Liangyuan County IAIL3 Civil Works Procurement Plan in 24 Months

Liangyuan County IAIL3 Civil Works Procurement Plan in 24 Months

2007. 4 Henan Province IAIL3 Goods Procurement Gather Worksheet Goods (Within 24 months) Unit: 000' Public Disclosure Authorized Procurument Method Quantity of Contract Cost _ _ _ __ _ ___ _ _ _ _ _ _ _USD RM B ICB NCB 8 3625. 00 27550.00 Shopping 29 1253. 71 9528. 20 Total 37 4878. 71 37078.20 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Henan Province IAIL3 goods Procurement by24 Months Package rcrmn-ehdo Prior/Posteri cost Issuing of Bid Contract Exp Bid No. No. content category 1GB N Shop Start/ No CB NB ig or Review RMB ('000) USD ('000) BD opening signing on(m I centrifugal pump 60csets, axial pump water conservancy I Prior Review 2400.00 315.79 Jul-07 Aug-07 Sep-07 Oct 2 QJ diving pump 1035pcs water conservancy I Prior Review 3380.00 444.74 Jul-07 Aug-07 Sep-07 Oct 3 QY diving pump 1037pcs, QS diving water conservancy V Prior Review 3550.00 467.11 Jul-07 Aug-07 Sep-07 Oct __ __ pum p 6l5pcs__ _ __ _ _ _ __ _ _ __ _ _ _ _ 4 agricultural low-voltage line383.1km water conservancy Posterior 1680.00 221.05 Jul-07 Aug-07 Sep-07 Oct 5 agricultural cable line 276.89km water conservancy Review 3180.00 418.42 Jul-07 Aug-07 Sep-07 Oct PVC (250mm/0.32Mpa) 1.2km Jul-07 Aug-07 Sep-07 Oct PVC (200mm/0.32Mpa) 0.7km Jul-07 Aug-07 Sep-07 Oct HNOOOIH7001 PVC (160mm/0.32Mpa) 0.7km Jul-07 Aug-07 Sep-07 Oct 6 water conservancy V Prior Review 4820.00 634.21 PVC (125mm/0.32Mpa) 45km Jul-07 Aug-07 Sep-07 Oct PVC (1 lOmm/0.32Mpa) 318.5km Jul-07 Aug-07 Sep-07 Oct PVC (9Omm/0.32Mpa) 7.5km Jul-07 Aug-07 Sep-07 Oct 7 transformer 95 sets water conservancy - Posterior 1700.00 223.68 Jul-07 Aug-07 Sep-07 Oct- pvc movable above-ground soft pipe 65mm 102km 7600.00 Jul-07 Aug-07 Sep-07 Oct- 8 pvc movable above-ground soft pipe water conservancy I Prior Review 1000. 00 Jul-07 Aug-07 Sep-07 Oct- 100mm 259kmI pvc movable above-ground soft pipe Jul-07 Aug-07 Sep-07 Oct- 75mm972km Il0Ag0 Se 7 Oc HNLYYSH7001 I sapling 90kilo-trunk agriculture V Posterior 360.00 46.75 2007.9 2007.10 2007.11 200, HNLYYCH7001 I sapling 90kilo-trunk agriculture I Posterior 360.00 46.75 2007.9 2007.10 2007.11 200, HNLYSXH7001 I sapling7Okilo-trunk agriculture I/ Posterior 280.00 36.36 2007.9 2007.10 2007.11 200W HNZMRNH7001 I saplingl2Okilo-trunk agriculture -I Posterior 362.00 47.01 2007.9 2007.10 2007.11 2001 HNZMPYH7001 1 sapling 80kilo-trunk agriculture I Posterior 260 33.77 2007.9 2007.10 2007.11 200O 1 saplingl6Okilo-trunk agriculture I Posterior 650.00 84.42 2007.9 2007.10 2007.11 2M00 HNKFKFH7001 telegraph pole: 210, needle-type bottle, ater-saving irrigation 2 switch box,ware, so on. i Posterior 200.00 25.97 2007.5 2007.6 2007.6 2007. 1 sapling 150kilo-trunk agriculture V Posterior 600.00 77.92 2007.9 2007.10 2007.11 2008 HNKFLKH7001 telegraph pole: 166, needle-type bottle, ater-saving irrigation - Posterior 310. 00 40. 26 2007.9 2007.10 2007.11 2008 Henan Province IAIL3 goods Procurement by24 Months Package Method of procurement Prior/Posteri cost Issuing of Bid Contract Exp Bid No.BdN. |akgeNo. contentcnetctgr | category ICB j NCB S Soho or Reviewzi RMB><Isigf ('000) USD ('000) BD openingl signingj jc |tart.'SonarV _ _ _ ping _ _ __ _ _ _ _ __ _ _ _ _ _m _ _ _ _ _ on__ 3 young white dragon soft tube: ater-saving irrigation - Posterior 287.40 37.32 2007.9 2007.10 2007.11 201 143. 7km I 1 saplingl6Okilo-trunk agriculture Z - Posterior 600 77.92 2007.9 2007.10 2007.11 201 telegraph pole:460, needle-type bottle, ater-saving irrigation Posterior 435 56.49 2007.06 2007.07 2007.08 2007 HNKFQXH7001 2 switch box,ware, so on. young white dragon' soft tube: 3 55km fater-saving iffigation - Posterior 110 14. 29 2007. 06 2007. 07 2007. 08 2007. HNDZ70 1 water speed gauge I set rater-saving irrigation V Posterior 4.00 0.52 2007.9 2007.10 2007.11 20( HNPDRZH700 1__ __ ___ 2 saplingl35kilo-trunk agriculture - .1 Posterior 560 72.73 2007.9 2007.10 2007.11 20( HNSQSXH7001 1 sapling 94kilo-trunk agriculture - V Posterior 310 40.26 2007.9 2007.10 2007.11 20C HNSQMQH7001 1 saplingl 16kilo-trunk agriculture - Posterior 464.0 60.26 2007.9 2007.10 2007.11 20C HNSQLYH7001 1 sapling 106kilo-trunk agriculture _ Posterior 340. 00 44.16 2007.9 2007.10 2007.11 20C HNSQNLH7001 1 sapling 70 kilo-trunk agriculture V Posterior 250 32.47 2007.9 2007.10 2007.11 200 1 instrument and equipments 1 Osets/pcs water-savng - Posterior 68.00 8.83 2007.9 2007.10 2007.11 200 2 saplingl45kilo-trunk agriculture - Posterior 300. 00 38.96 2007.9 2007.10 2007.11 200 HNXYPQH7001 1 sapling lOOkilo-trunk agriculture _ _ Posterior 200. 00 25.97 2007.9 2007.10 2007.11 200 1 water speed gauge 2sets water-saving I/ Posterior 6.00 0.78 2007.9 2007.10 2007.11 200 HNXYXXH7001 2 electric meter 60pc . ._.__/ Posterior 110.00 14.29 2007.9 2007.10 2007.11 200 3 sapling 60 kilo-trunk agriculture __ Posterior 136. 20 17.69 2007.9 2007.10 2007.11 200 HNNYWCH7001 1 saplingl66.3kilo-trunk agriculture V Posterior 582.00 75.58 2007.9 2007.10 2007.11 200 HNNYSQH7001 I saplingl47.2kilo-trunk agriculture V Posterior 441.60 57.35 2007.9 2007.10 2007.11 2001 HNNYFCH7001 1 saplingl32kilo-trunk agriculture I Posterior 396. 00 51.43 2007.9 2007.10 2007.11 2001 HNNYXYH7001 1 saplingl56kilo-trunk agriculture I Posterior 546. 00 70.91 2007.9 2007.10 2007.11 2001 Total 8 29 37838.20 4962.43 Yanshi County IAIL3 Civil Works Procurement Plan in 24 Months Method of procurement Prior/Post cotExp( Packag Issuing of Contract Start)' Bidding No. content category erior Bid opening e No. IBNBShop Review RMB USD BD signing tion(: IBNBping ('000) ('000) h Impervious canal 3000m; 40 1 bridges; 40 Drops; 126 Outlets; water-saving irrigation v Posterior 1384. 9 179. 86 2007. 8 2007. 9 2007. 10 2007 12 Small water storage dam 2 300 Maintenance Well buildings water-saving irrigation I Posterior 1260 163. 64 2007. 8 2007. 9 2007. 10 2007 HNLYYST7001 3 countryside gravel road 70km water-saving irrigation I Posterior 1400 181. 82 2007. 8 2007. 9 2007. 10 2007. 2007 4 PVC pipe installation 195km water-saving irrigation I Posterior 780 101. 30 2007. 8 2007. 9 2007. 10 2007 total in 2007 4 4824.9 626. 61 Yichuan County IAIL3 Civil Works Procurement Plan in 24 Months Method of Mtoofcost Expected procurement Prior/Pos Isigo i otatSatDr Bidding No. Packag content category terior Issuing of Bid Contract Start/Dura e No. ICB NCB Shop Review RMB USD BD opening signing tion(mont ping ('000) ('000) hs) 7619m Impervious canal; 40 wtrsvn HNLYYCT70001 1 Bridges; 107m2 Pumping station water-saving I Posterior 2070 268.83 2007.7 2007.8 2007. 10 2007.10 buildings; Gravel road 18862m. irrigation 38381m Impervious canal; HNLYYCT70002 I 57Bridges; 6 Gates; 304m2 water-saving v Posterior 3730 484.42 2007.7 2007.8 2007, 10 2007.10 Pumping station buildings; irrigation Gravel road 20868m. /(uUm Impervious canal; Travei HNLYYCT70003 road: 5270m; 30 Bridges; 14 water-saving Posterior 1260.00 163.64 2007.7 2007.8 2007, 10 2007.1 Gates; 107m2 Pumping station irrigation total in 2007 3 7060.00 916.88 Song County IAIL3 Civil Works Procurement Plan in 24 Months Method of cost Expected procurement Prior/Pos Issuing of Bid Contract Start/Dura Bidding No. Packag content category | terior Isi of Bin Start e No. ICB NCB Shop Review RMB USD BD opening signing tion(mont ping ('000) ('000) hs) 39.6km Impervious canal; 320 Gates; 1840 Outlets;43 Culverts; 1 52 Well buildings; Gravel road water-saving Posterior 2860.3 371.47 2007.5.18 2007.6.21 2007.7.1 2006.7.15 7.2km; Rural Transmission lines irrigation Installation: 6.3km; PVC Pipe Installation: 1.7km. - 41.7km Impervious canal; 380 Gates; 2200 Outlets;49 Culverts; HNLYSXT7001 2 46 Well buildings; Gravel road water-saving Posterior 2994.7 388.92 2007.5.18 2007.6.21 2007.7.1 2006.7.15 7.4km; Rural Transmission lines irrigation Installation:9.75km; PVC Pipe Installation: 5.8km. 10.4km Impervious canal; 64 3 Gates; 392 Outlets;20 Culverts; water-saving Posterior 981.5 127.47 2007.5.18 2007.6.21 2007.7.1 2006.7.15 13Well buildings; Gravel road irrigation 6.7km. total in 2007 3 6836.5 887.86 Runan County Civil Works Procurement Plan in 24 Months Method of procurement cost Expected Bidding No. Package content category Pterior/Pos Issuing of Bid Contract Start/Dur remarks No. ICB NCB Shopping Review RMB UBD opening signing ation(mo ('00 000)S nths) Sanmenzha Town: 6.5km impervious canal, building:100 (bridges, water-saving I Posterior 1136 147.53 2007.6 2007.8 2007.8 2007.9 Sanmenzha culverts,water gates,aqueduct,water irrigation Town outlets) HNZMDRNT7001 Bania1n Town: 8.5km impervious 2 canal, building:128 (bridges, water-saving I Posterior 1377 178.83 2007.6 2007.8 2007.8 2007.9 Sanmenzha culverts,water gates,aqueduct,water irrigation Town sub-total 2513.00 326.36 1 Jinpu Town: 160 bridges.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    25 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us