Tehsil Phillaur, Distt. Jalandhar, Punjab Contractor; Sh
Total Page:16
File Type:pdf, Size:1020Kb
Extension in validity of Environment Clearance Mining Site at Village Dhagara (Gag Dhagara), Tehsil Phillaur, Distt. Jalandhar, Punjab Contractor; Sh. Salwinder Singh S/o Sh. Ajaib Singh FORM I Application for Environmental Clearance APPENDIX I (See paragraph – 6) Form – I (I) Basic Information: S. No. Item No. Details 1 Name of the Project/s Extension in validity of Environment Clearance for Mining of Minor Minerals in the Revenue Estate of Village Dhagara (Gag Dhagara), Tehsil Phillaur, District Jalandhar, Punjab. 2 S. No. in the schedule The project falls under S.No. 1(a) - ‘Mining of Minor’ Category B2 i.e ≥5 and < 25 ha. 3 Proposed capacity / area / length/ Production capacity of Sand will be 2,18,280 TPA tonnage to be handled / command area Mining lease Area: 19.43Ha / lease area / number of wells to drilled No well is envisaged to be drilled 4 New/Expansion / Modernization EC Extension 5 Existing capacity / Area etc Existing in validity of EC capacity: 2,18,280 TPA (Mining Lease Area: 19.43 ha) 6 Category of the project ‘ A’, ‘B’ Category ‘B2’ 7 Does it attract the general conditions? No If Yes, Please Specify. 8 Does it attract the specific conditions? No If Yes, Please Specify 9 Location (Latitude/Longitude) 30°58'33.62" N to 30°58'17.83" N 75°34'45.77" E to 75°37'9.64" E Plot/ Survey/Khasra No. Block A 51/6,7,8,9 Block B 57/11,12,13,14,15 Block C 43/1, 2, 3, 4, 5, 6, 7, 8, 14, 15, 44/3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 45/1, 2, 3, 4, 5, 7, 8, 9, 10, 11, 12, 14, 15, 16, 17, 20 Village Gagdhagara Tehsil Phillaur District Jalandhar State Punjab 10. Nearest railway station / Airport along Nearest railway station - Nurmahal at a distance of with Distance in kilometers. approx.12 Km in north direction Nearest Airport – Ludhiana Airport at a distance of approx.38 Km in south east direction. 11 Nearest town/District headquarters Nearest Town – Sadhara at a distance of approx.0.83 along with distance in kilometers km in East Direction. Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in validity of Environment Clearance Mining Site at Village Dhagara (Gag Dhagara), Tehsil Phillaur, Distt. Jalandhar, Punjab Contractor; Sh. Salwinder Singh S/o Sh. Ajaib Singh FORM I Nearest City – Ludhiana at a distance of approx.25 km in South East Direction. District Head Quarter – Jalandhar at a distance of approx.38 km in North Direction. 12 Village Panchayat, Zilla Parishads, Gram Panchayat - Gag Dhagara, Block Phillaur, Municipal corporation, local Bodies District –Jalandhar, Punjab -144039. (Complete Postal address with Telephone No - +919465347750 telephone No. to be given) 13 Name of the applicant Sh. Salwinder Singh S/o Sh, Ajaib Singh 14 Registered address R/o Village: Ghudu Wala, PO Makhu, Tehsil Zira, Distt. Ferozepur, Punjab, India. 15 Address for correspondence : Name : Sh. Salwinder Singh Designation(owner/ Partner/CEO) Contractor Address Village: Ghudu Walla, PO Makhu, Tehsil Zira, Distt. Ferozepur, Punjab, India. Pin Code 142044 E- Mail [email protected] Telephone No. +91 9781312171 Fax No. 0172-4616225 16 Details of alternative Sites examined, Not Applicable, as it is a site specific project no if any. Location of these sites should alternate site is proposed. be shown on the topo Sheets. 17 Interlinked Projects Not Applicable, as the project is not interlinked with any other project. 18 Whether separate application of NA interlinked project has been submitted? 19 If Yes, date of submission. NA 20 If No, reason NA 21 Whether the Proposal involves approval / Clearance under : If Yes , details of the same and their to be given . (a) The Forest Conservation , Act,1980 No (b) the wild life Protection Act, 1972 No (c) The C.R.Z Notification, 1991. No 22 Either their is any government Order / policy relevant / relating to the site? 23. Forest land Involved (hectare) No Forest land is involved Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in validity of Environment Clearance Mining Site at Village Dhagara (Gag Dhagara), Tehsil Phillaur, Distt. Jalandhar, Punjab Contractor; Sh. Salwinder Singh S/o Sh. Ajaib Singh FORM I 24. Whether there is any litigation pending There is no litigation pending against the project. against the project and /or land in Undertaking regarding the same is enclosed as which the Projects is proposed to be Annexure –VII. set up? (a) Name of the court (b) Case no. (c) Orders / Directions of the Courts , if any and its relevance with the Project. (II) Activity 1. Construction, Operation or Decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change No The lease area is part of riverbed hence; the in land use, land cover or activity will not change the topography including increase in landuse/topography cover as extracted intensity of land use (with respect material will get replenished in every to local land use plan) monsoon season. 1.2 Clearance of existing land, No The entire mining lease area being part of vegetation and buildings? river bed of Satluj there is no vegetation in the leased out area. Hence, there would be no clearance of existing land, vegetation and buildings. 1.3 Creation of new land uses? No The mining activity will be confined to the lease area so no new land use will be created. 1.4 Pre-construction investigations No NA e.g. bore houses, soil testing? 1.5 Construction works? No No construction works will be done. 1.6 Demolition works? No No demolition work will be done. 1.7 Temporary sites used for Yes Local people will be hired for mining construction works or housing of activities; hence temporary rest shelters will construction workers? be built for the workers, for only day time requirements. 1.8 Above ground buildings, No The work involves excavation of sand from structures or earthworks river bed of Satluj. Excavated material will including linear structures, cut get replenished in every rainy season. and fill or excavations Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in validity of Environment Clearance Mining Site at Village Dhagara (Gag Dhagara), Tehsil Phillaur, Distt. Jalandhar, Punjab Contractor; Sh. Salwinder Singh S/o Sh. Ajaib Singh FORM I 1.9 Underground works including No There will not be any underground mining or mining or tunneling? tunneling. 1.10 Reclamation works? No NA 1.11 Dredging? No NA 1.12 Offshore structures? No -- 1.13 Production and manufacturing No Only Excavation of sand from riverbed Satluj processes? is involved. 1.14 Facilities for storage of goods or No Minerals extracted will be loaded directly materials? into trucks to the end users/local market. Hence, no storage facility will be required. 1.15 Facilities for treatment or No No solid waste generation will be Expected. disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing No Only local villagers from nearby villages will of operational workers? be employed for the mining activity. Thus no long term housing facility is required. 1.17 New road, rail or sea traffic No NA during construction or operation? 1.18 New road, rail, air waterborne or No There is already an approach road connecting other transport infrastructure to mining lease area to the nearest metalled including new or altered routes road so, new road, rail or sea traffic during and stations, ports, airports etc construction or operation is envisaged. 1.19 Closure or diversion of existing No There would be no closure or diversion of transport routes or infrastructure existing routes. Existing road will be used for leading to changes in traffic transportation purpose. movements? 1.20 New or diverted transmission No NA lines or pipelines? 1.21 Impoundment, damming, No No Impoundment, damming, culverting, culverting, realignment or other realignment or other changes to the changes to the hydrology of hydrology of watercourses or aquifers is watercourses or aquifers? envisaged. 1.22 Stream crossings? No No stream crossings are involved. 1.23 Abstraction or transfers of water Yes About 1.15 KLD will be required dust form ground or surface waters? suppression purpose and about 1.0 KLD for domestic therefore total water requirement is about 2.15 KLD. The water will be drawn from the nearby area. 1.24 Changes in water bodies or the No There will be no change in the land surface land surface affecting drainage or affecting drainage or run-off as mining will Consultant: Eco Laboratories & Consultants Pvt. Ltd. QCI-NABET Approved EIA Consultant Extension in validity of Environment Clearance Mining Site at Village Dhagara (Gag Dhagara), Tehsil Phillaur, Distt. Jalandhar, Punjab Contractor; Sh. Salwinder Singh S/o Sh. Ajaib Singh FORM I run-off? be limited within the river bed of Satluj. 1.25 Transport of personnel or Yes In the operation phase Sand/gravels will be materials for construction, picked and will be loaded directly into trucks operation or decommissioning? and transported to local market. 1.26 Long-term dismantling or No No long term dismantling or decommissioning or restoration decommissioning work is envisaged. works? Plantation will be done along the both sides of roads and near civic amenities in consultation with the local authorities. 1.27 Ongoing activity during No Only picking of gravel will be carried out as decommissioning which could per the approved mine plan no have an impact on the decommissioning would be there which environment? could have any adverse impact on environment.