Overview of Community Engagement in Columbia Basin Hydro
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Kootenay System Operations
Columbia River Treaty Review – Technical Studies Appendix C Kootenay System Operations Operation of the Kootenay River system is complicated as it is administered by several different jurisdictions and the hydroelectric facilities are owned by different agencies/companies. As shown in Figure 1, the Kootenay River originates in the Rocky Mountains not far from Field, BC. The river flows south, within a few km of the source of the Columbia River at Canal Flats, and then continues south into Koocanusa Reservoir, formed behind Libby Dam in Montana, United States. From Libby, the Kootenay River turns west and north, and re-enters British Columbia near the community of Creston, flowing into the south arm of Kootenay Lake. In the northern part of the Kootenay basin, the Duncan River is joined by the Lardeau River just downstream from Duncan Dam, and then flows into the north arm of Kootenay Lake. Water from the north and south arms of Kootenay Lake then flows through the west arm of the lake and past the Corra Linn Dam near Nelson (as well as other dams) en route to the Columbia–Kootenay confluence at Castlegar. The components of this system and various agreements/orders that regulate flows are described in this Appendix. November 29, 2013 1 Columbia River Treaty Review – Technical Studies Figure 1: Kootenay and Columbia Region November 29, 2013 2 Columbia River Treaty Review – Technical Studies 1.0 Coordination of Libby Operations Background Under the terms of the Columbia River Treaty, Canada permitted the U.S. to build the Libby Dam on the Kootenai River (U.S. -
Order in Council 93/2005
PROVINCE OF BRITISH COLUMBIA ORDER OF THE LIEUTENANT GOVERNOR IN COUNCIL Order in Council No. , Approved and Ordered FEB 1 1 2005 et drguustratel Executive Council Chambers, Victoria Administrato On the recommendation of the undersigned, the himagiTtitWebVefflor, by and with the advice and consent of the Executive Council, orders that the Public Sector Employers Regulation, B.C. Reg. 408/93, is amended according to the attached schedule. bi 01 Minister of Finance Presiding . mber the Executive Council (This part is for administrative purposes only and is not part of the Order.) Authority under which Order is made: Act and section:- Public Sector Employers Act, R.S.B.C. 1996, c. 384, s. 15 Other (specify):- order in council 1647/93 January 13, 2005 re sub 4-1/2005/13 page 1 of 2 SCHEDULE I The Public Sector Employers Regulation, B.C. Reg. 408/93, is amended in section 2, in the list of employers designated for the purposes of paragraph (b) of the definition of "public sector employer" in the Act, (a) by striking out the following: British Columbia Ferry Corporation Okanagan Valley Tree Fruit Authority Pacific National Exhibition Science Council of British Columbia Victoria Line Ltd. , and (b) by adding the following: BC Games Society BC Immigrant Investment Fund Ltd. BC Innovation Council B.C. Investment Fund Ltd. B.C. Safety Authority BC Transportation Financing Authority BCIF Management Ltd. British Columbia Pavilion Corporation British Columbia Transmission Corporation British Columbia Utilities Commission Columbia Basin Trust Columbia Power Corporation First Peoples' Heritage, Language & Culture Council Forestry Innovation Investment Ltd. Homeowner Protection Office Industry Training Authority Oil & Gas Commission Organized Crime Agency of British Columbia Partnerships British Columbia Inc. -
Electrical Service Information Form
Electrical Service Information Form Date: (DD/MM/YY) Service address (full address and postal code if available) Project name Legal description BC Hydro Reference # Anticipated energization date: Owner information Name Mailing address Email address Address line 2 Phone/Cell # GST# Technical contact persons Name Email address Phone no. Electrical contractor Electrical consultants General contractor Building and electrical details Building state: New Existing Proposed use of building: Permanent service Temporary service Number of hours of operation per day: Number of operational days per week: Main switch size: amps Code peak demand: kW Your Designer may inquire further about your computation 80% rated 100% rated (BC Hydro approval required) for the code demand Voltage: volts Average operating demand: kW Largest motor: hp Time of day of peak demand: AM PM Fire pump: No Yes - Size Building heated by: Gas Electric Heat pump - Locked Rotor Amp A Electric furnace Other On-site customer-owned generation: No Yes—open transition Yes—closed transition Requested service type: Overhead Underground Load details Existing (if applicable) New Electric heating load kW kW Lighting load kW kW Heat pump including geothermal kW kW Air conditioning motor load kW kW Electric vehicle charging load kW kW Other motor load kW kW Other load kW kW Total connected load kW kW Proposed future load kW kW Metering Information Total number of meters Residential: Commercial: Voltage: Meter type: 120/240 120/208 347/600 TBD 1 Phase 3 Phase TBD Meter details Other: Temporary master metering required Number of wires: Yes No Current transformer Bar CT lugs conductor size: x Window TBD CT type: Conductor to CT lugs: Cu Al Energization ○ Energization of the project will be scheduled upon receipt of: • Necessary approvals, permits from appropriate authorities, including municipal, electric inspection and other utilities. -
Development of Kootenay Performance Measures
Columbia River Treaty Review – Technical Report Appendix H Development of Kootenay Performance Measures Relative to the Columbia River, the Kootenay River system has not had as extensive a history of public planning processes to develop information about interests that may be affected by reservoir levels and flows. As a result, the project team undertook desktop studies to fill in some of the information gaps on the Kootenay system. Estimating how interests on the Kootenay River system might directly be affected by water management alternatives was undertaken using the following methods: Public consultative sessions in spring and fall of 2012; Discussions with individual First Nations; Feedback provided by communities to BC Hydro, FortisBC, and Columbia Power Corporation on operations over a number of years; Reviewing available reports prepared for other planning processes; Drawing parallels with similar situations in other areas of BC for which performance measures had already been developed; and The Fish and Wildlife Technical Committee had as a key focus to develop fish and aquatic ecosystem, and vegetation and wildlife performance measures for the Kootenay system. This appendix reviews the development of the new Kootenay performance measures covering the environmental performance measures reviewed by the Fish and Wildlife Technical Committee and social performance measures on interests that have been raised by basin residents. While detailed information on the Kootenay performance measures is provided in Appendix G, this appendix focuses on the interests that for various reasons did not have a performance measure developed. First Nations Culture and Archaeological Sites The linkages between aboriginal people and the Kootenay River system are long and enduring. -
Columbia River Treaty Review Technical Studies Report
Columbia River Treaty Review Technical Studies Prepared by BC Hydro and Power Authority November 29, 2013 Table of Contents Chapter 1: Introduction ........................................................................................................................................ 5 1.1 Background ......................................................................................................................................... 5 1.2 Approach to Treaty Strategic Decision ............................................................................................... 5 1.3 Process and Scope of Analysis ............................................................................................................ 7 1.3.1 Environmental Advisory Committee and Fish and Wildlife Technical Committee ............. 7 1.3.2 Water Use Plan and Structured Decision Making Process ................................................... 8 Chapter 2: Columbia and Kootenay Hydroelectric System Summary ............................................................. 9 2.1 Operations on the Columbia River - Relationship between Columbia River Treaty, Non Treaty Storage Agreement, and Water Use Plans ............................................................................................... 10 2.2 Operations on the Kootenay River - Relationship between Columbia River Treaty, Duncan Water Use Plan, International Joint Commission Order, and Canal Plant Agreement ...................................... 12 Chapter 3: Selection of Alternatives to Model ................................................................................................. -
BC Hydro's Response to Intervener Information Requests Round 4
Fred James Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 [email protected] November 14, 2019 Mr. Patrick Wruck Commission Secretary and Manager Regulatory Support British Columbia Utilities Commission Suite 410, 900 Howe Street Vancouver, BC V6Z 2N3 Dear Mr. Wruck: RE: Project No. 1598990 British Columbia Utilities Commission (BCUC or Commission) British Columbia Hydro and Power Authority (BC Hydro) Fiscal 2020 to Fiscal 2021 Revenue Requirements Application (the Application) BC Hydro writes in compliance with Commission Order No. G-279-19 to provide its responses to Round 4 information requests as follows: Exhibit B-22 Responses to Commission IRs (Public Version) Exhibit B-22-1 Responses to Commission IRs (Confidential Version) Exhibit B-23 Responses to Intervener IRs (Public Version) Exhibit B-23-1 Responses to Intervener IRs (Confidential Version) BC Hydro is filing a number of IR responses and/or attachments to responses confidentially with the Commission. In each instance, an explanation for the request for confidential treatment is provided in the public version of the IR response. BC Hydro seeks this confidential treatment pursuant to section 42 of the Administrative Tribunals Act and Part 4 of the Commission’s Rules of Practice and Procedure. Overall, BC Hydro received 327 Round 4 information requests. Responses to 260 of those information requests are included in this filing. Thirty-four information requests are the subject of BC Hydro’s letter of November 8, 2019 (the information requests at issue are listed in the attachment to that letter). They are being addressed through the comment process established by Order No. -
BC Hydro and Power Authority 2021/22
BC Hydro and Power Authority 2021/22 – 2023/24 Service Plan April 2021 For more information on BC Hydro contact: 333 Dunsmuir Street Vancouver, BC V6B 5R3 Lower Mainland 604 BCHYDRO (604 224 9376) Outside Lower Mainland 1 800 BCHYDRO (1 800 224 9376)] Or visit our website at bchydro.com Published by BC Hydro BC Hydro and Power Authority Board Chair’s Accountability Statement The 2021/22 – 2023/24 BC Hydro Service Plan was prepared under the Board’s direction in accordance with the Budget Transparency and Accountability Act. The plan is consistent with government’s strategic priorities and fiscal plan. The Board is accountable for the contents of the plan, including what has been included in the plan and how it has been reported. The Board is responsible for the validity and reliability of the information included in the plan. All significant assumptions, policy decisions, events and identified risks, as of February 28, 2021 have been considered in preparing the plan. The performance measures presented are consistent with the Budget Transparency and Accountability Act, BC Hydro’s mandate and goals, and focus on aspects critical to the organization’s performance. The targets in this plan have been determined based on an assessment of BC Hydro’s operating environment, forecast conditions, risk assessment and past performance. Doug Allen Board Chair 2021/22 – 2023/24 Service Plan Page | 3 BC Hydro and Power Authority Table of Contents Board Chair’s Accountability Statement ....................................................................................... -
Bc Hydro Rights of Way Guidelines Compatible Uses and Development Near Power Lines Contents
BC HYDRO RIGHTS OF WAY GUIDELINES COMPATIBLE USES AND DEVELOPMENT NEAR POWER LINES CONTENTS OVERVIEW ..........................................................................................................................................................................................................3 WHO ARE THESE GUIDELINES FOR? ................................................................................................................................................................4 PREPARING AND SUBMITTING A PROPOSAL ..................................................................................................................................................5 POSSIBLE COMPATIBLE USES OF RIGHT OF WAY ...........................................................................................................................................6 GENERAL SAFETY INFORMATION .....................................................................................................................................................................7 PLANTING AND LOGGING NEAR POWER LINES ..............................................................................................................................................8 UNDERGROUND INSTALLATIONS .....................................................................................................................................................................9 DESIGNING AROUND BC HYDRO RIGHTS OF WAY .........................................................................................................................................11 -
2019/20 – 2021/22 Service Plan
Columbia Power Corporation 2019/20 – 2021/22 SERVICE PLAN February 2019 For more information on Columbia Power Corporation contact: Suite 200, 445 13th Avenue Castlegar, B.C. 1.250.304.6060 [email protected] Or visit our website at columbiapower.org Columbia Power Corporation Board Chair Accountability Statement The 2019/20 – 2021/22 Columbia Power Corporation (Columbia Power) Service Plan was prepared under my direction in accordance with the Budget Transparency and Accountability Act. The plan is consistent with government's strategic priorities and fiscal plan. I am accountable for the contents of the plan, including what has been included in the plan and how it has been reported. I am responsible for the validity and reliability of the information included in the plan. All significant assumptions, policy decisions, events and identified risks, as of January 31, 2019 have been considered in preparing the plan. The performance measures presented are consistent with the Budget Transparency and Accountability Act, Columbia Power’s mandate and goals, and focus on aspects critical to the organization’s performance. The targets in this plan have been determined based on an assessment of Columbia Power’s operating environment, forecast conditions, risk assessment and past performance. Tim Stanley Board Chair 2019/20 – 2021/22 Service Plan 3 Columbia Power Corporation Table of Contents Board Chair Accountability Statement ................................................................................................... 3 Strategic -
White Paper on COLUMBIA RIVER POST-2024 FLOOD RISK MANAGEMENT PROCEDURE
White Paper on COLUMBIA RIVER POST-2024 FLOOD RISK MANAGEMENT PROCEDURE U.S. Army Corps of Engineers Northwestern Division September 2011 This page intentionally left blank PREFACE The Columbia River, the fourth largest river on the continent as measured by average annual flow, provides more hydropower than any other river in North America. While its headwaters originate in British Columbia, only about 15 percent of the 259,500 square miles of the river’s basin is located in Canada. Yet the Canadian water accounts for about 38 percent of the average annual flow volume, and up to 50 percent of the peak flood waters, that flow on the lower Columbia River between Oregon and Washington. In the 1940s, officials from the United States and Canada began a long process to seek a collaborative solution to reduce the risks of flooding caused by the Columbia River and to meet the postwar demand for energy. That effort resulted in the implementation of the Columbia River Treaty in 1964. This agreement between Canada and the United States called for the cooperative development of water resource regulation in the upper Columbia River Basin. The Columbia River Treaty has provided significant flood control (also termed flood risk management) and hydropower generation benefiting both countries. The Treaty, and subsequent Protocol, include provisions that both expire on September 16, 2024, 60 years after the Treaty’s ratification, and continue throughout the life of the associated facilities whether the Treaty continues or is terminated by either country. This white paper focuses on the flood risk management changes that will occur on that milestone date and satisfies the following purposes: 1. -
August 7, 2019 Mr. Patrick Wruck Commission Secretary
Fred James Chief Regulatory Officer Phone: 604-623-4046 Fax: 604-623-4407 [email protected] August 7, 2019 Mr. Patrick Wruck Commission Secretary and Manager Regulatory Support British Columbia Utilities Commission Suite 410, 900 Howe Street Vancouver, BC V6Z 2N3 Dear Mr. Wruck: RE: British Columbia Utilities Commission (BCUC or Commission) British Columbia Hydro and Power Authority (BC Hydro) Fleet Electrification Rate Application BC Hydro writes to file its Application pursuant to sections 58 to 60 of the Utilities Commission Act (UCA) for approval of Rate Schedules 164x – Overnight Rate (150 kW and over) and 165x - Demand Transition Rate (150 kW and over) for use for charging of electric fleet vehicles and vessels. These new services are in response to customer requests for fleet charging rates and support the electrification of commercial fleet vehicles and vessels. For further information, please contact Anthea Jubb at 604-623-3545 or by email at [email protected]. Yours sincerely, (for) Fred James Chief Regulatory Officer ac/tl Enclosure British Columbia Hydro and Power Authority, 333 Dunsmuir Street, Vancouver BC V6B 5R3 www.bchydro.com BC Hydro Fleet Electrification Rate Application August 7, 2019 August 7, 2019 Table of Contents 1 Introduction and Need for Fleet Electrification Rates ......................................... 1 1.1 Purpose of Application .............................................................................. 1 1.2 Need for the Optional Rates ..................................................................... -
Dams and Hydroelectricity in the Columbia
COLUMBIA RIVER BASIN: DAMS AND HYDROELECTRICITY The power of falling water can be converted to hydroelectricity A Powerful River Major mountain ranges and large volumes of river flows into the Pacific—make the Columbia precipitation are the foundation for the Columbia one of the most powerful rivers in North America. River Basin. The large volumes of annual runoff, The entire Columbia River on both sides of combined with changes in elevation—from the the border is one of the most hydroelectrically river’s headwaters at Canal Flats in BC’s Rocky developed river systems in the world, with more Mountain Trench, to Astoria, Oregon, where the than 470 dams on the main stem and tributaries. Two Countries: One River Changing Water Levels Most dams on the Columbia River system were built between Deciding how to release and store water in the Canadian the 1940s and 1980s. They are part of a coordinated water Columbia River system is a complex process. Decision-makers management system guided by the 1964 Columbia River Treaty must balance obligations under the CRT (flood control and (CRT) between Canada and the United States. The CRT: power generation) with regional and provincial concerns such as ecosystems, recreation and cultural values. 1. coordinates flood control 2. optimizes hydroelectricity generation on both sides of the STORING AND RELEASING WATER border. The ability to store water in reservoirs behind dams means water can be released when it’s needed for fisheries, flood control, hydroelectricity, irrigation, recreation and transportation. Managing the River Releasing water to meet these needs influences water levels throughout the year and explains why water levels The Columbia River system includes creeks, glaciers, lakes, change frequently.