The International Joint Commission Kootenay Lake Board of Control

Total Page:16

File Type:pdf, Size:1020Kb

The International Joint Commission Kootenay Lake Board of Control International Kootenay Lake Board of Control The International Joint Commission Kootenay Lake Board of Control Columbia Basin Regional Advisory Committee March 9, 2016 Castlegar, BC Presented by: Gwyn Graham IKLBC Canadian Secretary [email protected] 1 International Joint Commission–United States and Canada Kootenay(Kootenai) Basin 2 International Kootenay Lake Board of Control IJC Context ‘Boundary Waters Treaty’ 1909 Treaty Between the United States and Great Britain (for Canada) International Joint Commission (IJC) Corra Linn Dam International Kootenay IJC Kootenay Lake Order of Lake Board of Control Approval International Joint Commission–United States and Canada International Kootenay Lake Board of Control International Joint Commission Gordon Lana Walker Pollack Canada, U.S., Chair Chair Rich Moy, U.S. Dereth Glance, U.S. Richard Morgan, Canada Benoit Bouchard, Canada International Joint Commission–United States and Canada International Kootenay Lake Board of Control International Joint Commission • To prevent and resolve Canada/US water issues, the Commission… – Receives applications and references on transboundary issues – Notifies public, undertakes studies and holds hearings to inform decision – Issues Orders (e.g. 1938 IJC Order for Kootenay Lake) – Issues recommendations (i.e. for reference cases) • The Commission appoints Boards of Control to monitor compliance with terms of IJC Orders International Joint Commission–United States and Canada International Kootenay Lake Board of Control Kootenay Lake Board of Control • Duties of the Kootenay Lake Board of Control… – Monitor FortisBC’s operation of Corra Linn Dam for compliance with terms of IJC Order (e.g. maximum water levels on Kootenay Lake) – Assure all other provisions of the 1938 IJC Order are followed – Hold annual meetings, report and provide general support to the IJC on issues relating to the 1938 IJC Order International Joint Commission–United States and Canada International Kootenay Lake Board of Control 1938 Kootenay Lake Order • Kootenay Lake Order Kootenay River and Corra Linn Dam relates to Corra Linn Dam (FortisBC). • 1929: West Kootenay Power sought IJC approval for Corra Linn Dam & 6 ft of water storage in Kootenay Lake. • 1938: IJC Order of Approval for Corra Linn Dam – Required excavation at Grohman Narrows • Issue: The dam can affect Kootenay Lake levels and cause backwater effect up Kootenai River into Idaho. • Article IV of Boundary Waters Treaty applies International Joint Commission–United States and Canada Kootenai River Valley , Idaho International Kootenay Lake Board of Control 1938 Kootenay Lake Order • Directs FortisBC to help pay Idaho farmers to offset increased pumping costs for land drainage International Joint Commission–United States and Canada International Kootenay Lake Board of Control 1938 Kootenay Lake Order • Directed original Applicant (WKPL) to dredge Grohman Narrows (completed in the early 1940s) International Joint Commission–United States and Canada International Kootenay Lake Board of Control 1938 Kootenay Lake Order • Directs FortisBC to take advantage of the channel improvement at Grohman Narrows to lower peak water levels on Kootenay Lake International Joint Commission–United States and Canada International Kootenay Lake Board of Control Kootenay Lake Control • Lake level depends on Corra Linn Control balance of inflow and outflow Kootenay Lake (West Arm) • Corra Linn dam does not have exclusive control of Grohman Narrows Control lake outflow • When the Corra Linn forebay is kept low, control moves upstream to Corra Grohman Queens Nelson Linn Narrows Bay the channel constriction at Grohman Narrows International Joint Commission–United States and Canada International Kootenay Lake Board of Control 1938 Kootenay Lake Order Maximum Water Elevations Ordered Storage Period Drawdown Period 1745.32 1745.32 @ Queens Bay @ Queens Bay 1743.32 Lowering Formula @ Nelson Freshet Period 1739.32 Spring Rise Jan Apr Aug Sep Dec International Joint Commission–United States and Canada International Kootenay Lake Board of Control Kootenay Lake in 2015 1,758 1,756 Corra Linn control 0 Grohman Narrows control 1,754 2012 High Water 1,752 Rule Curve 1,750 Queens Bay Nelson Major Rain Events 1,748 Balanced control Stage (feet) Stage 1,746 1 1,744 2 1,742 1,740 13 Commencement of spring rise 2015/04/02 1,738 InternationalJ Joint CommissionF –MUnited StatesA and CanadaM J J A S O N D Precipitation Anomalies 2015 Kaslo - Precipitation 2015 Benchmark - Climate Normal (1981-2010) 40 40 1 35 35 30 30 25 25 20 C) ° .(mm) 20 15 Temp. ( Temp. Precip 10 15 2 5 10 0 5 -5 0 -10 ClimNorm_Daily Maximum (°C) Total Rain (mm) Total Snow (cm) Max Temp (°C) Kootenay Lake in 2012 1,758 1,756 Corra Linn control 0 Grohman Narrows control 1,754 Peak water: 1753.78 ft 1,752 Rule Curve (July 3rd) Queens Bay 1,750 Nelson Balanced control 1,748 Stage (feet) Stage 1,746 1,744 1,742 1,740 Commencement of spring rise 2012/04/20 1,738 J F M A M J J A S O N D Month International Kootenay Lake Board of Control Water Level Extremes: Kootenay Lake (Queen’s Bay) 1770 “Lowering” enabled by dredging1929 Condition Grohman 1 ModelledNarrows Maximum 9 1765 Maximum: 1761.95 ft (1961) 1760 Duncan Dam (1967) 1755 Libby Dam (1975) 1750 Stage (feet) Stage Max Pre-Libby range: Maximum Daily 24.54 feet Water Level 1745 Max. Post-Libby range: 16.36 feet Minimum Daily Water Level 1740 Minimum: 1737.41 ft (1944) 1735 1931 1935 1939 1943 1947 1951 1955 1959 1963 1967 1971 1975 1979 1983 1987 1991 1995 1999 2003 2007 2011 2015 Year 16 International Joint Commission–United States and Canada International Kootenay Lake Board of Control Summary • IJC Order dictates maximum water level conditions on Kootenay Lake. • To date, exceedances have been due to natural climate effects and influence of upstream CRT operations (no cases of non-compliance). • The CRT operations reference the IJC Order • The range of water level variation on Kootenay Lake has been reduced following development of upstream CRT dams. • 2015 El Niño: winter rain storms & run-off events (exceedances of IJC rule curve) and low peak water levels on Kootenay Lake. • 2012 high water conditions: more manageable winter conditions but early onset of lake rise due to upstream CRT flood management operations. • Grohman Narrows is limiting factor on Kootenay Lake discharge during high water periods. 17 International Joint Commission–United States and Canada International Kootenay Lake Board of Control Thank-you! Comments/Questions? 18 International Joint Commission–United States and Canada .
Recommended publications
  • Kootenay System Operations
    Columbia River Treaty Review – Technical Studies Appendix C Kootenay System Operations Operation of the Kootenay River system is complicated as it is administered by several different jurisdictions and the hydroelectric facilities are owned by different agencies/companies. As shown in Figure 1, the Kootenay River originates in the Rocky Mountains not far from Field, BC. The river flows south, within a few km of the source of the Columbia River at Canal Flats, and then continues south into Koocanusa Reservoir, formed behind Libby Dam in Montana, United States. From Libby, the Kootenay River turns west and north, and re-enters British Columbia near the community of Creston, flowing into the south arm of Kootenay Lake. In the northern part of the Kootenay basin, the Duncan River is joined by the Lardeau River just downstream from Duncan Dam, and then flows into the north arm of Kootenay Lake. Water from the north and south arms of Kootenay Lake then flows through the west arm of the lake and past the Corra Linn Dam near Nelson (as well as other dams) en route to the Columbia–Kootenay confluence at Castlegar. The components of this system and various agreements/orders that regulate flows are described in this Appendix. November 29, 2013 1 Columbia River Treaty Review – Technical Studies Figure 1: Kootenay and Columbia Region November 29, 2013 2 Columbia River Treaty Review – Technical Studies 1.0 Coordination of Libby Operations Background Under the terms of the Columbia River Treaty, Canada permitted the U.S. to build the Libby Dam on the Kootenai River (U.S.
    [Show full text]
  • Development of Kootenay Performance Measures
    Columbia River Treaty Review – Technical Report Appendix H Development of Kootenay Performance Measures Relative to the Columbia River, the Kootenay River system has not had as extensive a history of public planning processes to develop information about interests that may be affected by reservoir levels and flows. As a result, the project team undertook desktop studies to fill in some of the information gaps on the Kootenay system. Estimating how interests on the Kootenay River system might directly be affected by water management alternatives was undertaken using the following methods: Public consultative sessions in spring and fall of 2012; Discussions with individual First Nations; Feedback provided by communities to BC Hydro, FortisBC, and Columbia Power Corporation on operations over a number of years; Reviewing available reports prepared for other planning processes; Drawing parallels with similar situations in other areas of BC for which performance measures had already been developed; and The Fish and Wildlife Technical Committee had as a key focus to develop fish and aquatic ecosystem, and vegetation and wildlife performance measures for the Kootenay system. This appendix reviews the development of the new Kootenay performance measures covering the environmental performance measures reviewed by the Fish and Wildlife Technical Committee and social performance measures on interests that have been raised by basin residents. While detailed information on the Kootenay performance measures is provided in Appendix G, this appendix focuses on the interests that for various reasons did not have a performance measure developed. First Nations Culture and Archaeological Sites The linkages between aboriginal people and the Kootenay River system are long and enduring.
    [Show full text]
  • Columbia River Treaty Review Technical Studies Report
    Columbia River Treaty Review Technical Studies Prepared by BC Hydro and Power Authority November 29, 2013 Table of Contents Chapter 1: Introduction ........................................................................................................................................ 5 1.1 Background ......................................................................................................................................... 5 1.2 Approach to Treaty Strategic Decision ............................................................................................... 5 1.3 Process and Scope of Analysis ............................................................................................................ 7 1.3.1 Environmental Advisory Committee and Fish and Wildlife Technical Committee ............. 7 1.3.2 Water Use Plan and Structured Decision Making Process ................................................... 8 Chapter 2: Columbia and Kootenay Hydroelectric System Summary ............................................................. 9 2.1 Operations on the Columbia River - Relationship between Columbia River Treaty, Non Treaty Storage Agreement, and Water Use Plans ............................................................................................... 10 2.2 Operations on the Kootenay River - Relationship between Columbia River Treaty, Duncan Water Use Plan, International Joint Commission Order, and Canal Plant Agreement ...................................... 12 Chapter 3: Selection of Alternatives to Model .................................................................................................
    [Show full text]
  • White Paper on COLUMBIA RIVER POST-2024 FLOOD RISK MANAGEMENT PROCEDURE
    White Paper on COLUMBIA RIVER POST-2024 FLOOD RISK MANAGEMENT PROCEDURE U.S. Army Corps of Engineers Northwestern Division September 2011 This page intentionally left blank PREFACE The Columbia River, the fourth largest river on the continent as measured by average annual flow, provides more hydropower than any other river in North America. While its headwaters originate in British Columbia, only about 15 percent of the 259,500 square miles of the river’s basin is located in Canada. Yet the Canadian water accounts for about 38 percent of the average annual flow volume, and up to 50 percent of the peak flood waters, that flow on the lower Columbia River between Oregon and Washington. In the 1940s, officials from the United States and Canada began a long process to seek a collaborative solution to reduce the risks of flooding caused by the Columbia River and to meet the postwar demand for energy. That effort resulted in the implementation of the Columbia River Treaty in 1964. This agreement between Canada and the United States called for the cooperative development of water resource regulation in the upper Columbia River Basin. The Columbia River Treaty has provided significant flood control (also termed flood risk management) and hydropower generation benefiting both countries. The Treaty, and subsequent Protocol, include provisions that both expire on September 16, 2024, 60 years after the Treaty’s ratification, and continue throughout the life of the associated facilities whether the Treaty continues or is terminated by either country. This white paper focuses on the flood risk management changes that will occur on that milestone date and satisfies the following purposes: 1.
    [Show full text]
  • Brilliant Headpond Stewardship Initiative Draft
    DRAFT SCOPING STUDY WORKING COPY FOR VIEWING PURPOSES BRILLIANT ONLY HEADPOND STEWARDSHIP INITIATIVE KATARINA HARTWIG HEATHER LESCHIED MAY 2017 Scoping Study: Brilliant Headpond Stewardship Initiative Katarina Hartwig, Heather Leschied | May 2017 Design and Layout: Mandi McRobbie Cover Photo: Douglas Noblet, WildAir Photography ©2017 Living Lakes Canada All rights reserved. Permission is granted to reproduce all or part of this publication for non-commercial purposes, as long as you cite the source Living Lakes Canada Box 691 Invermere, BC V0A 1K0 EXECUTIVE SUMMARY The Brilliant Headpond Stewardship Initiative Scoping Study is intended to be the first phase of a stewardship strategy for the Brilliant Headpond Reservoir. The Scoping Study is guided by the Brilliant Headpond Stewardship Initiative Steering Committee, which includes leaders from the Brilliant Headpond communities of Tarrys, Thrums, Glade, Shoreacres, and South Slocan, representatives of the Ktunaxa First Nation and Okanagan Nation Alliance, and Regional District of Central Kootenay (RDCK) Area I Director, Andy Davidoff, and RDCK Area H Director, Walter Popoff. The Brilliant Headpond Reservoir (“BHPR”) was created by the damming of the Kootenay River at the Brilliant Canyon for the completion of the West Kootenay Power Corps. Brilliant Dam hydroelectric project completed in 1944. The BHPR area extends from Columbia Power Corporation’s (current owner) Brilliant Dam and Brilliant Expansion Project (2007) upstream to the Slocan Pool area just below BC Hydro’s Kootenay Canal (1975) and FortisBC’s South Slocan (1928) dams. FortisBC owns and operates the four dams on the Lower Kootenay, upstream of Brilliant Dam, and FortisBC operates Brilliant Dam and Brilliant Expansion facilities on behalf of Columbia Power Corporation.
    [Show full text]
  • 1 Meeting Minutes 2019 Annual Tour and Board Meeting
    Meeting Minutes 2019 Annual Tour and Board Meeting, International Kootenay Lake Board of Control (IKLBC) Thursday, September 19, 2019 Tour: 7:45 AM to 12:30 PM Board Meeting: 2:00 to 4:30 PM Visitor Information Centre, Nelson, British Columbia United States Canada Chair Colonel Mark Geraldi (Remote Attendee) Bruno Tassone (Host) Members Kyle Blasch Ted White Secretariat Kevin Shaffer Martin Suchy IJC Commissioners Lance Yohe IJC Advisors Mark Colosimo Wayne Jenkinson Guests Paul Allen (International Joint Commission, Canadian Section), Dale Ernst (Fortis BC), Caron DeMars (International Joint Commission, United States Section), Adam Greeley (International Joint Commission, United States Section), Dave Hutchinson (Environment and Climate Change Canada), Gillian Kong (BC Hydro), Felicia Minotti (Global Affairs Canada), Shannon Price (Fortis BC), Doug Walker (United States Department of State) IKLBC Board Tour Summary Board members visited the Fortis BC Operations Centre in Castlegar, British Columbia. The tour was led by Dale Ernst, System Operations Manager, and Wayne Gritchin, Power System Supervisor. The facility opened in 2017 and is utilized by Fortis BC to operate and monitor power generating facilities on the Kootenay and Pend Oreille Rivers. Transmission operators also control and monitor distribution ties with customers from the centre. Corra Linn Dam gates can be operated remotely from the centre, as well as at the dam site. Generation at Corra Linn Dam is dispatched under an operating agreement by BC Hydro, while Fortis BC makes decisions on flows and choice of generating units to meet the generation requests. The Kootenay Lake Operating Order specifies the Kootenay Lake Order of Approval and both Fortis BC and BC Hydro monitor dam operations for compliance with the Order.
    [Show full text]
  • The 5Th Annual West Kootenay Glacier Challenge Scotiabank MS Bike Tour!
    The 5th Annual West Kootenay Glacier Challenge Scotiabank MS Bike Tour Courtesy of: Nelson & District Chamber of Commerce 91 Baker Street Nelson B.C. Ph. 250 352 3433 [email protected] discovernelson.com Scotiabank MS Bike Tour August 20-21, 2016 The tour starts in New Denver… Slocan Valley… New Denver- Founded upon the discovery of silver in the mountains adjacent to Slocan Lake in 1891, prospectors from the United States came flooding up to the New Denver region in 1892 to stake their claims, and gather their riches. New Denver quickly grew to a population of 500 people with 50 buildings. In 1895 this growing community built government offices and supply houses for the Silvery Slocan Mines. “A Simple Curve” was filmed in and around the Slocan Valley and was debuted in 2005. The story is of a young man born to war resister parents. War Resisters- In 1976 as many as 14,000 Americans came to the Slocan Valley in an attempt to avoid the Vietnam War. About half of those who made the move were self-proclaimed war resisters, many of whom settled in the Kootenay Region. Nikkei Internment Memorial Centre This exclusive interpretive centre features the Japanese-Canadian internment history of New Denver during the Second World War. The camp is said to have held close to 1500 internees during the war. The memorial centre opened in 1994, which showcases several buildings including the community hall and three restored tar paper shacks with Japanese gardens. A well known Canadian to come out of one of these local institutions is Dr.
    [Show full text]
  • Overview of Community Engagement in Columbia Basin Hydro
    Community Engagement in Columbia Basin Hydro Operations An Overview of Current Practices August 2015 Community Engagement in Columba Basin Hydro Operations Contents Background and Purpose of this Research...........................................................................................3 Research Methodology and Limitations ..............................................................................................4 KEY FINDINGS: Current Citizen & Stakeholder Engagement Practices ...................................................4 Overview: Columbia River Hydro System Citizen Engagement Practices ...............................................7 INTERNATIONAL JOINT COMMISSION (IJC) KOOTENAY LAKE BOARD OF CONTROL ................................ 7 COLUMBIA RIVER TREATY ......................................................................................................................... 8 Assured Operating Plans, Detailed Operating Plans and Supplemental Operations Agreements ....... 8 Libby Coordination Agreement ............................................................................................................. 8 WATER LICENSES ....................................................................................................................................... 9 BC HYDRO .................................................................................................................................................. 9 PLANNING ............................................................................................................................................
    [Show full text]
  • Spatial Distribution of Impacts to Channel Bed Mobility Due to Flow Regulation, Kootenai River, Usa
    SPATIAL DISTRIBUTION OF IMPACTS TO CHANNEL BED MOBILITY DUE TO FLOW REGULATION, KOOTENAI RIVER, USA Michael Burke1, Research Associate, University of Idaho ([email protected]); Klaus Jorde1, Professor, University of Idaho; John M. Buffington1,2, Research Geomorphologist, USDA Forest Service; Jeffrey H. Braatne3, Assistant Professor, University of Idaho; Rohan Benjankar1, Research Associate, University of Idaho. 1Center for Ecohydraulics Research, Boise, ID 2Rocky Mountain Research Station, Boise, ID 3College of Natural Resources, Moscow, ID Abstract The regulated hydrograph of the Kootenai River between Libby Dam and Kootenay Lake has altered the natural flow regime, resulting in a significant decrease in maximum flows (60% net reduction in median 1-day annual maximum, and 77%-84% net reductions in median monthly flows for the historic peak flow months of May and June, respectively). Other key hydrologic characteristics have also been affected, such as the timing of annual extremes, and the frequency and duration of flow pulses. Moreover, Libby Dam has impeded downstream delivery of sediment from the upper 23,300 km2 of a 50,000 km2 watershed. Since completion of the facility in 1974, observed impacts to downstream channel bed and bars in semi-confined and confined reaches of the Kootenai River have included coarsening of the active channel bed, homogenization of the channel bed, disappearance of relatively fine-grained beach bars, and invasion of bar surfaces by perennial vegetative species. These impacts have led to reduced aquatic habitat heterogeneity and reduced abundance of candidate recruitment sites for riparian tree species such as black cottonwood (Populus trichocarpa) and native willows (Salix spp.). Limited quantitative documentation of the pre-regulation substrate composition exists.
    [Show full text]
  • Biological Opinion for the Idaho Water Quality Standards for Numeric Water Quality Criteria for Toxic Pollutants
    United States Department of the Interior FISH AND WILDLIFE SERVICE 911NE11 th Avenue Portland, Oregon 97232-4181 In Reply Refer To: FWS/Rl/AES Dan Opalski, Director JUN 2 5 2015 Office of Water and Watersheds U.S. Environmental Protection Agency 1200 Sixth A venue Seattle, Washington 98101 Dear Mr. Opalski: Enclosed are the U.S. Fish and Wildlife Service's (Service) Biological Opinion (Opinion) and concurrence determinations on the Idaho Water Quality Standards for Numeric Water Quality Criteria for Toxic Pollutants (proposed action). The Opinion addresses the effects of the proposed action on the following listed species and critical habitats: the endangered Snake River physa snail (Physa natricina), threatened Bliss Rapids snail (Taylorconcha serpenticola), endangered Banbury Springs lanx (Laroe sp.; undescribed), the endangered Bruneau hot springsnail (Pyrgulopsis bruneauensis), the threatened bull trout (Salvelinus confluenlus) and its critical habitat, and the endangered Kootenai River white sturgeon (Acipenser transmontanus) and its critical habitat. The concurrence determinations address the following listed species: the threatened grizzly bear (Ursus arctos horribilis), endangered Southern Selkirk Mountains woodland caribou (Rangifer tarandus caribou), threatened Canada lynx (Lynx canadensis), threatened northern Idaho ground squirrel (Spermophilus brunneus brunneus), threatened MacFarlane's four-o'clock (Mirabilis macfarlanei), threatened water howellia (Howellia aquatilis), threatened Ute ladies' -tresses (Spiranthes diluvialis),
    [Show full text]
  • Footprint Impacts of BC Hydro Dams on Rainbow Trout Populations In
    Footprint Impacts of BC Hydro Dams on Rainbow Trout in the Columbia River Basin, British Columbia Prepared by: Steve Arndt, M.Sc Fish and Wildlife Compensation Program – Columbia Basin 103-333 Victoria St., Nelson, British Columbia September 2009 Footprint Dam Impacts on Rainbow Trout Executive Summary The Fish and Wildlife Compensation Program (FWCP) – Columbia Basin has undertaken a project to assess the footprint impacts of BC Hydro dams in the Columbia River drainage in British Columbia. This review includes a primary productivity assessment (Moody et al. 2007), habitat gain/loss (Thorley 2008), and several species impact reviews. This report provides an impact assessment for rainbow trout, Oncorhynchus mykiss. Available information on population status before and after dams is summarized and compensation options for addressing losses are provided. Rainbow trout are a highly diverse species with respect to habitat use, life history, and phenotype. Five rainbow trout ecotypes are used to describe impacts in the basin (small-stream resident, fluvial, small lake adfluvial, large lake insectivorous, large lake piscivore). This species is arguably the most important fish in the basin in terms of its recreational and food use that contributes to quality of life and economic activities in the region. In large lakes and reservoirs, it occupies an important niche as one of the main species preying upon kokanee, Oncorhynchus nerka. Conservation status for the species as a whole is ranked as yellow (not at risk) in BC. Conservation status is not currently evaluated for individual ecotypes, but adfluvial piscivore and large river fluvial fish are relatively rare provincially. Prior to dams, rainbow trout were indigenous throughout the Columbia River drainage, and in the Kootenay River drainage below Kootenai Falls, Idaho.
    [Show full text]
  • 1 International Kootenay Lake Board of Control 2018 Annual Report To
    International Kootenay Lake Board of Control 2018 Annual Report to the International Joint Commission This Annual Report covers the operations of Corra Linn Dam by the Applicant to the IJC Order (FortisBC) and the associated effects on the water level of Kootenay Lake in 2018. FortisBC operates Corra Linn Dam on the Kootenay River, approximately 22 kilometers upstream from its confluence with the Columbia River, and downstream from the West Arm of Kootenay Lake. FortisBC controls discharge through and around Corra Linn Dam in accordance with requirements of the Order of the International Joint Commission dated November 11, 1938. FortisBC co-operates with BC Hydro, which also manages a hydro-electric generating facility (the Kootenay Canal Project) which is hydraulically connected to the Corra Linn dam forebay on the Kootenay River through a constructed canal. Corra Linn Dam 1 Kootenay Lake 2018 Summary Throughout 2018, FortisBC operated Corra Linn Dam in a manner consistent with that prescribed by the 1938 Kootenay Lake Order. The minimum instantaneous water level was observed at 02:05:00 PDT on April 14th, 2018, at elevation 530.079 metres1 (1739.10 feet). Due to high lake inflow beyond the control of the Applicant, the lake level exceeded the IJC rule curve during the winter-spring drawdown period on March 17th, 2018, and the lake level did not reach the low elevation target of 530.145 metres (1739.32 feet) by the date required in the order (on or around April 1st). However, the Board determined that there was no violation of the IJC Order for Kootenay Lake because the Applicant responded by taking appropriate action of maintaining maximum flow through the natural flow constriction at Grohman Narrows, upstream of Corra Linn Dam.
    [Show full text]