FEDERAL ENERGY REGULATORY COMMISSION Washington, DC 20426

DATE: May 03, 2002

MEMORANDUM TO: The Agency/Party Addressed

SUBJECT: Scoping of environmental issues for seismic remediation of the Saluda , Saluda Hydroelectric Project, FERC No. P-516, South Carolina

The Federal Energy Regulatory Commission (Commission) is requiring the seismic remediation of Saluda Dam at the Saluda Hydroelectric Project (FERC No. 516), licensed to South Carolina Electric and Gas Company. The project is located on the , in Richland, Lexington, Newberry, and Saluda counties, South Carolina.

The Commission intends to prepare an Environmental Assessment (EA) for the Saluda Dam Remediation Project, which will be used by the Commission to identify project impacts and to identify measures that may help mitigate the impacts caused by the project. To support and assist our environmental review, we are beginning the public scoping process to ensure that all pertinent issues are identified and analyzed, and that the environmental document is thorough and balanced.

We invite your participation in the scoping process, and are circulating the attached Scoping Document 1 (SD1) to provide you with information on the remediation project. We solicit your comments and suggestions on the SD1, which contains our preliminary list of issues and alternatives to be addressed in the EA.

We will hold two scoping meetings on May 17, 2000, to receive input on the appropriate scope of the environmental analysis. Both meetings will be held at the Embassy Suites Hotel, 200 Stoneridge Drive, Columbia, SC. A resource agency meeting will be held from 9:00 a.m to 12:00 noon. The public meeting will be held 7:00 p.m. until 9:00 p.m. The public and agencies may attend either or both meetings. The agency scoping meeting will focus on resource agency and non-governmental organization (NGO) concerns, while the public scoping meeting is primarily for public input.

Please review SD1 and, if you wish to provide comments, follow the instructions in section 3.0. If you have any questions concerning the scoping process, or the development of the EA for this project, please call John Mudre at (202) 219-1208.

Enclosure: Scoping Document 1 -2- cc: Mailing List Public Files

SCOPING DOCUMENT 1

SALUDA DAM SEISMIC REMEDIATION PROJECT

SOUTH CAROLINA

FERC Project No. 516

Federal Energy Regulatory Commission Office of Hydropower Licensing Washington, DC

May 2002 TABLE OF CONTENTS Section Page

1.0 INTRODUCTION ...... 1

2.0 SCOPING ...... 3 2.1 Purpose of Scoping ...... 3 2.2 Scoping Meetings ...... 4

3.0 REQUEST FOR INFORMATION ...... 5

4.0 PROPOSED ACTION AND ALTERNATIVES ...... 6 4.1 Applicant’s Proposed Action ...... 6 4.1.1 Description of Project Remediation ...... 6 4.1.2 Proposed Mitigative and Enhancement Measures ...... 7 4.2 Applicant’s Proposed Action With Commission Staff’s Modifications ...... 7 4.3 No-action Alternative ...... 7 4.4 Alternatives Considered But Eliminated From Detailed Analysis ...... 7 4.4.1 No-action Alternative ...... 8

5.0 SCOPE OF CUMULATIVE EFFECTS ANALYSIS AND ENVIRONMENTAL ISSUES ...... 8 5.1 Cumulative Effects ...... 8 5.1.1 Geographic Scope ...... 8 5.1.2 Temporal Scope ...... 8 5.2 Resource Issues ...... 9 5.2.1 Water Use and Quality ...... 9 5.2.2 Aquatic Resources ...... 9 5.2.3 Terrestrial Resources ...... 10 5.2.4 Threatened and Endangered Species ...... 10 5.2.5 Recreational Resources ...... 11 5.2.6 Land Use and Aesthetic Resources ...... 11 5.2.7 Cultural Resources ...... 11 5.2.8 Socioeconomic Resources ...... 11

6.0 EA PREPARATION SCHEDULE ...... 12

7.0 PROPOSED EA OUTLINE ...... 12

8.0 DISTRIBUTION LIST ...... 14

-iv- LIST OF FIGURES

Figure 1. General location of the Saluda Project and Lake Murray ...... 2

-v- 1.0 INTRODUCTION

The Federal Energy Regulatory Commission (Commission), under the authority of the Federal Power Act (FPA), licenses and oversees the operation of non-federal hydropower projects in the United States. As part of its oversight capacity, the Commission implements a dam safety program, through its Division of Dam Safety and Inspections (D2SI), to ensure that Commission-licensed projects comply with Federal dam safety standards and are designed constructed, and operated safely. Under 18 C.F.R. Part 12, the D2SI Regional Engineer has the authority to, among other things, require a licensee to take an action to repair or modify project works for the purpose of achieving or protecting the safety, stability, and integrity of project works.

It has been determined that the Saluda Dam near Columbia, SC (Figure 1) would fail if subjected to a repeat of the Charleston Earthquake that occurred in 1886. The magnitude of the Charleston earthquake is estimated by seismologists, including the United States Geological Survey, to be about 7.3. The Saluda Dam must be strengthened to withstand earthquakes in the interest of public safety for the thousands of people living downstream.

Consequently, the D2SI Director has directed South Carolina Gas and Electric Company (SCE&G), licensee for the Saluda Project (FERC No. 516), to design and construct a seismic stabilization of the Saluda Dam. Several alternatives were considered and it was concluded that a composite structure comprised of a rock fill berm in the downstream slope at the downstream toe of the existing dam and a free-standing roller compacted concrete dam at the downstream toe of the existing dam (where the rockfill berm would not fit due to space limitations) should be constructed. On March 25, 2002, SCE&G submitted the 95% complete design and plans and specifications package for Commission review. Although it was initially believed that remediation of the dam could be conducted without an impact to water levels in the Saluda Dam impoundment (i.e., Lake Murray), subsequent analyses, completed in March 2002, revealed the necessity of lowering Lake Murray to elevation 345 to ensure public safety during construction activities at the toe of the dam. This represents a 7 - 13 foot decrease from the normal Lake Murray water level, which varies seasonally, and is within the operating range allowed by the project license.

The Commission's Regulations categorically exclude from review under the National Environmental Policy Act of 1969 (NEPA)1, certain types of actions which do

1 National Environmental Policy Act of 1969, as amended (Pub. L. 91-190. 42 U.S.C. 4321-4347, January 1, 1970, as amended by Pub. L.94-52, July 3, 1975, Pub. L. 94- 83, August 9, 1975, and Pub. L. 97-258, section 4 (b), Sept. 13, 1982). -2- -3- not have a significant effect on the human environment.2 This categorical exclusion applies to compliance actions involving dam safety. However, the regulations also provide an exception to such categorical exclusions by stating that the Commission may consider public comment, and will prepare an environmental document, where circumstances indicate that an action may be a major federal action significantly affecting the quality of the human environment.3

In order to determine whether the Saluda Dam seismic remediation project is a major federal action significantly affecting the quality of the human environment and in order to identify mitigative measures may be implemented to reduce the impacts of the remediation project, the Commission staff intends to prepare an Environmental Assessment (EA) that describes and evaluates the probable effects, including an assessment of the site-specific and cumulative effects, if any, of the proposed action and alternatives. The EA preparation will be supported by a scoping process to ensure the identification and analysis of all pertinent issues.

2.0 SCOPING

2.1 Purpose of Scoping

Scoping is the process used to identify issues, concerns, and opportunities associated with a proposed action; the process, according to the NEPA, should be conducted early in the planning stages of the project.

The purposes of this Scoping Document 1 (SD1) are as follows:

• Invite participation of federal, state, and local resource agencies; Native American tribes; and individuals to identify significant environmental issues related to the proposed action.

• Determine the depth of analysis and significance of issues to be addressed in the EA.

C Identify how the project would or would not contribute to cumulative impacts in the project area and the Saluda River basin.

C Identify reasonable alternatives to the project that we should evaluate.

2 18 C.F.R. 380.4(a)(3)

3 18 C.F.R. 380.4(b) -4-

Following the comment period for this SD1, all issues raised will be reviewed and decisions made about the level of analysis needed. If preliminary analysis shows that any issues presented in this SD1 have little potential for causing significant impacts, the issue(s) will be identified and the reasons for not providing a more detailed analysis will be given in the EA.

The staff will revise this SD1, as necessary, to reflect comments received during the comment period, and will then issue Scoping Document 2 (SD2). If no substantial comments are received, and no revisions to the SD1 are necessary, we will notify all participants by letter.

2.2 Scoping Meetings

We will hold two scoping meetings in the project area. We invite all interested agencies, non-governmental organizations, Native American tribes, and individuals to attend one or both of the meetings and to assist the staff in identifying the scope of environmental issues to be analyzed in the EA. The times and locations of these meetings are as follows:

Morning Scoping Meeting

When: Friday, May 17, 2002, from 9:00 a.m. to noon Where: Embassy Suites Hotel 200 Stoneridge Drive Columbia, South Carolina

Evening Scoping Meeting

When: Friday May 17, 2002, from 7:00 p.m. to 9:00 p.m. Where: Embassy Suites Hotel 200 Stoneridge Drive Columbia, South Carolina

Scoping meetings will be recorded by a court reporter, and all statements (oral and written) will become part of the Commission’s public record for the project. Before each meeting, all individuals who attend, especially those individuals that intend to make statements, will be asked to sign in and to clearly identify themselves for the record before speaking. -5-

Interested parties who choose not to speak or are unable to attend the scoping meetings may provide written comments to the Commission as described in the next section.

3.0 REQUEST FOR INFORMATION

The Commission staff requests federal, state, and local resource agencies; Native American tribes; and other entities and individuals to forward to the Commission any information that will assist it in conducting an accurate and thorough analysis of the site- specific and cumulative effects of the Saluda Dam seismic remediation project. The types of information requested include, but are not limited to:

C information, quantified data, or professional opinion that may contribute to defining the geographical and temporal scope of the cumulative effects analysis and identifying significant environmental issues;

C identification of, and information from, any other EA, Environmental Impact Statement, or similar document of study (previous, ongoing, or planned) relevant to the Saluda Dam seismic remediation project;

C existing information and data that may aid in describing the past and present actions and effects of the project and other developmental activities on water quality, fish and wildlife resources, cultural resources, recreation resources or land use;

C identification of any federal, state, or local resources plans and future project proposals that encompass the Saluda Project area, with information on when they will be implemented, if known. For example, proposals to construct or operate water treatment facilities, recreation areas, water diversions, or to implement fishery management programs; and

C documentation that would support a conclusion that the proposed project does or does not contribute to cumulative adverse or beneficial effects on resources and, therefore, should be excluded from further study or included for further consideration of cumulative effects.

Documentation should include, but need not be limited to: how the project would interact with other projects in the area and other developmental activities; results from studies; resource management policies; and reports from federal, state, and local agencies.

The requested information and scoping comments should be submitted in writing to the Commission no later than June 17, 2002. All correspondence must clearly show at the -6- top of the first page: "Saluda Hydroelectric Project, FERC No. 516." Send your comments and any other information about the project to:

Magalie R. Salas, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Scoping comments may be filed electronically via the Internet in lieu of paper. See 18 CFR 385.2001 (a)(1)(iii) and the instructions on the Commission’s web site (http://www.ferc.gov) under the “e-Filing” link.

Any questions concerning the scoping or preparation of the EA for this proposed action should be sent to John Mudre, e-mail address: [email protected], or telephone (202) 219-1208 Federal Energy Regulatory Commission, Office of Energy Projects.

4.0 PROPOSED ACTION AND ALTERNATIVES

In accordance with NEPA guidelines, our environmental analysis will consider, at a minimum, the following alternatives: (1) the applicant's proposed action, (2) the applicant's proposed action with Commission staff’s modifications, and (3) the no-action alternative.

4.1 Applicant’s Proposed Action

SCE&G proposes to remediate the Saluda Dam through the construction of a rock berm and a roller-compacted concrete (RCC) dam in and at the downstream toe of the existing Saluda Dam. In addition, SCE&G proposes a number of measures to mitigate the adverse impacts of the dam remediation project.

4.1.1 Description of Proposed Remediation

SCE&G proposes to remediate Saluda Dam by constructing a downstream rock-fill berm with a RCC section in the center of the dam at the toe of the existing Saluda Dam. The berm and RCC sections would be the water impoundment structure in the event of the failure of the existing dam during an earthquake. This berm would have a crest elevation of 372 feet and is composed of three sections with a total length of 7,850 feet. The northern rock-fill section is approximately 3,450 feet long with a maximum width of about 340 feet. The center section is composed of RCC and is about 2,100 feet long, with a maximum width of about 130 feet. The southern rock-fill section is about 3,700 feet long, with a maximum width of about 390 feet. -7-

Construction of the berm will require about five million cubic yards (CY) of rock fill and filter material obtained from a quarry site immediately downstream of the dam and about 1,000,000 CY of RCC. The center RCC section functions as a gravity-stabilized dam and is necessary because of space limitations in the area adjacent to the powerhouse. Except for 90,000 CY of cement, all materials will be obtained on site.

In accordance with Commission directives, SCE&G plans to award the contract for project construction by August 12, 2002, and to begin construction by November 1, 2002. The drawdown of Lake Murray is scheduled to begin about October 1, 2002, at a rate not to exceed six inches per day, in order to be at elevation 345 by November 1. The need for a drawdown will end with the completion of excavation and backfilling at the toe of the dam, at the end of July 2004. Refilling of the reservoir will be dependent on inflows, and can not be predicted with any certainty. The remediation project will be completed in early 2006.

4.1.2 Proposed Mitigative and Enhancement Measures

SCE&G proposes a number of measures to mitigate environmental impacts associated with the Saluda Dam Remediation Project. These include preparation of a cultural resources management plan, mitigation for impacts to wetlands downstream of the dam, and procedures for temporary extension of docks, among others.

4.2 Applicant’s Proposed Action With Commission Staff’s Modifications

We will review and consider alternatives to the proposed mitigative measures, including environmental measures not proposed by SCE&G. Modifications could include recommendations by the agencies, non-governmental organizations, Native American tribes, interested parties, and the Commission staff. These will be analyzed in the EA.

4.3 No-action Alternative

Under the no-action alternative, the Saluda Dam would not be strengthened to meet safety standards. Under this scenario, Lake Murray would need to be drained and the Saluda Project decommissioned. This is not considered a feasible alternative.

4.4 Alternatives Considered But Eliminated From Detailed Analysis

We propose eliminating the following alternatives from detailed study in the EA.

4.4.1 No-action Alternative -8-

Because of the significant long term adverse impacts to the human environment associated with the no-action alternative, it is not considered to be a feasible alternative.

5.0 SCOPE OF CUMULATIVE EFFECTS ANALYSIS AND ENVIRONMENTAL ISSUES

5.1 Cumulative Effects

According to the Council on Environmental Quality’s regulations for implementing NEPA (50 CFR § 1508.7), the cumulative effects of a proposed action are the effects on the environment that result from the incremental effect of the action when added to other past, present, and reasonably foreseeable future actions. Cumulative effects can result from individually minor but collectively significant actions taking place over a period of time, including hydropower and other land and water development activities.

Based on information in the licensee's project description, agency comments, other filings related to the project, and preliminary staff analysis, we have preliminarily identified that no resources have the potential to be cumulatively affected by the Saluda Dam seismic remediation project in combination with other activities in the Saluda River basin. However, this determination will be revisited based on scoping comments received.

5.1.1 Geographic Scope

The geographic scope of the analysis defines the physical limits or boundaries of the proposed action’s effects on the resources. Because the proposed action would affect the resources differently, the geographic scope for each resource may vary. Should potential cumulative impacts be identified through scoping, the geographic scope of those impacts will be discussed in SD2.

5.1.2 Temporal Scope

The temporal scope of our cumulative analysis in the EA, should potentially cumulatively impacted resources be identified, will include past, present, and future actions and their possible cumulative effects on each resource identified. The appropriate temporal scope regarding future actions will be determined on a resource-specific basis once potentially cumulatively impacted resources are identified. The analysis will concentrate on the effect on the resources from reasonably foreseeable future actions. The historical discussion will, by necessity, be limited to the amount of available information for each resource. -9-

We are seeking further information from federal, state, and other agencies and any other sources pertaining to past, present, and future actions and their effects on potentially cumulatively impacted resources (in the form of previous studies; present plans; and future plans, goals, or forecasts) in the Saluda River Basin (see section 3.0 for how to submit information).

5.2 Resource Issues

In this section, we present a preliminary list of environmental issues to be addressed in the EA. We identified the issues, which are listed by environmental resource area, through our review of SCE&G's project description and the Commission’s record for the Saluda Dam remediation project. This list is not intended to be exhaustive or final, but is rather an initial listing of issues that could be significant. After the scoping process is complete, we will review the list and determine the appropriate level of analysis needed to address each issue.

5.2.1 Water Resources

• The effects of lowering the reservoir on water temperature and dissolved oxygen concentration in the Saluda River downstream of the Saluda Dam.

• The effects of the extended drawdown of the reservoir on dissolved oxygen concentration and water temperature in Lake Murray.

• The effects of the drawdown on shoreline erosion, turbidity, and sedimentation.

• The potential impacts of the drawdown on groundwater supplies and wells.

• The potential impact of the drawdown on municipal water supply.

• The potential impact of the drawdown on authorized and unauthorized private water withdrawal systems.

5.2.2 Aquatic Resources

• The impacts of any changes in water temperature or dissolved oxygen concentration on the coldwater fishery in the Saluda River downstream of Saluda Dam.

• The effects of any changes in water temperature and dissolved oxygen concentrations in Lake Murray on reservoir fish populations, in particular, striped bass populations. -10-

• The effects of the drawdown on spawning habitat available for centrarchids.

• The effects of drawdown-related reduced reservoir volume on available fish habitat.

• The potential effects of the dam remediation on Essential Fish Habitat, as defined by the Magnuson-Stevens Fisheries Conservation and Management Act.

5.2.3 Terrestrial Resources

C The effects of proposed construction activities on about 4.2 acres of jurisdictional wetlands located downstream of below the existing Saluda Dam.

C The effects of the extended drawdown on Lake Murray wetlands, including shallow cove, buttonbush and willow flats, wet flats, and bottomland hardwood habitats, that are dependent on at least periodic hydrologic augmentation from the reservoir.

C The potential effects of the drawdown on preservation of the 75-foot buffer zone along the reservoir shoreline.

C The potential effects of the drawdown on identified Environmentally Sensitive Areas, as defined and identified in SCE&G's Shoreline Management Plan.

C The potential effects of the drawdown on special-status plants and animals, if present, and appropriate measures to minimize project effects.

5.2.4 Threatened and Endangered Species

C The potential effects of dam remediation and lake drawdown on the federally listed threatened bald eagle.

C The potential effects of dam remediation on the federally listed endangered shortnose sturgeon.

5.2.5 Recreational Resources

• The effects of the drawdown on public access to the lake at boat ramps.

• The effects of the drawdown on public access to the lake at marinas.

• The effects of the drawdown on public access to the lake at beaches and parks. -11-

• The potential effects of the drawdown of the reservoir on fishing in the lake.

• The ability of the existing marinas and access points to operate during the drawdown.

• The impacts of the drawdown on safe navigability of Lake Murray.

• The potential effects of human disturbance to the exposed reservoir bottom.

5.2.6 Land Use and Aesthetic Resources

• The potential effects of the drawdown on the aesthetic resources of the project area.

• The effects of construction traffic on local traffic.

5.2.7 Cultural Resources

C The potential effects of dam construction on cultural resources downstream of Saluda Dam.

C The potential effects of lake drawdown on cultural resources located in the reservoir.

5.2.8 Socioeconomics

C The effects of the prolonged drawdown on Lake Murray-related businesses, including marinas and restaurants.

C The effects of the drawdown on local tax revenues.

6.0 EA PREPARATION SCHEDULE

The tentative schedule for preparing the Saluda Dam Seismic Remediation Project EA is:

Major Milestone Target Date

Scoping Meetings May 17, 2002 Scoping Comments Due June 17, 2002 Draft EA Issued July 15, 2002 -12-

Final EA Issued September 15, 2002

7.0 PROPOSED EA OUTLINE

The preliminary outline for the Saluda Dam Remediation Project EA is as follows:

SUMMARY

I. ACTION

II. PURPOSE AND NEED FOR ACTION

III. PROPOSED ACTION AND ALTERNATIVES A. Applicant’s Proposed Action 2. Project Description 3. Proposed Environmental Measures B. Proposed Action with Commission Staff’s Modifications C. No-action Alternative D. Alternatives Considered but Eliminated from Detailed Study

IV. CONSULTATION AND COMPLIANCE A. Agency Consultation B. Compliance with Endangered Species Act C. Compliance with Essential Fish Habitat Requirements D. Compliance with National Historic Preservation Act

V. ENVIRONMENTAL EFFECTS A. General Description of the Saluda River Basin B. Scope of the Cumulative Effects Analysis 1. Geographic Scope 2. Temporal Scope C. Environmental Analysis 1. Water Resources 2. Aquatic Resources 3. Terrestrial Resources 4. Threatened and Endangered Species 5. Recreational Resources 6. Land Use and Aesthetic Resources 7. Cultural Resources 8. Socioeconomics -13-

VI. ISSUES AND RECOMMENDATIONS

VII. SUMMARY AND CONCLUSIONS

VIII. FINDING OF (NO) SIGNIFICANT IMPACT

IX. LITERATURE CITED

X. LIST OF PREPARERS

APPENDICES (if necessary) -14-

8.0 DISTRIBUTION LIST

Principal/Party Name/Address Representative Name/Address

Office of Project Review Advisory Council on Historic Pres. The Old Post Office Building 1100 Pennsylvania Ave NW, Ste 809 Washington , DC 20004-2501

John T. Gangemi Conservation Director American Whitewater 482 Electric Ave Bigfork , MT 59911-3641

Executive Director Appalachian Council of Governments PO Box 6668 Greenville , SC 29606-6668

Robin Carter President Columbia Audubon Society Columbia Audubon Society 4165 E Buchanan Dr Columbia, SC 29206-2846

Parkin Hunter Columbia Audubon Society 230 Harden Street Columbia , SC 29205 -15-

Regional Engineer FERC Atlanta Regional Office 3125 Presidential Pkwy Ste 300 Atlanta , GA 30340-3700

Regional Engineer FERC Atlanta Regional Office 3125 Presidential Pkwy Ste 300 Atlanta , GA 30340-3700

Ben Clary, City Mgr. Gaffney, City of PO Box 2109 Gaffney , SC 29342-2109

Chairman Georgia Public Service Commission 244 Washington St., SW Atlanta , GA 30334-9007

Regional Director Georgia Regional Forester Southern Region 1720 Peachtree St., NW Atlanta , GA 30309-2449

Governor of South Carolina State House Columbia , SC 29211 -16-

Charles G Ditmer President Hawleek Creek Homeowners Association 108 Robbie Rd Lexington , SC 29073-7814

Dan Wojoski President Hawley Creek Homeowners Association PO Box 876 Chapin , SC 29036-0876

Alfred J Hendron Jr., Engineer PO Box 125 Savoy , IL 61874-0125

Buren Mitchell 787 Living Inn Rd Prosperity , SC 29127-9188

Publisher - Editor IRMO News PO Box 175 Irmo , SC 29063-0175

Joy Downs Lake Murray Association Inc PO Box 495 Ballentine , SC 29002-0495

David Kinard President Lake Murray Association Inc. PO Box 495 Ballentine , SC 29002-0495 -17-

Publisher - Editor Lake Murray News PO Box 175 Irmo , SC 29063-0175

Steve Bell, President Lake Watch 2116 Kennedy St Columbia , SC 29205-4350

Mary Kelly, Representative League of Women Voters - Columbia Area PO Box 12541 Columbia , SC 29211-2541

James L. Leslie, Jr. PO Box 327 Irmo , SC 29063-0327

National Marine Fisheries Service Southeast Regional Office 9721 Executive Center Dr., N Saint Petersburg , FL 33702-2449

David H Rackley, Fishery Biologist National Marine Fisheries Service Habitat Conservation Division 219 Fort Johnson Rd Charleston , SC 29412-9110 -18-

Regional Director National Marine Fisheries Service Southeast Regional Office 9721 Executive Center Dr., N Saint Petersburg, FL 33702-2449

Chief National Oceanic & Atmospheric Admin. 14th & Constitution Ave. N. W. Rm. 6117 Ecology & Conservation Office - HCHB SP Washington , DC 20230-0001

Mary K. Rountree National Park Service SE Regional Office, Atlanta Federal Cntr 1924 Building -- 100 Alabama St., SW Atlanta , GA 30303

Chairman Newberry, County of PO Box 156 Newberry , SC 29108-0156

Wanda M. Whitfield Chairperson Saluda, County of RR 5 Box 824 Prosperity , SC 29127-9505

Save Sandy Beach, Inc. (Bundrick Island) 264 Ripley Station Rd Columbia , SC 29212-1970 -19-

Malcolm Leaphart, Chair SC Council Trout Unlimited 115 Conrad Circle Columbia , SC 29212-2619

Steven M Bradley P.E. Acting Director SC Dept. of Health & Environmental Cntl Dam Safety 2600 Bull St Columbia , SC 29201-1708

State Archaeologist SC Institute of Archaeology &Anthropology 1321 Pendleton Street University of South Carolina Columbia , SC 29208-0001

Gerrit Jobsis South Carolina Coastal Conserv League 1207 Lincoln St., Ste 203C Columbia , SC 29201-3153

Chairman South Carolina Council for Economic Dev PO Box 927 Columbia , SC 29202-0927

Paul S. League South Carolina Department of Natural Res. PO Box 167 Columbia , SC 29202-0167 -20-

Director South Carolina Dept of Archives & History 8301 Parklane Road Columbia , SC 29223-4905

Preservation Officer South Carolina Dept of Archives & History 8301 Parklane Road Columbia , SC 29223-4905

Rodger E. Stroup, Director South Carolina Dept of Archives & History 8301 Parklane Road Columbia , SC 29223-4905

Legal Department South Carolina Dept of Natural Resources 1201 Main St Ste 1100 Columbia , SC 29201-3265

Paul S. League South Carolina Dept of Natural Resources 1201 Main St Ste 1100 Columbia , SC 29201-3265

Director South Carolina Dept of Natural Resources 1201 Main St., Ste 1100 Columbia , SC 29201-3265 -21-

Executive Director South Carolina Dept of Natural Resources PO Box 167 Columbia , SC 29202-0167

Legal Department South Carolina Dept of Parks, Recreation and Tourism 1205 Pendleton St Columbia , SC 29201-3731

B. J. Willoughby General Counsel South Carolina Dept of Parks, Recreation and Tourism 1205 Pendleton St. Columbia , SC 29201-3731

Director South Carolina Dept of Parks, Recreation and Tourism 1205 Pendleton St. Columbia , SC 29201-3731

Sally C. Knowles Director South Carolina Division of Water Quality Bureau of Water Pollution Control 2600 Bull St. Columbia , SC 29201-1708

Eli S. Nauful Manager Beth W. Trump Coordinator South Carolina Electric & Gas Company South Carolina Electric & Gas Company PO Box 764 PO Box 764 Columbia , SC 29218-0001 Columbia, SC 29202-0764 -22-

Elizabeth Woolly South Carolina Electric & Gas Company PO Box 764 Columbia , SC 29218-0001

Randolph R. Mahan South Carolina Electric & Gas Company PO Box 764 Columbia , SC 29218-0001

Tommy Boozer Management South Carolina Electric & Gas Company PO Box 764 Columbia , SC 29218-0001

Neville O. Lorick V. President South Carolina Electric & Gas Company 111 Research Drive Columbia , SC 29203-9389

Lorraine Mckiney, MC-08 South Carolina Electric & Gas Company PO Box 764 Columbia , SC 29218-0001

State Forester South Carolina Forestry Commission PO Box 21707 Columbia , SC 29221-1707 -23-

State of South Carolina South Carolina Geological Survey Budget and Control Board Harison Forest Road Columbia , SC 29210

Attorney General South Carolina Office of Attorney General Wade Hampton Office Building Columbia , SC 29211

Office Director South Carolina Office of Ocean & Coastal Resource Management 1362 McMillan Ave., Ste. 400 Charleston , SC 29405-2035

Jeffrey Galan South Carolina Public Service Authority P.O. Box 398 Moncks Corner , SC 29461-0398

Chairman South Carolina Public Service Commission PO Box 11649 Columbia , SC 29211-1649

Mitch Perkins Director South Carolina State Energy Office Suite 820 1201 Main St. Columbia , SC 29201-3200 -24-

Angela M Viney, Executive Director South Carolina Wildlife Federation 2711 Middleburg Dr., Ste. 104 Columbia , SC 29204-2413

Chairman South Dakota Public Utilities Commission Capitol Building 500 E Capitol Ave Pierre , SD 57501-5070

Wayne Bowers City Mgr. Spartanburg, City of P.O. Box 1749 Spartanburg , SC 29304-1749

Kenneth Westmoreland, County Mgr. Spartanburg, County of PO Box 5666 Spartanburg , SC 29304-5666

Buford S. Mabry, Jr. State of South Carolina Deputy Attorney General of the State of SC PO Box 167 Columbia, SC 29202-0167

Gary D. Lauderdale, Sr. V. Pres. Texas Gas Transmission Corporation PO Box 20008 Owensboro , KY 42304-0008 -25-

Roger L Banks U.S. Fish & Wildlife Service 176 Croghan Spur Road, Suite 200 Charleston , SC 29407

Director U.S. Fish & Wildlife Service 176 Croghan Spur Road, Suite 200 Charleston , SC 29407

Cynthia Bohn U.S. Fish & Wildlife Service Ecological Services 1875 Century Blvd., NE, Ste. 200 Atlanta , GA 30345-3319

Southeast Office Director U.S. National Park Service U.S. Department of the Interior 100 Alabama St., SW Atlanta , GA 30303-8701

Development Director Upper Savannah Council of Governments PO Box 1366 Greenwood, SC 29648-1366

Commander US Army Corps of Engineers S. Atlantic Div. - Attn: CESAD-ET-CO-H 60 Forsyth St., SW, Rm 9M15 Atlanta , GA 30303-8801 -26-

District Engineer US Army Corps of Engineers PO Box 889 Savannah , GA 31402-0889

Dr. James Kardatzke, Ecologist US Bureau of Indian Affairs Eastern Regional Office 711 Stewarts Ferry Pike Nashville , TN 37214-2751

Area Director US Bureau of Indian Affairs Eastern Area Office M.S. 260-VASQ 3701 Fairfax Dr. Arlington , VA 22203-1700

Malka Pattison US Bureau of Indian Affairs Office of Trust Responsibilities 1849 C Street, NW, MS 4513 MIB Washington , DC 20240-0001

Fred Allgaier US Bureau of Indian Affairs 3000 Youngfield St., Ste. 230 Lakewood , CO 80215-6551

District Manager US Bureau of Land Management PO Box 631 Milwaukee , WI 53201-0631 -27-

District Manager US Bureau of Land Management Jackson District Office 411 Briarwood Dr., Ste. 404 Jackson , MS 39206-3058

Commanding Officer US Coast Guard MSO Charleston 196 Tradd St Charleston , SC 29401-1800

Commanding Officer US Coast Guard MSO Savannah 222 W Oglethorpe Ave., Ste 402 Savannah , GA 31401-3665

Steven S. Gilbert US Department of Agriculture U.S. Fish & Wildlife Service 176 Croghan Spur Road, Suite 200 Charleston, SC 29407

Commissioner US Department of Agriculture PO Box 11280 Columbia , SC 29211-1280

James H. Lee US Department of the Interior Office of the Solicitor 75 Spring St., SW, Ste. 1328 Atlanta , GA 30303-3309 -28-

Cynthia Bohn US Department of the Interior U.S. Fish & Wildlife Service Ecological Services 1875 Century Blvd, NE, Ste. 200 Atlanta, GA 30345-3319

John H. Harrington, Solicitor US Department of the Interior Russell Federal Building 75 Spring St., SW, Ste 304 Atlanta , GA 30303-3311

Horace G Clark, Regional Solicitor Susan Cielinski US Department of the Interior Fish and Wildlife Service 75 Spring St., SW, Ste 304 1875 Century Blvd., NE Atlanta , GA 30303-3311 Atlanta, GA 30345-3319

Manager US Department of Transportation 2100 2nd St., SW U.S. Coast Guard, GM2 Washington , DC 20590

Diana M. Woods US Environmental Protection Agency Wetlands Section 61 Forsyth St SW Atlanta , GA 30303-8931 -29-

Regional Forester US Forest Service U.S. Department of Agriculture 1720 Peachtree St., NW, Ste. 800 Atlanta , GA 30309-2449

District Chief US Geological Survey 720 Gracern Rd., Ste 129 Columbia , SC 29210-7658

Honorable Floyd Spence Honorable US House of Representatives Washington , DC 20515

Ernest F. Hollings, Honorable US Senate Washington , DC 20510

Strom Thurmond Honorable US Senate Washington , DC 20510

State Conservationist US Soil Conservation Service Room 950 1835 Assembly St. Columbia , SC 29201-2430

Legal Department Wildlife & Marine Resources Dept. PO Box 167 -30-

Columbia , SC 29202-0167