DurgaMadhusudan Shanker Prasad, Mishra, IAS IAS Secretary,Secretary, MOHUA, MoUD, GoI GoI & & Chairman,Chairman, BMRCL

Mahendra Jain, IAS Pradeep Singh Kharola, IAS Managing Director & Managing Director Addl. Chief Secretary to Govt.

Urban Development Dept. GovernmentM. Naveen of KumarKarnataka

Director (Finance)

Vijay Kumar Dhir

VijayDirector Kumar (P&P) Dhir

Director (P&P) N.M. Dhoke

Director (RSE & OM) N.M. Dhoke

DirectorU.A. Vasanth (RSE & Rao OM)

General Manager (T&R) &

Chief PublicU.A. Vasanth Relations Rao Officer

GeneralEditorial Manager Team (T&R) & Chief Public Relations Officer

T. L. Ravi Prakash

SeniorEDITORIAL Manager-Public TEAM Relations

& T. L. Ravi Prakash SeniorSrivas Manager Rajagopalan-Public Relations Executive Asst-Public Relations & Registered Office Address Srivas Rajagopalan

Bangalore Metro Rail

BangaloreCorporation Metro Limited, Rail 3rdCorporation Floor, BMTC Limited, Complex, 3rdK HFloor, Road, BMTC Shantinagar, Complex, K BengaluruH Road, Shantinagar,—560 027 Bengaluru —560 027 Telephone / Fax Nos

Ph:Ph: +91+91--080080--2296930022969300/ / 301301 Fax : 080-22969222

Co. Identification No. (CIN) For any suggestions about NammaU16286KA1994GOI016286 Metro email us at [email protected] or trav- [email protected] feedback helps us

serve you better. For any Yoursuggestions continued aboutfeedback Nammahelps us Metro serve E you-mail better. us at

[email protected] can also call on Tollor [email protected] Helpline No. 1800-425-12345. You can Shri Mahendra Jain, IAS, Managing Director, BMRCL & Sri N M Dhoke, Director (RSE

alsoTweet: view @cpronammetro the updates on & O&M) along with other officials visited BEML Factory in on 21.12.2017 ww.facebook.com / bmrcl. & inspected the Intermediate Cars which are under various stages of manufacture by You can also call on BEML Limited. During the inspection & review meeting, Shri Deepak Kumar Hota, Toll Free Helpline No. CMD, BEML Limited, Shri Aniruddh Kumar, Advisor (Rail & Metro) & his team were

present 1800-425-12345

Shri Mahendra Jain, IAS, Managing Director, BMRCL & Sri N M Dhoke, Director (RSE & O&M) along with other officials visited BEML Factory in Bangalore on 21.12.2017 & inspected the Intermediate Cars which are under various stages of manufacture by BEML Limited. During the inspection & review meeting, Shri Deepak Kumar Hota, CMD, BEML Limited, Shri Aniruddh Kumar, Advisor (Rail & Metro) & his team were present

DETAILS OF LAND AND PROPERTY ACQUISITION FOR GOVERNMENT & PRIVATE PROPERTIES

PHASE-II

REACH-1 Extension—(Baiyappanahalli to Whitefield-15.50 KM)

 Compensation package in respect of 266 properties amounting to ₹ 979.59 Crores have been sent to SLAO, KIADB. SLAO has made payment in respect of 218 properties amounting to ₹ 854.94 Crores.  In respect of Electric Utility Shifting of 52 properties, package in respect of 47 properties have been sent to SLAO. Building valuation report in respect of 5 properties is awaited from the Engineering section.  In respect of 39 properties required for Electrical Utilities (additional) and additional lands from Indian Tin Industry to Whitefield, Land Committee has given the land valuation report. Building valuation report is awaited from the Engineering section.  Out of 34 Properties measuring 5368.54 sq meters required for viaduct between Jyothipura station and K.R. Puram station, packages in respect of 31 properties have been sent to Accounts section for verification. Building Valuation Report in respect of 3 properties is awaited from the Engineering section.  Packages in respect of 8 properties measuring 312.48 Sq meters required for shifting of Electrical towers has been sent to SLAO, KIADB.  28(1) notification for lands between Baiyappanahalli and Jyothipura is sent to SLAO for Government approval.  28(1) notification for B. Narayanapura Survey No. 75 to an extent 2925.75 sq, mtrs. has been sent to Government press for publication.  Packages in respect of 42 properties required for viaduct from Tin Factory to K.R. Puram station (Vijinapura Village) has been sent to Accounts section for verification.

REACH-2 Extension—(Mysuru Road Station to -6.50 KM)

 Compensation packages for 84 properties amounting to ₹ 186.06 Crores have been sent to SLAO, KIADB and

payment is made in respect of 84 properties amounting to ₹ 178.86 Crores.  28(4) notification in respect of 8 additional properties measuring 463.09 sq. mtrs. is sent to Government on 15.12.2017 for approval.  28(4) notification of 4 properties measuring 327.04 sq. mtrs. is sent to Spl. Deputy Commissioner on 18.12.2017.  28(4) notification of 9 properties is sent to Spl. Deputy Commissioner, KIADB measuring 62481.36 sq. mtrs. on 29.12.2017.  Draft 28(1) notification of 21 additional properties pertaining to Challaghatta Depot. Measuring 49633.41 Sq. mtrs. is sent to SLAO, KIADB on 28.12.2017.

REACH-3C Extension—(Nagasandra to Bangalore International Exhibition Centre-3.00 KM)

 Compensation packages in respect of 62 properties amounting to ₹ 99.11 Crores have been sent to SLAO, KIADB. Payment has been made in respect of 49 properties amounting to ₹ 83.66 Crores.  BIEC Station and Electrical Utility Shifting: 28(4) Notification is pending with the Government.

DETAILS OF LAND AND PROPERTY ACQUISITION FOR GOVERNMENT & PRIVATE PROPERTIES

REACH-4B Extension—(Yelachenahalli Cross to Township-6.50 KM)

 Compensation packages for 287 properties amounting to ₹ 308.85 Crores have been sent to SLAO, KIADB and payment has been made in respect of 282 properties amounting to ₹ 303.42 Crores.  Land plan for Anjanapura Depot is being revised by Chief Engineer (P&D) and action being taken to acquire the land.  28(4) Notification for additional area of 1005.21 sq. mtrs. is published in Gazette on 26.10.2017 and action will be taken to get the land valuation of the properties from the Land Committee is received, same will be placed to the screening committee for approval.  Draft 28(4) Notification for 1 property measuring 112.53 sq. mtrs. is sent to Government for approval.  28(1) notification for 1357.34 sq. mtrs. additional 6 properties is submitted to Spl. Deputy Commissioner for

approval on 18.12.2017. REACH-5 New Line-(R.V. Road to Bommasandra-18.50 KM)

 Out of total 545 properties acquired, compensation packages for 523 properties amounting to ₹ 1420.23 Crores have been sent to SLAO, KIADB and payment has been made in respect of 362 properties amounting

to ₹ 1031.76 Crores.  Notification u/s 28(4) in respect of 72 properties required for electric utility shifting is sent to Government for

approval.  28(4) Notification in respect of additional properties required for Jayadeva Station is sent to Government

Press for publications.  JMC is under progress for 94 properties required for Silk Board Station, Subways, Ramp, Loops and Viaduct

in RV Road to Bommasandra stretch is sent to ADLR for approval / attestation. REACH-6 New Line-( (IIMB) to Nagawara-22.00 KM)

 Out of 251 properties, compensation packages in respect of 173 properties amounting to ₹ 404.26 Crores have been sent to SLAO, KIADB for payment. Payment has been made in respect of 72 properties amounting to ₹ 190.82 Crores.  Depot – enquiry u/s 28(3) is completed by SLAO. 28(4) notification is being sent to Government in respect of 57 properties to an extend of 91,809 Sq. mtrs.  28(4) notification in respect of additional lands required for viaduct an extent of 1579.00 sq. mtrs. for 59 properties.  28(1) Notifications in respect of additional lands required for Ramp etc., as per revised land plan sent to the Government for approval of 43 properties to an extend of 4,797.19 Sq mtrs.  Notification u/s 28(4) of 30 properties to an extent of 606.50 sq. mtrs. to viaduct lands required for Electric Utility Shifting have been published in Gazette on 09.11.2017.  JMC is completed for Six Metro Stations i.e. (1) Dairy Circle (2) MICO (3) Langford (4) Vellara (5) M.G. Road (6) Shivajinagar and 28(4) notifications is sent to Government for publication of 80 properties to an extent of 16673.35 Sq. mtrs.  JMC is completed for 6 Underground Stations i.e. (1) Cantonment (2) Pottery Town (3) and (4) Venkateshapura (5) Arabic College (6) Nagawara. 28(1) notification will be sent after sketches issued by

survey supervisor.

REACH WISE PROGRESS OF PHASE-2

REACH-1Extension:- Construction of Elevated Structures (Viaduct) of length of 15.50 Kms. (approx.) consisting of 13 No of Stations from Baiyappanahalli dead end to Whitefield station dead end viz. Jyothipura Stn., K R Puram Stn., Mahadevapura Stn., Garudacharpalya Stn., Doddana Kundi Industrial Area Stn., Visvesvaraya Industrial Area Stn., Kundahalli Stn., Vaidhei Hospital Stn., Satyasai Medicals Stn., ITPL Terminal Stn., Kaadugodi Stn., Ujwala Vidyalaya Stn. & Whitefield Stn. in the extension on East side of East-West Corridor on Bangalore Metro Rail Project, Phase – 2

Name of the Contractor :- M/s ITD Cementation Limited (JV) Two Packages (P1 & P2) Progress of Package –1A (Reach-1A):-

Land Acquisition:-

 Baiyappanahalli to Mahadevapura: Abutment to Jyothipura alignment to be finalized. Jyothipura to KR Puram 33 Valuation Reports has been sent to Land Department for verification.

 Mahadevapura to Satya Sai Hospital: Valuation of Properties and final notification has been completed. Property wise compensation proposals are submitted to KIADB for disbursement to land owners are in progress.

 Satya Sai Hospital to Whitefield: Valuation of Properties completed and final notification has been completed. Property wise compensation proposals are submitted to KIADB. Disbursement to land owners is in progress.  BESCOM Utilities: 80 numbers have been identified for shifting of BESCOM utilities such as RMU’s and Transformers. 28/4 Notification has been issued. 23 properties has been de-notified and Compound wall of 30 Nos (Valuation is sent to Land section). Open land 27 Nos are identified.

Demolition of Buildings / Structures Identified for Acquisition:- The contract for demolition of structures have already been awarded to M/S B.R. Chawla for the entire stretch of 15.500km. Demolition work is under progress. 102 numbers of properties are demolished out of 122 Nos and balance 2 is in progress as far as Package 1A, balance 17 Nos is yet to start.

Shifting of Water Supply Lines & Underground Drainage (UGD) Lines:- The proposal for affected water lines has been identified along with BWSSB. Received estimate for Rs.12.90 Crores from BWSSB. An amount of ₹ 4.88 Crores (50% of the cost estimate of ₹ 9.76 Crores) has been deposited to BWSSB. Further ₹1.354 Crores (50% of the cost estimate of ₹ 2.70 Crores) has been deposited to BWSSB on 23.12.2016. Tender for shifting of utilities from B. Narayanapura to – BWSSB issued LOA on 31.05.2017. Procurement of material is under progress. Tender for shifting of utilities from A. Narayanapura to B. Narayanapura– BWSSB has issued LOA on 18.05.2017. Procurement of material is under progress and Contractor has started excavation work for laying of 600 mm dia line from Benniganahalli to Jyothipuram.

REACH WISE PROGRESS OF PHASE-2

220KV line from SAPLAB ( Station) to Satya Sai Station for about 3.00 km overhead line to be made underground:- An amount of Rs. 64 Crores has been deposited to KPTCL for taking up the work. 1) For 11 KV Line:

Package-1 Baiyappanahalli to Lowery School – Tender is under preparation. Tender is discharged, waiting of GAD. Package-2 Lowry School to EPIP – Utility Shifting work has been commenced based on the LOA dated 19.07.2017. Package –3 EPIP to Kadugodi - Tender awarded, agreement under process.

2) For Lamp Pole and Light Poles:

Package-1 Baiyappanahalli to - Light Pole shifting work is in progress.

Viaduct & Stations: along with Road Widening works:-

Reach-1A:

 M/s. ITD Cementation India Limited-ITD (JV) vide LOA No BMRCL/Phase2/Reach1A/BYP-VIA/Via & Stn /2016/14/LOA/ dated 11.04.2017. R1A Contract agreement was signed on 23.05.2017.  286 Piles in viaduct and 275 Piles in Station, Total 586 Piles are completed. 34 Pile Cap in Viaduct and 16 Pile Caps are completed in stations. 4 Piers completed in Viaduct and 7 Piers completed in K R Puram Station.  Road widening work is in progress in section 3 from BP-104 to BP-111 RHS. Drain works are in progress from LHS BP116 to BP 123 in RHS. Hume pipe laying work is in progress.  Road Widening work is in progress in section 4 from BP-161 to BP-172 (LHS).

Progress of works at Reach-1A of Phase-2 at Jyothipuram Station

REACH WISE PROGRESS OF PHASE-2

Progress of Package-1B (Reach-1B):-

Building Condition Study and Structural Analysis:- The work has been awarded to M/s. Civil Aid Techno Clinic Pvt Limited, Bangalore.

 The BCS work for the stretch BP-271 to BP-470 is completed.  The BCS work for the stretch BP-471 to Whitefield is in balance due to non finalization of alignment.

Valuation of building structures:  The valuation of buildings to be demolished along the alignment between BP-271 to BP-470 is completed.  The work of valuation for the stretch between BP-471 to Whitefield is in balance due to non finalization of alignment.

Demolition of buildings/ structures identified for acquisition: The work of demolition of buildings has been awarded to M/s. B.R. Chawla for the entire stretch.

 The demolition work is in progress in the stretch between BP-271 to BP-470.  Till now, out of 142 properties 69 properties have been demolished.

Shifting of water supply lines and Underground Drainage (UGD) lines:

 The affected water supply lines and Underground Drainage Lines are identified along with concerned BWSSB Engineers for the entire stretch.  Tenders for shifting of Water supply pipe lines and Underground Drainage Lines for the stretch between B. Narayanapura to Kadugodi have been called by BWSSB. The work has been awarded and LOA issued is issued to the agencies. The work for shifting of water supply and Underground Drainage Lines works between B. Narayanapura to Kadugodi is awarded and is in progress at various location along the alignment.  The work for shifting of water supply and Underground Drainage Lines has been started on site at various locations along the alignment.

Electric Utility Shifting :

 For 220 KV and 66 KV line LOA issued to M/S. UNIVERSAL CABLES LTD by KPTCL on 27.12.2016, Work has started on 2nd May 2017. Cable laying work has been completed in metro alignment and cable jointing work is in progress.  Electrical light poles removal work is in progress at various locations along the alignment.

Viaduct and stations (including Road widening works):

 The General Arrangement Drawing and land plans have been prepared and after BP-470 alignment is not finalized.  The Detailed Design and Drawings of viaduct and stations are in progress.  The Road widening plan has been prepared and submitted to Traffic police and permission letter is obtained from Addnl. Commissioner of Police (Traffic). Road widening work along the alignment is in progress in consultation with Traffic Police and BBMP.

REACH WISE PROGRESS OF PHASE-2

Progress of Package-1B (Reach-1B):-

 The work has been awarded to M/s. ITD Cementation India limited –ITD (JV) Vide LOA No. BMRCL /Phase2/ Reach1B/VIA-WTF/Via&Stn/2016/15/LOA/3978 dated 28.04.2017.R1B Contract agreement was signed on 09.06.2017.  Test pile (4 Nos) for initial vertical pile load test and lateral pile load test are completed at Hope Farm and Lesso location. Two initial vertical and Two lateral load test has been completed.  Total 2608 Rm of road widening at various locations of viaduct and 1080 Rm of road widening at station locations are in progress.  251 Nos of working pile have been completed in Viaduct portion. 157 Nos of working pile have been completed in Station location. 31 Nos of pile cap have completed in Viaduct and 11 Nos of pile cap have been completed at Station locations. 9 Nos of pier & 9 Nos of pier cap have been completed at Viaduct portion. 21 Nos of Segment and 7 Nos of RCC beams are casted at Casting Yard.

Progress of works between Visvesvaraya Industrial Area Station to Whitefield Station at Reach-1B

Piling Work is in progress for Viaduct Section

Pile cap concreting work completed for BP 464

Pier & Pier Concreting completed for Viaduct (BP 456 –BP 461)

Pier works in progress at viaduct (BP 273-278)

REACH WISE PROGRESS OF PHASE-2

Progress of works between Visvesvaraya Industrial Area Station to Whitefield Station at Reach-1B

BC completed in Road diversion location at BP 330-332

Segment Reinforcement binding work is in progress

Shutter assembling is in progress for Pre Tensioned I-Girder

Reinforcement binding is in progress for Post Tensioned I-Girder

Monthly Progress Report of R1-B of Phase-2 (Visvesvaraya Industrial Area to Whitefield)

Progress Work upto December-2017 Target % age Work Cum. % age % age for the Achieved achieved Balance Sl. Total completed Progress of work Description Unit month during during work to No Qty up to up to work to be of Dec Dec 2017 the be done Nov 2017 Dec 2017 Done Done 2017 month A) VIADUCT 1 Road Widening Works Rmt 6251 1105 1503 1503 100 2608 3645 41 58 2 Piling Works Nos 1398 151 100 100 100 251 1147 17 82 3 Pile Cap Works Nos 285 17 15 14 93 31 254 10 89 4 Pier & Pier Cap Works Nos 285 0 9 9 100 9 276 3 96 5 Segment Casting Works Nos 1956 6 15 15 100 21 1935 1 98 Segment Launching & Fixing of Span 234 0 0 0 Nil 0 234 0.00 100 6 Bearing 7 Parapet Casting & Erection Nos 4952 0 0 0 Nil 0 4952 0.00 100 8 Parapet Erection Span 248 0 0 0 Nil 0 248 0.00 100 9 Crash Barrier Nos 285 0 5 5 100 5 280 1 98 I-Girder (viaduct+pocket Nos 261 0 0 0 Nil 0 261 0.00 100 10 +depot+portal) B) STATIONS 1 Road Widening/Diversion Works Rmt 1620 450 630 630 100 1080 540 67 33 2 Piling Works Nos 480 121 65 36 55 157 323 33 67 3 Pile Cap Works Nos 80 4 8 7 88 11 69 14 86 Main Pier/Column upto Concourse Nos 80 0 0 0 Nil 0 80 0 100 4 Level Main Pier/Column from Concourse Nos 80 0 0 0 Nil 0 80 0 100 5 Level to Platform Level Pier Arm/Cantilever pier arm/main 6 beam/cross Beam at Concourse Nos 160 0 0 0 Nil 0 160 0 100 level Pier Arm/Cantilever pier arm/main Nos 160 0 0 0 Nil 0 160 0 100 7 beam/Cross Beam at Platform level Girder Launching Works at Nos 379 0 0 0 Nil 0 379 0 100 8 Concourse Level Girder Launching Works at Platform Nos 279 0 0 0 Nil 0 279 0 100 9 Level Girder Casting works form Nos 379 0 0 0 Nil 0 379 0 100 10 Concourse Level Girder Casting works form Nos 279 0 0 0 Nil 0 279 0 100 11 Platform Level Girder Launching Works at Rail Nos 270 0 0 0 Nil 0 270 0 100 12 Level Girder Casting works form Rail Nos 270 0 0 0 Nil 0 270 0 100 13 Level 14 Roof Truss and Sheeting Span 63 0 0 0 Nil 0 63 0 100 15 I-Girder Casting (Transition Span) Nos 90 6 6 1 17 7 83 8 92

REACH-2Extension-Reach-2A:- Construction of Elevated Structures of Length 3.945 kms (approx) from Mysuru Road Station dead end to Pattanagere Station including 4 Nos. of Elevated Metro Stations viz Station, Rajarajeshwarinagar Station, Jnanabharathi Station and Pattanagere Station in the extension on west side of East-West Corridor of Bangalore Metro Rail Project, Phase-2.

Name of the Contractor :- M/s IL&FS Engineering Construction Company Limited

Total Cost of the Project :- Rs. 327.00 Crores

Shifting of Water Supply Lines & Underground Drainage (UGD) Lines:- The affected water supply lines and Underground Drainage Lines are identified along with concerned BWSSB Engineers for the entire stretch. The drawings are prepared and submitted to BWSSB for shifting the identified utilities to the new location of utility corridor. BWSSB has submitted the estimate. According to that BMRCL deposited the estimated amount to BWSSB. The work has been taken up by BWSSB and completed at Jnanabharathi, Rajarajeshwari station and Nayandahalli Station in all respects.

Road Widening Works:- Road Widening works from Nayandahalli to Rajarajeshwarinagar both side completed and Jnanabharathi Station 100% road works completed and also at Pattanagere station. In Station’s both side drain work with Road widening/diversion work is in Progress. Retaining wall work is under construction.

The Estimate for road widening from Jnanabharathi to Pattanagere has been submitted by National Highway PWD Karnataka to BMRCL. The required amount has been deposited by BMRCL for Road Widening purpose for National Highway, PWD. Road Widening work from Jnanabharathi to R.V College is completed by National Highway PWD, Karnataka.

Viaduct & Stations:-

 The construction of 3.945 KM viaduct and four stations has been awarded to M/s IL&FS construction Pvt Ltd. and the work is in progress. Uncharted utility checking, Piling, Pile Cap, Pier and Pier Cap works under progress. Segment Erection for Thirty one spans is completed.  In Stations – Pile, Pile Cap, Column – Up to Concourse Level and Portal beam at concourse level casting work is in progress. Column from Concourse Level to Platform Level and Cross Beam at Platform and Rail Level is under progress at Nayandahalli Station, BGUC, Jnanabharathi Station. Portal Cross Beam at BGUC completed at concourse level and nine numbers at Pattanagere Station casting is completed, three numbers Portal Beam at Concourse Level is casted at Nayandahalli and six numbers at Rajarajeshwarinagar Station.  Phase1 incomplete Portal Pier No 438 B Pier has been casted.  220 KV High Tension Tower line has been shifted from P457 & P473 and piling work has also been completed for this pier. Precast concrete works of Segment Casting, I Girder Casting under Progress at Casting Yard. Parapet casting work is under progress at casting yard. Piling work 100% completed in all the four stations. Nayandahalli, Rajarajeshwari, Jnanabharathi and Pattanagere stations. The site office for field work has been established at Deepanjalinagar Property Development area.

 59 Nos of Span Segment Casting is completed for Viaduct  LG – 1 = Segment Erection work is under progress and Twenty seven numbers of Spans erected.  LG – 2 = Segment erection work is under progress and Twenty Five Span erected from P571.

Physical progress completed as on December 2017 is as below :

Stations Sl Description Viaduct Nayandahalli Rajarajeshwarinagar Jnanabharathi Pattanagere Total No (NYH) (RRN) (JNB) (PTN) Nos 1 Test Pile 2 1 1 1 1 6 2 Initial Vertical Pile load 2 1 1 1 1 6 test 3 Pile-1200 mm dia 596 108 108 90 108 1010 4 Pile-600 mm dia —- 95 88 81 91 355 5 Pile Cap-Viaduct 133 25 26 27 27 238 6 Pile Cap-Off Road — 20 2 22 8 52 7 Pier—Viaduct 127 31 32 33 36 259 8 Portal beam at 1 8 8 11 concourse level 12 40 9 Column at Concourse — 24 18 33 35 110 Level

10 Portal beam at — 19 Platform Level 3 3 10 3 11 Crash Barrier 112 7 9 — 6 134 12 Segment Erection 65 — — — — 65 13 Segment 792 — —- — — 792 14 Parapet 890 — — —- — 890 15 I-Girder Pre Tension — 200 (Concourse Level) 12 76 57 55 16 I-Girder-Pre Tension — 17 44 36 38 135 (Platform Level) 17 I-Girder Post Tension —- 1 33 29 —- 63 18 I-Girder Erection — — 6 57 — 63 19 Parapet Erection 4 — — — — 4 20 Median 7 — — — — 7

Track Level portal beam survey checking is in progress at Jnanabharathi Station at Reach-2A of Phase-2

View of span segment erection work is in progress at viaduct in P 440-P441 at Reach 2A

View of Portal Beam Staging work is in progress at Pattanagere Station of Reach 2A

REACH WISE PROGRESS OF WORKS OF PHASE-II

REACH-2Extension-Reach-2B:- Construction of Elevated Structures (Viaduct) of length of 4.869 Kms. (approx.) from Pattanagere Station (excluding) to beginning of Challagatta Depot including 2 Nos of Elevated Metro Stations viz. Mailasandra Station and Kengeri Station in the extension on west side of E-W Corridor on Bangalore Metro Rail Project, Phase – 2

Name of the Contractor :- M/s Soma Enterprise Limited,

Total Cost of the Project :- Rs. 332.00 Crores

Land Acquisition:- The land acquisition for Reach-2B from Pattanagere Station to Kengeri Arch Bridge is complete and the land is in position with BMRCL. From Kengeri Arch Bridge to Challaghatta Depot the preliminary notification for acquisition has been issued for Joint Measurement is in progress.

Building Condition Study & Structural Analysis:- The work has been awarded to M/s Civil Aid Techno Clinic Pvt Ltd. and the work has been completed from Pattanagere Station to Kengeri Arch Bridge and from Kengeri Arch Bridge to Challaghatta the work is in progress.

Demolition of Buildings / Structures Identified for Acquisition:- The work has been awarded to M/s Binyas Contech Pvt Ltd and M/s Sai Retro Fabs. The work has been completed from Pattanagere station to Kengeri Arch Bridge and from Kengeri Arch Bridge the work will commence after acquisition of properties.

Road Widening Works:- From Pattanagere Station to NICE Road the Road Widening work has been started by National Highway PWD Karnataka. 97% of the work is completed.

Viaduct & Stations:- The construction of 4.869 KMs Viaduct and Stations has been awarded to M/s SOMA Enterprises Limited and the work is in progress.

Test Pile :- Two numbers of Initial Vertical Pile Load test is completed for the Viaduct. Barricading work is in progress. Working Pile:- The work is in progress.

Casting Yard at Kanminike near Bidadi:- Two numbers of Batching Plant, Segment Casting Bed is in progress. The site office for field work has been established at Deepanjalinagar, Property Development area. All other preliminary works is under progress.

View of P601 Pile cap concrete work is in progress P594 at Viaduct

REACH WISE PROGRESS OF WORKS OF PHASE-II

Physical progress for the month of December 2017 is as below: Sl Stations Total No Particulars Unit Viaduct Mailasandra Kengeri Nos 1 Barricade Erection Nos 2850 100 140 3090 2 Initial Vertical Pile Load Test Nos 2 — — 2 3 Initial Lateral Pile Load Test Nos 2 — — 2 4 Piles Nos 640 — 60 700 5 Pile Cap Nos 111 — 9 120 6 Segment Casting Nos 703 — — 703 7 Secant Piles Nos —- 101 — 101 8 Pier & Pier Cap Nos 72 —- 9 81 9 Raft foundation concrete Rmt — 135 — 135 10 Upper Basement Slab Rmt — 135 — 135 11 Ground Floor Slab Rmt — 135 — 135 12 Concourse Slab Rmt — 135 — 135 13 I-Girder Casting (Post Tension) Nos 12 29 — 41 14 I-Girder Casting (Pre Tension) Nos — — 36 36 15 Parapet Casting Nos 72 — — 72 16 Segment Erection Span 20 — — 20

REACH-3Extension-Reach-3C:- Extension line of Reach-3b of Phase-1 on Northern Corridor from Hessaraghatta Cross to Bangalore International Exhibition Centre (BIEC) viz Manjunathanagara Stn., Jindal Stn., & BIEC Stn. The section length is 3.77 Kms with 3 Stations and fully Elevated Section.

Name of the Contractor :- M/s Simplex Infrastructures Limited.

Total Cost of the Project :- ` 298.65 Crores, Letter of Acceptance is issued on 27.02.2017.

Land Acquisition:- Payment of compensation towards acquired land and taking over of land by KIADB is under progress. Handing over of land to the Engineering section part by part is under progress. Out of 62 private properties, 43 Nos. of properties are handed over to Engineering section for execution of work. 36 properties are clear from any issues.

Demolition of Buildings / Structures Identified for Acquisition:- The work of demolition of buildings has been awarded to M/s. SAI Retro Fabs for the entire stretch. Out of 54 properties to be demolished 18 properties have been demolished.

Viaduct & Stations (including Road Widening works):- Issue of GFC drawings is in progress from the Design wing of BMRCL. The process for obtaining permission for use of NHAI service road/ROW for construction of viaduct and stations of Bangalore Metro Rail is under progress, with NHAI.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Notice to proceed to start the work has been issued on 27.04.2017 to the contractor, M/s. Simplex Infrastructures Limited.

 Development of casting yard is under progress. Project office of Simplex is ready at casting yard. Quality lab set up has been completed and calibration of equipment's completed. Erection and calibration of one number of batching plant is completed. One 15MT Gantry erected at the casting yard and components of 80MT Gantry arrived at the Casting yard. Raft of 3 segment casting beds completed and third is under progress. One set of intermediate segment shutters (soffit-1 set, outer form—2 sets, inner form—4sets and bulk heads– 3 sets) and pier head segment shutters have been arrived at the casting yard.  97 barricading boards are erected at Manjunathnagar and Jindal Station and 66 numbers of boards at Viaduct work site. Construction of drain, retaining wall, wherever necessary and cable duct works at Manjunathnagar Station is in progress. Drain of length 202 meters are completed and 26 nos of Precast drain of 2.5 meters each casted at casting yard till date.  4 nos. of Test piles & 36 working piles at Manjunatha Nagar Station, 2 Piles at Jindal Station and 29 piles of viaduct are casted as on December 2017. 17 numbers of Borehole for soil investigation is completed.  3 Nos of Initial vertical pile load tests (IVLT) completed out of 5 nos and fourth IVLT arrangements are in progress.

Erection of Gantries at the Casting yard is in progress Mock up segment shuttering works is in progress

Mock up segment arrangements work is in progress

Monthly Progress Report of Reach-3C of Phase-2 (Hessaraghatta Cross Station to BIEC)

Progress of Work for the month of December-2017 Target % age Work Cum. % age % age for the Achieved achieved Balance Sl. Total completed Progress of work Description Unit month during during work to No Qty up to up to work to be of Dec Dec 2017 the be done Nov 2017 Dec 2017 Done Done 2017 month A) VIADUCT 1 Road Widening Works % 100 — — — — — 100 0 100 2 Piling Works Nos 432 13 16 16 100 29 403 7 93 3 Pile Cap Works Nos 94 — — — — — 94 0 100 4 Pier & Pier Cap Works Nos 94 — — — — — 94 0 100 5 Segment Casting Works Nos 828 — — — — — 828 0 100 Segment Launching & Fixing of Span 88 — — — — — 88 0 100 6 Bearing 7 Parapet Casting & Erection Nos 97 — — — — — 97 0 100 8 Parapet Erection Span 97 — — — — — 97 0 100 9 Crash Barrier Nos 94 — — — — — 94 0 100 10 Road restoration Works Nos 97 — — — — — 97 0 100 B) STATIONS 1 Road Widening/Diversion Works % 100 — — — — — 100 0 100 2 Piling Works Nos 168 29 11 9 82 38 130 23 77 3 Pile Cap Works Nos 24 — — — — — 24 0 100 Main Pier/Column upto Concourse Nos 30 — — — — — 30 0 100 4 Level Main Pier/Column from Concourse Nos 30 — — — — — 30 0 100 5 Level to Platform Level Pier Arm/Cantilever pier arm/main 6 beam/cross Beam at Concourse Nos 30 — — — — — 30 0 100 level Pier Arm/Cantilever pier arm/main Nos 30 — — — — — 30 0 100 7 beam/Cross Beam at Platform level Girder Casting Works at Nos 180 — — — — — 180 0 100 8 Concourse Level Girder Casting Works at Nos 108 — — — — — 108 0 100 9 Platform Level Girder Casting works for Track / Nos 108 — — — — — 108 0 100 10 Rail Level Girder Casting works at Transition Nos 36 — — — — — 36 0 100 11 spans Girder Launching Works at Nos 180 — — — — — 180 0 100 12 Concourse Level Girder Casting works Platform Nos 108 — — — — — 108 0 100 13 Level Girder Launching works at Track Nos 108 — — — — — 108 0 100 14 Level Girder Launching Works at Nos 36 — — — — — 36 0 10 15 Transition Spans 16 Roof Truss and Sheeting Span 27 — — — — — 27 0 100

Monthly Progress Report of Reach-3C of Phase-2 (Hessaraghatta Cross Station to BIEC)

Progress Chart as on December 2017

VIADUCT WORKS

1000 Reach-3C Viaduct Progress Chart 900

826 800 Target 700 Achievement

600

500 432

400

300

200

100

97

97

97

94

94 94

100 88

29

-

-

-

-

-

-

-

- - 0 Road Widening Piling Works Pile Cap WorksPier & Pier Cap Segment Segment Parapet Parapet Crash Barrier Road Works Works Casting Works Launching Casting Erection Restoration works

STATION WORKS

Reach-3C Station Progress Chart Target Achievement 500

400

300

180 180

200 168

108 108 108 108 100

100

38 38

36 36

30 30 30 30

27

24

------

0

Pile Cap Works

Roof Truss and Sheeting

Piling Works (1200mm Dia)

Level (PL)

Road Widening/Diversion Works

at Platform level (PL).

at Concourse level (CL).

Girder Launching Works Track (TL).Level

Girder Casting Works at Transition Spans

Girder Casting works for Platform level (PL)

Girder Launching Works at Transition Spans

Girder Casting works for Track/Rail level (TL)

Main Pier/Column upto Concourse Level (CL)

Girder Casting works for Concourse level (CL)

Girder Launching Works at Platform Level (PL).

Girder Launching Works at Concourse Level (CL).

Main Pier/Column from Concourse level to Platform

Pier Arm/Cantilevel pier arm/main beam/cross beam Pier Arm/Cantilevel pier arm/main beam/cross beam

REACH WISE PROGRESS OF WORKS OF PHASE-II

REACH-4Extension-Reach-4B:- Construction of Elevated Structures of length 6.524 km (approx) from Cross Station to Anjanapura Township Station and further viaduct including 5 Nos. of Elevated Metro Stations Viz. Anjanapura Road Cross Station, Krishna Leela Park Station, Vajrahalli Station, Thalaghattapura Station and Anjanapura Township Station.

Name of the Contractor :- M/s Nagarjuna Constructions Company Limited.

Total Cost of the Project :- Rs. 508.86 Crores.

Viaduct & Stations:-

The work of Construction of this Project is awarded to M/s Nagarjuna Constructions Company Limited and the work is in progress.

 All major works like Piling, Pile caps, Piers and Pier caps, Road widening, Segment erection, Bearing Installation, Drain works etc. are in progress along Viaduct.

 All major works like piling, casting of plinth beams, pile caps, piers, pier arms, columns, Deck Slabs, Concourse Slabs, Track Level slabs, I-Girder erection and Drain works, Service Road etc. are in progress at Anjanapura Cross Road Station, Krishna Leela Park Station, Vajarahalli Station, Talaghattapura Station & Anjanapura Township Station.

 719 nos of Piles out of 1036 piles are completed for Viaduct structures. 743 nos of Piles out of 830 Nos of piles are completed for Station locations.

 166 nos of Pile caps out of 222 nos are completed for Viaduct structures. 129 nos of Pile caps are completed out of 320 nos for Off-road structures at Station locations.

 45 nos of Pile caps are completed out of 50 nos for C-Grid at Station locations.

 151 nos of Piers are completed out of 224 nos for Viaduct structures & 45 Nos of Piers upto Concourse Level out of 50 nos are completed at Station locations.

 42 nos of Pier Arm for Concourse level are completed out of 50 nos at Station locations.

 39 nos of Piers above Concourse level are completed out of 50 nos at Station locations. 18 nos of concourse slabs are completed out of 45 nos at stations locations. 11 Track level slabs are competed out of 45 nos at station locations. 38 numbers of Pier Arm for Platform Level is completed out of 50 numbers at Station locations.

 Drain including cover slab is completed for a length of 6697 Rmt. Sl Launching Activities (Viaduct) Launching Activities (Stations) No 1 LG-01 24 Segmental Spans are erected from Anjanapura Road Cross Station I-Girder erection has EP-128 to EP-143 & EP-144 to EP-153 been completed. 2 LG-02 19 Segmental Spans are erected from Vajarahalli Station–I-Girder erection has been EP-183 to EP-202 completed. 3 LG-03 19 Segmental Spans are erected from Krishna Leela Park Station I-Girder erection has been EP-239 to EP-258 completed.

REACH WISE PROGRESS OF WORKS OF PHASE-II

Casting Yard:- NCCL has been set up their Casting Yard on 20 Acres of land near Agara Cross (near Tataguni village), 4km away from EP344 (last pier of R4B Project)

The following activities are in progress at the Casting Yard:

 Setting up of Batching plants, 60cum/hr & 30cum/hr.  Segment and PSC I-Girder casting beds.  Setting up of site office, stores, QA/QC lab, etc.  3 nos of 20T, 1 no. of 80T& 1 no of 120T Gantries are erected & commissioned.  5 Long line & 5 Short line Beds are commissioned for Segment casting (One Bed for Curved Span).  8 Beds are commissioned for I-girder casting (Pre-tensioned I-Girders).  11 Beds are commissioned for I-girder casting (Post-tensioned I-Girders).  Reinforcement works for Piles, Pile caps, Piers, Pier caps, I-Girders, Segments and drains are in progress.  Pre-Casting of Segments, I-Girders, Parapets and drains are in progress.

Casting of Segments of 1157 nos are completed out of 1914 numbers. Casting of Pre-Tensioned I-Girders of 308 nos are completed out of 425 numbers. Casting of Post-Tensioned I-Girders of 124 numbers out of 240 numbers are completed. Casting of Parapets of 54 numbers out of 3954 numbers are completed. Transition Pier Cap Reinforcement is in progress Gird (C4-C5) Platform Level Slab Concrete work

at Vajrahalli Station. completed at Vajrahalli Station

Lifting Segments at Casting Yard

C3 Pier Crash Barrier Reinforcement Tying completed at Vajrahalli Station

REACH WISE PROGRESS OF WORKS OF PHASE-II

Abstract of Progress of Reach-4B for the month of December 2017

Progress for the Work Total Month of Dec 2017 Progress Sl No Item Unit done till Qty upto date Nov 2017 Till Last For this week week I VIADUCT WORKS 1 Piling 1200 mm dia Nos. 1036 708 2 9 719 2 Pile caps Nos. 224 163 1 2 166 3 Piers & Pier caps Nos. 224 144 7 — 151 4 Crash Barrier Nos. 224 96 3 4 103 5 Segment Casting Nos 1914 1113 29 15 1157 6 Segment Erection Span 205 54 3 5 62 7 Parapet Casting Nos 3954 39 12 3 54 8 Drain Rmt 10930 5081 — — 5081 9 Bearing Installation Spans 213 16 — — 16 II STATION WORKS 1 Piling 1200 mm dia Nos. 470 444 — — 444 2 Piling 600 mm dia Nos. 360 299 — — 299 3 Pile caps off Road Structures Nos. 320 129 — — 129 4 Pile caps C-Grid Structures Nos. 50 45 — — 45 5 Pier up to Concourse Level (C-Grid) Nos. 50 45 — — 45 6 Pier Arm for Concourse Level Nos. 50 40 — 2 42 7 Pier above Concourse Level (C-Grid) Nos 50 38 — 1 39 8 Pier Arm for Track Level Nos. 50 38 — — 38 Pre-Tension I-Girder casting (For Concourse 9 Nos. 245 186 — — 186 level) Pre-Tension I-Girder casting (For Platform 10 Nos. 180 110 8 4 122 Level) Post-Tension I-Girder casting (For Track 11 Nos. 180 98 8 6 112 Level) Post Tension I-Girder casting (for Transition 12 Nos. 60 6 6 — 12 Level) 13 I-Girder Erection (For Concourse Level) Nos 245 98 5 26 129

14 I-Girder Erection (For Platform Level) Nos 180 72 3 23 98

15 I-Girder Erection (For Track Level) Nos 180 72 4 18 94 16 Slab Casting at Concourse Level Nos 45 17 — 1 18 17 Slab casting at Track Level Nos 45 3 2 6 11 18 Drain Rmt 2850 1501 — — 1501

REACH WISE PROGRESS OF WORKS OF PHASE-II

REACH-5 (New Line) R V Road Station to Bommasandra Station viz. R V Road Stn., Ragigudda Stn., Ja- yadeva Hospital (Interchange) Stn., BTM Layout Stn., Central Silk Board Stn., HSR Layout Stn., Oxford College Stn., Muneshwaranagar Stn., Chikkabegur Stn., Basa- pura Road Stn., Hosa Road Stn., -1 Stn., Electronic City-2 Stn., Huskur Road Stn., Hebbagodi Stn., Bommasandra Stn. The section length is 18.82 Kms with 16 Stations fully Elevated Section. R V Road Station is on existing North-South Corridor with passenger interchange.

Building Condition Study & Structural Analysis:- The work has been awarded to M/s. Civil Aid Techno Clinic Pvt Ltd., Bangalore.  The BCS work for the stretch between Central Silk Board to Bommasandra is completed.

 The BCS for the section between Central Silk Board to RV Road stretch is in progress.

Demolition of Buildings / Structures Identified for Acquisition:- The work of demolition of buildings has been awarded to M/s. B.R. Chawla for the entire stretch. The demolition work is in progress in the stretch between Central Silk Board and Bommasandra.

Shifting of Water Supply Lines & Underground Drainage (UGD) Lines :- The affected water supply lines and Underground Drainage lines are identified along with concerned BWSSB Engineers for the entire stretch. The work for shifting of water supply and Underground Drainage works between Central Silk Board and Bommasandra is awarded and LOA is issued to the agencies and shifting of water supply lines is in progress.

Valuation of Building Structures:-  The valuation of buildings to be demolished between Central Silk Board to Muneshwaranagar is completed for this section.  The work of valuation for the stretch between Central Silk Board and RV Road is in progress. 67/114 properties valuation of buildings/properties are completed and submitted to land section.

Viaduct & Stations (Including Road Widening works):-

 The General Arrangement drawing are being issued progressively as per the work requirement.  The Road Widening plan has been prepared and submitted to Traffic Police and permission letter is obtained from Addnl. Commissioner of Police (Traffic).  The proposed traffic diversion plan along Marenahalli Road/Outer Ring Road has been shown to the concerned Traffic police. The approval for the same is expected shortly.  Road Widening work along the Outer Ring Road will be taken up in consultation with Traffic police, BBMP etc. The Tenders are awarded for Package –1, Package-2 & Package-3 of Reach 5 Line for Construction of Viaduct and Stations of packages between  Bommasandra to Hosa Road of 6.41 Kms length (Package-1) :- The work of construction of viaduct and stations between Bommasandra - Hosa Road of 6.41Km length is awarded. The casting yard is being established by the agency at Road. Casting and testing of test piles is completed. Piling work has been commenced for viaduct and Electronic City-2 Stations, Bommasandra, Hebbagodi Stations. The trial trenching work is completed for identification of UG utilities for confirmation of infringement with metro structures. The drain work is in progress wherever available land stretches.

REACH WISE PROGRESS OF WORKS OF PHASE-II

 Hosa Road to HSR Layout of 6.4 Kms length (Package-2) :- The work of construction of viaduct and stations between Hosa Road - HSR Layout of 6.4Km length is awarded. The casting yard is being established by the agency at Chandapura Road. Casting and testing of test piles is completed. Piling work has been commenced for Oxford College Station & Muneshwaranagar stations. The trial trenching work is completed for identification of UG utilities for confirmation of infringement with metro structures. The drain work has commenced in available land stretches.

 HSR Layout to R V Road of 6.34 Kms length (Package-3):- The work of construction of viaduct and stations between HSR layout to R V Road of 6.34Km length is awarded. The casting yard work is nearing completion at Hommadevanahalli on Banneraghatta Road. Road widening work in the stretch between RV Road to Ragigudda is in progress. Tree Transplantation work is in progress. Transplantation of trees completed for 127 trees out of 250. Test pile work is in progress.

Progress of works between Package-1 (BOMMASANDRA TO HOSA ROAD STATION)

Completed Segment for RP 495-496 Piling work in progress RP 507-509 Pile Cap completed RP 511-513

Progress of works between Package-2 (HOSA ROAD STATION TO HSR LAYOUT STATION ) Hosa Road, Muneshwara Station & HSR Layout Stations -Pilling Work is in progress

REACH WISE PROGRESS OF WORKS OF PHASE-II

Progress of works between Package-3 (HSR LAYOUT STATION TO RV ROAD STATION)

Reinforcement Cage for Pile works Road widening work completed is in progress at Ragigudda Park in front of CHROMA

Piling Rig Mobilized at working Barricading board erected at Pile location at RP 53 R V Road from RP 1 F to RP 30

Batching Plant Commissioning Road widening work completed completed at Casting Yard near Central Silk Board

The entire Network Map of Phase-1, at total length of 42.30 Kms, Phase-2 at total length of 72.095 Kms (13.79 km Underground) and 61 Stations with 12 Underground Stations & Phase-2A at total

length of 17.00 Kms. Each line can be traced along with the Station Names in the Map below.