(Bankhedi and Sohagpur Water Supply) Initial Environmental Examina
Total Page:16
File Type:pdf, Size:1020Kb
Initial Environmental Examination Document Stage: Draft Project Number: 42486-016 February 2016 IND: Madhya Pradesh Urban Services Improvement Program – Water Supply Improvement in Bankhedi and Sohagpur Package No: MPUSIP-1C Prepared by Madhya Pradesh Urban Development Company, Government of Madhya Pradesh for the Asian Development Bank. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. 1 Initial Environmental Examination Project No.: 42486 IND: Madhya Pradesh Urban Services Improvement Program –Package 1C 1 CURRENCY EQUIVALANCE (As on 1 Feb, 2016) Currency Unit - Conversion INR 1.00 = $ 0.015 $ 1.00 = INR 66.00 Abbreviations AC – Asbestos Cement ADB – Asian Development Bank ASI – Archeological Survey of India ASO – Assistant Safeguards Officer CFE – Consent for Establishment CFO – Consent for Operation CPCB Central Pollution Control Board EA – Executing Agency EAC – Expert Appraisal Committee EC – Environmental Clearance EHS – Environmental Health & Safety EIA – Environmental Impact Assessment EMP – Environmental Management Plan; ESR – Elevated Service Reservoir GOI – Government of India GOMP – Government of Madhya Pradesh IA – Implementing Agency IEE – Initial Environmental Examination; KL - Kilo liter NP – Nagar Parishad LPCD – Liters per Capita per Day MFF – Multi trench financing facility MLD – Million Liters per Day MOEF – Ministry of Environment and Forest MPPCB – Madhya Pradesh Pollution Control Board MPUDC – Madhya Pradesh Urban Development Company MPUSIP – Madhya Pradesh Urban Services Improvement Program NOC – No Objection Certificate OHT – Over Head Tank PE – Polyethylene PHED – Public Health Engineering Department PIU – Project Implementation Unit; PMC – Project Management Consultant PMU – Project Management Unit PO – Project Officer PPTA – Project Preparatory Technical Assistance PWD – Public Works Department REA – Rapid Environmental Assessment Checklist RoW – Right of Way 2 SEIAA – State Environmental Impact Assessment Authority SPS – Safeguard Policy Statement, 2009 ToR – Term of Reference UDED – Urban Development & Environment Department ULB – Urban Local Body WHO – World Health Organization WRD – Water Resource Department WSS – Water Supply Scheme WTP – Water Treatment Plant WEIGHTS AND MEASURES οC Degree Celsius km Kilometre lpcd litres per capita per day mm millimeter m metre MLD million litres per day mm millimetre Nos Numbers sq.km Square Kilometer MCM Million cubic meter 3 TABLE OF CONTENT 1. INTRODUCTION ....................................................................................... Error! Bookmark not defined. 1.1 BACKGROUND ...................................................................................... Error! Bookmark not defined. 1.2 REPORT STRUCTURE .......................................................................... Error! Bookmark not defined. 2. DESCRIPTION OF THE PROJECT ......................................................... Error! Bookmark not defined. 2.1 PROJECT AREA ..................................................................................... Error! Bookmark not defined. 2.2 EXISTING WATER SUPPLY SITUATION .............................................. Error! Bookmark not defined. 2.2.1 SOHAGPUR ................................................................................. Error! Bookmark not defined. 2.2.2 BANKHEDI ................................................................................... Error! Bookmark not defined. 2.3 PROPOSED PROJECT COMPONENT ................................................. Error! Bookmark not defined. 2.3.1SOHAGPUR .................................................................................. Error! Bookmark not defined. 2.3.2 BANKHEDI ................................................................................... Error! Bookmark not defined. 2.4 PROJECT IMPLEMENTATION SCHEDULE .......................................... Error! Bookmark not defined. 3. POLICY, LEGAL & ADMINISTRATIVE FRAMEWORK ............................ Error! Bookmark not defined. 3.1. ADB POLICY .......................................................................................... Error! Bookmark not defined. 3.2 NATIONAL ENVIRONMENTAL LAWS ................................................... Error! Bookmark not defined. 4. DESCRIPTION OF THE ENVIRONMENT ................................................ Error! Bookmark not defined. 4.1 METHEDOLOGY USED FOR BASELINE STUDY ................................ Error! Bookmark not defined. 4.2 BASELINE ENVIRONMENTAL PROFILE .............................................. Error! Bookmark not defined. 5. ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES .............. Error! Bookmark not defined. 5.1 OVERVIEW ............................................................................................. Error! Bookmark not defined. 5.2 PRE-CONSTRUCTION IMPACTS–DESIGN & LOCATION ................... Error! Bookmark not defined. 5.3 CONSTRUCTION IMPACT ................................................................................................................. 54 6. PUBLIC CONSULTATION AND INFORMATION DISCLOSURE ........................................................... 64 6.1 OVERVIEW ........................................................................................................................................... 64 6.2 PUBLIC CONSULTATION .................................................................................................................... 64 6.3 INFORMATION DISCLOSURE ............................................................................................................. 65 4 7. PROJECT SPECIFIC GRIEVANCE READRESS MECHANISM ............................................................ 66 8. ENVIRONMENTAL MANAGEMENT PLAN ............................................................................................ 69 8.1 OVERVIEW ........................................................................................................................................... 69 8.2 ENVIRONMENT MANAGEMENT PLAN .............................................................................................. 70 8.3 IMLEMENTATION ARRANGEMENT ................................................................................................... 89 8.4 SAFEGUARDS COMPLIANCE RESPONSIBILITIES ........................................................................... 89 8.5 TRAINING NEEDS ............................................................................................................................ 91 8.6 MONITORING AND REPORTING ........................................................................................................ 92 8.7 EMP IMPLEMENTATIONCOST ........................................................................................................... 93 9. CONCLUSION AND RECOMMENDATION ............................................................................................ 95 LIST OF TABLES Table 1: Summery for proposed WSS component of Package 1C TownError! Bookmark not defined. Table 2: Applicable Environmental Regulations ........................................ Error! Bookmark not defined. Table 3: WHO Ambient Air& Noise Quality Guidelines .......................... Error! Bookmark not defined. Table 4: Baseline Characteristics of Package 1C Town ........................ Error! Bookmark not defined. Table 5: Site Environmental Features of Sohagpur ............................... Error! Bookmark not defined. Table 6: Site Environmental Features of Bankhedi Town ...................... Error! Bookmark not defined. Table 7:Water Source Quality of project .............................................................................................. 51 Table 8: Environmental component to be affected ............................................................................... 55 Table 9 :Design Stage Environmental Management Plan .................................................................... 70 Table 10:Environmental Management Plan of Anticipated Impacts during Pre-Construction .............. 73 Table 11:Environmental Management Plan of Anticipated Impacts during Construction ..................... 75 Table 12: Environmental Management Plan of Anticipated Impacts during Operation ........................ 85 Table 13: Environmental Monitoring Plan of Anticipated Impacts during Construction ........................ 86 Table 14: Environmental Monitoring Plan of Anticipated Impacts during Operation ............................ 88 Table 15: Outline Capacity Building Program on EMP Implementation…………………………………91 Table 16: Cost Estimates to Implement the EMP ………………………………………………… 93 5 LIST OF FIGURES Figure 1: Location of Project area Error! Bookmark not defined. Figure 2: Layout Plan of Sohagpur WSS Error! Bookmark not defined. Figure 3: Schematic Flow diagram of proposed WTP in Sohagpur Error! Bookmark not defined. Figure 4: Key elevation plan for Sohagpur WSS Error! Bookmark not defined. Figure 5: Layout plan for proposed WSS in Bankhedi Error! Bookmark not defined. Figure 6: Key Elevation Plan for Bankhedi