Hawton Lane Route 3
Total Page:16
File Type:pdf, Size:1020Kb
Route 5 Blind summit on approach NORTH to road bridge Existing grass verge · Potential to locate cycle route Key Route 3 on shared footway. · Change speed limit along Proposed signage to warn vehicles Existing Sustrans Route 64 Hawton Lane Concrete Block Manufacturing Plant to Newark 2 miles of cyclists. Existing cyclists Existing Segregated Cycle Footway rejoin carriageway sign Wide access roads for HGV'S ROUTE 64 Existing Shared Cycle Footway turning in/out of industrial estate. Existing ramp connects Proposed Shared Cycle Footway 30/40 mph Farm Star Hawton Lane with Blind summit on approach to road bridge Ltd 3 Goods Yard signage Jewson National Route 64 and change in speed limit from residential area to industrial area. Proposed Segregated Cycle Footway 40 30 HAWTON LANE Proposed Signed Cycle Route THORPE CLOSE 40 30 Existing grass verge Cut line Construction Existing Dedicated Cycleway Access HAWTON LANE Proposed Dedicated Cycleway Existing / Proposed Toucan Crossing Existing Highway tree to be removed BOWBRIDGE LANE BOWBRIDGE X Existing cycle Crown lift existing vegetating to improve signage existing signage.(Signage way marks ramp to Cotham Bingham Existing Highway tree Proposed signage to access on to National Route 64) warn vehicles of cyclists ROAD ROUTE 64 NELSON GROSVENOR ROAD Existing cycle route within Width of surfaced footway varies cutting along track bed of former along Hawton Lane Newark to Bottesford Railway Turning HGV'S across 11.3m wide access Busy straight road with HGV'S. Higher road. Consider road markings/safety perceived risks with cyclists using footway. issues SOUTHERN LINK ROAD LINK SOUTHERN &URZQFRS\ULJKWDQGGDWDEDVHULJKWV Ordnance Survey 100019713. John Hunt Primary and Nursery School Improve carriageway - maintenance repairs LONDON ROAD Existing cycle track sign replaced with Proposed directional directional cycle signage Newark to the Rev Auth Date signage to London left and Fernwood right on segregated Status Description Drawn Ch'kd Road footway. Project Proposed directional WARWICK ROAD Newark Strategic Cycle signage to GARDENS Bowbridge Lane Route Improvement National Route 64 MASEFIELD CRESCENT 3 ROAD MEADOW THORPE CLOSE Status Project No. Cut line HOWARD'S B.S. Title B.S. Hawton Lane, Newark B.S. HAWTON LANE Proposed Cycle Route 3 Consultation Drawing CENTENARY Existing warning sign Vehicles pulling on attached to lamp KINGSWAY Scale Drawn Date /off parking area in column. A.S. Aug 17 front of shop and Ch'kd Date 1:1250 @A1 M.E. 29/8/17 install hazard signs CLOSE Auth Traced ROAD M.E. K.H. Drawing No. Rev LANSBURY ROAD EMD/HW10183/13-2 NELSON Proposed cycle signage to Hawton Lane urban extention site off Bowbridge Lane and National cycle Route 64 in partnership with &URZQFRS\ULJKWDQGGDWDEDVHULJKWV Ordnance Survey 100019713. www.viaem.co.uk Tel 01623 873873 Bilsthorpe Depot, Bilsthorpe Business Park,Bilsthorpe, Nottinghamshire NG22 8ST Route 3: Hawton Lane © Via East Midlands Limited,Registered in England no.09903246 Aug 30,2017 - 4:06pm I:\Highways\Design and Construction\Roads and Highways\Projects17-18\10000\10183 Newark Strategic Cycle Route Improv\LandRec\CAD\Newark Strategic Cycle Network\Cycle Route.dwg A1.