2007. 4 Province IAIL3 Goods Procurement Gather Worksheet

Goods (Within 24 months) Unit: 000' Public Disclosure Authorized Procurument Method Quantity of Contract Cost ______USD RM B ICB NCB 8 3625. 00 27550.00 Shopping 29 1253. 71 9528. 20 Total 37 4878. 71 37078.20 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Henan Province IAIL3 goods Procurement by24 Months

Package rcrmn-ehdo Prior/Posteri cost Issuing of Bid Contract Exp Bid No. No. content category 1GB N Shop Start/ No CB NB ig or Review RMB ('000) USD ('000) BD opening signing on(m

I centrifugal pump 60csets, axial pump water conservancy I Prior Review 2400.00 315.79 Jul-07 Aug-07 Sep-07 Oct

2 QJ diving pump 1035pcs water conservancy I Prior Review 3380.00 444.74 Jul-07 Aug-07 Sep-07 Oct

3 QY diving pump 1037pcs, QS diving water conservancy V Prior Review 3550.00 467.11 Jul-07 Aug-07 Sep-07 Oct __ __ pum p 6l5pcs______4 agricultural low-voltage line383.1km water conservancy Posterior 1680.00 221.05 Jul-07 Aug-07 Sep-07 Oct 5 agricultural cable line 276.89km water conservancy Review 3180.00 418.42 Jul-07 Aug-07 Sep-07 Oct PVC (250mm/0.32Mpa) 1.2km Jul-07 Aug-07 Sep-07 Oct PVC (200mm/0.32Mpa) 0.7km Jul-07 Aug-07 Sep-07 Oct HNOOOIH7001 PVC (160mm/0.32Mpa) 0.7km Jul-07 Aug-07 Sep-07 Oct 6 water conservancy V Prior Review 4820.00 634.21 PVC (125mm/0.32Mpa) 45km Jul-07 Aug-07 Sep-07 Oct PVC (1 lOmm/0.32Mpa) 318.5km Jul-07 Aug-07 Sep-07 Oct PVC (9Omm/0.32Mpa) 7.5km Jul-07 Aug-07 Sep-07 Oct 7 transformer 95 sets water conservancy - Posterior 1700.00 223.68 Jul-07 Aug-07 Sep-07 Oct- pvc movable above-ground soft pipe 65mm 102km 7600.00 Jul-07 Aug-07 Sep-07 Oct-

8 pvc movable above-ground soft pipe water conservancy I Prior Review 1000. 00 Jul-07 Aug-07 Sep-07 Oct- 100mm 259kmI pvc movable above-ground soft pipe Jul-07 Aug-07 Sep-07 Oct- 75mm972km Il0Ag0 Se 7 Oc HNLYYSH7001 I sapling 90kilo-trunk agriculture V Posterior 360.00 46.75 2007.9 2007.10 2007.11 200, HNLYYCH7001 I sapling 90kilo-trunk agriculture I Posterior 360.00 46.75 2007.9 2007.10 2007.11 200, HNLYSXH7001 I sapling7Okilo-trunk agriculture I/ Posterior 280.00 36.36 2007.9 2007.10 2007.11 200W HNZMRNH7001 I saplingl2Okilo-trunk agriculture -I Posterior 362.00 47.01 2007.9 2007.10 2007.11 2001 HNZMPYH7001 1 sapling 80kilo-trunk agriculture I Posterior 260 33.77 2007.9 2007.10 2007.11 200O 1 saplingl6Okilo-trunk agriculture I Posterior 650.00 84.42 2007.9 2007.10 2007.11 2M00 HNKFKFH7001 telegraph pole: 210, needle-type bottle, ater-saving irrigation 2 switch box,ware, so on. i Posterior 200.00 25.97 2007.5 2007.6 2007.6 2007. 1 sapling 150kilo-trunk agriculture V Posterior 600.00 77.92 2007.9 2007.10 2007.11 2008

HNKFLKH7001 telegraph pole: 166, needle-type bottle, ater-saving irrigation - Posterior 310. 00 40. 26 2007.9 2007.10 2007.11 2008 Henan Province IAIL3 goods Procurement by24 Months

Package Method of procurement Prior/Posteri cost Issuing of Bid Contract Exp Bid No.BdN. |akgeNo. contentcnetctgr | category ICB j NCB S Soho or Reviewzi RMB>

young white dragon' soft tube: 3 55km fater-saving iffigation - Posterior 110 14. 29 2007. 06 2007. 07 2007. 08 2007.

HNDZ70 1 water speed gauge I set rater-saving irrigation V Posterior 4.00 0.52 2007.9 2007.10 2007.11 20( HNPDRZH700 1______2 saplingl35kilo-trunk agriculture - .1 Posterior 560 72.73 2007.9 2007.10 2007.11 20( HNSQSXH7001 1 sapling 94kilo-trunk agriculture - V Posterior 310 40.26 2007.9 2007.10 2007.11 20C HNSQMQH7001 1 saplingl 16kilo-trunk agriculture - Posterior 464.0 60.26 2007.9 2007.10 2007.11 20C

HNSQLYH7001 1 sapling 106kilo-trunk agriculture _ Posterior 340. 00 44.16 2007.9 2007.10 2007.11 20C HNSQNLH7001 1 sapling 70 kilo-trunk agriculture V Posterior 250 32.47 2007.9 2007.10 2007.11 200 1 instrument and equipments 1 Osets/pcs water-savng - Posterior 68.00 8.83 2007.9 2007.10 2007.11 200 2 saplingl45kilo-trunk agriculture - Posterior 300. 00 38.96 2007.9 2007.10 2007.11 200

HNXYPQH7001 1 sapling lOOkilo-trunk agriculture _ _ Posterior 200. 00 25.97 2007.9 2007.10 2007.11 200 1 water speed gauge 2sets water-saving I/ Posterior 6.00 0.78 2007.9 2007.10 2007.11 200 HNXYXXH7001 2 electric meter 60pc . ._.__/ Posterior 110.00 14.29 2007.9 2007.10 2007.11 200

3 sapling 60 kilo-trunk agriculture __ Posterior 136. 20 17.69 2007.9 2007.10 2007.11 200 HNNYWCH7001 1 saplingl66.3kilo-trunk agriculture V Posterior 582.00 75.58 2007.9 2007.10 2007.11 200 HNNYSQH7001 I saplingl47.2kilo-trunk agriculture V Posterior 441.60 57.35 2007.9 2007.10 2007.11 2001 HNNYFCH7001 1 saplingl32kilo-trunk agriculture I Posterior 396. 00 51.43 2007.9 2007.10 2007.11 2001 HNNYXYH7001 1 saplingl56kilo-trunk agriculture I Posterior 546. 00 70.91 2007.9 2007.10 2007.11 2001 Total 8 29 37838.20 4962.43 Yanshi County IAIL3 Civil Works Procurement Plan in 24 Months

Method of procurement Prior/Post cotExp( Packag Issuing of Contract Start)' Bidding No. content category erior Bid opening e No. IBNBShop Review RMB USD BD signing tion(: IBNBping ('000) ('000) h

Impervious canal 3000m; 40 1 bridges; 40 Drops; 126 Outlets; water-saving irrigation v Posterior 1384. 9 179. 86 2007. 8 2007. 9 2007. 10 2007 12 Small water storage dam

2 300 Maintenance Well buildings water-saving irrigation I Posterior 1260 163. 64 2007. 8 2007. 9 2007. 10 2007

HNLYYST7001

3 countryside gravel road 70km water-saving irrigation I Posterior 1400 181. 82 2007. 8 2007. 9 2007. 10 2007.

2007 4 PVC pipe installation 195km water-saving irrigation I Posterior 780 101. 30 2007. 8 2007. 9 2007. 10 2007

total in 2007 4 4824.9 626. 61 Yichuan County IAIL3 Civil Works Procurement Plan in 24 Months

Method of Mtoofcost Expected procurement Prior/Pos Isigo i otatSatDr Bidding No. Packag content category terior Issuing of Bid Contract Start/Dura e No. ICB NCB Shop Review RMB USD BD opening signing tion(mont ping ('000) ('000) hs)

7619m Impervious canal; 40 wtrsvn HNLYYCT70001 1 Bridges; 107m2 Pumping station water-saving I Posterior 2070 268.83 2007.7 2007.8 2007. 10 2007.10 buildings; Gravel road 18862m. irrigation 38381m Impervious canal; HNLYYCT70002 I 57Bridges; 6 Gates; 304m2 water-saving v Posterior 3730 484.42 2007.7 2007.8 2007, 10 2007.10 Pumping station buildings; irrigation Gravel road 20868m. /(uUm Impervious canal; Travei HNLYYCT70003 road: 5270m; 30 Bridges; 14 water-saving Posterior 1260.00 163.64 2007.7 2007.8 2007, 10 2007.1 Gates; 107m2 Pumping station irrigation

total in 2007 3 7060.00 916.88 IAIL3 Civil Works Procurement Plan in 24 Months

Method of cost Expected procurement Prior/Pos Issuing of Bid Contract Start/Dura Bidding No. Packag content category | terior Isi of Bin Start e No. ICB NCB Shop Review RMB USD BD opening signing tion(mont ping ('000) ('000) hs)

39.6km Impervious canal; 320 Gates; 1840 Outlets;43 Culverts; 1 52 Well buildings; Gravel road water-saving Posterior 2860.3 371.47 2007.5.18 2007.6.21 2007.7.1 2006.7.15 7.2km; Rural Transmission lines irrigation Installation: 6.3km; PVC Pipe Installation: 1.7km. - 41.7km Impervious canal; 380 Gates; 2200 Outlets;49 Culverts; HNLYSXT7001 2 46 Well buildings; Gravel road water-saving Posterior 2994.7 388.92 2007.5.18 2007.6.21 2007.7.1 2006.7.15 7.4km; Rural Transmission lines irrigation Installation:9.75km; PVC Pipe Installation: 5.8km. .

10.4km Impervious canal; 64 3 Gates; 392 Outlets;20 Culverts; water-saving Posterior 981.5 127.47 2007.5.18 2007.6.21 2007.7.1 2006.7.15 13Well buildings; Gravel road irrigation 6.7km.

total in 2007 3 6836.5 887.86 Civil Works Procurement Plan in 24 Months

Method of procurement cost Expected Bidding No. Package content category Pterior/Pos Issuing of Bid Contract Start/Dur remarks No. ICB NCB Shopping Review RMB UBD opening signing ation(mo ('00 000)S nths)

Sanmenzha Town: 6.5km impervious canal, building:100 (bridges, water-saving I Posterior 1136 147.53 2007.6 2007.8 2007.8 2007.9 Sanmenzha culverts,water gates,aqueduct,water irrigation Town outlets) HNZMDRNT7001 Bania1n Town: 8.5km impervious 2 canal, building:128 (bridges, water-saving I Posterior 1377 178.83 2007.6 2007.8 2007.8 2007.9 Sanmenzha culverts,water gates,aqueduct,water irrigation Town

sub-total 2513.00 326.36

1 Jinpu Town: 160 bridges. water-saving -Posterior 679 as. 2007.6 2007.8 2007.8 2007.9 TSanmenzha irrigation 6 8 Town 2 Sanmenzha Town: HNZMRNT002wate-saingBandian70 bridges. aitgersaving I Posterior 296 38.44 2007.6 2007.8 2007.8 2007.9 Town

sub-total 975.00 126.62 Jinpu Town: 180 wells to be water-saving 1 renavoted, underground water pipe irrigation Posterior 996.00 129.35 2007.6 2007.8 2007.8 2007.9 installation: 10km HNZMDRNT7003 Sanmenzha Town: 140 wells to be water-saving 2 renavoted, underground water pipe irrigation Posterior 758 98.44 2007.6 2007.8 2007.8 2007.9 installation:5km - sub-total 1754.00 227.79

1 Jinpu Town: gravel road:lOkm. water-saving I Posterior 960 124.68 2007.6 2007.8 2007.8 2007.9 1 TownJinp grave roadlOkm. irrigation____ HNZMDRNT7004 Sanmenzha Town: gravel road: I Okm. ater-saving I Posterior 1000 129.87 2007.6 2007.8 2007.8 2007.9 HNZMDRNT0042 SnmenzhaTown: grvel roa: 10km.irrigation______sub-total 1960.00 254.55 Jinpu Town: county 1 agrotechnical seeding water-saving I Posterior 158 20.52 2007.6 2007.8 2007.8 2007.9 HNZMDRNT7005 building: 140m2, sunning irrigation ground : 700m2, sub-total 158.00 20.52 total in 2007 1 6 3 7360.00 955.84 Runan County IAIL3 Additional Plan for Civil Works Procurement in 24 Months

Method of procurement cost Expected PPackagerior/Post Issuing Bid Contract Start/Dur B idding No. Package content c ategory |IB|C|rg||(OO |IC N.ICB NCB Shoppi Review RMB UD(00 of BD opening signing ation(mon ng ('00)U000) 00)ths)

HNZMRNT6 1 41bridges. water-saving irrigation .V Posterior 300 38.96 2007. 7 2007. 8 2007. 8 2007. 9 a Tow

081 gravel road:5km. water-saving irrigation v Posterior 300 38.96 2007. 7 2007. 8 2007. 8 2007. 9 Sarme 008 1a Towi

total in 2006 2 600. 00 77.92

Notes: There was Y 883590 saved in procurement of 2006.According to the exchange rate,add these 2 contracts. PingYu County Civil Works Procurement Plan in 24 Months

Package Method of procurement Prior/Posteri cost Issuing of Bid Contract Expec Bidding No. No. content category orRve.MBB pnn sinn Start/Di ICB NCB Shopping orRR USD ('000) BD opog s g on(moi

HNZMPUT7001 1 426 Bridges water-saving irrigation - Posterior 1920 249.35 2007.6 2007.8 2007.8 20'

HNZMPUT7002 2 402 Improved Tube wells water-saving irrigation - Posterior 1810 235.06 2007.6 2007.8 2007.8 201

HNZMPUT7003 3 Gravel road: 19km, sunning water-saving irrigation | Posterior 2620 340.26 2007.6 2007.8 2007.8 20( ground:400rn2. total in 2007 3 1 6350.001 824.681 Kai feng County IAIL3 Civil Works Procurement Plan in 24 Months

Method ofcotEp procurement Prior/Pos cs x B N Packa | | temior Issuing of Bid Contract Start) Bidding No. geN.content category terior ge No. ICB NCB Shop Review RMB USD BD opening signing tion(i ping ('000) ('000) hba

1 2bridges (span 10-4m); 89 bridges water-saving Posterior 1090 141. 56 2007. 5 2007. 6 2007. 6 200' (span below 4m) irrigation

HNKFKFT7001 2 210tube wells ,22 wells to be water-saving v Posterior 1072 139. 22 2007. 5 2007. 6 2007. 6 200' maintained irrigation

3 gravel road:25km water-saving v Posterior 1500 194. 81 2007. 5 2007. 6 2007. 6 200', irrigation

HNKFKFT7002 1 low-voltage cable line installation: water-saving V Posterior 744 96. 62 2007. 5 2007. 6 2007. 6 2007 43km, transformer: 16sets irrigation

total in 2007 3 1 4406.00 572. 21 IAIL3 Civil Works Procurement Plan in 24 Months

Method of - procurement Prior/Pos Isig Bd Cnrc t Packag Isig Bd Cnrc t Bidding No. e N content category S teinor j U of,u ing signing ti ICB NCB Sop Review RB US ofB opng siig to ping ('000) ('000)

Dongbatou:6 bridges (10- 4m) . 83 bridges (span 1 below 4m) 2 gates(1-3m3/s).65tube wells.gravel water-saving irrigation V Posterior 2279.00 295.97 2007. 06 2007. 07 2007. 08 20( road: I Okm HNKFLKT700 1 ______

2 Guyang: 73 bridges (span below 4m) 3 lgates(span water-saving irrigation Posterior 2275.00 295.45 2007. 06 2007. 07 2007. 08 20( below Im3/s).47tube wells.gravel road: 1Okm

1 Dongbatou .Guyang: low-voltage cable line water-saving irrigation V Posterior 396.00 51.43 2007. 06 2007. 07 2007. 08 20C installation: 30km, transformer: 16 sets HNKFLKT7002 agriculture Dongbatou. Guyang:200 ecology construction of standardization and 2 rural areas. organization V Posterior 600.00 77.92 2007. 06 2007. 07 2007. 08 200 development

total in 2007 2 2 5550.00 720.78 Qi County IAIL3 Civil Works Procurement Plan in 24 Months

Method of cost Exi Pakgprocurement Prior/Pos Issuing of Bidtropening Bidding No. e No. content category Sho terior R | B Bid i g tion ping ('000) ('000)

12 bridges (span 10-4m);47 bridges (span below I 4m),4 culvert(60-lOOcm),136tube wells wells ,16to v Posterior 1608 208.83 2007. 06 2007. 07 2007. 08 200, be maintained 23 bridges (span 10-4m);20bridges (span below 2 4m),4 culvert(60-lOOcm),1 18tube wells wells, 17to water-saving irrigation v Posterior 1386 180.00 2007. 06 2007. 07 2007. 08 200 , be maintained

HNKFQXT700 1 __

3 gravel road: lOkm water-saving irrigation v Posterior 1000 129.87 2007. 06 2007. 07 2007. 08 200

4 gravel road: 12km water-saving irrigation | Posterior 1200 155.84 2007. 06 2007. 07 2007. 08 2007

low-voltage cable line installation: 70km, water-saving irrigation v Posterior 630 81.82 2007. 06 2007. 07 2007. 08 2007 transformer: 15 sets HNKFQXT7002 agriculture 2 140 ecology construction of rural areas. standardization and I/ Posterior 420 54.55 2007. 06 2007. 07 2007. 08 2007 organization development

total in 2007 4 2 6244.00 810.91 County IAIL3 Civil Works Procurement Plan in 24 Months Method of Expected Package pcureent Issuing Bid Contract StartIDurz Bidding No. No. content category Shopp sterior RMB USD of BD opening signing ion(month ing Review ('000) ('000) )

1 gravel road 40km ,20 bridges (span < water-saving Posterior 1034 134.29 2007.7 2007.8 2007.9 2007.9- 4m); 2 bridges (span 4-iOn); irrigation 12

HNPDRZT7001 Impervious canal: Branch canal: 7 km (N21000m ), ateral/sub- water-saving 2007.9 2 kmr.2km lateram/u 2 iatio Posterior 4480 581.82 2007.7 2007.8 2007.9 2. lateral:52km (73500m 2), 284 irrigation 12 Culverts, 12 Gates 34 New Tube wells water-saving - Posterior 510 66.23 2007.7 2007.8 2007.9 2007.9- irrigation 12 Pumping station 2 1 Earthwork: 195m ,Township agri- water-saving V Posterior 377.5 49.03 2007.7 2007.8 2007.9 2007.9- technical service station iffrigation 12 HNPDRZT7002 Building:500 m2 . 2 PVC Pipe Installation water-saving v Posterior 572 74.29 2007.7 2007.8 2007.9 2007.9- irrigation V 12 3 Rural Transmission lines Installation water-saving - Posterior 97.5 12.66 2007.7 2007.8 2007.9 2007.9- irrigation 12 Total in2007 3 3 7071.0 918.31 Sui County IAIL3 Civil Works Procurement Plan in 24 Months

Method of Piro cstExpected Bidding No. PackIage No. p ouen P|siorP ct Issuing of Bid Contract Start/Durat BdigN.PcaeN.content category IBNB Shopp Sterior (10 USD BD opening signing ion(months CBNB ing Review ('000 )

20 bridges (span 4-1im); 63bridges water-saving Review 2007.8- 1 (span <4m), 20 Culverts irrigation V behind 2145.00 278.57 2007.6 2007.7 2007.7 2007.12 (60cm

HNSQSXT7001 252 Improved Tube wells, 24 Well 2 buildings, 80 Maintenance Tube wells, water-saving Review 2007.8- Rural Transmission lines Installation: irrigation behind 2007.12 40km, PVC Pipe Installation: 12km.

Gravel road:8km ir-saviong Revie 589.00 76.49 2007.6 2007.7 2007.7 20078- Totalirrigation)7 = 3 behind 2007.12 Total in2007 3 4792.0 622.3 IAIL3 Civil Works Procurement Plan in 24 Months Method of Epce pocremn Prior/Post cost Epce MrD sIssuing of Bid Contract Start/Dunr Bidding No. Package No. content category Shopp erior | USD BD opening signing ion(montl ICB NCB ing Review ('000 ('0)______)

19 bridges (span 4-10m); 83bridges water-saving 2007.09- 1 (span <4m); 8 Culverts iIrrigation v Posterior 2584.00 335.58 2007.06 2007.07 2007.08 2007.12 (60cm

Method of procurement cost Expt Packag PeiorPo Issuing of Contract Start/ Bidding No. eNo content category B NCB Shop terioer RMB USD BD Bid opening signing tion(i ping ('000) ('000) h

24bridges (span 10-4m);20bridges (span 1 below 4m) water-saving irrigation v Posterior 1304 169.35 2007. 7 2007. 8 2007. 10 2007

fINSQLYT7001 2 240 Improved Tube wells water-saving irrigation v Posterior 1872 243.12 2007.7 2007.8 2007.10 2007

3 gravel road: 1.93km, 6OWeIl buildings water-saving irrigation |/| Posterior 930. 4 120.83 2007. 7 2007. 8 2007. 10 2007

1 PVC Pipe Installation: 33km water-saving iffigation V Posterior 198 25.71 2007. 7 2007. 8 2007. 10 2007 H7NSQLYT7002

2 Rural Transmission lines Installation: water-saving irrigation V Posterior 120. 6 15.66 2007. 7 2007. 8 2007. 10 2007.

80km

total in 2007 3 2 4425 574. 68 Ningling County IAIL3 Civil Works Procurement Plan in 24 Months

Method of procurement cost Expected Packag Prior/Pos Issuing of Bid Contract Start/Dura Bidding No. e No. content category NC Shop teview (' USD BD opening signing tion(mont ping ('000) hs)

48bridges (span below 4m), 2007.10 1 60 ecology construction of iwfigation Posterior 1062 137.92 2007.7 2007.8 2007.9-2007.12 rural areas

HNSQNLT7001 2 172well to be renovated water-saving Posterior 1200 155.84 2007.7 2007.8 2007.9 -2007.12 ,60 well houses iffigation -071

3 gravel road(<6m): 19km iwater-saving Posterior 1120 145.45 2007.7 2007.8 2007.9 --2007.12

l PVC Pipe Installation water-saving V Posterior 150 19.48 2007.7 2007.8 2007.9 2007.10 irrigation --2007.12 HNSQNLT7002

2 Rural Transmission lines water-saving V Posterior 130 16.88 2007.7 2007.8 2007.9 2007.10 Installation irrigation -2007.12

total in 2007 3 2 3662 475.58 IAIL3 Civil Works Procurement Plan in 24 Months

Method of procurement Prior/Pos cost Expected

No. PacagkBidding content category teriorPos Issuing of Bid opening Contract Start/Dura Bidn No.eN Shop tevior RMB USD BD pnn signing tion(mont ping ('000) ('000) hs)

impervious canal: 32.168km, 4 water-saving 2006-. 1 Watervius, 322 4 wation Posterior 6398.0 830.91 2006- 6/7 2006, 8 8/9 2006, 10 Water Gates, 322 Water Outlets irrigation 8/9 HNXYLST70011

2 24bridges,277culverts, 14 -saving Posterior 2612.0 339.22 2006. 6/7 2006. 8 2006, 2006, 10 anqueduct, 13.2km gravel road irrigation 8/9

total in 2007 2 9010. 00 1170. 13 Pingqiao County IAIL3 Civil Works Procurement Plan in 24 Months

Method of procurement Pr/P cost Expect Packag Issuing of Contract Start/Di Bidding No. e No. content category terior RMB USD BD Bid opening signing tion(m( eNo. ~~~~~~ICBNCB Shop Review RMUSBDsgig to( ping I('000) ('000) hs)

1 gravel road(<6m): 12km, 236 buildings water-saving irrigation I Posterior 1740.00 225.97 2007.08 2007.09 2007.09 2007.'

2 20km impervious canal, 264 buildings water-saving irrigation I Posterior 3020.00 392.21 2007.08 2007.09 2007.09 2007.'

HNXYPQT7001 3 12 small-scale water storing projects to be water-saving irrigation I Posterior 2160.00 280.52 2007.08 2007.09 2007.09 2007.' enlarged and reinforced, 60 buildings

3 improved electricity irrigation stations, 2 4 mobile stations, 3 canals and 8 water storage water-saving irrigation I/ Posterior 754.00 97.92 2007.08 2007.09 2007.09 2007.' pool. _ I_I_

5 2 wells, 7 well houses, 9 outlets, canal: 2km. water-saving irrigation I Posterior 501.00 65.06 2007.08 2007.09 2007.09 2007.S

total in 2007 5 8175.00 1061.69 Pingqiao County IAIL3 Additional Plan for Civil Works Procurement in 24 Months

Method of procurement Pro/otcost Expected Bidding No. PcaecontentPackage category Meh fFcummPrior/Posterior cotIssuing Isun Bidi ContractotatSatDrremarks Start/Dur No. ICB NCB Shoppi Review RMB USD ('000) of BD opening signing ation(mon ng ('00 UD(000) ths)

impervious canal: 6 kin, Sanmenzh 1 69 rvings water-saving irrigation | Posterior 842 109. 35 2007.7 2007. 8 2007.8 2007. 9 T

HNXXPQT6 2 ponds, 15 buildings. water-saving irrigation I Posterior 198 25. 71 2007. 7 2007.8 2007.8 2007. 9 Sanmenzh 002 pod,1 ulig.a Town

3 5 km gravel road, 53 water-saving irrigation I/ Posterior 691 89. 74 buildings. total in 2006 3 1731.00 224.81

Notes: There was Y883590 saved in procurement of 2006.According to the exchange rate,add these 2 contracts. Xi County IAIL3 Civil Works Procurement Plan in 24 Months

Method of procurement cost Expi BdigN. Packag cotntcteoyieorPo Issuing of Contract Start BiddingeNo. e No.content categoBy Sh Review RMB USD BD Bid opening signing tion(

ping ('000) ('000) h

39 New Tube wells,52 Well g water-saving I/ Posterior 999. 00 129.74 2007. 07 2007. 07 2007. 08 200'

2 gravelroad(<6m):w16km2 oad(6m):16kmirrigationgrvel water-saving I/ Posterior 1797. 90 233.49 2007. 07 2007. 07 2007. 08 2007

Impervious canal 2 HNXYXXT7001 3 22700m ,266buildings(20 Culverts, 56 irrigationwater-saving Posterior 1823. 03 236.76 2007. 07 2007. 07 2007. 08 2007 Gates,18Bridges,172 Outlets) Impervious canal 4 21800m,251buildings(15 Culverts, 52 water-saving Posterior 1715. 72 222.82 2007. 07 2007.07 2007. 08 2007 Gates, 144Bridges, 170 Outlets) -

5 ISS Culverts,5 15 Cuvert,l8Brigesirrigation1483ridges water-saving v Posterior 1625.51 211.11 2007.07 2007.07 2007.08 2007

HNXYXXT7002 6 Rural Transmission lines Installation water-saving V Posterior 497.99 64.67 2007. 07 2007. 07 2007. 08 2007, iffigation

total in 2007 5 1 8459. 15 1098. 59 WanCheng County IAIL3 Civil Works Procurement Plan in 24 Months

Method of ProPo cs Package p eet-Issuing of Bid Contract Expected Bidding No. No. content SpcategoySp sterior RMB USD BD opening signing Start/Durati caeoy ICB NCB n Review ('00 ('00 on(months)

1 gravel road:Width ) 6m: 7.2km. Width < water-saving v Posterior 1126. 3 146.27 2007.8 2007.9 2007.9 07/10- 6m: 7.4km. irrigation

2 gravel road:Width D 6m: 9km. Width < water-saving I/ Posterior 1501.8 195.04 2007.8 2007.9 2007.9 07/10- 6m: 10.6km. irrigation 08/03 6 bridges (span below 4-10m),262 bridges . 07/10 3 (span below <4m),26culverts(Dia.60- water-saving Posterior 678. 8 88.16 2007.8 2007.9 2007.9 08/03 3 (san),20culverts(Dia.o<60an). i 10 bridges (span below 4-10m),374 4 bridges (span below < water-saving v Posterior 992.1 128.84 2007.8 2007.9 2007.9 07/10- 4m),38culverts(Dia.60- 100 irrigation 08/03 cm).26culverts(Dia. <60cm). - 'Tbnew tub)e wet S,42improvea water-saving 4Pseir 874 630 20.8 079 20.9 07/10- HNNYWCT 5 Wells,20Maintenance Wells,1 Owell irrigation 487. 4 63.30 2007.8 2007.9 2007.9 0Poterior08/03

7001 60new tube wells,501mproved water-saving 4Pseir 9.0 1.5 2078 079 20.9 07/10- 6 Wells,8Maintenance Wells,lOwell irrigation v Posterior 121.95 200708 2007.9 2007.9 08/03

__ __ houses.______impervious canal:(Length 7.8km,Impervious arer8800m') ,lwater water-saving 4 Posterior 755.9 98.17 2007.8 2007.9 2007.9 07/10 7 ae(lw -3m3/s), I 2water gates(Flow 75.9 9.7 078 2079 20. 08/03oseir < 1 m3/s), 13aqueducts,90water outlets, 34bridges.

impervious canal:(Length 2 4.2km,Impervious arer4690m ) , Iwater 8 gates(Flow: 1-3m3/s), I 3water gates(Flow water-saving v Posterior 561. 0 72.86 2007.8 2007.9 2007.9 078/03 < 1 m3/s), I 2aqueducts,40water outlets, 22bridges.

Total 8 7042.30 914.58 1 ___ IAIL3 Civil Works Procurement Plan in 24 Months

Pack Method of procurement Prior/Post cost Expected Issuing Bid Contract Start/Dura Bidding No. age content category erior RiV)B USD of BD opening signing tion (month No. ICB NCB Shopping Review ('000) ('000) ______s)

I lOm),302bridges (span belowZ water-saving Posterior 954.3 123.94 2007-6 2007-7 2007-7 07/08--12 4m) Irrigation

2 gravel road: 25.6km water-saving - Posterior 1536.0 199.48 2007-6 2007-7 2007-7 07/08--12 irrigation Review

3 gravel road: 11. 7km water-saving Posterior 700.2 90.94 2007-6 2007-7 2007-7 07/08-- 12 irrigation Review

4 gravel road: 11.6km water-saving Posterior 700.0 90.91 2007-6 2007-7 2007-7 07/08--12 HNNYSQT70 rvl od irrigatio Review 01 2 small-scale water storing water-saving , Posterior 178.0 23.12 2007-6 2007-7 2007-7 07/08--12 projects irrigation Review

57 new tube wells 40wells to be water-saving Posterior 6 renovated,20well houses. irrigation Review

30 new tube wells ,3 lwells to be water-saving Posterior 610 79.22 2007-6 2007-7 2007-7 07/08--12 renovated irrigation Review

8 24 new tube wells ,49wells to be water-saving Posterior 759 98.57 2007-6 2007-7 2007-7 07/08--12 renovated,5well houses. irrigation Review

Total 8 6507.5 845.1 IAIL3 Civil Works Procurement Plan in 24 Months Method of rocreent Prior/Poste cost Expected Actu BdngN. Package cnetorIssuing of Bid Contract Start/Dur start/r No. Ndd.ngNo. content category Shopp rirUSD BD opening signing ation(mon IBNB ing Review ('000 (00 h) to

gravel road: 2007-10--- water I Width < 6m: 19.5km. water-saving irrigation I/ Posterior 1196. 90 155.44 2007-08 2007-09 2007-09 2008103 conservai

gravel road: 2007-10--- water 2 Width < 6m: 19.4km. water-saving irrigation 4/ Posterior 1160. 00 150.65 2007-08 2007-09 2007-09 2008-03 conservar 20-3 Zhaohe T 2 bridges (span below 4-1 On), 2007-10- water 3 239 bridges (span below <4m), water-saving irrigation 4 Posterior 937. 50 121.75 2007-08 2007-09 2007-09 008-1 conservar 2 Improved Small water storage dam Bowang I

22new tube wells, 2007-10-- wat- 4 2O0mproved Wells, water-saving irrigation V Posterior 533. 60 69.30 2007-08 2007-09 2007-09 2008-03 conservan 1Owell houses. Bowang I HNNYFCT7001 .. SW U ...paILy-IvUL wv, impervious canal:(Length 6.58km,Impervious arer9870m') 2007-10- water 5 6 water gates(Flow< lm3/s),3 Aqueduct 2 water-saving irrigation 4 Posterior 576. 30 74.84 2007-08 2007-09 2007-09 2008-03 conservan Drop 8 Inverted siphon,80 water Bowang T outlets,

impervious canal:(Length 1l.48km,1mpervious arerl67OM') I 2007-106- water 6 water gates(Flow< Im3/s),3 Aqueduct water-saving irrigation 4 Posterior 847. 00 110.00 2007-08 2007-09 2007-09 2008-03 conservan( 27 Inverted siphon,90 water outlets, 18 Zhaohe Tc Dia.<60cm Culvert

30new tube wells, 2007-10- water 7 201mproved Wells water-saving irrigation 4 Posterior 480. 00 62.34 2007-08 2007-09 2007-09 2008 03 conservanc ______I____ _I______I______I______I__ _ I__ _ I__ Z haohe T o

total in 2007 7 5731.30 744.321 IAIL3 Civil Works Procurement Plan in 24 Months

Method of procurement Prior/poster cost Issuing of Contract Expec Bidding No. Package No. content category - hod iorReview K USt ; BeBid opening sgi StartlDui C hpig o eiw OwIn)'I T ID T igin (mont]

1 175buildings (bridges, gates). water-saving irrigation V Posterior 1375.40 178.62 2007.7 2007.8 2007.8 20078

2 173wells water-saving irrigation / Posterior 1039.3 134.97 2007.7 2007.8 2007.8 2007.S 2008 HNNYXYT7001

3 174wells water-saving irrigation I Posterior 1045.3 135.75 2007.7 2007.8 2007.8 20078.

2007.9 4 gravel road:l16km. water-saving irrigation IPosterior 1193.6 155.01 2007.7 2007.8 2007.8 2008.'

total in2007 4 4653.60 604.36T