Minutes 3Rd CAD Meeting 13-06-14
Total Page:16
File Type:pdf, Size:1020Kb
Minutes of the CAD Committee 3rd meeting held on 13-06-2014, in the Chambers of the Engineer-in-Chief (A.W), 3rd Floor, Jalasoudha Building, Errummanzil, Hyderabad on O&M Action Plan of 2014-15. Officers Present: 1. M.Venkateswara Rao 2. M.Venkateswara Rao, Engineer-in-Chief (Admn.Wing), Engineer-in-Chief (Irrigation), CAD Committee, Chairman, A.P. CAD Committee Member, A.P. 3. M.Giridhara Reddy, 4. Mohd. Mahboob Hussian, Chief Engineer, CDO, Executive Engineer, CAD, CAD Committee Member, A.P. CAD Committee, Convenor, A.P. * * * * * The 3rd CAD Committee meeting was held on 13-06-2014 in the Chambers of the Engineer-in-Chief (A.W), A.P, 3rd floor, Jalasoudha Building, Errummanzil, Hyderabad for finalization of O&M works Action plan for the year 2014-15. The Engineers-in-Chief (Irrigation) and the Chief Engineers have submitted the proposals of O&M works under Category ‘A’. The above proposals were reviewed by the CAD Committee and approved the Annual Action plan of O&M works which are as shown below: Category-A (Rs. In Lakhs) HOA 2700– 80 – MH 800 O.E – SH (14) -270/272 Action Plan Action Plan Project Water Tax Proposed Approved Sl. HOD Circle Division Remarks Name Eligible No. of No. of Amount Amount works works 1 2 3 4 5 6 7 8 9 10 11 Drainage 1 Division, 146 241.75 146 241.75 Approved. Repalle, I.C. Guntur 1506.41 KDS Drainage Divn, 2 32 52.69 32 51.97 Approved. Chirala ENC(I) Sub Total 178 294.44 178 293.72 Drainage IC, 3 GDS Division, 48 416.00 48 416.00 Approved. Dowlaiswaram 425.715 Kakinada 10 Nos 15.64 10 13.04 WUA C.E. Nagavali 2 Nos Approved. 4 North River I.C.Bobbili I.D.Srikakulam 20.60 3.89 2 3.89 Coast System DC The Estimated amounts are restricted to the extent 2 Nos PC 3.91 2 3.65 of available Water Tax Collection only. Sub Total 14 23.44 14 20.58 Grand Total : 240 733.88 240 730.30 Committee recommended for approval for the following list of works under Category-A Category -A Project : KDS, I.C.Guntur,Drainage Divn, Repalle S.No WUA/DC/PC Name of the work Amount O&M to R.M drain From Km 0.000 to Km 50.624 and 1 P.C 3996000 R.M Drain Old Course fom Km 0.000 to Km 23.924 O&M to B.M drain from Km 8.000 to Km 47.000 and B.M Drain Left 2 P.C 2489000 Arm from Km 4.000 to Km 9.654. Removal of Weed Growth in Tungabhadra drain from 3 P.C 1656000 KM 0.000 to Km 31.900 in Tungabhadra Drainage Basin. Removal of Weed Growth in Tenali drain drain from 4 P.C 700000 KM 0.000 to Km 26.050 in Tungabhadra Drainage Basin. 5 P.C O & M to Guntur Nallah drain from Km.0.00 to Km.22.475 995000 6 P.C O & M to Guntur No.2 drain from Km.0.000 to Km.3.450 76000 Total of PC Works 9912000 D.C WORKS 1 DC 34 Kolluru O&M to Chinapulivarru medium drain from km 0.00to5.00 84000 2 --Do-- O&M to Jagajjeru medium drain from km 0.00to 10.120 160000 3 DC 35 Vellaturu O&M to Kanagala affluent from km 0.00to 6.40 120000 4 --Do-- O&M to Surepalli medium drain from km 0.00to 8.80 115000 5 DC 36, Repalle O&M to Nagaram South drain from km 0.00 to 10.300 250000 6 DC 36 Repalle O&M to Allaparru Medium drain from Km 0.00 to 5.90 110000 7 --Do-- O&M to Kuchinapudi Medium drain from Km 2.50 to 6.80 132000 8 --Do-- O&M to Pillivagu Medium drain from Km 0.00 to 5.600 155000 9 DC 37 Morthota O&M to Jannakalava medium drain from km 0.00 to 4.80 110000 10 --Do-- O&M to Badekalava medium drain from km 0.00 to 4.80 108400 11 --Do-- O&M to Tungakalava medium drain from km 0.00 to 7.60 108400 12 --Do-- O&M to Pakalagadi medium drain from km 3.00 to 7.60 77000 13 DC 41 Govada O&M to L.G Affluent from km 0.00 to 4.60 65000 D.C No. 43 P.V O&M to Pedapalli No.1 Drain ,Pedapalli No.2 Drain and Pandicodu 14 365000 Palem. drain in Tungabhadra Drainage Basin under D.C No. 43 P.V Palem D.C No. 44 O&M to Yazali Drain from K.M 0.000 To 14.380 in Tungabhadra 15 540000 Jagarlamudi. Drainage Basin under D.C No. 44 Jagarlamudi. D.C No. 41 O& M to Kavuru affluent medium drain from K.M 0.000 to 8.200 in 16 230000 Govada. Repalle Main Drainage Basin under D.C No. 41,Govada. D.C No. 48 17 O& M to Ganapavaram Swamp Drain from K.M 0.000 To 7.300 183000 Bapatla-1 D.C No. 45 18 O& M to Konderu Drain from K.M 0.000 To 14.500 177000 Ponnur-1 19 DC 33, Vemuru O & M to Kollipara No.2 drain from Km.0.000 to Km.4.025 58000 20 DC 33, Vemuru O & M to Gunderu drain from Km.0.000 to Km.11.300 176000 21 DC 34, Kolluru O & M to Ravikampadu affluent drain from Km.0.000 to Km.9.600 197000 O & M to Edlapalli Affluent Medium drain from Km.0.000 to 22 44-Jagarlamudi 163000 Km.6.200 S.No WUA/DC/PC Name of the work Amount 23 44-Jagarlamudi O & M to D.R.B.C.C drain from Km.0.000 to Km.5.000 150000 24 39-Kolakaluru O & M to D.R.B.C.C drain from Km.5.000 to Km.10.500 151000 25 39-Kolakaluru O & M to Namburu drain & Ext. to Namburu drain 187000 26 39-Kolakaluru O & M to Guntur No.2 drain from Km.3.450 to Km.13.200 91000 27 39-Kolakaluru O & M to Kolakaluru No.1 drain & Kolakaluru No.2 drain. 108000 28 39-Kolakaluru O & M to Garagunta drain & Ext. to Garagunta drain. 141000 29 42-Kuchipudi O & M to Kopalle Affluent drain from Km.0.000 to Km.5.200 101000 30 DC-33 Vemuru O & M to Danthaluru Codu drain from Km.0.000 to Km.6.00 207300 31 DC-38 Duggirala O & M to Danthaluru Codu drain from Km.6.000 to Km.15.550 194000 32 DC-38 Duggirala O & M to D.R.B.C.C drain from Km.10.500 to Km.21.650 257400 33 DC-38 Duggirala O & M to Catch drain from Km.0.000 to Km.9.810 147200 TOTAL of DC Works 5418700 W.U.A WORKS 229 1 O&M to Chavali drain, Chavali No.1,No.2 drains& Gudavali Drains. 85000 Vemuru-2 O & M to Removal of Weed growth by Spraying Chemicals in 2 230 Penamarru Penamarru No.2,Chipulamma donka drain, Chavali Minor Drain and 94000 Penamarru No.1 Minor Drain. 3 231 Peravali O&M to Koma drains & Upper Koma 20000 4 236 Donepudi O & M to Donepudi drain and extension 17000 O&M to Aachammacheru No.1 & No.2 minor drains and extension 5 237 Kolluru 65000 drains 6 238, Pedapulivarru O & M to Akkivaripalem minor drain and Gorekapudi minor drain 35000 O & M to Karumur and extension and extesion to Karumur, Pallikona 7 239 Karumuru 20000 minor drain. O & M to Peteru NO.1 & 2, Oleru road side drain, Oleru(v) road side 8 240 Peteru 220000 drain, Vadamarugu drain O & M Battiprolu drain, Kondaveti Donka and Nattala Donka minor 9 243 Bhattiprolu 30000 drains. O & M to Allamudi minor. Konetipuram minor drain and extension to 10 244 Surepalli 50000 Surepalli drain O & M to Alluru Minor drain. Leading drain to Alluru drain , 11 245Kanagala 80000 Thotapalli No.1 from Km 0.000 to 1.500 & Ilavaram minor drain. 12 245Kanagala O & M to Reddypalem and Yellappa Minor drains. 32000 O & M to Thotapalli No.1 drain from Km 1.500 to 5.000 and 246 Thotapalli No.2 drain, Mangalagunta drain and Mangalagunta 13 155000 Dhulipudi extension, Palakodivada drain and extension drain & Addankivaripalem minor drain 14 247 Nagaram O & M to Pamidimarru, Bellamvaripalem and Maddiralamma(part) 80000 15 248 Arepalli O & M to Tatayya , Rojolu and Rajolu extension drains. 34000 O & M to Maddiralamma(part). Rallakalava and Nagaram -Muttupalli 16 249 Eletipalem 70000 minor drains. O & M to Pudivada, Lanka drain infalling in to R.M drain and Lanka 17 250 Edupalli 100000 drain infalling in to R.M drain Old Course, Edupalli minor drain. O & M to Penumudi minor drain from Km 0.000 to 6.800, Penumudi 251 18 Extension Drain,Nallazinka minor drain, Uppudi drain and Uppudi 309500 Repalle extension drain. 252 O & M to B.M drain Old Cousre infalling at Km 15.000 of B.M drain, 19 37000 Sajjavaripalem Ullipalem drain, Feeder drain to Ullipalem drain. S.No WUA/DC/PC Name of the work Amount O & M to B.M drain Old Cousre infalling at Km 13.000 and 12.200, 253 20 Horispeta drain, Buddadi lanka drain and Cheruvu drain, 125500 Mantripalem Manthripalem Drain.