyushu.
    [Show full text]
  • Itinerary Japan
    Transportation By Train Date Destination From To Remark w/o JR Pass JR Pass Station Track Time Station Track Time TOTAL Monday, 16 Nov 15 Ueno Park Narita Int Airport 09.15 Tokyo 1 10.17 Ltd. Exp Narita Express 8 ¥ 2,820 ¥ ‐ Tokyo 7 10.26 Ueno 6 10.31 JR Joban Line for TSUCHIURA Sightseeing Ueno 12.36 Akihabara 12.39¥ 140 ¥ ‐ JR Yamanote Line for OSAKI Osaka Akihabara 14.20 Tokyo 14.23 JR Keihin‐Tohoku/Negishi Line Rapid for ISOGO Tokyo 17 14.33 Shin‐Osaka 24 17.26 Shinkansen Hikari 517 Shin‐Osaka 16 17.38 Osaka 4 17.42 ¥ 13,940 ¥ ‐ JR Special Rapid Service for BANSHUAKO Osaka 2 17.45 Kyobashi (Osaka) 17.51 JR Kansai Airport Rapid Service for KYOBASHI Kyobashi (Osaka) 17.53 Teradacho 18.04 Osaka Loop Line for TENNOJI Shinsaibashi Shopping Street Teradacho 19.01 Tennoji 14 19.03 ¥ 120 ¥ ‐ Osaka Loop Line for TENNOJI Tennoji 19.09 Shinsaibashi 19.17 ¥ 240 ¥ 240 Osaka City Subway Midosuji Line for SHIN‐OSAKA Rest at Hotel Shinsaibashi 21.05 Tennoji 21.14 ¥ 240 ¥ 240 Osaka City Subway Midosuji Line for TENNOJI Tennoji 11 21.20 Teradacho 21.22 ¥ 120 ¥ ‐ Osaka Loop Line for OSAKA TOTAL ¥ 17,620 ¥ 480 Tuesday, 17 Nov 15 Osaka Castle Teradacho 08.33 Osakajokoen 08.44 ¥ 160 ¥ ‐ Osaka Loop Line for SAKURAJIMA Kiyomizudera Osakajokoen 12.03 Osaka 1 12.12 ¥ 160 ¥ ‐ Osaka Loop Line for OSAKA Drop Luggage at Locker Coin of Osaka Station Osaka 7 12.26 Shin‐Osaka 14 12.30 JR Kyoto Line Local for TAKATSUKI ¥ 2,610 ¥ ‐ Shin‐Osaka 25 12.40 Kyoto 11 12.55 Shinkansen Hikari 468 Kyoto 9 13.07 Tofukuji 13.09 ¥ 140 ¥ ‐ JR Nara Line for JOYO Tofukuji 13.13 Kiyomizu‐gojo 13.16 ¥ 150 ¥ 150 Keihan Main Line Sub‐Exp.
    [Show full text]
  • JICA Experts Study for the Operations and Maintenance Structure Of
    Republic of India Mumbai Metro Rail Corporation JICA Experts Study for the Operations and Maintenance Structure of Mumbai Metro Line 3 Project in India Final Report October 2015 Japan International Cooperation Agency (JICA) Japan International Consultants for Transportation Co., Ltd. PADECO Co., Ltd. 4R Metro Development Co., Ltd JR 15-046 Table of Contents Chapter 1 General issues for the management of urban railways .............................. 1 1.1 Introduction ........................................................................................................................ 1 1.2 Management of urban railways ........................................................................................ 4 1.3 Construction of urban railways ...................................................................................... 12 1.4 Governing Structure ........................................................................................................ 17 1.5 Business Model ................................................................................................................. 21 Chapter 2 Present situation in metro projects ............................................................ 23 2.1 General .............................................................................................................................. 23 2.2 Metro projects in the world ............................................................................................. 23 2.3 Summary........................................................................................................................
    [Show full text]
  • Linking People, Building Communities Annual Report 2012
    LINKING People, BUILDING Communities Annual Report 2012 WEST JAPAN RAILWAY COMPANY with SAFE RAILWAYS West Japan Railway Company (JR-West) is one of the six passenger railway transport companies formed by the split-up and privatization of Japanese National Railways (JNR) in 1987. Its mainstay railway business operates a network of lines with a total route length of approximately 5,000 kilometers, extending through 18 prefectures that account for around one-fifth of Japan’s land area. Railway systems in Japan evolved as a natural consequence of the cities that formed through the accumulation of people in the limited number of plains throughout the country. Joined like links in a chain, the geographical distribution of these cities has created a solid demand base that accounts for one-fourth of all passenger volume in Japan. While railway operations remain the core of its business, JR-West also aims to make the most of the assets that are part of its network of stations and railways to develop its retail, real estate, and hotel businesses. Contents 02 — Overview 04 — Consolidated Financial Highlights 06 — The President’s Message 09 — Medium-Term Management Plan 10 — Special Feature: LINKING People, BUILDING Communities The special feature focuses on JR-West’s initiatives for two major projects—direct services with the Kyushu Shinkansen Line and Osaka Station City. 14 — Operating Results by Business Segment 24 — Corporate Social Responsibility 24 CSR Overview 26 Safety Measures 28 Implementing Earthquake and Tsunami Countermeasures 30 Environment
    [Show full text]
  • “JR-West Group Medium-Term Management Plan 2017” Overview of Major Initiatives 1 【Safety】
    “JR-West Group Medium-Term Management Plan 2017” Overview of Major Initiatives 1 【Safety】 Legend As of May 8, 2017 Black text: Projects indicated at previous update (May 2, 2016) Red text: Projects added since previous update ※Timing has not yet been determined FY2014.3 FY2015.3 FY2016.3 FY2017.3 FY2018.3 FY2019.3~ Strengthen track facilities When replacing track facilities, we are strengthening facilities by transitioning from standard-length rails to continuous welded rails, (prolongation of rail length replacing wood ties with prestressed concrete ties, and using plastic ties on bridges. Investment in with welding , etc.) maintenance to sustain and Maintain safety and To secure safe, reliable transportation service on the Sanyo Shinkansen, we will evaluate expected future risks that could affect structures and implement enhance the increase durability of Sanyo countermeasures, such as reinforcement measures. functions of Shinkansen structures existing facilities Complete replacement of When replacing facilities, we will strive to improve riding comfort by transitioning to systems utilizing a smooth brake control method Sanyo Shinkansen ATC that is suitable for the characteristics of the rolling stock. system: "New ATC" ▼Spring 2017: Transition to new control method As an addition to existing ATS functions, this system backs up crew members through means such as preventing excessive speed and stop-light violation or preventing incorrect door operation and excessive speed in planned speed reduction zone associated with construction work. We have approved the introduction of this system on On-board oriented train the Sanyo Line (Shiraichi–Iwakuni) in the Hiroshima area. We continue to consider the possibility of installing this system on the Fukuchiyama Line (Amagasaki– control system (ground Sasayamaguchi) and Tokaido/Sanyo Line (Maibara–Kamigori) in the Kansai Urban Area.
    [Show full text]
  • Namba Parks Osaka, Japan
    Namba Parks Osaka, Japan Project Type: Mixed-Use/Multi-Use Case No: C035006 Year: 2005 SUMMARY Namba Parks is an urban lifestyle center fitted onto a 3.37-hectare (8.33-acre) underutilized parcel in the heart of Osaka’s central business district (CBD). The site is part of a narrow strip of land owned by Nankai Electric, which has been progressively developing it over the course of half a century, starting from the densest end. Surrounded by raised railroad tracks to the east and an urban boulevard and elevated viaduct to the west, Namba Parks offers green space atop an eight-level assemblage of 108 shops and restaurants arranged to form an indoor-outdoor urban retail and entertainment complex visually anchored by a 30-floor office tower. FEATURES Pedestrian-Friendly Design Transit-Oriented Development Infill Development Shared Parking Underground Parking Namba Parks Osaka, Japan Project Type: Mixed Use/Multiuse Volume 35 Number 06 January–March 2005 Case Number: C035006 PROJECT TYPE Namba Parks is an urban lifestyle center fitted onto a 3.37-hectare (8.33-acre) underutilized parcel in the heart of Osaka’s central business district (CBD). The site is part of a narrow strip of land owned by Nankai Electric, which has been progressively developing it over the course of half a century, starting from the densest end. Surrounded by raised railroad tracks to the east and an urban boulevard and elevated viaduct to the west, Namba Parks offers green space atop an eight-level assemblage of 108 shops and restaurants arranged to form an indoor-outdoor urban retail and entertainment complex visually anchored by a 30-floor office tower.
    [Show full text]
  • Operating Results by Business Segment (PDF, 787KB)
    operating reSuLtS By BuSiness Segment Our Transportation Network contributes to the development of the Community we Serve. Transportation Operations oOPERATINGperating rRESULTSeSuLTs JR-West’s Transportation Operations segment consists of railway operations Billions of yen Billions of yen and small-scale bus and ferry services. Its railway operations encompass 18 1,000 200 prefectures in the western half of Japan’s main island of Honshu and the northern tip of Kyushu, covering a total service area of approximately 104,000 800 150 square kilometers. The service area has a population of approximately 43 million people, equivalent to 34% of the population of Japan. The railway 600 100 network comprises a total of 1,222 railway stations, with an operating route length of 5,012.7 kilometers, almost 20% of passenger railway kilometerage in Japan. This network includes the Sanyo Shinkansen, a high-speed intercity 400 50 railway line; the Urban Network, serving the Kyoto–Osaka–Kobe metropolitan ~ area; and other conventional railway lines (excluding the three JR-West branch 0 07 08 09 10 11 0 offices in Kyoto, Osaka, and Kobe). In fiscal 2011, operating revenues in this Operating Revenues Operating Income (right) segment were up 1.1% year on year, to ¥806.4 billion. While demand for domestic tourism declined following the Great East Japan Earthquake, which occurred on March 11, 2011, this decline was more than offset by the revenues generated due to the strong economic recovery trend seen up until the earth- quake, which contributed to an overall rise in revenues. Operating income also increased, rising 35.3%, to ¥61.1 billion.
    [Show full text]