Agreement1 to Proceed with The

Total Page:16

File Type:pdf, Size:1020Kb

Agreement1 to Proceed with The AGREEMENT1 TO PROCEED WITH THE CONSTRUCTION OF AMISTAD DAM ON THE RIO GRANDE TO FORM PART OF THE SYSTEM OF INTERNATIONAL STOITAGE DAMS PROVIDED FOR BY THE WATER TREATY OF FEBRUARY 3 1944. SIGNED AT CIUDAD ACUÑA’, OCTOBER 24, 19602 Dwight D. Eisenhower, President of the United States of America, and Adolfo L6pez Mateos, President of the United Mexican States, inspired by the true friendship that binds the Governments and peoples of' the United States of America and Mexico and by the fruitful cooperation that has characterized their relations, Considering that international hydraulic works constitute one of the most valued examples of this cooperation, the bases of which were established in the Water Treaty between the United States of America and Mexico signed on February 3, 1944; Considering that Amistad Dam will complement Falc6n Dam and will form part of the sytem of international dams provided for in the above-mentioned treaty; Considering that Amistad Dam will serve to control floods of the Rio Grande, which repeatedly have caused very serious damage to border communities and agricultural areas of both countries; to provide additional waters for irrigation needs of' both countries; and to permit production of hydroelectric energy as required; Have agreed that: The Government of the United States of America and the Government of Mexico will proceed with the construction of' Amistad Dam as soon as possible after the two Governments have approved the technical recommendations that are to be made for that purpose by the International Boundary and Water Commission, United States and Mexico. Done in two copies in the English and Spanish languages at Ciudad Acuna, Coahuila, Mexico, October 24, 1960. DWIGHT D. EISENHOWER A. L. MATEOS 1Came into force upon signature. 2United States Treaties and other International Agreements, TIAS 4624. 1 2 1 2 .
Recommended publications
  • Sharing the Colorado River and the Rio Grande: Cooperation and Conflict with Mexico
    Sharing the Colorado River and the Rio Grande: Cooperation and Conflict with Mexico December 12, 2018 Congressional Research Service https://crsreports.congress.gov R45430 {222A0E69-13A2-4985-84AE-73CC3DFF4D02}-R-065134085251065165027250227152136081055238021128244192097047169070027044111226189083158176100054014174027138098149076081229242065001223143228213208120077243222253018219014073197030033204036098221153115024066109133181160249027233236220178084 SUMMARY R45430 Sharing the Colorado River and the December 12, 2018 Rio Grande: Cooperation and Conflict with Nicole T. Carter Specialist in Natural Mexico Resources Policy The United States and Mexico share the waters of the Colorado River and the Rio Grande. A bilateral water treaty from 1944 (the 1944 Water Treaty) and other binational agreements guide Stephen P. Mulligan how the two governments share the flows of these rivers. The binational International Boundary Legislative Attorney and Water Commission (IBWC) administers these agreements. Since 1944, the IBWC has been the principal venue for addressing river-related disputes between the United States and Mexico. The 1944 Water Treaty authorizes the IBWC to develop rules and to issue proposed decisions, Charles V. Stern called minutes, regarding matters related to the treaty’s execution and interpretation. Specialist in Natural Resources Policy Water Delivery Requirements Established in Binational Agreements. The United States’ and Mexico’s water-delivery obligations derive from multiple treaty sources and vary depending on the body of water. Under the 1944 Water Treaty, the United States is required to provide Mexico with 1.5 million acre-feet (AF) of Colorado River water annually. The 1944 Water Treaty also addresses the nations’ respective rights to waters of the Rio Grande downstream of Fort Quitman, TX. It requires Mexico to deliver to the United States an annual minimum of 350,000 AF of water, measured in five-year cycles (i.e., 1.75 million AF over five years).
    [Show full text]
  • B-196345 Contractual Arrangements Relating to Sale Of
    is ,[GEN1RAL OF UN ITED AT43L \ X~~~~~~~~~~~~~VA~fl1tlG70t4, Vteet 24544 13-196345 flay 1, 1980 The Honorable Abraham K~azen, Jr. House of IRepresentafires Dear 1\r. Kazen: 8ittI*,O .Plblo rAd IIIg* This is in answer to your request for our *pinion ot whether contracts for the disposition and trvelztsmission of powyer and energy from the Falcon and Amistad hydro-eleculec p~rojects violate the preference provision of the Falcon-Amis tard Darn Act, (Act'of June 18, 1954, Pubu. L. No, 83-406, 68 Sta~t 255, as ame nded by the Act of December 23, 1963, Pzub, L. No. 88-237, 77 Stat.t 475). as well1 axs on certain relatend issues, We have studied the view's of all the parties concerned as well as the relevant statutory provisions and other applicable documents. Wye do not believe the contracts in question vriolate either the }preterence clause or any other applicable stattltory provision, This and your other questions are addressed belowg in the, order, they appear In your, letter. Backgrouund On August 9, 1977, the SIouthd-Texas Electric Cooperative, Ines (OTE C) and Medina Electric Cooperative'.Inc. (MEC) contracted with the United States Burcau of Reclamation, De6'parttennt of Interior (Burceau), to pi~r- 'V,',Wchase all of then pouver and energy',(hereafter referred to'collectively £qs powver) to be generated at the AmilI'tad and Falcon hydro-'blectric facli~ties after the Amistad plant Is placed Ipto coffinercial operation,, The Ce'tral Power and Light Company (CPLi oisvn's the only transmission lines in the vicinity of either the Falcon or Amistad dams and construction of dupli-.
    [Show full text]
  • Draft Draft Draft Draft 10/31/05
    Binational Rio Grande Summit Cooperation for a Better Future Cooperación para un Futuro Mejor Cumbre Binacional del Río Bravo November 17-18, 2005 Reynosa,Tamaulipas & McAllen, Texas BACKGROUND DOCUMENT International Boundary and Water Commission United States and Mexico “Lasting peace will come from the careful, patient, practical solution of particular problems.” ---United States President Lyndon B. Johnson “The factors that unite us are enough to construct a solid pedestal of enduring friendship.” ---Mexican President Adolfo Lopez Mateos Remarks at El Paso, Texas-Ciudad Juarez, Chihuahua, September 25, 1964, regarding the Chamizal Project on the Rio Grande, which settled a longstanding boundary dispute between the United States and Mexico. Binational Rio Grande Summit Background Document INDEX Page # Message from the Commissioners ........................................................................................... 4 Introduction................................................................................................................................ 5 The International Boundary and Water Commission............................................................ 5 Geography and Hydrology of the Rio Grande Basin ............................................................ 6 Convention of 1906 .................................................................................................................... 8 1944 Water Treaty ....................................................................................................................
    [Show full text]
  • Texas-Mexico International Bridges and Border Crossings
    TEXAS-MEXICO INTERNATIONAL BRIDGES AND BORDER CROSSINGS Existing and Proposed 2015 Texas-Mexico International Bridges and Border Crossings Existing and Proposed 2015 Table of Contents Overview ...............................................................................................................................................................................i Map ..................................................................................................................................................................................... II Summary ........................................................................................................................................................................... III Veterans International Bridge at Los Tomates ................................................................................................................ 1 Gateway International Bridge ........................................................................................................................................... 4 Free Trade Bridge ............................................................................................................................................................... 8 Weslaco-Progreso International Bridge ......................................................................................................................... 10 Donna International Bridge ............................................................................................................................................
    [Show full text]
  • Beyond the Rio Grande Water Debt
    ISSUE BRIEF 12.08.20 Beyond the Rio Grande Water Debt Stephen P. Mumme, Ph.D., Nonresident Scholar, Center for the United States and Mexico The Rio Grande water war1 is over, at least Mexico’s capacity to meet the treaty’s for now. A summer’s worth of rancor, requirements. There is clearly a need to recrimination, violent protests, and one rethink at least some of the elements that tragic death ended abruptly on October 21, factor into the fulfillment of Mexico’s Rio three days before payment in full was due, Grande treaty obligations. when Mexico agreed to transfer water stored Ironically, the pertinent provisions of the in Rio Grande dams to the United States. 1944 water treaty, officially titled “Utilization Mexico’s last-minute decision to of Waters of the Colorado and Tijuana Rivers meet its 1944 water treaty2 obligation and of the Rio Grande,” were thought, at was greeted with both sighs of relief and the time, to be exceptionally flexible and annoyance in Texas where irrigation demand to Mexico’s advantage in meeting its treaty peaked July through September, diminishing deal (Enriquez Coyro 1976, 1174). Those the utility of the suddenly restored water provisions, located in the treaty’s Article 4, supply (Arevalo 2020). It peeved Mexican commit Mexico to delivering 350,000 acre- irrigators as well. In Chihuahua, riled feet of water annually to the United States, farmers seized control of La Boquilla Dam a figure that is calculated as an average in the upper Rio Conchos in August to avert over a water delivery cycle of five years, a depletion of that reservoir to fulfill Mexico’s sum obligation of 1,750,000 acre-feet in treaty obligation, and a protest erupted each cycle.
    [Show full text]
  • 2004 Calendar Year Report to the Rio Grande Compact Commission
    University of New Mexico UNM Digital Repository Law of the Rio Chama The Utton Transboundary Resources Center 2004 2004 Calendar Year Report to the Rio Grande Compact Commission Hal D. Simpson Colorado John R. D'Antonio New Mexico Joe G. Hanson Texas Bill Ruth Federal Chairman Follow this and additional works at: https://digitalrepository.unm.edu/uc_rio_chama Recommended Citation Simpson, Hal D.; John R. D'Antonio; Joe G. Hanson; and Bill Ruth. "2004 Calendar Year Report to the Rio Grande Compact Commission." (2004). https://digitalrepository.unm.edu/uc_rio_chama/49 This Report is brought to you for free and open access by the The Utton Transboundary Resources Center at UNM Digital Repository. It has been accepted for inclusion in Law of the Rio Chama by an authorized administrator of UNM Digital Repository. For more information, please contact [email protected], [email protected], [email protected]. RECLAMATION Managing Water in the West ·. 2004 Calendar Year Report to the Rio Grande Compact Commission COLORADO NEW MEXICO TEXAS Hal D. Simpson John R. D' Antonio Joe G. Hanson FEDERAL CHAIRMAN Bill Ruth Department of the Interior Bureau of Reclamation Upper Colorado Region Albuquerque Area Office Albuquerque, New Mexico March 2005 I MISSION STATEMENTS The mission of the Department of the Interior is to protect and provide access to our Nation's natural and cultural heritage and honor our trust responsibilities to Indian Tribes and our commitments to island communities. The mission of the Bureau of Reclamation is to manage, develop, and protect water and related resources in an environmentally and economically sound manner in the interest of the American public.
    [Show full text]
  • Enhancing Local River Flood Hazard Communication in the Rio Grande Valley
    Enhancing Local River Flood Hazard Communication at the Rio Grande Valley Mike Castillo, Alfredo Vega, Barry S. Goldsmith, and Jeral Estupinan NOAA/National Weather Service Brownsville, TX Hurricane Alex Making Landfall in Water Flowing from Carranza Reservoir Abstract Northeast Mexico on 30 June 2010, Impacts of the Rio Grande River How can there be a flood about 100 miles south of the Rio Grande Along the Rio Salado to Falcon Lake River flooding along the lower Rio Grande river reached record to near record levels in middle to late July 2010, after estimates of in Deep South Texas coming when there is not a more than 127 cm (50 in.) of rain fell across the northern portions of the Sierra Madre Oriental in Northeast Mexico, mainly in the states of Nuevo Leon, Coahuila, and Chihuahua, associated with the cloud in the sky ? remnants of Hurricane Alex and Tropical Depression Two. Initial heavy rains across mountainous Nuevo Leon produced devastating Conveying the potential impact of major river flooding well after flash floods in Monterrey. The heavy rains produced additional a tropical storm or hurricane affects an area can be a daunting runoff, which filled a network of reservoirs on the lee of the Sierra task, especially when there is not a cloud in the sky. Summer Madre in Mexico, as well as along the lower Rio Grande River. 2010 was a perfect example, as residents and interests along Ultimately, the water flowed into a network of floodways in the the lower Rio Grande had to prepare and evacuate because of the impacts of Hurricane Alex and Tropical Depression Two Lower Rio Grande Valley.
    [Show full text]
  • Sustainability of Engineered Rivers in Arid Lands: Euphrates-Tigris and Rio Grande/Bravo
    Sustainability of Engineered Rivers in Arid Lands: Euphrates-Tigris and Rio Grande/Bravo 190 Policy Research Project Report Lyndon B. Johnson School of Public Affairs Policy Research Project Report Number 190 Sustainability of Engineered Rivers in Arid Lands: Euphrates-Tigris and Rio Grande/Bravo Project Directed by Aysegül Kibaroğlu Jurgen Schmandt A report by the Policy Research Project on Sustainability of Euphrates-Tigris and Rio Grande/Bravo 2016 The LBJ School of Public Affairs publishes a wide range of public policy issue titles. ISBN: 978-0-89940-818-7 ©2016 by The University of Texas at Austin All rights reserved. No part of this publication or any corresponding electronic text and/or images may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or any information storage and retrieval system, without permission in writing from the publisher. Cover design by Lauren R. Jahnke Maps created by the Houston Advanced Research Center Policy Research Project Participants Graduate Students Deirdre Appel, BA (International Relations and Public Policy), University of Delaware; Master of Global Policy Studies student, LBJ School of Public Affairs, The University of Texas at Austin Jose Balledos, BS (Physics), University of San Carlos; Master of Global Policy Studies student, LBJ School of Public Affairs, The University of Texas at Austin (Fall term only) Christine Bonthius, BA (Physical Geography), University of California, Las Angeles; Ph.D. student (Geography and the Environment),
    [Show full text]
  • Amistad Amistad National Recreation Area Texas
    National Park Service U.S. Department of the Interior Amistad Amistad National Recreation Area Texas Dam Location Follow Highway 90 west approximately 8 miles from Del Rio, Texas and turn left onto Spur 349. Proceed 2.4 miles until you reach the top of the dam. Be aware that the dam is an official Port of Entry and visitors wishing to see the dam are required to have a valid passport with them. The Dam is open most days from 10 am to 6 pm. There is parking available on the top of the dam on both the American and Mexican side. Amistad Dam, located on the Rio Grande, is 12 river miles (19km) northwest of Del Rio, Texas and Ciudad Acuna, Coahuila, 574 miles (924 km) upriver from the Gulf of Mexico, and 1 mile (1.6 km) below the confluence with the Devils River. Purpose The concrete gravity dam with flanking earth embankments was built for flood control, water conservation, hydroelectric power and recreation. History Amistad (meaning “friendship” in Spanish) Dam was Amistad Dam was dedicated by President Richard constructed by the United States and Mexico in Nixon of the United States and President Diaz Ordaz of accordance to the Water Treaty Act of 1944. It was Mexico on September 8, 1969. built in response to frequent droughts and a number of floods, the worst of which occurred in 1954, killing Each country separately installed hydroelectric over 300 Del Rio residents. generating plants. The U.S. Power Plant was constructed 1980-1983. Mexico’s Power Plant was While several sites were considered for the dam the constructed 1981-1987.
    [Show full text]
  • Monitoring the Water Quality of the Nation's Large Rivers Rio Grande NASQAN Program
    USGS science fora changing world Monitoring the Water Quality of the Nation's Large Rivers Rio Grande NASQAN Program The U.S. Geological Survey (USGS) has monitored the water quality in the Rio Grande Basin as part of the redesigned National Stream Quality Accounting Network (NASQAN) since 1995 (Hooper and others, 1997). The NASQAN program was designed to characterize the concentra­ tions and transport of sediment and selected chemical constituents found in the Nation's large rivers including the Mississippi, Colorado, and Columbia in addition to the Rio Grande. In these four basins, the USGS currently (1998) operates a network of 40 NASQAN sites, with an emphasis on quantifying the mass flux for each constituent (the amount of material moving past the site, expressed in tons per day). By applying a consistent flux-based approach in the Rio Grande Basin, the NASQAN pro­ gram is generating the information needed to identify regional sources for a variety of constit­ uents, including agricultural chemicals and trace elements, in the basin. The effect of the large reservoirs on the Rio Grande can be observed as constituent fluxes are routed downstream. The analysis of constituent fluxes on a basin-wide scale will provide the means to assess the influence of human activity on water-quality conditions in the Rio Grande. Environmental Setting Irrigation withdrawals from the Rio Grande site at El Paso is 125 river miles (in the lower Rio Grande Valley, which downstream of Elephant Butte The Rio Grande originates in the San comprises Cameron, Hildalgo, Starr, and Reservoir in New Mexico and 1 .7 miles Juan Mountains of southern Colorado and Willacy Counties) accounted for about 44 upstream of the American Dam at El follows a 1,885-mile course before it percent of the surface-water irrigation Paso.
    [Show full text]
  • Flow, Salts, and Trace Elements in the Rio Grande
    47. Texas Water Quality Board. 1975a. Intensive Sur- 51. Westcot, D.W. 1988. Reuse and disposal of high face Water Monitoring Survey for Segment 2305. salinity subsurface drainage water: A review. Agr. Amistad Reservoir. Report IMS21. Austin, TX. Water Mgt. 14:483-511. 48. Texas Water Quality Board. 1975b. Intensive Sur- 52. White, D.H., and E. Cromartie. 1985. Bird use and face Water Monitoring Survey for Segment 2303. heavy metal accumulation in waterbirds at dredge Falcon Lake. Report IMS II. Austin, TX. disposal impoundments. Corpus Christi, Texas. Bull. 49. U.S. Fish and Wildlife Service. 1986. Preliminary Environ. Contam. Toxicol. 34:295-300. survey of contaminant issues of concern on Na- 53. White, D.H., C.A. Mitchell, H.D. Kenney, A.J. tional Wildlife Refuges. Washington, D.C.. Krynrtsky, and M.A. Ribrick. 1983. Elevated DDE and 50. Wells, F.G., G.A. Jackson and W.J. Rogers. 1988. toxaphene residues in fishes and birds reflect local Reconnaissance investigation of water quality, bot- contamination in the Lower Rio Grande Valley, Texas. tom sediment, and biota associated with irrigation Southwestern Naturalist. 28:325-333. drainage in the Lower Rio Grande Valley and La- FLOW, SALTS, AND TRACE ELEMENTS guna Atascosa National Wildlife Refuge, Texas. 1986-87. USGS Report 87-4277, Austin, TX. IN THE RIO GRANDE: A REVIEW S. Miyamoto, L.B. Fenn, and D. Swietlik Drs. Miyamoto and Fenn are professors at the Texas A&M University Agricultural Research Center at El Paso; Dr. Swietlik is a professor at the Texas A&M University — Kingsville Citrus Center. Contributing to this project were the Texas A&M University Agricultural Research Center at El Paso; the Texas A&M University—Kingsville Citrus Research Center; and the Texas Water Research Institute, The Texas A&M University System.
    [Show full text]
  • Designation of Critical Habitat for the Rio Grande Silvery Minnow; Proposed Rule
    Thursday, June 6, 2002 Part IV Department of the Interior Fish and Wildlife Service 50 CFR Part 17 Endangered and Threatened Wildlife and Plants; Designation of Critical Habitat for the Rio Grande Silvery Minnow; Proposed Rule VerDate May<23>2002 18:22 Jun 05, 2002 Jkt 197001 PO 00000 Frm 00001 Fmt 4717 Sfmt 4717 E:\FR\FM\06JNP3.SGM pfrm17 PsN: 06JNP3 39206 Federal Register / Vol. 67, No. 109 / Thursday, June 6, 2002 / Proposed Rules DEPARTMENT OF THE INTERIOR ADDRESSES: 1. Send your comments on fishes in the Rio Grande Basin, this proposed rule, the draft economic occurring from Espan˜ ola, NM, to the Fish and Wildlife Service analysis, and draft EIS to the New Gulf of Mexico (Bestgen and Platania Mexico Ecological Services Field Office, 1991). It was also found in the Pecos 50 CFR Part 17 2105 Osuna Road NE, Albuquerque, River, a major tributary of the Rio RIN 1018–AH91 NM, 87113. Written comments may also Grande, from Santa Rosa, NM, be sent by facsimile to (505) 346–2542 downstream to its confluence with the Endangered and Threatened Wildlife or through the Internet to Rio Grande (Pflieger 1980). The silvery and Plants; Designation of Critical [email protected]. You may also minnow is completely extirpated from Habitat for the Rio Grande Silvery hand-deliver written comments to our the Pecos River and from the Rio Grande Minnow New Mexico Ecological Services Field downstream of Elephant Butte Reservoir Office, at the above address. You may and upstream of Cochiti Reservoir AGENCY: Fish and Wildlife Service, obtain copies of the proposed rule, the (Bestgen and Platania 1991).
    [Show full text]