Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village , , Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

Application for Environmental Clearance Form – I (I) Basic Information: S. Item No. Details No. 1 Name of the Project/s Expansion of Residential Project namely “Rajgadh Estates Phase-II & Phase-II Ext.” at Village Birmi, Ludhiana, Punjab by M/s. Dev Arjuna Promoters & Developers (P) Ltd. 2 S. No. in the schedule The project falls under S.No. 8(a) - „Building & Construction Project‟ as the built-up area of the project is 29,018.64 sq.m. 3 Proposed capacity / area / length/ M/s. Dev Arjuna Promoters & Developers (P) tonnage to be handled / command area / Ltd has plan to construct Residential Project lease area / number of wells to drilled namely “Rajgadh Estates Phase-II & Phase-II Extension” at Village Birmi, Ludhiana, Punjab.

Total SI. EC Description Difference (After No. Accorded Expansion)

Total Plot 35.56 29.925 65.485 1. Area acres acres acres

Built-up 89,839.56 -60,820.92 29,018.64 2. Area sq.m sq.m Sq.m.

Detailed comparison between earlier EC and revised details as per revised layout plan is given in Table-2 of Conceptual Plan.

The following documents are enclosed: A-1: Project related approvals i.e. scrutiny letter from PPCB, Change in land use, LOI for land, License, Consent to Establish (NOC) from PPCB, RERA registrations and Bank Guarantees, etc. A-2 : Board of Resolution for Authorized Signatory A-3 : Undertaking for no litigation, no forest & wildlife clearance A-4: Agreement with A2Z waste management

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

(Ludhiana) Ltd. A-5(a): CGWA Permission A-5(b): Undertaking A-6 : Site Photographs A-7: Affidavit regarding Environment Management Cell A-8: Agreement for 5 acres land for discharge of excess treated effluent. A-9: Test Reports A-10(a): Field Data sheets A-10(b): Email regarding Intimation A-11: PERT Chart A-12: MoA of Dev Arjuna Promoters & Developers (P) Ltd. A-13: Previous Six monthly compliance report A-14: Consultant Accreditation certificate A-15: Receiving MoEF for Verification of Compliance. A-16: Quantification of Energy A-17: CGWA Application for 534 KLD The following drawings are enclosed: D-1: Google Earth Image showing project site & surroundings within 500 m D-2: Master Plan of Ludhiana showing project location. D-3: Revised Approved Marked Layout Plan D-4: Site Plan & Basement Parking Plan of Group Housing D-5 : Water Supply Layout Plan D-6: Sewer & Treated water Layout Plan D-7: Layout showing rain water recharging pits D-8: Landscape Plan 4 New/Expansion / Modernization Expansion

5 Existing capacity / Area etc EC accorded for 197 plots & group housing having Built-up Area = 89,839.56 sq.m. 6 Category of the project „ A‟, „B‟ , „C‟ Category-B

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

7 Does it attract the general conditions? If No Yes, Please Specify. 8 Does it attract the specific conditions? If No Yes, Please Specify

9 Location Google Earth Image showing the project site and sorroundings within 500 m is attached as Drawing-1. Plot/ Survey/Khasra No. Khasra nos. are mentioned in Change in land use obtained for an area of 35.56 acres and 29.975 acres; copy is attached along as Annexure-1(b) & 1(c) respectively. Village Birmi District Ludhiana State Punjab

10. Nearest railway station / Airport along Ludhiana Railway station: Approx. 11 km, E; with Distance in kilometers. Ludhiana (Sahnewal) Airport: Approx. 22 km, SE

11 Nearest town/District headquarters District Headquaters: District Court, Ludhiana: along with distance in kilometers Approx. : 10 km 12 Village Panchayat, Zilla Parishads, Greater Ludhiana Area Development Authority Municipal corporation, local Bodies (GLADA) (Complete Postal address with Street No. 2, Ferozpur Road, Ranjit Nagar, telephone No. to be given) New Professor Colony, Ludhiana, Punjab- 142021 13 Name of the applicant Mr. Kunal Verma (Authorized Signatory) Authorization letter is enclosed as Annexure-2 14 Registered address M/s Dev Arjuna Promoters & Developers (P) Ltd. 3-A, Industrial Area –A Extension, Ludhiana 141003, Punjab. 15 Address for correspondence : Name : Mr. Kunal Verma Designation(owner/ Partner/CEO) Authorized Signatory

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

Address M/s Dev Arjuna Promoters & Developers (P) Ltd. 3-A, Industrial Area –A Extension, Ludhiana 141003, Punjab. Pin Code 141003 E- Mail [email protected] Telephone No. +91-161-2221232 Fax No. +91-161-2608592 16 Details of alternative Sites examined, if No any. Location of these sites should be shown on the topo Sheets. 17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked project has been submitted?

19 If Yes, date of submission. Not Applicable 20 If No, reason Not Applicable 21 Whether the Proposal involves approval No. Undertaking regarding the same is enclosed / Clearance under : If Yes , details of the as Annexure-3. same and their to be given . (a) The Forest Conservation , Act,1980 (b) the wild life Protection Act, 1972 (c) The C.R.Z Notification, 1991. 22 Either their is any government Order / NBC policy relevant / relating to the site? Building Bye laws 23. Forest land Involved (hectare) Not Applicable 24. Whether there is any litigation pending There is no litigation pending against the project. against the project and /or land in which Undertaking regarding the same is enclosed as the Projects is proposed to be set up? Annexure-3. (a) Name of the court (b) Case no. (c) Orders / Directions of the Courts , if any and its relevance with the Project.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

(II) Activity 1. Construction, Operation or Decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes/No Details thereof (with approximate quantities No. confirmation /rates, wherever possible) with source of information data 1.1 Permanent or temporary Yes The Project “Rajgadh Estates Phase-II & Phase-II change in land use, land Extension” is located at Village Birmi, Ludhiana, cover or topography Punjab which is being developed by M/s. Dev Arjuna including increase in Promoters & Developers (P) Ltd. The change of land intensity of land use (with use has already been obtained and copy is attached as respect to local land use Annexure-1(b) & 1(c). plan) 1.2 Clearance of existing land, Yes The construction of the proposed site will involve vegetation and buildings? clearance of weeds and grasses. 1.3 Creation of new land uses? No There is no need of creation of new land use. Project falls within Residential zone (low density) as per the Master Plan of Ludhiana 1.4 Pre-construction Yes The Pre-construction investigation has already been investigations e.g. bore done prior to development work. houses, soil testing? 1.5 Construction works? Yes The constriction of the project shall be as per approved layout copy layout plan is enclosed as Drawing-3. Details of construction are mention in Table 2 of conceptual plan. 1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for Yes The manpower required during construction period construction works or shall be around 50. The most of the workers shall be housing of construction local or from nearby areas. Only 10 workers shall workers? reside at the site during peak construction period. Temporary hutments and sanitation facilities are be provided for these workers within the project site. 1.8 Above ground buildings, Yes Excavation work will be done for caring out structures or earthworks remaining area development work. including linear structures, cut and fill or excavations 1.9 Underground works No Not Applicable

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

including mining or tunneling? 1.10 Reclamation works? No No reclamation work is required 1.11 Dredging? No No dredging is required 1.12 Offshore structures? No No offshore structures is required

1.13 Production and No No production/ manufacturing process involved as manufacturing processes? the project is a residential project.

1.14 Facilities for storage of Yes Raw material for construction will be stored at site in goods or materials? a covered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open.

1.15 Facilities for treatment or Yes As per earlier EC: disposal of solid waste or The total design population of the project is 2,200 liquid effluents? persons. The water requirement as per Manual on Water Supply & Treatment, Government of @ 135 lpcd for residential and @ 45 lpcd for floating is approx. 310 KLD. 250 KLD of sewage will be generated from the project. This wastewater will be treated in STP of 250 KLD capacity within the project.

Solid waste of about 880 kg/day will be generated (@ 0.40 kg/capita/day for residential and @ 0.20 kg/capita/day for floating).

As per revised details: The total actual population of the project is 4,878 persons. The water requirement as per Manual on Water Supply & Treatment, Government of India @ 135 lpcd for residential and @ 45 lpcd for floating is approx. 594 KLD, fresh water demand is 534 which will be abstracted from tubewell. The water calculations along with water balance diagram are given in the Conceptual Plan. Approx. 498 KLD of sewage will be generated from

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

the project. This wastewater will be treated in existing STP of 250 KLD & proposed STP of 250 KLD capacity. In Proposed Total Previous Description EC (After Granted Expansion) Phase II Total Water 284 KLD 310 KLD 594 KLD Demand

Fresh Water 270 KLD 264 KLD 534 KLD Demand

Wastewater 248 KLD 250 KLD 498 KLD Generated

Existing STP Existing of 250 KLD STP Capacity STP of 250 KLD & proposed 250 KLD STP of 250 capacity KLD

Solid waste of about 1,809 kg/day will be generated (@ 0.40 kg/capita/day for residential and @ 0.20 kg/capita/day for floating). As per Total (After Description Earlier Proposed Expansion) EC Solid waste 880 929 kg/day 1,809 kg/day generation kg/day

The solid waste will be collected in designated place where segregation of Biodegradable & Non- Biodegradable waste will be done at source. Presently, municipal solid waste is being sold to A2Z waste management (Ludhiana) Ltd. for which agreement has been done; copy is enclosed as Annexure-4. The municipal waste will be collected from the designated dump point of project site and disposed off directly to Tajpur Dumping Site.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

However, Mechanical composter will be installed for Biodegradable waste in future. 1.16 Facilities for long term Yes Local labourers will be hired from nearby areas housing of operational during construction phase. In addition, temporary workers? hutments will be provided for 10 workers. 1.17 New road, rail or sea traffic No No new infrastructure for this purpose is required. during construction or The project is well connected to - operation? Mullanpur village link road. Only internal roads are to be developed near the future buildings. 1.18 New road, rail, air No There is no need of New road, rail, air waterborne or waterborne or other other transport infrastructure including new or altered transport infrastructure routes and stations, ports, airports etc. including new or altered routes and stations, ports, airports etc 1.19 Closure or diversion of No There will be no need for diversion or closure of existing transport routes or existing traffic routes. infrastructure leading to changes in traffic movements? 1.20 New or diverted No There are no new or diverted transmission lines or transmission lines or pipelines within the project site. pipelines? 1.21 Impoundment, damming, No No Impoundment, damming, culverting, realignment culverting, realignment or or other changes to the hydrology of watercourses or other changes to the aquifers is proposed. hydrology of watercourses or aquifers? 1.22 Stream crossings? No There is no stream running across the site. 1.23 Abstraction or transfers of Yes During Construction period, a Water demand of 60 water form ground or KLD may be there depending upon phases of surface waters? construction. This will include domestic demand for 50 workers during peak period i.e. 3 KLD. Total 21 no. of rain water recharging pits will be provided so as to recharge the ground water. Further, 4 no. of rain water harvesting pits have already been constructed within the project and in future, 17 no. of pits will be constructed. Layout plan showing 21 rain

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

water recharging pits is enclosed as Drawing-7

Total EC Rain water Proposed (After Accorded Recharging Expansion) Pits 9 Pits 12 Pits 21 Pits

1.24 Changes in water bodies or No Not Applicable. the land surface affecting drainage or run-off? 1.25 Transport of personnel or Yes During construction phase, movement of 10-12 materials for construction, vehicles shall be there. And during operational phase, operation or parking provision will be provided within their decommissioning? individual plot owners and parking provision of 383 Cars within the Group Housing will be provided. Parking Provision Total (After EC Accorded Proposed Expansion)

243 ECS 140 ECS 383 ECS

1.26 Long-term dismantling or No Not Applicable decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an area No There shall be no influx but routine movement of in either temporarily or people. The maximum number of workers engaged in permanently? construction at any time is not more than 50. Out of these, more than half of the work force is local and only about 10 workers resides within project. The expected population of the project on full occupation will be 4,878 persons. This will also have a gestation period of 5 years after the development work and construction is over. So, there will be no sudden influx but gradual occupation. 1.29 Introduction of alien No The landscaping is being carried out with mainly species? local species like Ticoma Gaudi Chandi, Ficus

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

Panda, Duranta Golden, Juniperus, Chukrasia velutina, Dalbergia sissoo, Bishmarkia, Hyophorbe lagenicaulis, etc. 1.30 Loss of native species or No The site comprises of weed and grass. genetic diversity? There is no cutting or clearance of trees, shrubs and herbs. Therefore, no loss of native species. 1.31 Any other actions? No Not Applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Information/Checklist Yes/ Details thereof (with approximate quantities /rates, S.No. confirmation No wherever possible) with source of information data 2.1 Land especially Yes The change in land use has already been obtained from undeveloped or Chief Town Planner, Punjab. CLU is enclosed as agricultural land (ha). Annexure-1(b) & 1(c).

2.2 Water (expected source Yes The water will be provided from (2 Nos.) borewells. The & competing users) total water requirement after full occupancy will be 594 unit: KLD KLD. However, net fresh water requirement will be 534 KLD. Presently, water demand is 6 KLD which is being supplied by Borewell. CGWA Permission has also been obtained for 310 KLD; vide letter no. 21-4(503)/NWR/CGWA/2011- 4322 dated 17th Aug, 2012. Copy is enclosed as Annexur- 5(a). In addition, application has been submitted for the fresh water demand; Copy of acknowledgement along with set of application filed for additional water demand is enclosed as Annexure 17. 2.3 Minerals (MT) Yes Minerals such as sand & aggregates will be required during the construction phase. 2.4 Construction material – Yes Construction materials will be required for remaining stone, aggregates, development & construction work. This will be arranged sand/soil (expected from local areas in and around Ludhiana. source – MT) 2.5 Forests and timber Yes The Project shall involve minimum use of timber. All (source – MT) material required for shuttering purpose shall be that of mild steel. 2.6 Energy including Yes Present power load is 3522 KW. Total Power requirement

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

electricity and fuels of the project is 6,027 KW which is being provided by (source, competing Punjab State Power Corporation Limited. One DG set of users) Unit: fuel (MT), 180 kVA capacity has been kept for power back up for energy (MW) emergency purposes. EC Total After Description Proposed Accorded Expansion Power 2527 3500 KW 6,027 KW Load KVA Not DG set 1 DG of 180 kVA proposed

2.7 Any other natural No Not Applicable resources (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 3.1 Use of substances or No The project is for residential usage and does not materials, which are envisage any hazardous substances/ chemicals hazardous (as per MSIHC except for the used Oil from DG set (Hazardous rules) to human health or the Waste Category 5.1). The same is being stored in environment (flora, fauna, and HDPE tanks and is sold to the authorized recyclers water supplies) in the region. 3.2 Changes in occurrence of No Suitable drainage and waste management measures disease or affect disease (with frequent spray of insecticides etc.) are being vectors (e.g. insect or water adopted in both the construction and operational borne diseases) phase such that there is no stagnation of water or accumulation of waste. This effectively restricts the reproduction and growth of disease vectors. 3.3 Affect the welfare of people Yes The project provides improved living facility to e.g. by changing living local people. It also provides employment during conditions? construction period as well as later in activities like security, operation and maintenance of pollution

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

control equipments, landscaping etc.

3.4 Vulnerable groups of people No Not Applicable who could be affected by the project e.g. hospital patients, children, the elderly etc. 3.5 Any other cause No Not Applicable

4. Production of Solid Wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, confirmation No wherever possible) with source of information data 4.1 Spoil, overburden or No The project area is plain thus not much of the land will mine wastes be excavated. 4.2 Municipal waste Yes The construction waste will be used in making the (domestic and or internal roads/floors. commercial wastes) About 1,809 kg/day of solid waste will be generated once project is fully operational.

The solid waste will be collected in designated place where segregation of Biodegradable & Non- Biodegradable waste will be done at source. Presently, municipal solid waste is being sold to A2Z waste management (Ludhiana) Ltd. for which agreement has been done; copy is enclosed as Annexure-4. The municipal waste will be collected from the designated dump point of project site and disposed off directly to Tajpur Dumping Site. However, Mechanical composter will be installed for Biodegradable waste in future. As per Total (After Description Earlier Proposed Expansion) EC Solid waste 880 929 kg/day 1,809 kg/day generation kg/day

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

4.3 Hazardous wastes (as per Yes Category 5.1, used oil from DG sets. Hazardous Waste Management Rules) 4.4 Other industrial process No Not Applicable wastes 4.5 Surplus product No Not Applicable 4.6 Sewage sludge or other Yes STP sludge will be generated as sewage will be treated sludge from effluent in existing STP of 250 KLD & proposed STP of 250 treatment KLD capacity. 4.7 Construction or Yes The construction waste generated during development demolition wastes work is being used in making the internal roads/floors. 4.8 Redundant machinery or No Redundant machinery will not be generated. equipment 4.9 Contaminated soils or No Contaminated soils or other materials will not be other materials generated. 4.10 Agricultural wastes No Not Applicable

4.11 Other solid wastes No Not Applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 5.1 Emissions from combustion Yes The project has installed 1 DG of 180 kVA of fossil fuels from stationary capacity which run on diesel. These are to be or mobile sources used only as standby and comply with emission limits as given in GSR 520 (E) EIA rules 2003 at the manufacturing stage itself. 5.2 Emissions from production No No production processes involved. Hence, there processes will be no such emissions. 5.3 Emissions from materials No Not Applicable handling including storage or transport

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

5.4 Emissions from construction Yes Dust will be generated during activities as activities including plant and excavation for future development; the equipment foundation shall be excavated in a minimum time by using machines. The vehicles which carry construction materials as sand will be covered from top and made wet before movement and thus, no dust will be generated. 5.5 Dust or odours from Yes Dust is anticipated during loading and unloading handling of materials of construction material and excavation of upper including construction earth surface. These will however be temporary materials, sewage and waste in nature, which will be controlled by providing water sprinklers. Tarpaulin cover will be provided on stored loose materials to reduce the dust emission. The construction material involved shall not provide any odour. Greenery has been done along the boundary and Solid Waste Segregation Area to mitigate crossover of odours if any. 5.6 Emissions from incineration No No incineration of waste is proposed. of waste 5.7 Emissions from burning of No Open burning of biomass/other material will be waste in open air (e.g. slash prohibited on site. materials, construction debris) 5.8 Emissions from any other No Not Applicable sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist Yes/No Details thereof (with approximate quantities confirmation /rates, wherever possible) with source of information data 6.1 From operation of Yes Source of noise in the operational phase is from equipment e.g. engines, backup DG set (which will be in operation only ventilation plant, crushers during power failure) and pumps & motors. The DG set, is with in-built acoustic enclosure as approved by CPCB and confirming to MoEF Notification, GSR 371 (E).

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

6.2 From industrial or similar No Not Applicable processes 6.3 From construction or Yes Due to various construction activities, there will demolition be short-term noise impacts in the immediate vicinity of the project site. No construction at night shall be there. 6.4 From blasting or piling No Not Applicable 6.5 From construction or Yes The traffic during construction phase may be operational traffic around only 10 vehicles in a day. This shall not have any significant impact. However, adequate Parking provision will be the responsibility of individual plot owners and ECS proposed for Group Housing. In addition, adequate green is being provided within the project. 6.6 From lighting or cooling No Not Applicable systems 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: S.No. Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 7.1 From handling, storage, use No The used oil from DG sets is being carefully or spillage of hazardous stored in HDPE drums at isolated storage, and materials periodically sold to authorized recyclers. All precautions are being taken to avoid spillage from Storage as per The Hazardous Wastes (Management & Handling) Rules, 1989.

7.2 From discharge of sewage or Yes About 498 KLD of sewage shall be generated other effluents to water or the from the project after full occupancy which will land (expected mode and be treated in Existing STP of 250 KLD & place of discharge) proposed STP of 250 KLD. Treated water shall be recycled for the purpose of irrigation and flushing in group Housing within the project and remaining will be discharged for adjacent land reserved for karnal technology.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

7.3 By deposition of pollutants No Not Applicable emitted to air into the land or into water 7.4 From any other sources No Not Applicable

7.5 Is there a risk of long term No Not Applicable build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.No. Information/Checklist Details thereof (with approximate quantities confirmation Yes/ /rates, wherever possible) with source of No information data 8.1 From explosions, spillages, Yes To deal with any fire related accident, fire- fires etc. from storage, fighting facility is being provided within the handling, use or production project. of hazardous substances. 8.2 From any other causes No The Building shall comply with the requirements of National Building Code towards Fire Safety for multistory structures. 8.3 Could the project be affected Yes The Building is designed against Earthquakes by natural disasters causing for Zone-IV requirements as laid down in NBC. environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.No. Information/Checklist Details thereof (with approximate quantities confirmation Yes/ /rates, wherever possible) with source of No information data 9.1 Lead to development of Yes The project is upcoming residential project that supporting. utilities, provides high end facilities to the population and ancillary development or isn‟t likely to impact the environment adversely

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

development stimulated by in any manner. There shall not be any further the project which could consequential cumulative impacts. have impact on the environment e.g.: The project will have positive impact on the ancillary infrastructure like road, markets, public health, amenities, conveyance facilities etc. •Supporting infrastructure The project is proposed for the development of (roads, power supply, residential plots, Group housing, commercial waste or waste water area, amenities & institutional area etc. only. treatment, etc.) • housing development Not applicable Not applicable Not applicable

• extractive industries • supply industries • other 9.2 Lead to after-use of the No Not Applicable site, which could have an impact on the environment 9.3 Set a precedent for later Yes The project provides good infrastructure & developments better life style and will set an example later development in the areas. 9.4 Have cumulative effects No Not Applicable due to proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity S.No. Name/ Aerial distance (within Areas Identity 15 km) Proposed project location boundary 1 Areas protected under international None There is no such area conventions, national or local legislation for present within 15 km of their ecological, landscape, cultural or other the project site. However, related value Tiger Safari Zoo is

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

situated at approx. 10 km from the project site. 2 Areas which are important or sensitive for Rajwaha Minor Approx. 0.5 km; S ecological reasons - Wetlands, watercourses Canal or other water bodies, coastal zone, Sidhwan Canal Approx. 1 km; S biospheres, mountains, forests 3 Areas used by protected, important or None Nil sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground None Nil waters 5 State, National boundaries None Nil

6 Routes or facilities used by the public for Ludhiana Road Approx. 5 km, S access to recreation or other tourist, pilgrim (NH-95) areas 7 Defense installations None NA 8 Densely populated or built-up area Yes The project is situated within well established Ludhiana 9 Areas occupied by sensitive man-made land Neurociti Hospital Approx. 9 km; SE uses (hospitals, schools, places of worship, community facilities) Delhi Public School Approx. 2 km; SE Ludhiana

Shamrock Christian Approx. 4 km; NE Senior Secondary School

Iskcon Temple Approx. 11 km; SE Ludhiana Approx. 8 km; E Shiv Temple

Gurdwara Sri Guru Approx. 8 km; SE Singh Sabha 10 Areas containing important, high quality or No None scarce resources (ground water resources,

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No The area is not subjected environmental damage. (those where to any environmental existing legal environmental standards are damage. exceeded). 12 Areas susceptible to natural hazard which No The site falls under the could cause the project to present zone IV as per the environmental problems (earthquakes, Seismic Zone Map of subsidence, landslides, erosion, flooding or India. extreme or adverse climatic conditions) There are no possibilities of project getting as per records available.

(IV) Proposed Terms of Reference for EIA studies

Not Applicable as project comes under category 8(a).

(b) I hereby give the Undertaking that the data and information given in the application and enclosure are true to the best of my knowledge and belief, I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.

Date: 20.07.2019 Place: Ludhiana

Kunal Verma 3-A, Industrial Area –A Extension, Ludhiana Punjab 141003.

NOTE:

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01 Expansion in Environmental Clearance “Rajgadh Estates Phase- II & Phase- II Ext.” Village Birmi, Ludhiana, Punjab M/s Dev Arjuna Promoters & Developers (P) Ltd. Form I

1. The project involving clearance under Coastal Regulation zone Notification, 1991 shall submit with the application a C.R.Z map duly demarcated by one of the authorized agencies, showing the project activities, w.r.t. C.R.Z (at the stage of TOR) and the recommendation of the state coastal zone Management Authority (at the stage of EC). Simultaneous action shall also be taken to obtain the requisite clearance under the provisions of the C.R.Z Notification, 1991 for the activities to be located in the CRZ. 2. The project to be located within 10 km of the National parks, Sanctuaries, Biophere Reserves, Migratory Corridors of wild Animals, the project proponent shall submit the map duly authenticated by chief wildlife warden showing these features vis-à-vis the project location and the recommendation or comments of the Chief wildlife warden thereon (at the stage of EC). 3. All correspondence with the Ministry of Environment & Forests including submission of application for TOR/Environmental Clearance, subsequent clarification, as may be required from time to time, participation in the authorized signatory only. The authorized signatory should also submit a document in support of his claim of being an authorized signatory for the specific project.

Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Format No. EL\EIA\F-5.3\9 Dated 15.07.2019, Rev.01